BS
s 'O_ SIGN INN TRADING & CONTRACTING CO EEL
WARRANTY CERTIFICATE
‘Ref: SITCO/WC/520/2022 Dadet 9 May 2022
Client: : Woqod Qatar Fuel
Mat Contractor —: AU Muftaly Contracting W.LL
Project! : Waterproofing System for Woqod petrol station at Rawdat Egdatey
Consultant :Woqod Qatar Fuel
Applied Bituminous Primer owthe surface
Installed one-layer 4nunvthick waterproofing membrane
Installed one-layer 50mm thick extruded heat insulation 32-35kg/m2 density
Installed one-layer geotextile fabric 100gsm as separation layer
Casted Screed 5Omun avg: over the separation layer
Wehereby provide warranty for 4munvthick waterproofing membrane applied to-the above said:
roof for apertodof ter (10) years witiveffect from 9 May 2022, subject te the following
condittony
1. Should the roof develop any leakage within the warranty period, we shall rectify the
same at free of cot
2. Thr warranty doey not cover leakage attributable to the following:
2. Fadure of deck, wall or foundations and technical dewigns fire damages
and other conditions subjecting the roof te abnormal use.
b. Any undue premure and tension due to abnormal conditions such ar
bombardment or natural calamity etc,
« Onwaccount ofthe waterproofing being tampered with or punctured under
any circumstances:
3. Nothing ovthiy warranty shall cause Sign Inw Trading & Contracting (SITCO) Uablefor
fname and to the building or by and to- any persow or property inv the,
a Neds ial peet onc) as wcica Sproles Contracting (SITCO) uable for
consequentialdamager.
5. Thi Warranty ow null and votd if full payment for the whole project t not received: by
Sign Inw Trading & Contracting (SITCO).
For Sigw In Trading & Contracting Co: (SITCO)
ea
engi aad a mts
%
(aR
A... Fora