Tata Sponge lron Limited (TSIL) was incorporated in 1982 as a joint venture
of Tata Steel and the lndustrial Promotion & lnvestment Corporation of
HA
Orissa Limited (lPlCOL). lt was set up for the production of sponge iron
s based on the TISCO Direct Reduction (TDR) technology, which was
developed in-house at Tata Steel. Later during 1991, Tata Steel acquired
*, lPlCOLs stake and at present TSIL is a sister company of Tata Steel.
The plant was initiatly designed for a production capacity of 90,000 TPA,
which was enhanced to 1,2b,000 TPA through various modifications during
1990-91. Later, to cater to the growing demand of quality sponge iron, TSIL
doubled its capacity by adding another kiln of equivalent capacity in 1998-
99.
The third kiln with a capacity of 150,000 TPA was commissioned in MaICh
2006'and the present installed capacity of the plant is 390,000 tonnes per
annum. lnstallation of 18.5 MW power plant to utilize waste heat from kiln-1
and kiln-3 is also completed. __-1/,_,r.*1
<:->--'
The Board'has approved in principle a long term growth plan consistin.g of
adding three more kilns of 1,b0,000 TPA eich to increase the total'ip-lill,e$ .'1
capa.ity to 8,40,000 TPA and also enhance power generation tO, PQ f1j|W i,' t. (, r Irrlld
the future in a phased manner. -'"r-o ,r..3,
,- * t)'
rhi
Considering the high cost of non-coking coal TSIL was exploring various
alternatives including acquisition of a coal block for ensuring long term
supplies of this vital raw material at considerably lower cost.
Mining Ptan of Radhikapur East (tncluding tJtkal-F) coa! Bock of TATA Sponge lron Ltd. . 1-1
X"wsx*ih:rr'
Rr}p
Talcher coalfield spread over an area of 1860 Sq.km contains the largest
coal resources of all the coalfields in lndia with a total reserve of 39.635
billion tonnes i.e., 155% of the total coal resources of 255.172 billion tonnes
upto a depth of 1200m in the Country as on 1st January 2007 (As per Coal
Resource Scenario of lndla of CoalWing, Geological Survey of lndia).
Mining Lease shall be obtained in the name of M/s TATA Sponge lron
t-tcl (l-eader) and the entire investment for coal block shall also made
by thr. Leader.
Biock is to be mined by Leader who would carry out mining operations
in accordance with applicabie Statutes/Rules/Orders/Directions
governing mining of coal and any further conditions imposed by or
agreed to by the Central Govt.
The total coal requirement of the Leader and its Associates and their
ultimate satisfaction level is as follows:
"l-%/a'
flllffiefl,"foflfibs
M,'sTATA Sponge lron Linrited (Leader) (45%l .-,,g"tl-,,. o"76',t
^i
M/s SCAW lndustrres Ltd. (Associate) (36%) ry,t 'l oi1i.r.,'1h0"
M/s SPS Sponge tron ttO. (Aisociate) (19%) ao{|}" $k<6\' 32
Total Requirement 168
Extractable Reserves (Prov. Estimates by CMPDI) 115
Satisfaction Level 68%
The Mining Plan is developed to seek clearances for mining'of coal from
h. Radhikapur East (lncluding Utkal-F) Coal Block based on Geological Report
of the Coal Block prepared by MECL in March 2006.
&:
{E1!.
Min Mec Consultants Pvt. Ltd. was engaged as consultant for preparation of
Mining Plan and Sri B.D. Sharma as Recognised Qualified Person.
+.
The mining project would be funded from internal resources of the Lerader.
u.,:
---<y*--
, i r- '
1.. r-
tG?D/-.,,, r ,,\..
Uiig ptu, of Rudt,lkat)* Eusnl,rclrding Utkal-F) Coal tu 8