MD 513 0G00 CN CV MST 2042 2001 - C01
MD 513 0G00 CN CV MST 2042 2001 - C01
STATUS OF DOCUMENT
NOTE: THE APPROV AL OF THIS DRAWING/DOCUMENT DOES NO T RELIEVE THE V ENDOR/SUBCONTRACTOR OF HIS
RESPONSIBILITY IN THE PROJECT OBLIGATIONS AS SPECIFIED IN THE CONTRACTUAL DOCUMENTS.
REVIEW GRA DE
Result Code Description
A Accepted
C Proceed with exceptions to next submission and Revision
R Do Not Proceed / Revise as noted and Resubmit
Acceptance in any of these categories in no way relieves the Contractor/Supplier of its
responsibility for the due & proper performance of the Works in accordance with the
Cont ract/Purchase Order
PROJECT MA NAGER S IGN-OFF:
NAME: DA TE:
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 2 of 25
TABLE OF CONTENTS
PAGES
1.0 Purpose 3
2.0 Scope 3
3.0 Responsibility 3
10.0 Attachment 24
Page 2
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 3 of 25
1) PURPOSE:
This document defines requirements for the anticorrosion lining systems to be supplied and
installed for the protection of concrete structures belonging to Umm Wu´al EPC Project
Infrastructure, utilities & Off-sites at Ras al Khair.
2) SCOPE:
This installation procedure is referring to the horizontal and vertical surfaces of the concrete
basement protection of the following storage tanks belonging to Umm Wu´al EPC Project
Infrastructure, utilities & Off-sites at Ras al Khair between the sub-contract agreement
between DRAGADOS GULF CONSTRUCTION CO. LTD. and BINZAGR FACTORY
FOR INSULATION MATERIALS CO LTD.
3) RESPONSIBILITY:
Project Manager / Construction Manage r is responsible for the implementation of this
procedure. He shall ensure that all engineers, supervisors, foremen and craftsmen associated
with this job will comply with this procedure and shall ensure availability of required tools
and equipment for the job described in this procedure.
Safety Supe rintendent/Supervisor/of fice r will ensure safety regulations and rules as
required by the project.
a. All tools, labor, associated site services and equipment which are necessary for the
construction of the acid resistant lining work shall be provided by the contractor, and the
work shall be executed in accordance with this method o f statement.
Page 3
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 4 of 25
Electric Power
Water
Proper light for Installation
Hand tools to remove packing Materials
Trowels, Jointing Trowels & Floaters
Rollers and Brus hes
Marking Chalk
Wheelbarrow
Leveling Instrument
All necessary Carpenters tools
All necessary small cleaning tools
Mixers (minimum 2 sets)
Buckets & Measuring Beakers
Vacuum Cleaner
a. All materials shall be stored as per the material specification and requirement.
b. All materials shall be classified item by item in a logical sequence and shall be ready for
use.
c. Contractor shall check all the quantities of the materials delivered at the storage area.
d. Shortage or missing items or mistakes in the packing lists shall be reported within 24
hours after receiving the materials in writing to the engineer.
e. The contractor shall be respo nsible for the handling o f materials throughout the job.
f. Care shall be taken in storing, handling and moving the materials to minimize breakage
or loss.
h. Quantities of materials transported and/or damaged in each shift and materials requiring
to be transported during the following shift shall be noted on each shift report.
Page 4
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 5 of 25
i. The contractor shall maintain a good access to the storage and working area. Empty
boxes, foil etc. shall be removed.
j. All items must be kept in closed containers and stored at temperature between +10 to
+30°C.
k. Keep materials away from all fire hazards and out of direct sunlight.
6) APPLICATION PROCEDURE:
a. A preliminary inspection has to be carried out in order to verify the following points:
b. The surface shall be sweep blasted using Garnet 30/60 grit in order to remove cement
slurry, oil releases and all other loose particles.
c. Residual moisture content of the concrete substrate must not exceed 4%. Analog meter
will be used to determine the sub residual moisture.
d. The surface has to be protected from any kind of moisture (condensation, fog,
precipitation or other water source).
Page 5
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 6 of 25
e. During the installation works, the relative humidity and the substrate temperature indicate
on the data sheets will be taken as a reference. Therefore, the supervisors experienced in
installation of Steuler-KCH materials will have the final decision to control and decide if
the conditions will be suitable.
f. All the gaske ts and unwanted blasting areas to be covered and protected from blasting.
All surfaces shall receive a sweep blasting before start of lining applications. After blasting
concrete surfaces shall be cleaned by means of using a brush, respectively vacuum cleaner.
Page 6
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 7 of 25
Thoroughly mix the components for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Cons umption: 0.25 Kg/m2, 1 coat.
