You are on page 1of 8

NOTES

SR TYPE DIA THK DETAILS OF INSERT PLATE 1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS, CO-ORDINATES ARE IN METERS UNO.
NO OF OF OF CROSS SECTION 2. FOR OTHER NOTES, REFERENCES AND LEGEND, REFER DRG. NO. AD-90-C-331104.
INSERT LUGS INSERT PLAN 3. ALL INSERT PLATE LUGS TO BE BARE HIGH STRENGTH STEEL (UNCOATED) TYPE-2 HOT ROLLED
DEFORMED BARS CONFORMING TO BS EN 10080 AND BS4449 WITH MINIMUM YIELD STRENGTH OF
D- 140 200

250
500 MPA UNLESS OTHERWISE SPECIFIED IN THE DRAWINGS.
30 =
=
4. INSERT PALTE SHALL BE WELDABLE STEEL IN ACCORDANCE WITH BS EN 10025-S275JR.
30 6

30
EL (T.O.C) 1 IP1 12 12 5. THE LONGER SIDE OF PLATE SHALL BE KEPT PARALLEL TO LONGER SIDE OF PEDESTAL.
6. ALL EMBEDED PARTS SHALL BE FLUSHED WITH CONCRETE SURFACE.

140
L

75
PIT WALL C OF WALL 40" CS SLEEVE 7. ALL WELDING OF EMBEDED PART SHAL BE IN ACCORDANCE WITH AWS D1.1.
ANCHORED IN CONCRETE

30

2d
SIZE 200x200
HYDROPHILIC SEALANT
(WITH DELAY COAT) E SECTION 30 290
= =
30
250
-

30
AROUND PIPE AS 6
HYDROTITE CJ

HOLD
OR EQUAL

290
900 FOR FIXING DETAIL
REFER STANDARD DRAWING 2 IP2 16 16
L
C 34" PIPE
L
C 34" PIPE

125
30
SIZE 350x350 HOLD 1 : PENDING FINAL VENDOR DATA FOR ACTUATOR (XV-5574)
E 30 540 30

350
- = =

30
335
3 IP3 16 16 6

10 THK. X (PIPE OD+ 150)∅ TYPICAL LADDER PEDESTAL DETAIL

335

250
D
PUDDLE FLANGE SHOP WELDED TO PIPE
SECTION

1340
1 DETAIL 125

335
-
- SCALE 1:25
LEGEND

335
30
SIZE 600x1400
30 190 30
= = 250
REFERENCE DRAWINGS

30
6

30 190
4 IP4 16 16

75
SIZE 250x250
EL +5.900 (T.O.C)
IP1 IP1 F.G.L. + 5.700

DFT=2 mm THICK ACRYLIC MODIFIED


CEMENTITIOUS WATER PROOF COATING

50
LPP 4-M20

GROUT (TYP)
NON SHRINK
ANCHOR BOLTS

25THK
PVC WATER STOP A.F1.20.100/2.450
230x10 THK EL +3.700 EL 1.800
(TYP)
EL T.O.C
EL +2.575 (T.O.C) E
KEY PLAN

==
700
400
PD2
EL +2.300 (T.O.C) -
PD1
CONCRETE PROTECTION
600

TYPE-B (CASE B1) 150


REF STD DWG No
AD-90-C-331011
(TYP)
C SECTION 500
331104
B SECTION
==

331104

TYPICAL DETAIL OF PD1 F SECTION


-
IP FOR LADDER
SUPPORT
6 NOS 150 DIA
PVC PIPE SLEEVE HOLD 1

185
EL +5.900 (T.O.C)
IP2 IP2 F.G.L. + 5.700
IP2
1 IP2 IP2 2 02.09.23 ISSUED FOR CONSTRUCTION (IFC) ADK SS SSS SS/SPM DLC
- IP2 IP2
1 16.05.23 ISSUED FOR REVIEW (IFR) MK AP GD STM DLC
REV DATE DESCRIPTION BY CHK ENG LDE APPD
CONSULTANT/CONTRACTOR/VENDOR
FOR PLATFORM
EL +3.700
L
C PIPE 75 DIA PVC PIPE SLEEVE L
C PIPE
(TYP)
300

