Professional Documents
Culture Documents
Basic TBQC Consultant Online Training
Basic TBQC Consultant Online Training
TBQC
Consultant
HOW TBQ C IS APPLIED IN TENDERING PROCESS
QS CONSULTANTS
BOQ QTO TDOC PTE ADDM EVA
1 2 3 4 5 6
Efficient Tendering + Team Collaboration Accurate Cost Analysis Secure Data Management
Report Addendum
Import Data Link Qty from Cost Estimate Tender Evaluation
Management
Model to TBQC Customize and print
BOQ to bind tender Link rates to BOQ
document and print PTE Intelligent
comparison of
Electronic
Schedule of Submissions (*.bqs)
Historical data in E-Tender
Excel / PDF / TBQ Rates
format
Generate Electronic
Flexible pricing mode
Tender Document
establish an enterprise-
(*.bqd)
level rate library
CHAPTER 1
PRODUCT OVERVIEW
Cubicost TBQ C
•BQ preparation & cost management application •Web-based tendering platform for Consultants &
•Interoperable with TAS C-II, TRB C-II & E-Tender Contractors
•Install in Client’s Computer
Step #5
Step #4
Administrator assigns
Step #3 Administrator product to each user
adds/removes by clicking Assign
Administrator user(s) emails in Permissions
login to Glodon Employee
Step #2 License Management
Management
Customer receives Center to check
a Glodon Account purchased
Verification email products
Step #1 to validate account
Customer provides
a valid email to
Glodon for
registration
INSTALLATION & QUICK START
Setup Guides – Product License
1 2
Company’s Server
INSTALL
3 4
5 6
Company’s Server
SET SERVER
Enter enterprise email & password, Select a company administrator from
click Next user list shown, then click Next
START SERVER
Setup Guides – Start / Stop Server
8 9
1 2
Client’s Computer
3 4
CHAPTER 2
➢ User
File Menu
USER INTERFACE
BOQ Edit Interface
Modules
TBQC CONSULTANT
CHAPTER 3
Specify the content of table headers Users can also modify and set them
automatically according to their key manually after they are specified
words automatically.
BILLS OF QUANTITY PREPARATION
Import From Excel
Type
S/N
Description
Unit
Net Rate
Trade Code
Element Code
Remarks
Reusable data of
the selected
historical project is
displayed
BILLS OF QUANTITY PREPARATION
Get Data From Other Projects
To reuse an entire
bill/element, select
it directly and copy
and paste into the
current project.
BILLS OF QUANTITY PREPARATION
Get Data From Other Projects
If a reused item
includes any price
data, its details will
also be pasted into
the current project
and the related
items will be
created in Build-up
Unit Rates
BILLS OF QUANTITY PREPARATION
Get Data From BQ Library
How to trigger
Import by Item:
Import by
Category:
CHAPTER 4
Quantity
1. Manual Quantity
2. Live Link from TAS C/TRB C
3. Get Data from Excel
QUANTITY
Manual Quantity
How to trigger
Click on ‘Close
TBQ project’ after
you have finish
link the quantity
How to trigger
CHAPTER 5
Costing
1. Direct Pricing
2. Schedule of Rates
3. Build-Up Unit Rates
4. Link Unit Rate to BQ
5. Get Data from Excel
6. Resource Library
7. Cost Adjustment
8.Cost Analysis
COSTING
Direct Pricing
To create item
for the base price,
click on ‘Item’
How to trigger
COSTING
Build-up Unit Rates
Item with one All-In rate Item with rate breakdown (left-right)
COSTING
Build-up Unit Rates
How to trigger Select “Import from SOR” to Drag the rate code to Unit
open new window of SOR Rate details to link the price
COSTING
Get Data From Excel
Click on ‘Batch
Import from RL’
Open Schedule
of Rates
COSTING
Cost Adjustment
How to trigger
COSTING
Cost Analysis
CHAPTER 6
Report
1. View Report
2. Report Edit
3. Share Report Template
4. Export BQ in Excel
5. Printing
REPORT
View Report
How to trigger
REPORT
Report Edit
How to trigger
There is multiple
option for user
to edit the report:
Layout, Text,
Format and
General
REPORT
Report Edit
Adjusting the page margin, Change the font of the BQ Change the page no format Adjusting the general
description area margin and settings of the BQ
also indentation
REPORT
Share Report Template
REPORT
Share Report Template
REPORT
Export BQ in Excel
If you click on publish and print, the tender content If you click on print only, you still able
will be locked. you can only edit the pre-tender to make changes in your BQ.
estimate or create addendums.
TBQC CONSULTANT
CHAPTER 7
Addendum
1. Create & Mange
Addendum
2. Addendum Settings
REPORT
Create & Manage Addendum Version
CHAPTER 7
E-Tender
1. Generate Tender Doc
2. Tender Evaluation
3. Intelligent Analysis
E-TENDER
Generate Tender Document
How to trigger
Set the file password, this password required to The file type will save as ‘.bqd’
share to contractor in order for contractor to open
the tender doc
How to trigger