BAHAN STYLE BALI 2017

Sat.
NO NAMA BARANG HARGA BAHAN

1 Bata press 5x11x22 cm bj 3,000.00


2 Batu Tabas Karangasem 4x18x40 cm M2
3 Batu Tabas Karangasem 3x18x40 cm M2
4 Batu Tabas Karangasem 8x8x40 cm M'
5 Batu Paras Kerobokan bh
6 Batu Paras Sarwagenep bh
7 Batu Paras Jogya Putih bh
8 Batu Paras Silakarang Tipis bh
9 Batu Tulung Agung bh
10 Batu Candi Hitam bh 12,000.00
11 Batu Gunung ex. Karang Asem bh
12 Batu Granit Hitam M2
13 Ijuk Bali Kg
14 Ijuk Lampung Kg
15 Kayu Cepaka Balok 10x20 cm, 11x22 cm M3
16 Kayu Cepaka Balok (standard) M3
17 Kayu Cepaka Mbung (Papan Tarib) M3
18 Kayu Cepaka Papan M3
19 Kayu Merbau Balok 11x22 cm M3
20 Kayu Merbau Balok 12x12 cm M3
UPAH STYLE BALI 2017

No. Uraian Tenaga Kerja Sat. HARGA UPAH

1 Kepala tukang pasang style bali Hari


2 Tukang pasang style bali Hari
3 Tukang pasang bata press 5x11x22 cm M2
4 Tukang batu tabas karangasem 4x18x40 cm M2
5 Tukang kupak lambang kayu M'
6 Tukang kupak saka kayu Bh
7 Tukang ukir lambang kayu M'
8 Tukang ukir saka kayu Bh
9 Tukang ukir canggahwang Bh
10 Tukang ukir kencut Bh
11 Tukang ukir kapu-kapu Bh
12 Tukang ukir ring-ring M'
13 Tukang ukir kayu Hari
14 Tukang ukir batu Hari
15 Tukang ukir saka + canggahwang + kencut Set
16 Pasang Bata Gosok 1 Muka M2 Rp 100,000.00
17 Pasang Bata Gosok 2 Muka M2
18 Pasang batu Paras Diukir M2 Rp 400,000.00
HARGA SATUAN BAHAN BANGUNAN 2017

NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

1 Batu Kali M3 185,000.00


2 Pasir Urug M3 135,000.00
3 Pasir Pasang M3 165,000.00
4 Pasir Beton M3 155,000.00
5 Koral Beton (Pecah) M3 245,000.00
6 Tanah Urug M3 70,000.00
7 Lime ston SI M3 85,000.00
8 Sirtu M3 145,000.00
9 Semen Gresik 50 kg zak 56,000.00
10 Semen Tiga Roda 50 Kg zak 55,000.00
11 Semen Tonasa 50 kg zak 52,000.00
12 Semen Instan (MU-380) untuk perekat Bata Ringan 40 kg zak 85,000.00
13 Semen Instan (MU-301) untuk plesteran 40 kg zak 50,000.00
14 Semen Instan (MU-200) untuk Acian 40 kg zak 105,000.00
15 Semen warna/semen grouting kg 6,500.00
16 Batako cetak lobang KW I Bh 1,600.00
17 Batu Bata Pasangan Klas I Bh 950.00
18 Batu Bata Gosol Klas I Bh 2,700.00
19 Bata Ringan ukuran 10x20x60 Bh 8,500.00
20 Bata Ringan m3 800,000.00
21 Batu Palimanan (Paras Jogya) M2 110,000.00
22 Batu Candi (Jogya) M2 110,000.00
23 Batu Paras (Tulungagung) M2 110,000.00
24 Batu Paras (Kerobokan) bj 9,500.00
25 Batu Paras Gosok Abu (Silakarang) bj 12,500.00
26 Besi Beton Kg 7,500.00
27 Kawat Beton Kg 13,500.00
28 Baja WF Kg 9,250.00
29 Baja Profil Kg 9,250.00
30 Besi kotak Kg 12,000.00
31 Besi Strip Kg 14,000.00
32 Besi Wiremesh Kg 13,500.00
33 Paku 12 cm Kg 12,500.00
34 Paku 10 cm Kg 13,000.00
35 Paku 7 cm Kg 14,000.00
36 Paku 5 cm Kg 14,200.00
37 Paku 3 cm Kg 14,300.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

38 Paku List Kg 14,300.00


39 Paku Kalsiboard Kg 82,000.00
40 Paku beton kotak 35,000.00
41 Paku sekrup kotak 45,000.00
42 Kayu Jati Balok M3 22,500,000.00
43 Kayu Merbau Balok M3 13,500,000.00
44 Kayu Bangkirai Balok M3 7,900,000.00
45 Kayu Kamper Balok M3 6,900,000.00
46 Kayu Meranti Balok M3 4,100,000.00
47 Kayu Kruing Balok M3 4,750,000.00
48 Kayu Seseh Balok M3 5,750,000.00
49 Kayu Jati Papan M3 30,000,000.00
50 Kayu Merbau Papan M3 14,500,000.00
51 Kayu Bangkirai Papan M3 11,200,000.00
52 Kayu Kamper Papan M3 7,000,000.00
53 Kayu Meranti Papan M3 2,300,000.00
54 Kayu Kruing Papan M3 5,800,000.00
55 Kayu Kamfer Usuk M3 6,500,000.00
56 Kayu Kamfer reng M3 5,200,000.00
57 Kayu Meranti Usuk M3 2,200,000.00
58 Kayu terentang/Begesting M3 2,000,000.00
59 Kayu Usuk Kruing M3 4,500,000.00
60 Kayu usuk 4/6 Begesting M3 1,500,000.00
61 Kayu Dolken 8' - 10' /4 m Btg 145,000.00
62 Kayu Profil m' 9,500.00
63 Bambu sedang Ukuran 4 m Btg 11,500.00
64 Bambu Kecil Ukuran 4 m Btg 9,500.00
65 Gedeg kulit kelas I m2 37,500.00
66 Formika m2 30,000.00
67 Minyak Bekisting ltr 20,000.00
68 Tali Ijuk Kg 11,500.00
69 Ijuk Kg 8,500.00
70 Lem Kayu Kg 12,000.00
71 Alluminium foil Single m2 10,500.00
72 Alluminium foil Double m2 12,700.00
73 Genteng Karang Pilang setara Good Year bj 5,500.00
74 Genteng Bubungan Karangpilang bj 15,500.00
75 Genteng Kanmuri di Glazur bj 12,800.00
76 Genteng Bubungan Kanmuri di Glazur bj 18,700.00
77 Genteng Sirap bj 1,700.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

78 Genteng Pletong bj 2,100.00


79 Genteng Pletong Di cat bj 2,500.00
80 Bubungan Pletong bj 7,500.00
81 Asbes Gelombang 1,80 m x 0,80 m x 5 mm bj 35,000.00
82 Bubungan Steel Gelombang Lbr 35,000.00
83 Seng BJLS 0,20 gelombang Lbr 32,500.00
84 Seng BJLS 0,28 gelombang Lbr 42,500.00
85 Seng Plat 3" x 6" BJLS 28 Lbr 38,500.00
86 Alang - Alang (panjang 2.4 m) Lbr 35,000.00
87 Tali pengikat Alang - alang ikat 10,500.00
88 Multiplex tbl 18 mm uk 120 x 240 Lbr 220,000.00
89 Multiplex tbl 15 mm uk. 120 x 240 Lbr 190,000.00
90 Multiplex tbl 12 mm uk. 120 x 240 Lbr 155,000.00
91 Playwood tbl 9 mm uk. 120 x 240 Lbr 90,000.00
92 Playwood tbl 6 mm uk. 120 x 240 Lbr 78,000.00
93 Teaxwood tbl 3 mm uk 120 x 240 Lbr 71,000.00
94 Tripleks tbl 6 mm uk 120 x 240 Lbr 78,000.00
95 Gypsum tbl 9 mm uk. 120 x 240 Lbr 75,000.00
96 Kalsiboard tbl 4.5 mm uk. 120 x 240 Lbr 89,500.00
97 Kayu semen Eave 2 in 1 (235 mm x 3050 mm x 16 mm) Bt 160,000.00
98 Kayu Semen lap sidding 8" G2 (200 mm x 3050 mm x 11 mm) Bt 135,000.00
99 Eternit lbr 45,000.00
100 Rangka Hollow 2 x 4 tbl. 0,4 mm m1 7,000.00
101 Rangka Hollow 4 x 4 tbl 0,4 mm m1 10,000.00
102 Alluminium lapis jeruk tbl 3 mm uk 120 x 240 Lbr 47,500.00
103 Keramik 80 x 80 setara Niro Granite (Homogenius) m2 230,000.00
104 Keramik 80 x 80 setara Niro Granite (Homogenius) anti slip m2 230,000.00
105 Keramik 60 x 60 setara Niro Granite (Homogenius) m2 201,000.00
106 Keramik 60 x 60 setara Niro Granite (Homogenius) anti slip m2 201,000.00
107 Keramik 30 x 60 setara Niro Granite (Homogenius) m2 210,000.00
108 Keramik 80 x 80 setara Granito (Homogenius) m2 280,000.00
109 Keramik 80 x 80 setara Granito (Homogenius) anti slip m2 290,000.00
110 Keramik 60 x 60 setara Granito (Homogenius) m2 242,000.00
111 Keramik 60 x 60 setara Granito (Homogenius) anti slip m2 242,000.00
112 Keramik 30 x 60 setara Granito (Homogenius) m2 250,000.00
113 Keramik 80 x 80 setara Ezenza (Homogenius) m2 372,000.00
114 Keramik 80 x 80 setara Ezenza (Homogenius) anti slip m2 390,000.00
115 Keramik 60 x 60 setara Ezenza (Homogenius) m2 285,000.00
116 Keramik 60 x 60 setara Ezenza (Homogenius) anti slip m2 285,000.00
117 Keramik 30 x 60 setara Ezenza (Homogenius) m2 300,000.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

