NOTES

1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS, CO-ORDINATES ARE IN


METERS UNO.
2. FOR OTHER NOTES, REFERENCES AND LEGENDS REFER DRAWING NO.
NG-100-A2Q-5-01552-001.
PEDESTAL
1050
= =
300 300 PEDESTAL PEDESTAL
A.F1.42.190/2.850 800 450
ANCHOR BOLTS = = = =
PLATE (IP1) PLATE (IP2)

300
1050
PEDESTAL
= = PEDESTAL PEDESTAL

= =

= =
300

900

900
D SECTION E SECTION F SECTION
- (PD1-12 NOS) - (PD2 - 4 NOS) - (PD2 - 2 NOS)

PD / IP E OF PD / IP F- SR TYPE DIA THK DETAILS OF INSERT PLATE


-

175
NO OF OF OF
IP2
+5.900 (T.O.C) / TOP OF PL IP1
+5.900 (T.O.C) / TOP OF PL INSERT LUGS INSERT PLAN CROSS SECTION
OF IP 1 IP1 16 16 650
30 590 30

30
CONCRETE PROTECTION IP2 IP2 = =
TYPE-B CASE B1

350
REFER STD. DWG NO.
AD-90-C-331011

EQ
PAVEMENT (T.O.C) PAVEMENT (T.O.C)
VARIES

= =
750
VARIES

EQ
6

EQ
CONCRETE PROTECTION
TYPE-B CASE B1
REFER STD. DWG NO.
HOLD

30
AD-90-C-331011
CJ CJ
100

100
2 IP2 16 16 300
30 240 30

30
EQ EQ EQ EQ
REFERENCE DRAWINGS

350
+3.000 (B.O.F) +3.000 (B.O.F)

750
6

30
B SECTION C SECTION
01552 -

(FORMWORK DETAILS)
01552 -

(FORMWORK DETAILS)
LEGEND
(4 LOCATIONS) (2 LOCATIONS)

PCV PCV PCV


1 2 3
GROUT (TYP)
NON SHRINK

6400 6550
25 THK

(N.T.S) (N.T.S)

+5.150 (T.O.C) D- D- D-
PAVEMENT (T.O.C) 2 16.09.23 ISSUED FOR CONSTRUCTION ZAS YVN SS/SPM DLC
VARIES 1 22.06.23 ISSUED FOR REVIEW (IFR) BSH YVN SS/SPM DLC
REV DATE DESCRIPTION DRN CHK ENG APP APP
ADGAS

ABU DHABI GAS LIQUEFACTION COMPANY LTD.


CONCRETE PROTECTION (ADNOC GAS)
TYPE-B CASE B1
(TYP)

CJ (TYP) LZ LTDP-1
100

REFER STD. DWG NO.


AD-90-C-331011 CONCRETE PROTECTION NEW MAIN GAS LINE (NMGL)
REFER NOTE 9 (TYP) PROJECT
FROM DWG NO.
NG-100-A2Q-5-01552-001 CONTRACTOR: NATIONAL PETROLEUM CONSTRUCTION COMPANY
P.O. BOX: 2058, MUSSAFAH ABU DHABI, UAE.
Tel: +971 2 554 9000
Fax: +971 2 554 9111
850

100 CONTRACTOR
+3.000 (B.O.F) (TYP) DRAWING NUMBER 2369-Q-08053-001
DRAWING TITLE
50 THK BLINDING GA AND REINFORCEMENT DETAILS FOR
REFER NOTE 7 & 8 (TYP) CONCRETE (TYP) PRESSURE CONTROL VALVE STATION

ADNOC GAS A1 FORMAT


A
FROM DWG NO.
NG-100-A2Q-5-01552-001 READ THIS DRAWING IN CONJUNCTION WITH PLATFORM FOUNDATION (SHEET-2)
SECTION DRG. NO. NG-100-A2Q-5-01552-001,
01552 -
NG-100-A2Q-5-01554-001 TO
NG-100-A2Q-5-01559-001,
CONTRACT No. ADNOC LNG DRAWING NUMBER REV.

(FORMWORK DETAILS) NG-100-A2Q-5-01623-001 TO 4700016503 NG-100-A2Q-5-01553-001 2


NG-100-A2Q-5-01625-001
(ANCHOR BOLT ARE SHOWN INDICATIVELY)
SCALE: 1:25 CAD FILE No. NG-100-A2Q-5-01553-001.dwg
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

NPCC Transmittal No: 2369-NPCC-ADNOC-T-52391 ADNOC Offshore Trl ref No: 11689-E-O-T-LNG-IFR-000233

Dated Received : 25-07-2023 Date Reviewed: : 03-08-2023

Document No. Document Title Rev Document Class Approval Class * Approval code **

NG-100-A2Q-5- Ga And Reinforcement Details For Control APPROVED WITH COMMENTS.


01552 Pressure Control Valve Station Platform 1 2 2
Foundation ( Sheet 1)

NG-100-A2Q-5- Ga and reinforcement details for control APPROVED WITH COMMENTS.


01553 pressure control valve station platform 1 2 2
foundation ( sheet 2)

NG-100-A2Q-5- Ga and reinforcement details for control


01554 pressure control valve station platform 1 2 2 APPROVED WITH COMMENTS.
foundation ( sheet 3)

Review Code (MUST BE SELECTED): 2 = Approved with comments


(proceed with work, incorporate comments and resubmit)
1 = Approved
4 = For Information 5= Rejected
x 3 = Reviewed with comments (correct & resubmit) (Accepted for information only) (Document must be resubmitted once comments are incorporated and then
contents meets the requirements of Agreement)

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 1 of 3
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1

Document No. NG-100-A2Q-5-01552-01554 2369-Q-08052 TO 08054

Contractor Contractor
Srl. Reference Company Comment Company Comments
Response Response
Foundation Coordinates need to be verified with Piping Plot
1 NG-100-A2Q-5-01552 Noted.
Plan and Model
NG-100-A2Q-5-01552
2 Show dimensions. Noted and updated.
NG-100-A2Q-5-01552
3 Add - R/F detail standard drawing. Noted and Updated.
NG-100-A2Q-5-01552 Noted & Updated
4 Not matching with Piping Plot Plan - NG-100-A2L-5-10354
from piping layout.
NG-100-A2Q-5-01553
5 PROVIDE DETAILS Noted and Updated.
NG-100-A2Q-5-01553 Sleeper foundation is
combined with
6 Reduce depth of foundation for sleeper foundation foundation Mat as
there is no scope for
single foundation.
NG-100-A2Q-5-01553 Drawing title is as per
7 Drawing title - FOUNDATION
document list.
NG-100-A2Q-5-01553
8 T12 - Refer Anchor Bolt Standard drawing - Table 1 - Note F. Noted and updated.

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 2 of 3
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

Title Name Signature Date

Engineer Sunil Shinge 15-9-2023

Lead Engineer Sanjay Shelar / Sreekanth P 15-9-2023


Menon
PEM Devdatt Liladhar Chaure 15-9-2023

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 3 of 3