Lining Oxydur ES
Base: Polyurethane
Thoroughly mix the two Liquids for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Page 7
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 8 of 25
Waiting Times:
Temperature Hours.
At 15 °C approx. 12 hours
At 20 °C approx. 8 hours
At 30 °C approx. 6 hours
Pot Life :
Temperature Time
At 15 °C 90 min.
At 20 °C 40 min.
At 30 °C 10 min.
Cons umption:
- Base coat: Approx. 0,875 Kg/m2
- Top coat: Approx. 0,805 Kg/m2
Once the surface is prepared according to the specifications from the data sheet (TIS010)
explained before.
Base: Epoxy
Page 8
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 9 of 25
Base: Polyurethane
Base: Polyurethane
Oxydur ES
Page 9
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 10 of 25
Thoroughly mix the components for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Page 10
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 11 of 25
Base: Polyurethane
Thoroughly mix the two Liquids for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Waiting Times:
Temperature Hours.
At 15 °C approx. 12 hours
At 20 °C approx. 8 hours
At 30 °C approx. 6 hours
Page 11
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 12 of 25
Pot Life:
Temperature Time
At 15 °C 90 min.
At 20 °C 40 min.
At 30 °C 10 min.
Cons umption:
- Base coat: Approx. 0,875 Kg/m2
- Top coat: Approx. 0,805 Kg/m2
Properties: Furadur Cements are two-component resin cements specifically designed for
bedding and jointing acid-resistant ceramic split tiles and brick linings as well as carbon bricks
or tiles. Furadur Cements cure at normal ambient temperatures without subsequent heat
treatment. To attain a better resistance to solvents, subsequent heat treatment is, however,
recommended.
Furadur Cements display resistance to acids, alkalis, solvents, greases and oils as well as
conditiona l resistance to oxidizing agents.
Page 12
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 13 of 25
Temperature Hours.
At 15 °C approx. 8 hours
At 20 °C approx. 5 hours
At 30 °C approx. 2.5 hours
Waiting Times:
To support foot traffic,
To achieve full chemical resistance properties: 5 days at 20 °C (for service temperatures to 160
°C), with subsequent heat treatment, 2 da ys warm air 60 - 80 °C (for service temperatures to 180
°C and for solvents).
Pot Life:
Temperature Time
At 20 °C 30 min.
Page 13
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 14 of 25
Base: SiO2
Once the surface is prepared according to the specifications from the data sheet (TIS010)
explained before:
Base: Polyurethane
Base: Polyurethane
Page 14
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 15 of 25
Base: Polyurethane
Instructions:
Bedding:
App ly the Furadur Cements to the substrate or, particularly when lining vertical surfaces, to the
bricks or tiles to be laid. The thickness of the bed should be at least 4 mm but no more than 10
mm. Where a thicker bed is necessary, first trowel-apply a layer of cement to the substrate. The
thickness of this layer must not exceed 10 mm. A total bed thickness of 15 mm. max. is
permissible.
Jointing:
Then smooth the material before it has had a chance to cure using a jointer. Joints should have a
minimum width of 4 mm (ideal is 6 - 8 mm). The joints between the fields are closed after
termination of the first curing phase (usually after 1-2 days). Therefore, there will be no effect on
site progress.
Base: SiO2
Page 15
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 16 of 25
6.5 System 3: Oxydur ES +acid resistant red shale brick 70 mm. bebbed and
jointed with Furadur Cement. Materials and procedure.
6.5.1 Prime r Alkadur P82
Page 16
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 17 of 25
Thoroughly mix the components for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Base: Polyurethane
Page 17
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 18 of 25
Thoroughly mix the two Liquids for 2 minutes using a power drill 300-500 rpm with cement
stirrer.
Waiting Times:
Temperature Hours.
At 15 °C approx. 12 hours
At 20 °C approx. 8 hours
At 30 °C approx. 6 hours
Pot Life:
Temperature Time
At 15 °C 90 min.
At 20 °C 40 min.
At 30 °C 10 min.
Cons umption:
- Base coat: Approx. 0,875 Kg/m2
- Top coat: Approx. 0,805 Kg/m2
Page 18
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 19 of 25
Properties: Furadur Cements are two-component resin cements specifically designed for
bedding and jointing acid-resistant ceramic split tiles and brick linings as well as carbon bricks
or tiles. Furadur Cements cure at normal ambient temperatures without subsequent heat
treatment. To attain a better resistance to solvents, subsequent heat treatment is, however,
recommended.
Furadur Cements display resistance to acids, alkalis, solvents, greases and oils as well as
conditional resistance to oxidizing agents.
Page 19
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 20 of 25
Waiting Times:
Temperature Hours.