118 Keramik 40 x 40 cm setara Platinium Kls I M2 55,000.00


119 Keramik 40 x 40 cm setara Platinium anti slip KLs I M2 56,000.00
120 Keramik 20 x 20 cm setara Platinium M2 45,000.00
121 Keramik 20 x 20 cm setara Platinium anti slip M2 48,000.00
122 Keramik 20 x 25 cm setara Platinium M2 48,000.00
123 Keramik border 10 x 20 cm setara Platinium Bh 9,800.00
124 Keramik 40 x 40 cm setara Ikad Kls I M2 68,700.00
125 Keramik 40 x 40 cm setara Ikad anti slip KLs I M2 69,000.00
126 Keramik 30 x 30 cm setara Ikad M2 42,000.00
127 Keramik 20 x 20 cm setara Ikad M2 65,000.00
128 Keramik 20 x 20 cm setara Ikad anti slip M2 65,000.00
129 Keramik 20 x 25 cm setara Ikad M2 65,000.00
130 Keramik border 10 x 20 cm setara Ikad Bh 12,500.00
131 Keramik 40 x 40 cm setara Roman Kls I M2 43,000.00
132 Keramik 40 x 40 cm setara Roman anti slip KLs I M2 103,000.00
133 Keramik 20 x 20 cm setara Roman M2 85,500.00
134 Keramik 20 x 20 cm setara Roman anti slip M2 46,000.00
135 Keramik 20 x 25 cm setara Roman M2 46,000.00
136 Keramik border 10 x 20 cm setara Roman Bh 9,800.00
137 Keramik step nossing tangga 8 x 40 cm setara Platinium Bh 17,800.00
138 Keramik step nossing tangga 8 x 40 cm setara Ikad Bh 18,700.00
139 Keramik step nossing tangga 8 x 40 cm setara Roman Bh 19,200.00
140 Roster Keramik Bh 35,000.00
141 Cat Meni kayu Kg 24,000.00
142 Cat Meni besi Kg 24,000.00
143 Cat Dasar Kayu Kg 33,000.00
144 Cat Tembok setara vinilex Kg 24,200.00
145 Cat Tembok setara Duluk (Interior) warna standar Kg 28,900.00
146 Cat Tembok setara Duluk (Interior) warna khusus Kg 61,500.00
147 Cat Tembok setara Dulux Watershield (Exterior) warna standar Kg 86,000.00
148 Cat Tembok setara Dulux Watershield (Exterior) warna khusus Kg 87,100.00
149 Alkali untuk Interior Kg 39,500.00
150 Alkali untuk Exterior Kg 44,300.00
151 Cat Kayu setara Emcolux Kg 51,200.00
152 Cat Kayu setara Mowilex Kg 67,000.00
153 Cat Besi Viglass warna standar Kg 45,600.00
154 Cat Besi Viglass warna khusus Kg 49,200.00
155 Cat Besi Watershield Glass warna standar Kg 76,000.00
156 Cat Besi Watershield Glass warna khusus Kg 87,500.00
157 Wood Filler setara Propan Kg 33,000.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

158 Sending SeEMCO Kg 52,000.00


159 Wood Stain (Warna) setara Propan Kg 60,000.00
160 Clear (Glass Dop) setara Propan Kg 55,000.00
161 Tinner A Ltr 24,500.00
162 Dempul Sanpolac Ltr 45,000.00
163 Politur Vernis Ltr 55,000.00
164 Politur Ultra Ltr 55,000.00
165 Politur Dasar Ltr 55,000.00
166 Plamir tembok kg 22,000.00
167 Masterseal 440 kg 65,000.00
168 Amplas lbr 3,000.00
169 Kuas BH 6,500.00
170 Coating Batu alam setara Arca ltr 55,000.00
171 Clear Gross Kg 55,000.00
172 Lokset MTS IL 8485 SSS setara Dekson Bh 189,000.00
173 Handle LHTR 0016 SSS setara Dekson Bh 237,000.00
174 Kunci Bulat KCBL 8587 BK SSS setara Dekson Bh 148,000.00
175 Kunci tanam 2 slag Bh 175,000.00
176 Kunci slot Bh 155,000.00
177 Engsel pintu 4 " 4x3x3, 2BB ES/EL setara Dekson Bh 75,000.00
178 Engsel jendela 3 " 3x2 BB setara Dekson Bh 39,000.00
179 Engsel Casment Type FS HD S 250 10"" setara Dekson ps 175,000.00
180 Grendel Jendela Rabuncis Type CHW 4 LHNH setara Dekson bh 84,000.00
181 Spring Kenip CWH 103 Z, SN bh 275,000.00
182 Espagnoilet TanamType FB 040. 8" + 12 SS setara Dekson Bh 137,000.00
183 Door Closer 300 Hold Open setara Dekson Bh 345,000.00
184 Kabel NYM/ NYA 3 X 2.5 mm2 setara Supreme M1 12,000.00
185 Kabel BC 70 mm2 M1 110,000.00
186 Kabel BC 50 mm2 M1 55,000.00
187 Kabel BC 35 mm2 M1 43,700.00
188 Kabel BC 25 mm2 M1 32,500.00
189 Kabel BC 16 mm2 M1 23,500.00
190 Kabel NYMHY 3 x 2,5 mm2 m1 13,000.00
191 Kabel NYMHY 2 x 2,5 mm2 m1 9,300.00
192 Kabel NYA 2 x 1 x 1,5 mm2 m1 6,100.00
193 Kabel UTP Cat 6 m1 7,300.00
194 Kabel ITC 2 Prs m1 4,200.00
195 Kabel COAXIAL RG 11 m1 15,200.00
196 Kabel NYFGbY 4 x185 mm2 m1 960,000.00
197 Kabel NYFGbY 4 x 150 mm2 m1 765,000.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

198 Kabel NYFGbY 4 x 95 mm2 m1 495,000.00


199 Kabel NYFGbY 4 x 70 mm2 m1 260,000.00
200 Kabel NYFGbY 4 x 50 mm2 m1 264,000.00
201 Kabel NYFGbY 4 x 35 mm2 m1 197,000.00
202 Kabel NYFGbY 4 x 16 mm2 m1 98,900.00
203 Kabel NYFGbY 4 x 10 mm2 m1 80,900.00
204 Kabel NYFGbY 4 x 6 mm2 m1 55,800.00
205 Kabel NYY 4 x 70 mm2 m1 335,000.00
206 Kabel NYY 4 x 50 mm2 m1 242,000.00
207 Kabel NYY 4 x 35 mm2 m1 180,700.00
208 Kabel NYY 4 x 25 mm2 m1 138,000.00
209 Kabel NYY 4 x16 mm2 m1 89,700.00
210 Kabel NYY 4 x10 mm2 m1 63,000.00
211 Kabel NYY 4 x6 mm2 m1 11,900.00
212 Kabel Telephone m1 6,500.00
213 Coaxial cable 5C - 75 ohm commscof m1 35,000.00
214 Pipa clipsal 20 mm hitam Bt 10,000.00
215 Tee dos clipsal 20 mm hitam Bh 5,000.00
216 Klem clipsal 20 mm hitam Bj 500.00
217 Sock clipsal 20 mm hitam Bj 1,500.00
218 Inbow dos plastik clipsal E 157 P Bj 6,000.00
219 Socket data Bh 110,000.00
220 Socket telephone Bh 60,000.00
221 Socket MATV Bh 60,000.00
222 Smoke Detector Bh 70,000.00
223 Smoke Detector + EOL Bh 110,000.00
224 Alarm Bell Bh 80,000.00
225 Indicator Lamp Bh 125,000.00
226 Push Button Bh 100,000.00
227 Combination Box Bh 765,000.00
228 Ω Clem Ø 20 mm pcs 850.00
229 Ω Clem Ø 25 mm pcs 2,150.00

230 Lampu TL 2 x 18 Watt+ EBC Philips (Armatur Platinium RMI setara SAKA) Bh 750,000.00

231 Lampu TL 2 x 36 Watt+ EBC Philips (Armatur Platinium RMI setara SAKA) Bh 1,100,000.00

232 Lampu TL 2 x 18 Watt+ EBC Philips (Armatur V Shape setara SAKA) Bh 385,000.00

233 Lampu TL 2 x 36 Watt+ EBC Philips (Armatur V Shape setara SAKA) Bh 490,000.00

234 Lampu Down Light Recessed Halogen 35 Watt, Philips (Armatur setara SAKA ) dia 075 mm Bh 195,000.00

235 Lampu Down Light PLC 10 watt, Philips (Armatur 2 Kaki setara SAKA) dia 100 mm Bh 175,000.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

