Professional Documents
Culture Documents
Insert 3
Insert 3
300
1050
PEDESTAL
= = PEDESTAL PEDESTAL
= =
= =
300
900
900
D SECTION E SECTION F SECTION
- (PD1-12 NOS) - (PD2 - 4 NOS) - (PD2 - 2 NOS)
175
NO OF OF OF
IP2
+5.900 (T.O.C) / TOP OF PL IP1
+5.900 (T.O.C) / TOP OF PL INSERT LUGS INSERT PLAN CROSS SECTION
OF IP 1 IP1 16 16 650
30 590 30
30
CONCRETE PROTECTION IP2 IP2 = =
TYPE-B CASE B1
350
REFER STD. DWG NO.
AD-90-C-331011
EQ
PAVEMENT (T.O.C) PAVEMENT (T.O.C)
VARIES
= =
750
VARIES
EQ
6
EQ
CONCRETE PROTECTION
TYPE-B CASE B1
REFER STD. DWG NO.
HOLD
30
AD-90-C-331011
CJ CJ
100
100
2 IP2 16 16 300
30 240 30
30
EQ EQ EQ EQ
REFERENCE DRAWINGS
350
+3.000 (B.O.F) +3.000 (B.O.F)
750
6
30
B SECTION C SECTION
01552 -
(FORMWORK DETAILS)
01552 -
(FORMWORK DETAILS)
LEGEND
(4 LOCATIONS) (2 LOCATIONS)
6400 6550
25 THK
(N.T.S) (N.T.S)
+5.150 (T.O.C) D- D- D-
PAVEMENT (T.O.C) 2 16.09.23 ISSUED FOR CONSTRUCTION ZAS YVN SS/SPM DLC
VARIES 1 22.06.23 ISSUED FOR REVIEW (IFR) BSH YVN SS/SPM DLC
REV DATE DESCRIPTION DRN CHK ENG APP APP
ADGAS
CJ (TYP) LZ LTDP-1
100
100 CONTRACTOR
+3.000 (B.O.F) (TYP) DRAWING NUMBER 2369-Q-08053-001
DRAWING TITLE
50 THK BLINDING GA AND REINFORCEMENT DETAILS FOR
REFER NOTE 7 & 8 (TYP) CONCRETE (TYP) PRESSURE CONTROL VALVE STATION
NPCC Transmittal No: 2369-NPCC-ADNOC-T-52391 ADNOC Offshore Trl ref No: 11689-E-O-T-LNG-IFR-000233
Document No. Document Title Rev Document Class Approval Class * Approval code **
*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 1 of 3
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet
COMMENTS ON Rev 1
Contractor Contractor
Srl. Reference Company Comment Company Comments
Response Response
Foundation Coordinates need to be verified with Piping Plot
1 NG-100-A2Q-5-01552 Noted.
Plan and Model
NG-100-A2Q-5-01552
2 Show dimensions. Noted and updated.
NG-100-A2Q-5-01552
3 Add - R/F detail standard drawing. Noted and Updated.
NG-100-A2Q-5-01552 Noted & Updated
4 Not matching with Piping Plot Plan - NG-100-A2L-5-10354
from piping layout.
NG-100-A2Q-5-01553
5 PROVIDE DETAILS Noted and Updated.
NG-100-A2Q-5-01553 Sleeper foundation is
combined with
6 Reduce depth of foundation for sleeper foundation foundation Mat as
there is no scope for
single foundation.
NG-100-A2Q-5-01553 Drawing title is as per
7 Drawing title - FOUNDATION
document list.
NG-100-A2Q-5-01553
8 T12 - Refer Anchor Bolt Standard drawing - Table 1 - Note F. Noted and updated.
*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 2 of 3
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet
*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 3 of 3