RFI-S-01663-04 - Arup
RFI-S-01663-04 - Arup
REQUEST:
Referring to above matter and previous revision, please find attached proposed Denka Grout catalog and Attachment 1 for your further
review and approval. We are looking for terminating the vertical rebars that are clashes with steel connection node at D505 (both
CP14). From the details, it is understand that column are terminating at L05 and only taking loading from L05 only. Thus, there is no
other moment acting on the column which is why we proposed to terminate the rebar below the steel connection node.
Further on this, we are going to provide grouting (Attachment 2) for fill up the confined space in the steel connection node.
RESPONSE:
Arup: We have no objection to Contractor's alternative proposal provided there is no time and cost implication.
In fact, Contractor shall amend the calculation report as per the latest attachment & submit this alternative
proposal and justification for the rectification work under proper workflow.
Responded by:
Arup Jurunding Sdn Bhd Ng Say Gim 27/12/2023
Company Name / Signature Date
ATTACHMENT 1
NOTE :
. ALL DIMENSIONS ARE IN MILLMETERS AND LEVELS IN METRES U.N.O.
. ALL STEEL GRADE ARE S U.N.O.
. OR BULT UP MEMBER SIDE PLATE DETAILS RE ER TO DRAWING
BL SSH STL SCT C .
. OR TYPICAL WELDING DETALS RE ER TO DRAWING
BL SSH STL SCT C .
. OR TYPICAL STUD ARRANGEMENT DETAILS RE ER TO DRAWING
180
INDICATES COLUMN BELOW ONLY
(S460) PBW ULL PENETRATION BUTT WELD
BX3(BOX1500*1000*50*120)
05b
PPBW PARTIAL PENETRATION BUTT WELD
200
as per Attachment 2
THE WORK REPRESENTED ON THIS DRAWING HAS BEEN
COORDINATED WITH ALL SUB CONSTRACTORS NOMINATED
05c
200
SUB CONTRACTORS AND OTHER A ECTED CONTRACTORS.
280mm CONTRACTOR S
REPRESENTATIVES DATE:
T16 LINK TO WELD ON BEAM WEB
200
COORDINATED BY
200
440mm S SCT
05a M SCT
E SCT
200
KEY PLAN
280mm
150
LOT L LOT L1 LOT M
05d
166 165 164
05b
05d 05a
T16 LINK TO WELD ON BEAM WEB N
180
200
PROJECT MANAGER :
200
K L CC
200
J S H K L
T :( )
200
200
200
CONTRACTOR :
200
200
200
S S S S S S
200
200
ARCHITECTS :
200
NRY
S M A M L
N . J L K L
200
200
T :( )
200
:( )
E : . .
150
150
150
01 01 01 01 ARUP JURUNDING SDN. BHD. (ARUP)
01 L W
01 N . J A A
T16-LINKS T16-LINKS T16-LINKS T16-LINKS B M K L
T16-LINKS T :( )
T16-LINKS :( )
140MM THK. PLATE (S460) MECHANICAL ELECTRICAL ENGINEERS :
CP14(BU850*850*35*65) CHT INTERNATIONAL SDN. BHD.
Section 05c - 05c Section 05d - 05d U
D
B B P
J
D P
1:15 1:15 O J D P J
S D E
T :( )
Section 05b - 05b LANDSCAPE ARCHITECT :
:( )
1:15
WAA DESIGN SDN. BHD.
N A M J I
K L
T :( )
:( )
DESIGNER :
T12 8
28 Feb 2023
T16 10
T20 13
DRAWING TITLE :
T25 16
T32 20 LEVEL 5 ZONE C2-1
Arup:
T40 25 1 Mar 2023 Arup's assessment of this submittal is strictly on the structural impact of additional opening and COLUMN STIFFENER AND
stiffener plate details on steel beam/column web as shown in the drawings.
LINK OPENING DETAIL 01
NOTE : APPROVED IN SUBMITTAL Contractor shall refer to the latest approved general arrangement and connection submittals for
19BL-SMT-CAL-C&S-2072-00 other details.
We assume that all the structural steel elements as shown in this submittal are as per the latest
COLUMN MAIN BARS LINKS STIFFENER (t x w, MM) WELDING THICKNESS (MM) approved shop drawings. If there is any discrepancy, Contractor should revise and resubmit
DRAWN BY : CHECKED BY :
these drawings based on the latest approved structural steel shop drawings for Engineer's
CP14 92T40 T16-200 40x90 & 40X50 FPBW approval.
YY Frankie Lee
SCALE : DATE :
*ALL STIFFENER PLATE SHALL BE S355 U.O.N 1 : 15 22.02.2023
DRAWING NO. : REV. :
19BL-SSH-STL-SCT-L05-C2-1-5002 01
RFI-S-01663-04 Attachment #02 Page 1 of 2
ATTACHMENT 2
RFI-S-01663-04 Attachment #02 Page 2 of 2