236 Lampu Down Light PLC 18 watt, Philips (Armatur 2 Kaki setara SAKA) dia 125 mm Bh 185,000.00

237 Lampu Down Light PLC 26 watt, Philips (Armatur 2 Kaki setara SAKA) dia 150 mm Bh 190,000.00

238 Celling Exhaust Fan Type FV-11VQ5 setara Panasonic Unit 600,000.00
239 Ceiling Fan 4 Metal Blade 140 cm (56") setara Panasonic Unit 425,000.00
240 Sakral Tunggal setara Clipsal Bh 25,000.00
241 Saklar Double setara Clipsal Bh 30,000.00
242 Saklar Tukar/Hotel setara Clipsal Bh 50,000.00
243 Stop Kontak setara Clipsal Bh 30,000.00
244 Stop Kontak AC setara Clipsal Bh 50,000.00
245 AC 3/4 PK Inverter, Wall Mounted setara Daikin Unit 5,400,000.00
246 AC 1 PK Inverter, Wall Mounted setara Daikin Unit 4,000,000.00
247 AC 1,5 PK Inverter, Kapasitas 11,900 BTUH Wall Mounted setara Daikin 5,700,000.00
248 AC 2 PK Inverter, Wall Mounted setara Daikin Unit 7,800,000.00
249 AC 2,5 PK Inverter, Wall Mounted setara Daikin Unit 15,400,000.00
250 AC 3 PK Celling Casssete setara Daikin Unit 19,200,000.00
251 Pipa Refrigerant 3/4 PK M' 70,000.00
252 Pipa Refrigerant 1 PK M' 70,000.00
253 Pipa Refrigerant 2 PK M' 85,000.00
254 Pipa Refrigerant 2,5 PK M' 110,000.00
255 Pipa Refrigerant 3 PK M' 110,000.00
256 Pipa Drain 3/4 PK, PVC dia 20 mm + Insulation M' 12,500.00
257 Pipa Drain 1 PK, PVC dia 20 mm + Insulation M' 12,500.00
258 Pipa Drain 2 PK, PVC dia 20 mm + Insulation M' 18,000.00
259 Pipa Drain 2,5 PK, PVC dia 20 mm + Insulation M' 18,000.00
260 Pipa Drain 3 PK, PVC dia 20 mm + Insulation M' 25,000.00
261 LCD Proyektor XGA (1024x768) setara BENQ bh 5,200,000.00
262 LCD Proyektor XGA (1024x768) setara ACER bh 5,050,000.00
263 LCD Proyektor XGA (1024x768) setara SONY bh 9,275,000.00
264 Screen Motorize dia 70" bh 3,075,000.00
265 Braket bh 205,000.00
266 Pipa PVC TIPE AW Ø ½˝ ( Ø 15 mm ) M' 4,100.00
267 Pipa PVC TIPE AW Ø ¾˝ ( Ø 20 mm ) M' 6,200.00
268 Pipa PVC TIPE AW Ø 1˝ ( Ø 25 mm ) M' 8,500.00
269 Pipa PVC TIPE AW Ø 1,25˝ ( Ø 32 mm ) M' 12,100.00
270 Pipa PVC TIPE AW Ø 1.5˝ ( Ø 40 mm ) M' 14,000.00
271 Pipa PVC TIPE AW Ø 2˝ ( Ø 50 mm ) M' 18,700.00
272 Pipa PVC TIPE AW Ø 3˝ ( Ø 80 mm ) M' 38,500.00
273 Pipa PVC TIPE AW Ø 4˝ ( Ø 100 mm ) M' 63,400.00
274 Pipa PVC TIPE AW Ø 5˝ ( Ø 125 mm ) M' 105,500.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

275 Pipa PVC TIPE AW Ø 6˝ ( Ø 150 mm ) M' 147,000.00


276 Pipa PVC TIPE AW Ø 12˝ ( Ø 300 mm ) M' 565,000.00
277 Pipa Galvanis Ø ½˝ ( Ø 15 mm ) M' 25,000.00
278 Pipa Galvanis AW Ø ¾˝ ( Ø 20 mm ) M' 32,750.00
279 Pipa Galvanis Ø 1˝ ( Ø 25 mm ) M' 50,000.00
280 Pipa Galvanis Ø 1,25˝ ( Ø 32 mm ) M' 66,550.00
281 Pipa Galvanis Ø 1.5˝ ( Ø 40 mm ) M' 75,650.00
282 Pipa Galvanis Ø 2˝ ( Ø 50 mm ) M' 102,700.00
283 Pipa Galvanis Ø 2,5˝ ( Ø 65 mm ) M' 131,450.00
284 Pipa Galvanis Ø 3˝ ( Ø 80 mm ) M' 168,000.00
285 Pipa Galvanis Ø 4˝ ( Ø 100 mm ) M' 244,100.00
286 Ball Valve dia 20 mm Bh 73,950.00
287 Ball Valve dia 25 mm Bh 104,700.00
288 Ball Valve dia 32 mm Bh 183,800.00
289 Ball Valve dia 40 mm Bh 267,500.00
290 Ball Valve dia 50 mm Bh 376,100.00
291 Check Valve dia 32 mm Bh 185,000.00
292 Y-Strainer dia 32 mm Bh 246,000.00
293 Foot Valve dia 40 mm Bh 223,000.00
294 Gate Valve 50 mm Flange Bh 1,698,000.00
295 Gate Valve 80 mm Flange Bh 2,700,000.00
296 Kloset Duduk CW 660 NJ/SW 660J (Komplit) setara TOTO Unit 2,200,000.00
297 Kloset Jongkok Type CE 6 setara TOTO Unit 275,000.00
298 Kloset Jongkok CE 9 (Komplit) setara TOTO Unit 3,535,000.00
299 Kloset Jongkok porselin setara INA Unit 225,000.00
300 Kloset Duduk Disabled Type CW. 705 L setara TOTO Unit 5,260,000.00
301 Urinoir Type U 57 setara TOTO Unit 2,475,000.00
302 Urinoir Partition A100 With Unit 1,345,000.00
303 Wastafel Type L 52 V1A (Komplit) setara TOTO Unit 750,000.00
304 Wastafel Disabled Type LW JT 01 setara TOTO Unit 2,840,000.00
305 Grab Bar Disable Type TX 3 A3 setara TOTO Unit 870,000.00
306 Floor Drain 2 " Type TX 1 BN setara TOTO Bh 450,000.00
307 Tempat Sabun Type S 156 NV1 setara TOTO Bh 130,000.00
308 Jetwasher Type TGB 500 AZRV 24 setara TOTO Bh 675,000.00
309 Croos Handle Stop Valve Type TX 421 SC setara TOTO Unit 865,000.00
NO NAMA BAHAN/BARANG SATUAN HARGA BAHAN

310 Single Lever shower Mixer Type TX 443 SE setara TOTO Unit 975,000.00
311 Floor Paper Holder Type YH 116 setara TOTO Unit 595,000.00
312 Bak mandi fibre glass 70x70x66 cm Unit 325,000.00
313 Kran Air setara Sanei Bh 131,000.00
314 Kran Air setara Honda Bh 38,000.00
315 Seal Tape Bh 2,500.00
316 Tangki Stainless Steel Kapasitas 2000 liter Bh 3,200,000.00
317 Paving Block 10 x 20 Tbl. 6 Cm m2 67,500.00
318 Paving Block 10 x 20 Tbl. 6 Cm m2 67,500.00
319 Paving Block 10 x 20 Tbl. 8 Cm m2 77,800.00
320 Paving Block 10 x 20 Tbl. 8 Cm m2 77,800.00
321 Paving Block 10 x 20 Tbl. 8 Cm m2 77,800.00
322 Paving Block 10 x 20 Tbl. 10 Cm m2 87,900.00
323 Paving Block 20 x 20 Tbl. 6 Cm m2 67,500.00
324 Paving Block 20 x 20 Tbl. 6 Cm m2 67,500.00
325 Paving Block 20 x 20 Tbl. 8 Cm m2 77,800.00
326 Paving Block 20 x 20 Tbl. 8 Cm m2 77,800.00
327 Paving Block 20 x 20 Tbl. 8 Cm m2 77,800.00
328 Paving Block 20 x 20 Tbl. 10 Cm m2 87,900.00
329 Paving Block 20 x 20 Tbl. 10 Cm m2 87,900.00
330 Paving Block 20 x 20 Tbl. 10 Cm m2 87,900.00
331 Paving Block Tiga Berlian Tbl. 6 Cm m2 72,000.00
332 Grass Blok Tbl. 10 cm m2 87,900.00
333 Koral sikat zak 55,000.00
334 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m' 67,800.00
335 1 M1 KANSTEIN JUMBO (P :50, L:15, T: 30 CM ,K225) m' 67,800.00
336 1 M1 KANSTEIN SEGI LIMA JUMBO (P: 50, L :15, T: 40 CM K. 225) m' 78,750.00
337 Buis beton 1/2 Diameter 30 cm m' 84,750.00
338 Kaca Tempered 12 mm m2 659,000.00
339 Kaca Tempered 10 mm m2 409,500.00
340 Kaca Bening 10 mm m2 209,000.00
341 Kaca Bening 8 mm m2 149,000.00
342 Kaca Bening 5 mm m2 97,000.00
343 Kaca Cermin 5 mm m2 135,000.00
344 Kaca Nako Bh 12,500.00
345 Kaca Nako teralis bening m2 765,000.00
346 Kaca Bevel 5mm Bh 225,000.00
347 Kaca Es 5mm Bh 165,000.00
HARGA SATUAN UPAH 2017

NO URAIAN TENAGA KERJA SATUAN HARGA UPAH

1 Mandor Hari 100,000.00


2 Kepala Tukang Besi Hari 85,000.00
3 Kepala Tukang batu Hari 85,000.00
4 Kepala Tukang kayu Hari 85,000.00
5 Kepala Tukang Cat Hari 85,000.00
6 Kepala Tukang Pipa Hari 85,000.00
7 Kepala Tukang Style Bali Hari 100,000.00
8 Kepala Tukang Las Konstruksi Hari 85,000.00
9 Kepala Tukang Alluminium Hari 80,000.00
10 Tukang Batu Hari 80,000.00
11 Tukang kayu Hari 80,000.00
12 Tukang Besi Hari 80,000.00
13 Tukang Cat Hari 80,000.00
14 Tukang Pipa Hari 80,000.00
15 Tukang Listrik Hari 80,000.00
16 Tukang Las Konstruksi Hari 80,000.00
17 Tukang Alluminium Hari 80,000.00
18 Pekerja Hari 76,643.70
19 Tukang style Bali Hari 100,000.00
DAFTAR ANALISA PEKERJAAN
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 11,500.00 14,375.00
2.5000 kg Semen Portland 1,120.00 2,800.00
1.2000 lbr Seng gelombang 3" - 5" 32,500.00 39,000.00
0.0050 m3 Pasir Beton 155,000.00 775.00
0.0090 m3 Koral beton 245,000.00 2,205.00
0.0720 m3 Kayu Meranti Usuk 5/7 1,500,000.00 108,000.00
0.0600 kg Paku biasa 2" - 5" 14,200.00 852.00
0.4500 kg Meni Besi 24,000.00 10,800.00
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0200 oh Mandor 100,000.00 2,000.00
Total : 50,357.48 178,807.00 229,164.48

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 1,500,000.00 18,000.00
0.0200 kg Paku Biasa 2" - 5" 14,200.00 284.00
0.0070 m3 Kayu Papan Meranti 3/20 2,000,000.00 14,000.00
0.1000 oh Tukang Kayu 80,000.00 8,000.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 17,014.37 32,284.00 49,298.37