EL +3.168 (T.O.C) FOR EARTHING (TYP) (UNO) DRAWING No. 2369-Q-09105-001

PD2 PD2 PD2 PROJECT/PMR TITLE


IP2
EL +2.300 (T.O.C) LZ LTDP-1 EPC WORK FOR NEW MAIN GAS LINE (NMGL) PROJECT
IP2 IP2
50
600

REFER NOTE 7 & 8 WELL COMPACTED


50 THK BLINDING CONCRETE IN DWG NO. SOIL (TYP)
DRAWING TITLE DAS ISLAND
AD-90-C-331104
VALVE PIT
A SECTION (TYP)
GENERAL ARRANGEMENT - PLANS & SECTIONS
331104 THIS DRAWING IS TO BE READ IN SHEET - 2

SHT. SIZE : A1
CONJUNCTION WITH DRAWING BUDGET REF. DRAWING No. SHT.No. REV.
AD-90-C-331104-SHT-001
AD-90-C-331106-SHT-001 TO
AD-90-C-331108-SHT-001
11689
PROJ/PMR No. SCALE AD-90-C-331105 001 2
4700016503 1:50
THE INFORMATION/DESIGN CONTAINED ON THIS DRAWING IS CONFIDENTIAL. IT MUST NOT BE COPIED, GIVEN AWAY, LENT OR MADE AVAILABLE TO A THIRD PARTY WITHOUT THE WRITTEN CONSENT OF ADNOC Offshore. Filename : AD-90-C-331105_2.dwg
ALL THE WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE CONTRACT SPECIFICATION. EXPLANATIONS OF ABBREVIATIONS, SYMBOLS ETC. ARE GIVEN IN ADNOC Offshore CODES OF PRACTICE.
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

NPCC Transmittal No: 2369-NPCC-ADNOC-T-51606 ADNOC Offshore Trl ref No: 11689-E-O-T-AOF-IFR-000644

Dated Received : 18-05-2023 Date Reviewed: : 12-06-2023

Rev Document Approval Approval code **


Document No. Document Title Class Class *

AD-90-C-331104 VALVE PIT GENERAL ARRANGEMENT -


1 2 2 Approved with comments
PLANS & SECTIONS SHEET-1

AD-90-C-331105 VALVE PIT GENERAL ARRANGEMENT –


1 2 2 Approved with comments
PLANS & SECTIONS SHEET-3
AD-90-C-331106 VALVE PIT GENERAL ARRANGEMENT –
1 2 2 Approved with comments
PLANS & SECTIONS SHEET-3

Review Code (MUST BE SELECTED): x 2 = Approved with comments


(proceed with work, incorporate comments and resubmit)
1 = Approved
x
x 4 = For Information 5= Rejected
3 = Reviewed with comments (correct & resubmit) x (Accepted for information only) (Document must be resubmitted once comments are incorporated and then
contents meets the requirements of Agreement)
x

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 1 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1
AD-90-C-331104 / 331105 /
Document No. xxxxxxx
331106
Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response
AD-90-C-331104 All Elevations corresponds to Das Noted and incorporated
1 NOTES Island chart datum which is below
1.04 m MSL
AD-90-C-331104 Delete this note as already in Note is kept for information
2
NOTES Concrete Protection drawings
AD-90-C-331104 Delete as all are covered in
3 Note is kept for information
NOTES standard drawings
Add: Concrete Protection, Anchor
AD-90-C-331104
4 Bolts, Civil Layout in Valve Pit area, Noted and incorporated
REFERENCE
331105 to 331108
AD-90-C-331104 Provide Base plate with Anchor Bolts
5 PLAN AT EL. 2.300 instead of insert plate for Plarform Noted and incorporated
(T.O.C) Columns
AD-90-C-331104
Correct Pipe Support Number in line Noted and incorporated as
6 PLAN AT EL. 2.300
with Piping Plot Plan and Model per piping input
(T.O.C)
AD-90-C-331104 Superimpose Topo Survey drawings
7 PLAN AT EL. 2.300 and underground detection Survey Noted and incorporated
(T.O.C) drawings
Not Matching with Piping Plot Plan Noted and incorporated as
8 AD-90-C-331104
AD-27-L-270009 Rev 2 per piping input

