06 Gs Exemples Ponts Precobeam
06 Gs Exemples Ponts Precobeam
Drawing Execution
VFT-WIB
Reinforcement cages action formwork
VFT-WIB
Launching for casting
VFT-WIB
Precasted elements
Formwork Casting
VFT-WIB
Ausgeschaltes Fertigteil mit Randabschalung
Pre-casted element including the lateral formwork
VFT-WIB
VFT-WIB
Placed girders
VFT-WIB
Total costs of structures 1.030 €/m2
Kuchl Viaduct (Austria)
Longitudinal section
Cross-section
Specifications
• System: Frame with 4 spans
• Span: 2x 19,70m; 2x 19,50m
• Cross-section: VFT-WIB
• Construction height: 85 / 115 [ cm ]
• Slenderness: 23 / 17
• Use: Road
VFT-WIB elements
Hardening of compsoite elements
Bridge in service
VFT-WIB External reinforcement
Comparison
of construction height
kh
Comparison of
effective construction height
kh,eff
Pilot-Träger VFT-RAIL (Max Bögl)
Pilot girder VFT-RAIL by Max Bögl
Messtechnik und FE-Analysen
VFT-Rail
Longitudinal section
Cross-section Simmerbach
principle
Plan view
Construction site
Torch cutting
Geometry of torch cut
Main reinforment
Reinforcement cage prefabricated
Approval of tolerances
Einheben des Bewehrungskorbs
Reinforcement of composite dowels
Rail channel
The existing structure the night before
Existing superstructure
Existing superstructure
Removal of column head
Einheben der Auflagerbänke
Placing of new column head
Begleitwege
Sidewalks
Verlegen der Begleitwege
Placing of Sidewalks
Refilled ballast
Placing of Rail system
Brückenüberbauten mit Gleis
Cross-section of superstructure
Externe Bewehrung im Hauptträger
Bewehrungsführung
Grundriss
Bewehrungsführung
Tragverhalten im Rahmeneck
Verschub des Rahmens