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu Ø 8 - 10/4m 145,000.00 181,250.00
0.1800 m3 Kayu Meranti 4,100,000.00 738,000.00
0.8500 kg Paku Biasa 2" - 5" 14,200.00 12,070.00
1.1000 kg Besi Strip 14,000.00 15,400.00
35.0000 kg Semen Portland 1,120.00 39,200.00
0.1500 m3 Pasir Pasang 165,000.00 24,750.00
0.1000 m3 Pasir Beton 155,000.00 15,500.00
0.1500 m3 Koral Beton 245,000.00 36,750.00
30.0000 bh Bata Merah 950.00 28,500.00
0.2500 lbr Seng Plat 38,500.00 9,625.00
2.0000 bh Jendela Nako 12,500.00 25,000.00
0.0800 m2 Kaca Polos 149,000.00 11,920.00
0.1500 bh Kunci Tanam 175,000.00 26,250.00
0.0600 lbr Plywood 4 mm 78,000.00 4,680.00
2.0000 oh Tukang Kayu 80,000.00 160,000.00
1.0000 oh Tukang Batu 80,000.00 80,000.00
2.0000 oh Pekerja 76,643.70 153,287.40
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 423,787.40 1,168,895.00 1,592,682.40

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 11,500.00 19,550.00
0.2100 m3 Kayu Meranti 4,100,000.00 861,000.00
0.3000 kg Paku Biasa 2" - 5" 14,200.00 4,260.00
10.5000 kg Semen Portland 1,120.00 11,760.00
0.0300 m3 Pasir Beton 155,000.00 4,650.00
0.0500 m3 Koral Beton 245,000.00 12,250.00
1.5000 lbr Seng gelombang BJLS 28 38,500.00 57,750.00
2.0000 oh Tukang Kayu 80,000.00 160,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.2000 oh Kepala Tukang 85,000.00 17,000.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 258,643.70 971,220.00 1,229,863.70

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 11,500.00 34,500.00
0.2760 m3 Kayu Meranti 4,100,000.00 1,131,600.00
0.7000 kg Paku biasa 2" - 5" 14,200.00 9,940.00
1.5000 lbr Seng gelombang BJLS 28 38,500.00 57,750.00
1.5000 oh Tukang Kayu 80,000.00 120,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.1500 oh Kepala Tukang 85,000.00 12,750.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 214,393.70 1,233,790.00 1,448,183.70

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 76,643.70 7,664.37
0.0500 oh Mandor 100,000.00 5,000.00
Total : 12,664.37 12,664.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 11,500.00 14,375.00
0.1860 m3 Kayu Meranti 4,100,000.00 762,600.00
0.3000 kg Paku Biasa 2" - 5" 14,200.00 4,260.00
18.0000 kg Semen Portland 1,120.00 20,160.00
0.0300 m3 Pasir Beton 155,000.00 4,650.00
0.0500 m3 Koral Beton 245,000.00 12,250.00
1.5000 lbr Seng gelombang BJLS 28 38,500.00 57,750.00
1.3500 lbr Plywood 4 mm 78,000.00 105,300.00
2.0000 oh Tukang Kayu 80,000.00 160,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.2000 oh Kepala Tukang 85,000.00 17,000.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 258,643.70 981,345.00 1,239,988.70

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 2,000,000.00 72,000.00
0.0800 kg Paku Biasa 2" - 5" 14,200.00 1,136.00
1.0000 btg Kaso 5/7 32,200.00 32,200.00
0.3000 oh Tukang kayu 80,000.00 24,000.00
0.0015 oh Mandor 100,000.00 150.00
Total : 24,150.00 105,336.00 129,486.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu ukuran kecil 9,500.00 9,500.00
0.2500 kg Tali Ijuk 11,500.00 2,875.00
0.0170 oh Tukang Kayu 80,000.00 1,360.00
0.0020 oh Pekerja 76,643.70 153.29
0.2500 oh Kepala Tukang 85,000.00 21,250.00
0.0130 oh Mandor 100,000.00 1,300.00
24,063.29 12,375.00 36,438.29

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 185,000.00 27,750.00
0.0900 m3 Batu Pecah 5 - 7 245,000.00 22,050.00
0.0100 m3 Pasir Pasang 165,000.00 1,650.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.0500 oh Mandor 100,000.00 5,000.00
Total : 81,643.70 51,450.00 133,093.70

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 76,643.70 510,983.55
0.3330 oh Mandor 100,000.00 33,300.00
Total : 544,283.55 544,283.55

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 76,643.70 510,983.55
0.0330 oh Mandor 100,000.00 3,300.00
Total : 514,283.55 514,283.55

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 76,643.70 57,482.77
0.0250 oh Mandor 100,000.00 2,500.00
Total : 59,982.77 59,982.77
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 76,643.70 68,979.33
0.0450 oh Mandor 100,000.00 4,500.00
Total : 73,479.33 73,479.33

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 76,643.70 80,475.89
0.0670 oh Mandor 100,000.00 6,700.00
Total : 87,175.89 87,175.89

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 76,643.70 76,643.70
0.0320 oh Mandor 100,000.00 3,200.00
Total : 79,843.70 79,843.70

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 76,643.70 114,965.55
0.0600 oh Mandor 100,000.00 6,000.00
Total : 120,965.55 120,965.55
5a 1 M3 GALIAN TANAH KARANG DALAM 1 METER
8.0000 oh Pekerja 76,643.70 613,149.60
0.0800 oh Mandor 100,000.00 8,000.00
Total : 621,149.60 621,149.60
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 76,643.70 91,972.44
0.0450 oh Mandor 100,000.00 4,500.00
Total : 96,472.44 96,472.44

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 76,643.70 3,832.19
0.0050 oh Mandor 100,000.00 500.00
Total : 4,332.18 4,332.18

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 76,643.70 25,292.42
0.0100 oh Mandor 100,000.00 1,000.00
Total : 26,292.42 26,292.42

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
19,994.26

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 76,643.70 38,321.85
0.0500 oh Mandor 100,000.00 5,000.00
Total : 43,321.85 43,321.85

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 135,000.00 162,000.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.0100 oh Mandor 100,000.00 1,000.00
Total : 23,993.11 162,000.00 185,993.11

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk Bali - -
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 12,996.55 - 12,996.55

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 145,000.00 174,000.00
0.2500 oh Pekerja 76,643.70 19,160.93
0.0250 oh Mandor 100,000.00 2,500.00
Total : 21,660.93 174,000.00 195,660.93

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 70,000.00 84,000.00
0.5000 oh Pekerja 76,643.70 38,321.85
0.0500 oh Mandor 100,000.00 5,000.00
Total : 43,321.85 84,000.00 127,321.85
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone 85,000.00 102,000.00
0.2500 oh Pekerja 76,643.70 19,160.93
0.0250 oh Mandor 100,000.00 2,500.00
Total : 21,660.93 102,000.00 123,660.93

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 185,000.00 222,000.00
202.0000 kg Semen Portland 1,120.00 226,240.00
0.4850 m3 Pasir Pasang 165,000.00 80,025.00
1.5000 oh Pekerja 76,643.70 114,965.55
0.7500 oh Tukang Batu 80,000.00 60,000.00
0.0750 oh Kepala Tukang 85,000.00 6,375.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 188,840.55 528,265.00 717,105.55

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 185,000.00 222,000.00
163.0000 kg Semen Portland 1,120.00 182,560.00
0.5200 m3 Pasir Pasang 165,000.00 85,800.00
1.5000 oh Pekerja 76,643.70 114,965.55
0.7500 oh Tukang Batu 80,000.00 60,000.00
0.0750 oh Kepala Tukang 85,000.00 6,375.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 188,840.55 490,360.00 679,200.55
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 185,000.00 222,000.00
136.0000 kg Semen Portland 1,120.00 152,320.00
0.5440 m3 Pasir Pasang 165,000.00 89,760.00
1.5000 oh Pekerja 76,643.70 114,965.55
0.7500 oh Tukang Batu 80,000.00 60,000.00
0.0750 oh Kepala Tukang 85,000.00 6,375.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 188,840.55 464,080.00 652,920.55

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 185,000.00 222,000.00
117.0000 kg Semen Portland 1,120.00 131,040.00
0.5610 m3 Pasir Pasang 165,000.00 92,565.00
1.5000 oh Pekerja 76,643.70 114,965.55
0.7500 oh Tukang Batu 80,000.00 60,000.00
0.0750 oh Kepala Tukang 85,000.00 6,375.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 188,840.55 445,605.00 634,445.55

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 185,000.00 222,000.00
91.0000 kg Semen Portland 1,120.00 101,920.00
0.5840 m3 Pasir Pasang 165,000.00 96,360.00
1.5000 oh Pekerja 76,643.70 114,965.55
0.7500 oh Tukang Batu 80,000.00 60,000.00
0.0750 oh Kepala Tukang 85,000.00 6,375.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 188,840.55 420,280.00 609,120.55

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 185,000.00 88,800.00
194.0000 kg Semen Portland 1,120.00 217,280.00
0.3120 m3 Pasir Beton 155,000.00 48,360.00
0.4680 m3 Koral Beton 245,000.00 114,660.00
126.0000 kg Besi Beton 7,500.00 945,000.00
1.8000 kg Kawat Beton 13,500.00 24,300.00
3.4000 oh Pekerja 76,643.70 260,588.58
0.8500 oh Tukang Batu 80,000.00 68,000.00
0.0850 oh Kepala Tukang 85,000.00 7,225.00
0.1700 oh Mandor 100,000.00 17,000.00
352,813.58 1,438,400.00 1,791,213.58

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 185,000.00 83,250.00
194.0000 kg Semen Portland 1,120.00 217,280.00
0.3120 m3 Pasir Beton 155,000.00 48,360.00
0.4680 m3 Koral Beton 245,000.00 114,660.00
2.4000 oh Pekerja 76,643.70 183,944.88
0.8000 oh Tukang Batu 80,000.00 64,000.00
0.0800 oh Kepala Tukang 85,000.00 6,800.00
0.1190 oh Mandor 100,000.00 11,900.00
Total : 266,644.88 463,550.00 730,194.88

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 185,000.00 222,000.00
0.4320 m3 Pasir Urug 135,000.00 58,320.00
0.7800 oh Pekerja 76,643.70 59,782.09
0.3900 oh Tukang Batu 80,000.00 31,200.00
0.0390 oh Kepala Tukang 85,000.00 3,315.00
0.0390 oh Mandor 100,000.00 3,900.00
Total : 98,197.09 280,320.00 378,517.09

iv PEKERJAAN DINDING (SNI 6897 : 2008)