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 2 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1
AD-90-C-331104 / 331105 /
Document No. xxxxxxx
331106
Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response
PLAN AT EL. 2.300
(T.O.C)
AD-90-C-331104 CONTRACTOR to confirm that valve
Noted and Valve pit is
9 PLAN AT EL. 2.300 pit layout is extracted from E3D
extracted from E3d Model
(T.O.C) Model
AD-90-C-331104 Review Pipe support spacing with
Noted and updated as per
10 PLAN AT EL. 2.300 Piping Plt plan. There is a
input from piping
(T.O.C) discrepancy observed.
AD-90-C-331104 Noted and Grade shall be
Provide details of screed as it is not
11 PLAN AT EL. 2.300 C20 (reference table 9.1 of
covered in Standard drawing.
(T.O.C) AGES SP-01-001)
AD-90-C-331104 Title is kept as per
12 Delete
TITLE Document List
AD-90-C-331105 Noted and incorporated
13 , Reference drawings, Legend
NOTES
AD-90-C-331105 Noted and incorporated
14 Delete Note
NOTES
AD-90-C-331105
Correct drawing No. Noted and incorporated
NOTES
AD-90-C-331105
Legend and Reference drawings are
15 LEGEND AND Noted and incorporated
already covered in 331104
REFERENCE

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 3 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1
AD-90-C-331104 / 331105 /
Document No. xxxxxxx
331106
Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response
Noted,
Structural Steel Platform
detail in dwg. AD-90-C-
This is HOLD as Per ANNEXURE 1 - 331108 and insert plate
AD-90-C-331105
16 Piping Input to Valve Pit Calculation location in dwg. AD-90-C-
SECTION A
Report 331104/331105/331106 is
under hold due to pending
final vendor data for
actuator (xv-5574)
AD-90-C-331105
17 Show LADDER Noted and incorporated
SECTION A
AD-90-C-331105
18 TOC Noted and incorporated
SECTION A
AD-90-C-331105 Already Covered in Concrete
19 Noted and incorporated
SECTION A Protection standard drawing
Noted and incorporated
AD-90-C-331105 MARK FGL as per Topo Survey
20
SECTION B Findings.

Noted and incorporated


AD-90-C-331105
21 Internal Coating Acrylic modified
SECTION B
cementitious flexible
*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 4 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1
AD-90-C-331104 / 331105 /
Document No. xxxxxxx
331106
Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response
waterproof coating (DFT-
2mm) shall be indicated in
drawing
AD-90-C-331105
22 Draw Section Noted and incorporated
DETAIL 1
AD-90-C-331105
23 TYPICAL LADDER LDP Noted
PEDESTAL DETAIL
AD-90-C-331105
24 Delete Title will be kept as per DCI
TITLE
AD-90-C-331105
25 INSERT PLATE Provide details of Insert plate Noted and incorporated
DETAIL
AD-90-C-331106 Follow comments in drawing No Noted and incorporated
26
NOTES 331104
AD-90-C-331106 Delete and refer standard details of Noted and incorporated
27
NOTES Reinforcement drawing
AD-90-C-331106
28 Delete Key plan Noted and incorporated
Key plan
AD-90-C-331106 Specify Identification mark for Bar bending schedule will be
29
Section A Reinforcement Bar arrangement prepared by Subcontractor

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 5 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1
AD-90-C-331104 / 331105 /
Document No. xxxxxxx
331106
Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response
and will not be in Design
drawings.
AD-90-C-331106
30 Specify overlapping length Noted and incorporated
Section A
COMPANY comments on Valve Pit
AD-90-C-331106
31 Calculation Report shall be Noted and incorporated
General
addressed in the drawing

Title Name Signature Date

Engineer Mithun Pal

Lead Engineer Sreekanth P Menon

PEM Devdatt Liladhar Chaure

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 6 of 7
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 7 of 7

You might also like