At 15 °C approx. 8 hours
At 20 °C approx. 5 hours
At 30 °C approx. 2.5 hours
To achieve full chemical resistance properties: 5 days at 20 °C (for service temperatures to 160
°C), with subsequent heat treatment, 2 days warm air 60 - 80 °C (for service temperatures to 180
°C and for solvents).
Pot Life:
Temperature Time
At 20 °C 30 min.
Base: Clay
Once the surface is prepared according to the specifications from the data sheet (TIS010)
explained be fore:
Page 20
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 21 of 25
Base: Epoxy
Base: Polyurethane
Apply: System applies by a Trowel.
+ Surface reinforced with a fiberglass Rowela RO 80.
Base: Polyurethane
Base: Polyurethane
Page 21
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 22 of 25
Instructions:
Bedding:
Apply the Furadur Cements to the substrate or, particularly when lining vertical surfaces, to the
bricks or tiles to be laid. The thickness of the bed should be at least 4 mm but not more than 10
mm. Where a thicker bed is necessary, first trowel-apply a layer of cement to the substrate. The
thickness of this layer must not exceed 10 mm. A total bed thickness of 15 mm. max. is
permissible.
Jointing:
Then smooth the material before it has had a chance to cure using a jointer. Joints should have a
minimum width of 4 mm (ideal is 6 - 8 mm).
The joints between the fields are closed after termination of the first curing phase (usually after
1-2 days). Therefore, there will be no effect on site progress.
Base: Clay
Oxydur ES with acid resistant ceramic red shale bricks in Furadur ce ment
1.- Alkadur P 82
2.- Oxydur ES
3.- Furadur cement
4.- Acid resistant ceramic red shale bricks
Page 22
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 23 of 25
Oxydur ES with acid resistant ceramic red shale bricks in Furadur ce ment
CONCRETE INSPECTION: For the inspection of the concrete surface will be taken as a
reference the form sheet 010 (requirements for concrete structures and cement–based surfaces to
be protected by acid-resistant linings ).
CLIMATIC CONTROL: For the control climatic data, 3 manual measurements per day at the
working area of the ambient temperature and the relative humidity will be taken.
Page 23
Doc. No. MD-513-0G00-CN-CV-
MA'ADEN WA'AD AL SHAMAL MST-2042-2001
PHOSPHATE COMPANY Rev No. C01
Page 24 of 25
8) REPAIR WORK
For small patch repairs, less than 50 cm², the concerned areas shall be ground to the substrate and
beveled as much as possible at the borders by means of using a right angle grinder with rough
grind ing discs. Remove dust and re-apply as per the original instructions. Make sure areas for
overlap are properly beveled and primed. Allow the lining to cure and retest the repaired area.
9) SAFETY PRECAUTIONS
10) ATTACHMENT
Page 24
Surface Protective Systems
Product Information Sheet
_____________________________________________________________________________________________
Chemical Analysis
Al203 22,5%
Fe203 7,0 %
Physical Properties
Dimensions
The above data are standard values applicable to machine-pressed straight bricks and similar sizes. They have been determined in compliance with the current
DIN specifications. They cannot be taken without reservation for other sizes or as inspection specification.
All Information correspond to the present state of our knowledge. However a liability concerning properties cannot be derived from the data. We reserve the right
to make any technical alterations.
All other contrary data, which have been published until now, are no longer valid.
Actual state in 10/03
Steuler Industriewerke GmbH – Surface Protective Systems Division - 56203 Höhr-Grenzhausen – Phone +49 (0) 2624/13-349 – Fax +49 (0) 2624/13-223
Surface Protective Systems
Technical Information
TI 136
Issue: 07/06/2013
Alkadur P 82
Base: Epoxy resin
Material Group: Priming, Levelling
Description: Steel:
Refer to DIN EN14879-1 as well as to STEULER-KCH-
Alkadur P 82 is a solvent-free primer for Oxydur UP 82 - /
Formsheet 020.
Oxydur PTB – systems on concrete and steel substrates.
The steel surface shall be sandblasted to a metallic bright
finish. A preparation degree of Sa 2 ½ as specified in DIN
Use: EN ISO 12944-4 and a roughness grade “medium (G)” as
Primer on concrete and steel substrates. specified in DIN EN ISO 8503-1 must be achieved; minimum
surface roughness Rz = 70 µm. After blasting, a new forma-
Substrate: tion of rust is to be avoided by appropriate procedures, e. g.
immediate application of a primer.
The substrate should have a temperature of
approx. 12 – 25 °C.
Concrete / screed Moisture
Refer to DIN EN 14879-1 as well as to STEULER-KCH- Residual moisture content of concrete substrate must not
Formsheet 010. exceed 4 %. During application, the substrate must be kept
To attain a sufficient adhesive tensile strength, the substrate absolutely dry. Uncured material has to be protected from
is generally to be pretreated in such a way that it is free of any kind of moisture (condensation, fog, precipitation or oth-
cement slurry, cement skin, loose and crumbly particles, er water source). Distance to dew point has to be at least 3
structure imperfections and separating substances. K, at a relative humidity of above 70 % at least 5 K.