1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2


PS
140.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 133,000.00
43.5000 kg Semen Portland 1,120.00 48,720.00
0.0800 m3 Pasir Pasang 165,000.00 13,200.00
0.6000 oh Pekerja 76,643.70 45,986.22
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0300 oh Mandor 100,000.00 3,000.00
66,686.22 194,920.00 261,606.22
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 133,000.00
32.9500 kg Semen Portland 1,120.00 36,904.00
0.0910 m3 Pasir Pasang 165,000.00 15,015.00
0.6000 oh Pekerja 76,643.70 45,986.22
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0300 oh Mandor 100,000.00 3,000.00
66,686.22 184,919.00 251,605.22

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 133,000.00
26.5500 kg Semen Portland 1,120.00 29,736.00
0.0930 m3 Pasir Pasang 165,000.00 15,345.00
0.6000 oh Pekerja 76,643.70 45,986.22
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0300 oh Mandor 100,000.00 3,000.00
66,686.22 178,081.00 244,767.22

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 133,000.00
22.2000 kg Semen Portland 1,120.00 24,864.00
0.1020 m3 Pasir Pasang 165,000.00 16,830.00
0.6000 oh Pekerja 76,643.70 45,986.22
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0300 oh Mandor 100,000.00 3,000.00
66,686.22 174,694.00 241,380.22

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 133,000.00
18.5000 kg Semen Portland 1,120.00 20,720.00
0.1220 m3 Pasir Pasang 165,000.00 20,130.00
0.6000 oh Pekerja 76,643.70 45,986.22
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0300 oh Mandor 100,000.00 3,000.00
66,686.22 173,850.00 240,536.22

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
18.9500 kg Semen Portland 1,120.00 21,224.00
0.0380 m3 Pasir Pasang 165,000.00 6,270.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
33,343.11 93,994.00 127,337.11

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
14.3700 kg Semen Portland 1,120.00 16,094.40
0.0400 m3 Pasir Pasang 165,000.00 6,600.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 89,194.40 122,537.51

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
11.5000 kg Semen Portland 1,120.00 12,880.00
0.0430 m3 Pasir Pasang 165,000.00 7,095.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 86,475.00 119,818.11

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
9.6800 kg Semen Portland 1,120.00 10,841.60
0.0450 m3 Pasir Pasang 165,000.00 7,425.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 84,766.60 118,109.71
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
8.3200 kg Semen Portland 1,120.00 9,318.40
0.0490 m3 Pasir Pasang 165,000.00 8,085.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 83,903.40 117,246.51

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 950.00 66,500.00
6.5000 kg Semen Portland 1,120.00 7,280.00
0.0500 m3 Pasir Pasang 165,000.00 8,250.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 82,030.00 115,373.11

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako 1,600.00 20,000.00
7.5000 kg Semen Portland 1,120.00 8,400.00
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
1.9500 kg Besi Beton 8 mm 7,500.00 14,625.00
0.3200 oh Pekerja 76,643.70 24,525.98
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 34,875.98 47,480.00 82,355.98

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 1,600.00 20,000.00
7.5000 kg Semen Portland 1,120.00 8,400.00
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
0.3200 oh Pekerja 76,643.70 24,525.98
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 34,875.98 32,855.00 67,730.98

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 35,000.00 1,050,000.00
11.0000 kg Semen Portland 1,120.00 12,320.00
0.0350 m3 Pasir Pasang 165,000.00 5,775.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 1,068,095.00 1,101,438.11

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I 11,500.00 17,250.00
0.0140 m3 Kayu kamper usuk/reng 6,500,000.00 91,000.00
0.0120 kg Paku Biasa 14,000.00 168.00
0.0030 m3 List Kayu 2/4 6,500,000.00 19,500.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0020 oh Mandor 100,000.00 200.00
Total : 12,289.37 127,918.00 140,207.37

16 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 7,5 CM DGN MORTAR SIAP PAKAI
8.4000 m3 Bata Ringan tebal 7,5 cm 8,500.00 71,400.00
0.4730 kg Mortar siap pakai -
0.6700 oh pekerja 76,643.70 51,351.28
1.3000 oh Tukang Batu -
0.1300 oh Kepala Tukang Batu -
0.0030 oh Mandor -
Total : 51,351.28 71,400.00 122,751.28

16a 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 12.5 CM DGN MORTAR SIAP PAKAI
0.1250 m3 Bata Ringan tebal 10 cm 800,000.00 100,000.00
0.0630 sak Mortar siap pakai 2,125.00 133.88
0.1300 oh pekerja 76,643.70 9,963.68
0.1300 oh Tukang Batu 80,000.00 10,400.00
0.1300 oh Kepala Tukang Batu 85,000.00 11,050.00
0.0030 oh Mandor 100,000.00 300.00
Total : 31,713.68 100,133.88 131,847.56

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 1,120.00 17,364.48
0.0160 m3 Pasir Pasang 165,000.00 2,640.00
0.3000 oh Pekerja 76,643.70 22,993.11
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 20,004.48 57,772.59
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,120.00 11,450.88
0.0200 m3 Pasir Pasang 165,000.00 3,300.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 14,750.88 52,518.99
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 1,120.00 8,709.12
0.0230 m3 Pasir Pasang 165,000.00 3,795.00
0.2500 oh Pekerja 76,643.70 19,160.93
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,935.93 12,504.12 46,440.05

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland 1,120.00 6,988.80
0.0240 m3 Pasir Pasang 165,000.00 3,960.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 10,948.80 48,716.91

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland 1,120.00 5,806.08
0.0260 m3 Pasir Pasang 165,000.00 4,290.00
0.2500 oh Pekerja 76,643.70 19,160.93
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,935.93 10,096.08 44,032.01

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 1,120.00 4,945.92
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 9,400.92 47,169.03

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,120.00 3,870.72
0.0290 m3 Pasir Pasang 165,000.00 4,785.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 8,655.72 46,423.83

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 1,120.00 15,267.84
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0220 oh Mandor 100,000.00 2,200.00
Total : 50,557.48 19,722.84 70,280.32

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 1,120.00 11,612.16
0.0310 m3 Pasir Pasang 165,000.00 5,115.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0220 oh Mandor 100,000.00 2,200.00
Total : 50,557.48 16,727.16 67,284.64

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland 1,120.00 9,318.40
0.0320 m3 Pasir Pasang 165,000.00 5,280.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0220 oh Mandor 100,000.00 2,200.00
Total : 50,557.48 14,598.40 65,155.88
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,120.00 7,741.44
0.0350 m3 Pasir Pasang 165,000.00 5,775.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0220 oh Mandor 100,000.00 2,200.00
Total : 50,557.48 13,516.44 64,073.92
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 1,120.00 6,594.56
0.0360 m3 Pasir Pasang 165,000.00 5,940.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Batu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0220 oh Mandor 100,000.00 2,200.00
Total : 50,557.48 12,534.56 63,092.04

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 1,120.00 560.00
0.0130 m3 Pasir Pasang 165,000.00 2,145.00
0.0800 oh Pekerja 76,643.70 6,131.50
0.4000 oh Tukang Batu 80,000.00 32,000.00
0.0400 oh Kepala Tukang 85,000.00 3,400.00
0.0040 oh Mandor 100,000.00 400.00
Total : 41,931.50 2,705.00 44,636.50

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,120.00 4,838.40
0.0060 m3 Pasir Pasang 165,000.00 990.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1000 oh Tukang Batu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,343.11 5,828.40 39,171.51

15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20


M')
3.1080 kg Semen Portland 1,120.00 3,480.96
0.1500 oh Pekerja 76,643.70 11,496.55
0.0750 oh Tukang Batu 80,000.00 6,000.00
0.0080 oh Kepala Tukang 85,000.00 680.00
0.0080 oh Mandor 100,000.00 800.00
Total : 18,976.56 3,480.96 22,457.52

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland 1,120.00 1,792.00
0.0700 oh Pekerja 76,643.70 5,365.06
0.0350 oh Tukang Batu 80,000.00 2,800.00
0.0040 oh Kepala Tukang 85,000.00 340.00
0.0040 oh Mandor 100,000.00 400.00
Total : 8,905.06 1,792.00 10,697.06

17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2


PS
6.3400 kg Semen Portland 1,120.00 7,100.80
0.0120 m3 Pasir Pasang 165,000.00 1,980.00
0.3000 oh Pekerja 76,643.70 22,993.11
0.1500 oh Tukang Batu 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 37,768.11 9,080.80 46,848.91

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,120.00 3,640.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 25,178.74 3,640.00 28,818.74

19 1 M2 PEKERJAAN PLESTERAN EX Pmortar- 200 tebal 1 cm 1 sisi


0.4000 zak Pmortar - 301 50,000.00 20,000.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 17,514.37 20,000.00 37,514.37

20 1 M2 PEKERJAAN ACIAN EX Pmortar- 300 tebal 2-3 mm 1 sisi


0.1000 zak Pmortar - 200 105,000.00 10,500.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Labur/Cat 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 17,514.37 10,500.00 28,014.37
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper 6,900,000.00 7,590,000.00
1.2500 Kg Paku 10 Cm 13,000.00 16,250.00
1.0000 Kg Lem Kayu 12,000.00 12,000.00
7.0000 oh Pekerja 76,643.70 536,505.90
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
21.0000 oh Tukang Kayu 80,000.00 1,680,000.00
2.1000 oh Kepala Tukang 85,000.00 178,500.00
0.3500 oh Mandor 100,000.00 35,000.00
Total : 2,430,005.90 7,618,250.00 10,048,255.90
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing 4,750,000.00 5,700,000.00
1.2500 Kg Paku 10 Cm 13,000.00 16,250.00
1.0000 Kg Lem Kayu 12,000.00 12,000.00
6.0000 oh Pekerja 76,643.70 459,862.20
18.0000 oh Tukang Kayu 80,000.00 1,440,000.00
1.8000 oh Kepala Tukang 85,000.00 153,000.00
0.3000 oh Mandor 100,000.00 30,000.00
Total : 2,082,862.20 5,728,250.00 7,811,112.20

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR


KAYU KELAS II
0.0400 m3 Papan Kayu Kamper 7,000,000.00 280,000.00
0.0500 Kg Paku 5-7 Cm 13,000.00 650.00
0.3500 oh Pekerja 76,643.70 26,825.30
1.0500 oh Tukang Kayu 80,000.00 84,000.00
0.1050 oh Kepala Tukang 85,000.00 8,925.00
0.0180 oh Mandor 100,000.00 1,800.00
Total : 121,550.30 280,650.00 402,200.30

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing 5,800,000.00 232,000.00
0.0500 Kg Paku 5-7 Cm 13,000.00 650.00
0.3500 oh Pekerja 76,643.70 26,825.30
1.0500 oh Tukang Kayu 80,000.00 84,000.00
0.1050 oh Kepala Tukang 85,000.00 8,925.00
0.0180 oh Mandor 100,000.00 1,800.00
Total : 121,550.30 232,650.00 354,200.30

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper 7,000,000.00 280,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 286,000.00 633,143.70

5a MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II KOMBINASI KACA BEVEL
0.0250 m3 Papan Kayu Kamper 7,000,000.00 175,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
0.5000 m2 Kaca 5 mm bevel 225,000.00 112,500.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 293,500.00 640,643.70

5b MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU RAM KAYU KELAS I/II


0.0350 m3 Papan Kayu Kamper 7,000,000.00 245,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 251,000.00 598,143.70

5c MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL + KULIT JERUK KAYU KELAS I/II
0.0400 m3 Papan Kayu Kamper 7,000,000.00 280,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 lbr Lapis Kulit jeruk -
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 286,000.00 633,143.70

5d MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KAMPER
0.0400 m3 Papan Kayu Kamper 7,000,000.00 280,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 286,000.00 633,143.70
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu kamper 7,000,000.00 168,000.00
1.0000 m2 Kaca Bening 5 mm 97,000.00 97,000.00
0.3000 Kg Lem Kayu 12,000.00 3,600.00
0.8000 oh Pekerja 76,643.70 61,314.96
2.4000 oh Tukang Kayu 80,000.00 192,000.00
0.2400 oh Kepala Tukang 85,000.00 20,400.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 277,714.96 268,600.00 546,314.96

6a MEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS I/II


0.0129 m3 Papan Kayu Kamper 7,000,000.00 90,300.00
0.7500 m2 Kaca 5 mm 97,000.00 72,750.00
0.3000 Kg Lem Kayu 12,000.00 3,600.00
0.8000 oh Pekerja 76,643.70 61,314.96
2.4000 oh Tukang Kayu 80,000.00 192,000.00
0.2400 oh Kepala Tukang 85,000.00 20,400.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 277,714.96 166,650.00 444,364.96

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA


JALUSI, KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper 7,000,000.00 448,000.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 454,000.00 801,143.70

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 7,000,000.00 175,000.00
0.0300 Kg Paku 1-2,5 Cm 13,000.00 390.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 Lbr Plywood 6 mm 78,000.00 78,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 259,390.00 606,533.70

MEMBUAT 1 M2 DAUN PINTU TEAK WOOD RANGKAP RANGKA


8a TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 7,000,000.00 175,000.00
0.0300 Kg Paku 1-2,5 Cm 13,000.00 390.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 Lbr Teaxwood tbl 3 mm uk 120 x 240 71,000.00 71,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
3.0000 oh Tukang Kayu 80,000.00 240,000.00
0.3000 oh Kepala Tukang 85,000.00 25,500.00
0.0500 oh Mandor 100,000.00 5,000.00
Total : 347,143.70 252,390.00 599,533.70

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 7,000,000.00 179,200.00
0.0300 Kg Paku 1-2,5 Cm 13,000.00 390.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 Lbr Plywood 4 mm 78,000.00 78,000.00
0.8000 oh Pekerja 76,643.70 61,314.96
2.4000 oh Tukang Kayu 80,000.00 192,000.00
0.2400 oh Kepala Tukang 85,000.00 20,400.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 277,714.96 263,590.00 541,304.96

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper 7,000,000.00 420,000.00
0.1500 Kg Paku 1-2,5 Cm 13,000.00 1,950.00
0.6700 oh Pekerja 76,643.70 51,351.28
2.0000 oh Tukang Kayu 80,000.00 160,000.00
0.2000 oh Kepala Tukang 85,000.00 17,000.00
0.3350 oh Mandor 100,000.00 33,500.00
Total : 261,851.28 421,950.00 683,801.28
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE,


KAYU KELAS I
0.0256 m3 Papan Kayu Kamper 7,000,000.00 179,200.00
0.0300 Kg Paku 1-2,5 Cm 13,000.00 390.00
0.5000 Kg Lem Kayu 12,000.00 6,000.00
1.0000 Lbr Teaxwood tbl 3 mm uk 120 x 240 71,000.00 71,000.00
0.8000 oh Pekerja 76,643.70 61,314.96
2.4000 oh Tukang Kayu 80,000.00 192,000.00
0.2400 oh Kepala Tukang 85,000.00 20,400.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 277,714.96 256,590.00 534,304.96

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA


RANGKA EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu kamper 7,000,000.00 175,000.00
0.0300 Kg Paku 1-2,5 Cm 14,300.00 429.00
0.8000 Kg Lem Kayu 12,000.00 9,600.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 71,000.00 71,000.00
0.5000 Lbr Formika 47,500.00 23,750.00
0.8000 oh Pekerja 76,643.70 61,314.96
2.4000 oh Tukang Kayu 80,000.00 192,000.00
0.2400 oh Kepala Tukang 85,000.00 20,400.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 277,714.96 279,779.00 557,493.96

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 6,900,000.00 7,590,000.00
15.0000 Kg Besi Strip Tebal 5 cm 14,000.00 210,000.00
5.6000 Kg Paku 12 Cm 12,500.00 70,000.00
4.0000 oh Pekerja 76,643.70 306,574.80
12.0000 oh Tukang Kayu 80,000.00 960,000.00
1.2000 oh Kepala Tukang 85,000.00 102,000.00
0.2000 oh Mandor 100,000.00 20,000.00
Total : 1,388,574.80 7,870,000.00 9,258,574.80

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper 6,900,000.00 8,280,000.00
15.0000 Kg Besi Strip Tebal 5 cm 14,000.00 210,000.00
5.6000 Kg Paku 12 Cm 12,500.00 70,000.00
6.7000 oh Pekerja 76,643.70 513,512.79
20.1000 oh Tukang Kayu 80,000.00 1,608,000.00
2.0100 oh Kepala Tukang 85,000.00 170,850.00
0.3350 oh Mandor 100,000.00 33,500.00
Total : 2,325,862.79 8,560,000.00 10,885,862.79

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 6,900,000.00 7,590,000.00


15.0000 Kg Besi Strip Tebal 5 cm 14,000.00 210,000.00
3.0000 Kg Paku 12 Cm 12,500.00 37,500.00
2.4000 oh Pekerja 76,643.70 183,944.88
7.2000 oh Tukang Kayu 80,000.00 576,000.00
0.7200 oh Kepala Tukang 85,000.00 61,200.00
0.1200 oh Mandor 100,000.00 12,000.00
Total : 833,144.88 7,837,500.00 8,670,644.88

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 2,200,000.00 30,800.00
0.0036 m3 Reng ( 2 x 3 ) Cm 6,500,000.00 23,400.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00 3,500.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Kayu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 17,014.37 57,700.00 74,714.37

16a MEMASANG 1 M2 USUK KAYU KAMPER EXPOSE


0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 6,500,000.00 91,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00 3,500.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Kayu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 17,014.37 94,500.00 111,514.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 2,200,000.00 30,800.00
0.0072 m3 Reng ( 2 x 3 ) Cm 6,500,000.00 46,800.00
0.2500 Kg Paku 5 Cm dan 10 Cm 12,500.00 3,125.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Kayu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 17,014.37 80,725.00 97,739.37

17.a MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II


0.0072 m3 Reng ( 2 x 3 ) Cm 6,500,000.00 -
0.2500 Kg Paku 5 Cm dan 10 Cm 12,500.00 -
0.1000 oh Pekerja 76,643.70 -
0.1000 oh Tukang Kayu 80,000.00 -
0.0100 oh Kepala Tukang 85,000.00 -
0.0050 oh Mandor 100,000.00 -
Total : - -
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 6,500,000.00 1,072,500.00


0.2000 Kg Paku 5 Cm dan 10 Cm 14,000.00 2,800.00
0.1200 oh Pekerja 76,643.70 9,197.24
0.1200 oh Tukang Kayu 80,000.00 9,600.00
0.0120 oh Kepala Tukang 85,000.00 1,020.00
0.0060 oh Mandor 100,000.00 600.00
Total : 20,417.24 1,075,300.00 1,095,717.24

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 2,200,000.00 33,880.00
0.2000 Kg Paku 7 Cm dan 10 Cm 12,500.00 2,500.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.3000 oh Tukang Kayu 80,000.00 24,000.00
0.0300 oh Kepala Tukang 85,000.00 2,550.00
0.0750 oh Mandor 100,000.00 7,500.00
Total : 45,546.56 36,380.00 81,926.56

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 2,200,000.00 35,860.00
0.2500 Kg Paku 7 Cm dan 10 Cm 14,000.00 3,500.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.3000 oh Tukang Kayu 80,000.00 24,000.00
0.0300 oh Kepala Tukang 85,000.00 2,550.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 42,878.74 39,360.00 82,238.74

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS


I/II
0.0108 m3 Papan Kayu Kamper 7,000,000.00 75,600.00
0.1000 Kg Paku 5 Cm dan 7 Cm 12,500.00 1,250.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0050 oh Mandor 100,000.00 500.00
Total : 25,864.37 76,850.00 102,714.37

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS


I/II
0.0110 m3 Papan Kayu Kamper 7,000,000.00 77,000.00
0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00 700.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0050 oh Mandor 100,000.00 500.00
Total : 25,864.37 77,700.00 103,564.37