All information contained in this Technical Information is based on the present state of our knowledge and practical experience. All
data are approximate values for guidance only. A legally binding warranty of certain characteristics or the suitability for a certain
purpose of use cannot be derived from this. The information given in this Technical Information is our intellectual property. The
Technical Information may neither be copied nor used by unauthorized parties, nor professionally distributed or otherwise made ac-
cessible to third parties without our prior consent. This issue replaces all previous versions.
213
Issue: 05/2011
Oxydur ES
Broadcast Lining System
Base: Polyurethane
Packaging
Substrate
Packed in the mixing ratio.
Concrete: Observe DIN 28052, Parts 2 and 3 as well as
Primer: Steuler-KCH-Formsheets 010 and 011.
Alkadur P82 Liquid: 5,2 kg PE-bucket Steel: Observe DIN 28053 and DIN 28054 as well as Steuler-
Alkadur P82 Hardener: 2,5 kg Can KCH-Formsheets 020 and 021.
Oxydur ES:
Oxydur UP 82 E Liquid 1 6,0 kg PE-bucket Moisture
Oxydur UP 82 Liquid 2 2,4 kg Can
Residual moisture content of concrete substrate must not exceed
Silica sand 0,5 - 1,0 mm 25,0 kg PE-Sack 4%.
During application, the substrate must remain absolutely dry. Un-
Oxydur UP 82 E Liquid 1 is a coloured component, which is to
cured material has to be protected from any kind of moisture
be thoroughly stirred before use. (condensation, fog, precipitation or other water source).
Colour: grey, red, green, brown
Special colours: On request. Distance to dew point has to be at least 3 K, at an relative humid-
ity of above 70° minimum 5 K.
Please note: Under UV-irradiation discolouring and tarnishing of
the surface possible.
Top Coat:
Before application of the top coat, the sand-rough surface is
shortly ground to better the appearance and reduce the material
consumption. The top coat is then applied in the same way as
the base coat, but without broadcasting.
Standard thickness (base and top coat): 2 – 3 mm
All information contained in this Product Information sheet is based on the present state of our knowledge and practical experience. All
data are approximate values for guidance only. A legally binding warranty of certain characteristics or the suitability for a certain pur-
pose of use cannot be derived from this.
The information given in this Product Information sheet is our intellectual property. The Product Information sheet may neither be copied
nor used by unauthorized parties, nor professionally distributed or otherwise made accessible to third parties without our prior consent.
322
Issue: 05/2011
Furadur Cement, Furadur F Cement
Resin cements for corrosion resistant tile and brick linings
Conductive discharge <106 <106 Ohm Pot Life of the Prepared Material
DIN 28052-6 At a material temperature of 20 °C: 30 minutes
Abrasion resistance 0.4 0.4 cm3/50 cm2 Lower temperatures extend, higher temperatures reduce the
DIN 52108 pot life.
Minimum application 15 15 °C
Instructions for Brick or Tile Linings
Maximum application Bedding:
(cool material to 20°C) 30 30 °C Apply the Furadur Cements to the substrate or, particularly
when lining vertical surfaces, to the bricks or tiles to be laid.
Chemical Resistance The thickness of the bed should be at least 4 mm but no more
See above. Refer to Technical Information 320 (Furadur Ce- than 10 mm.
ment, Furadur F Cement) for further details. Contact Steuler-
KCH before specifying or applying the material.
Curing Times
To support foot traffic:
at a substrate and material temperature of
15°C 8,0 hours
20°C 5,0 hours
30°C 2,5 hours
To achieve full chemical resistance properties:
5 days at 20°C (for service temperatures to 160°C), with sub-
sequent heat treatment, 2 days warm air 60-80°C (for service
temperatures to 200°C and for solvents).
All information contained in this Product Information sheet is based on the present state of our knowledge and practical experience. All
data are approximate values for guidance only. A legally binding warranty of certain characteristics or the suitability for a certain pur-
pose of use cannot be derived from this.
The information given in this Product Information sheet is our intellectual property. The Product Information sheet may neither be cop-
ied nor used by unauthorized parties, nor professionally distributed or otherwise made accessible to third parties without our prior
consent.
TI401
Edición 01/2014
3
Densidad bruta [DIN EN ISO 10545-3] > 2,33 g/cm
Bulk density
2
Resistencia flexión [DIN EN ISO 10545-4] > 35 mm
Modulus of ruptura
3
Resistencia a la abrasión profunda [ DIN EN ISO10545-6] < 185 mm
Resistance to deep abrasion