22a MEMASANG 1 M' LISPLANK UKURAN (3 X 15) CM, KAYU KELAS I/II
0.0055 m3 Papan Kayu Kamper 7,000,000.00 38,500.00
0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00 700.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0050 oh Mandor 100,000.00 500.00
Total : 25,864.37 39,200.00 65,064.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

22b MEMASANG 1 M' LISPLANK UKURAN (3 X 10) CM, KAYU KELAS I/II
0.0037 m3 Papan Kayu Kamper 7,000,000.00 25,666.67
0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00 700.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0050 oh Mandor 100,000.00 500.00
Total : 25,864.37 26,366.67 52,231.04
22c MEMASANG 1 M' LISPLANK UKURAN (3 X 10) CM, Conwood
1.1000 m Conwood Eave 2 in 1 53,333.33 58,666.67
0.1000 Kg Paku 5 Cm dan 7 Cm 14,000.00 1,400.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0050 oh Mandor 100,000.00 500.00
Total : 25,864.37 60,066.67 85,931.04

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280 m3 Balok Kayu Kamper 6,900,000.00 193,200.00
0.1500 Kg Paku 5 Cm dan 7 Cm 12,500.00 1,875.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.4500 oh Tukang Kayu 80,000.00 36,000.00
0.0450 oh Kepala Tukang 85,000.00 3,825.00
0.0080 oh Mandor 100,000.00 800.00
Total : 52,121.56 195,075.00 247,196.56

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 6,900,000.00 193,200.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00 2,100.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 71,000.00 61,060.00
0.5600 Kg Lem Kayu 12,000.00 6,720.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.4500 oh Tukang Kayu 80,000.00 36,000.00
0.0450 oh Kepala Tukang 85,000.00 3,825.00
0.0080 oh Mandor 100,000.00 800.00
Total : 52,121.56 263,080.00 315,201.56

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 6,900,000.00 193,200.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00 2,100.00
0.8600 Lbr Playwood tbl 6 mm uk. 120 x 240 78,000.00 67,080.00
0.5600 Kg Lem Kayu 12,000.00 6,720.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.6000 oh Tukang Kayu 80,000.00 48,000.00
0.0600 oh Kepala Tukang 85,000.00 5,100.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 69,428.74 269,100.00 338,528.74

MEMASANG 1 M2 RANGKA DINDING PEMISAH KALSYIBOARD


25.a
10 MM RANGKAP, RANGKA METAL STUD
3.0000 m1 Rangka Metal stud -
0.2200 Kg Paku skrup -
0.8600 Lbr Kalsiboard tbl 4.5 mm uk. 120 x 240 89,500.00 76,970.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.6000 oh Tukang Kayu 80,000.00 48,000.00
0.0600 oh Kepala Tukang 85,000.00 5,100.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 69,428.74 76,970.00 146,398.74

MEMASANG 1 M2 RANGKA DINDING PEMISAH GYPSUM 9 MM


25.b
RANGKAP, RANGKA METAL STUD
3.0000 m1 Rangka Metal stud -
0.2200 Kg Paku skrup -
0.8600 Lbr Gypsum (120x240x9) 75,000.00 64,500.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.6000 oh Tukang Kayu 80,000.00 48,000.00
0.0600 oh Kepala Tukang 85,000.00 5,100.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 69,428.74 64,500.00 133,928.74

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 7,000,000.00 49,000.00


0.1000 Kg Paku 5 Cm dan 10 Cm 14,000.00 1,400.00
0.1500 Kg Paku Skrup 10 cm 45,000.00 6,750.00
0.6000 oh Pekerja 76,643.70 45,986.22
1.8000 oh Tukang Kayu 80,000.00 144,000.00
0.1800 oh Kepala Tukang 85,000.00 15,300.00
0.0300 oh Mandor 100,000.00 3,000.00
Total : 208,286.22 57,150.00 265,436.22
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

26.a MEMASANG 1 M2 LAMBRIZIRING DARI SESEH KELAS I


0.0070 m3 Seseh 5,750,000.00 40,250.00
0.1000 Kg Paku 5 Cm dan 10 Cm 14,000.00 1,400.00
0.1500 Kg Paku Skrup 10 cm 45,000.00 6,750.00
0.6000 oh Pekerja 76,643.70 45,986.22
1.8000 oh Tukang Kayu 80,000.00 144,000.00
0.1800 oh Kepala Tukang 85,000.00 15,300.00
0.0300 oh Mandor 100,000.00 3,000.00
Total : 208,286.22 48,400.00 256,686.22

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN


(120 X 240) CM
0.4000 Lbr Playwood tbl 6 mm uk. 120 x 240 78,000.00 31,200.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 14,000.00 700.00
0.0250 oh Pekerja 76,643.70 1,916.09
0.0750 oh Tukang Kayu 80,000.00 6,000.00
0.0080 oh Kepala Tukang 85,000.00 680.00
0.0010 oh Mandor 100,000.00 100.00
Total : 8,696.09 31,900.00 40,596.09

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
247.0000 kg Semen Portland 1,120.00 276,640.00
869.0000 kg Pasir Beton 110.71 96,210.71
999.0000 kg Koral Beton 181.48 181,300.00
215.0000 lt Air -
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
159,142.10 554,150.71 713,292.82
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
276.0000 kg Semen Portland 1,120.00 309,120.00
828.0000 kg Pasir Beton 110.71 91,671.43
1,012.0000 kg Koral Beton 181.48 183,659.26
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 589,825.69 748,967.79

3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,120.00 334,880.00
799.0000 kg Pasir Beton 110.71 88,460.71
1,017.0000 kg Koral Beton 181.48 184,566.67
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 613,282.38 772,424.49

4 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,120.00 365,120.00
760.0000 kg Pasir Beton 110.71 84,142.86
1,029.0000 kg Koral Beton 181.48 186,744.44
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 641,382.30 800,524.41

5 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
352.0000 kg Semen Portland 1,120.00 394,240.00
731.0000 kg Pasir Beton 110.71 80,932.14
1,031.0000 kg Koral Beton 181.48 187,107.41
215.0000 lt Air -
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 662,279.55 821,421.66
6 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,120.00 415,520.00
698.0000 kg Pasir Beton 110.71 77,278.57
1,047.0000 kg Koral Beton 181.48 190,011.11
215.0000 lt Air -
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 682,809.68 841,951.79
7 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,120.00 430,080.00
692.0000 kg Pasir Beton 110.71 76,614.29
1,039.0000 kg Koral Beton 181.48 188,559.26
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 700,628.54 859,770.65
8 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,120.00 454,720.00
684.0000 kg Pasir Beton 110.71 75,728.57
1,026.0000 kg Koral Beton 181.48 186,200.00
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 722,023.57 881,165.68
9 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
413.0000 kg Semen Portland 1,120.00 462,560.00
681.0000 kg Pasir Beton 110.71 75,396.43
1,021.0000 kg Koral Beton 181.48 185,292.59
215.0000 lt Air 25.00 5,375.00
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 728,624.02 887,766.13
10 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,120.00 491,680.00
670.0000 kg Pasir Beton 110.71 74,178.57
1,006.0000 kg Koral Beton 181.48 182,570.37
215.0000 lt Air -
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 748,428.94 907,571.05
11 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,120.00 501,760.00
667.0000 kg Pasir Beton 110.71 73,846.43
1,000.0000 kg Koral Beton 181.48 181,481.48
215.0000 lt Air -
1.6500 oh Pekerja 76,643.70 126,462.10
0.2750 oh Tukang Batu 80,000.00 22,000.00
0.0280 oh Kepala Tukang 85,000.00 2,380.00
0.0830 oh Mandor 100,000.00 8,300.00
Total : 159,142.10 757,087.91 916,230.02

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 7,500.00 78,750.00
0.1500 kg Kawat Beton 13,500.00 2,025.00
0.0700 oh Pekerja 76,643.70 5,365.06
0.0700 oh Tukang Besi 80,000.00 5,600.00
0.0070 oh Kepala Tukang 85,000.00 595.00
0.0040 oh Mandor 100,000.00 400.00
Total : 11,960.06 80,775.00 92,735.06
13.a PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Total : 1,196.01 8,077.50 9,273.51

13b Pembesian 100 kg jaring kawat (wiremesh) untuk pelat atau dinding
102.0000 Kg Wire mesh 13,500.00 1,377,000.00
0.5000 Kg Kawat ikat 13,500.00 6,750.00
0.2500 Oh. Pekerja 76,643.70 19,160.93
0.2500 Oh. Tukang besi 80,000.00 20,000.00
0.0250 Oh. Kepala Tukang 85,000.00 2,125.00
0.0250 Oh. Mandor 100,000.00 2,500.00
Total 43,785.93 1,383,750.00 1,427,535.93
untuk 1 kg 437.86 13,837.50 14,275.36

14 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00 3,900.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.1000 ltr Minyak Bekisting 20,000.00 2,000.00
0.5200 oh Pekerja 76,643.70 39,854.72
0.2600 oh Tukang Kayu 80,000.00 20,800.00
0.0260 oh Kepala Tukang 85,000.00 2,210.00
0.0260 oh Mandor 100,000.00 2,600.00
Total : 65,464.72 85,900.00 151,364.72
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

15 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00 3,900.00
0.1000 ltr Minyak Bekisting 20,000.00 2,000.00
0.5200 oh Pekerja 76,643.70 39,854.72
0.2600 oh Tukang Kayu 80,000.00 20,800.00
0.0260 oh Kepala Tukang 85,000.00 2,210.00
0.0260 oh Mandor 100,000.00 2,600.00
Total : 65,464.72 85,900.00 151,364.72
2x Pakai Total : 65,464.72 42,950.00 108,414.72

16 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0150 m3 Kayu Usuk 4/6 4,500,000.00 67,500.00
0.3500 lbr Playwood tbl 9 mm uk. 120 x 240 90,000.00 31,500.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 11,500.00 23,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 211,200.00 294,289.84

16.a 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0150 m3 Kayu Usuk 4/6 1,500,000.00 22,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
0.3100 m2 Scafolding 50,000.00 15,500.00
0.3300 oh Pekerja 76,643.70 25,292.42
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 57,797.42 158,700.00 216,497.42
2x Pakai 57,797.42 79,350.00 137,147.42

17 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0180 m3 Kayu Usuk 4/6 4,500,000.00 81,000.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 11,500.00 23,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 224,700.00 307,789.84

17.a 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0180 m3 Kayu Usuk 4/6 1,500,000.00 27,000.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
0.3100 m2 Scafolding 50,000.00 15,500.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 163,200.00 246,289.84
2x Pakai 83,089.84 81,600.00 164,689.84

18 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0150 m3 Kayu Usuk 4/6 4,500,000.00 67,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
6.0000 btg Dolken Kayu 8" - 10"/4m 11,500.00 69,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 257,200.00 340,289.84
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

18a 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0150 m3 Kayu Usuk 4/6 1,500,000.00 22,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
1.0000 m2 Scafolding 50,000.00 50,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 193,200.00 276,289.84

18b 1 M2 PASANG BEKISTING UNTUK PLAT PARAFET/MEJA PANTRY


0.0400 m3 Kayu Kelas III 2,000,000.00 80,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 ltr Minyak Bekisting 20,000.00 4,000.00
0.0150 m3 Kayu Usuk 4/6 1,500,000.00 22,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 143,200.00 226,289.84
18c 1 M2 Bekesting lantai Floordeck tipe plat
0.0054 m3 Kayu Perancah/kruing 4,500,000.00 24,300.00
0.1000 Kg paku 13,000.00 1,300.00
1.2000 m2 Floordeck Tebal 0.75mm 135,000.00 162,000.00
1.0000 Ls alat Bantu 25,000.00 25,000.00
0.0500 oh Pekerja 76,643.70 3,832.19
0.0500 oh Tukang besi 80,000.00 4,000.00
0.0250 oh Kepala Tukang 85,000.00 2,125.00
0.0250 oh Mandor 100,000.00 2,500.00
Total 12,457.19 212,600.00 225,057.19

19 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III 2,000,000.00 60,000.00
0.4000 Kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.2000 Ltr Minyak Bekisting 20,000.00 4,000.00
0.0200 M3 Kayu Usuk 4/6 4,500,000.00 90,000.00
0.3500 Lbr Plywood 9 mm 90,000.00 31,500.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 11,500.00 34,500.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer -
0.6600 Oh Pekerja 76,643.70 50,584.84
0.3300 Oh Tukang Kayu 80,000.00 26,400.00
0.0330 Oh Kepala Tukang 85,000.00 2,805.00
0.0330 Oh Mandor 100,000.00 3,300.00
83,089.84 225,200.00 308,289.84

20 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 2,000,000.00 60,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.1500 ltr Minyak Bekisting 20,000.00 3,000.00
0.0150 m3 Kayu Usuk 4/6 4,500,000.00 67,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 11,500.00 23,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 190,200.00 273,289.84

20a 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 2,000,000.00 60,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00 5,200.00
0.1500 ltr Minyak Bekisting 20,000.00 3,000.00
0.0150 m3 Kayu Usuk 4/6 4,500,000.00 67,500.00
0.3500 lbr Plywood 9 mm 90,000.00 31,500.00
1.0000 m2 Scafolding 50,000.00 50,000.00
0.6600 oh Pekerja 76,643.70 50,584.84
0.3300 oh Tukang Kayu 80,000.00 26,400.00
0.0330 oh Kepala Tukang 85,000.00 2,805.00
0.0330 oh Mandor 100,000.00 3,300.00
Total : 83,089.84 217,200.00 300,289.84
83,089.84 108,600.00 191,689.84
21 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
0.0264 m3 Kayu Kelas III (Papan) 2,000,000.00 52,800.00
0.6000 kg Paku Biasa 5' - 12' 13,000.00 7,800.00
0.5000 btg Dolken Kayu 8" - 10"/4m 11,500.00 5,750.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0080 oh Mandor 100,000.00 800.00
Total : 16,721.56 66,350.00 83,071.56
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

22 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III 2,000,000.00 400,000.00
1.5000 kg Paku Biasa 5' - 12' 13,000.00 19,500.00
0.4000 ltr Minyak Bekisting 20,000.00 8,000.00
157.0000 kg Besi Beton 7,500.00 1,177,500.00
2.2500 kg Kawat Beton 13,500.00 30,375.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
5.3000 oh Pekerja 76,643.70 406,211.61
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.3000 oh Tukang Kayu 80,000.00 104,000.00
1.0500 oh Tukang Besi 80,000.00 84,000.00
0.2620 oh Kepala Tukang 85,000.00 22,270.00
0.2650 oh Mandor 100,000.00 26,500.00
Total : 664,981.61 2,293,845.00 2,958,826.61

23 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 2,000,000.00 540,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00 26,000.00
0.6000 ltr Minyak Bekisting 20,000.00 12,000.00
210.0000 kg Besi Beton 7,500.00 1,575,000.00
3.0000 kg Kawat Beton 13,500.00 40,500.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
5.6500 oh Pekerja 76,643.70 433,036.91
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.5600 oh Tukang Kayu 80,000.00 124,800.00
1.4000 oh Tukang Besi 80,000.00 112,000.00
0.3230 oh Kepala Tukang 85,000.00 27,455.00
0.2830 oh Mandor 100,000.00 28,300.00
Total : 747,591.91 2,851,970.00 3,599,561.91

24 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.2700 m3 Kayu Kelas III 2,000,000.00 540,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00 26,000.00
1.5000 ltr Minyak Bekisting 20,000.00 30,000.00
130.0000 kg Besi Beton 7,500.00 975,000.00
4.5000 kg Kawat Beton 13,500.00 60,750.00
168.0000 kg Semen Portland 1,120.00 188,160.00
3.0000 m3 Pasir Beton 155,000.00 465,000.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1500 m3 Kayu Kelas II balok 4,750,000.00 712,500.00
3.5000 lbr Plywood 9 mm 90,000.00 315,000.00
6.0000 btg Dolken Kayu 8" /4 m 11,500.00 69,000.00
7.0500 oh Pekerja 76,643.70 540,338.09
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.6500 oh Tukang Kayu 80,000.00 132,000.00
2.1000 oh Tukang Besi 80,000.00 168,000.00
0.4030 oh Kepala Tukang 85,000.00 34,255.00
0.3530 oh Mandor 100,000.00 35,300.00
Total : 931,893.09 3,579,860.00 4,511,753.09

25 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.2500 m3 Kayu Kelas III 2,000,000.00 500,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00 26,000.00
1.6000 ltr Minyak Bekisting 20,000.00 32,000.00
130.0000 kg Besi Beton 7,500.00 975,000.00
3.0000 kg Kawat Beton 13,500.00 40,500.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1300 m3 Kayu Kelas II balok 4,750,000.00 617,500.00
2.8000 lbr Plywood 9 mm 90,000.00 252,000.00
9.0000 btg Dolken Kayu 8" /4 m 11,500.00 103,500.00
6.3500 oh Pekerja 76,643.70 486,687.49
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.6500 oh Tukang Kayu 80,000.00 132,000.00
1.4000 oh Tukang Besi 80,000.00 112,000.00
0.3330 oh Kepala Tukang 85,000.00 28,305.00
0.3180 oh Mandor 100,000.00 31,800.00
Total : 812,792.49 3,204,970.00 4,017,762.50
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
26 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III 2,000,000.00 640,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00 41,600.00
1.6000 ltr Minyak Bekisting 20,000.00 32,000.00
157.5000 kg Besi Beton 7,500.00 1,181,250.00
2.2500 kg Kawat Beton 13,500.00 30,375.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1200 m3 Kayu Kelas II balok 4,750,000.00 570,000.00
2.8000 lbr Plywood 9 mm 90,000.00 252,000.00
32.0000 btg Dolken Kayu 8" /4 m 11,500.00 368,000.00
5.3000 oh Pekerja 76,643.70 406,211.61
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.3000 oh Tukang Kayu 80,000.00 104,000.00
1.0500 oh Tukang Besi 80,000.00 84,000.00
0.2650 oh Kepala Tukang 85,000.00 22,525.00
0.2650 oh Mandor 100,000.00 26,500.00
665,236.61 3,773,695.00 4,438,931.61
27 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III 2,000,000.00 480,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00 41,600.00
1.6000 ltr Minyak Bekisting 20,000.00 32,000.00
157.0000 kg Besi Beton 7,500.00 1,177,500.00
2.2500 kg Kawat Beton 13,500.00 30,375.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1600 m3 Kayu Kelas II balok 4,750,000.00 760,000.00
2.8000 lbr Plywood 9 mm 90,000.00 252,000.00
24.0000 btg Dolken Kayu 8" /4 m 11,500.00 276,000.00
5.3000 oh Pekerja 76,643.70 406,211.61
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.3000 oh Tukang Kayu 80,000.00 104,000.00
1.0500 oh Tukang Besi 80,000.00 84,000.00
0.2620 oh Kepala Tukang 85,000.00 22,270.00
0.2650 oh Mandor 100,000.00 26,500.00
664,981.61 3,707,945.00 4,372,926.61
28 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III 2,000,000.00 500,000.00
3.0000 kg Paku Biasa 5' - 12' 13,000.00 39,000.00
1.2000 ltr Minyak Bekisting 20,000.00 24,000.00
210.0000 kg Besi Beton 7,500.00 1,575,000.00
3.0000 kg Kawat Beton 13,500.00 40,500.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1050 m3 Kayu Kelas II balok 4,750,000.00 498,750.00
2.5000 lbr Plywood 9 mm 90,000.00 225,000.00
14.0000 btg Dolken Kayu 8" /4 m 11,500.00 161,000.00
5.6500 oh Pekerja 76,643.70 433,036.91
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.5600 oh Tukang Kayu 80,000.00 124,800.00
1.4000 oh Tukang Besi 80,000.00 112,000.00
0.3230 oh Kepala Tukang 85,000.00 27,455.00
0.2830 oh Mandor 100,000.00 28,300.00
747,591.91 3,721,720.00 4,469,311.91

29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X


11 CM)
0.0020 m3 Kayu Kelas III 2,000,000.00 4,000.00
0.0100 kg Paku Biasa 5' - 12' 13,000.00 130.00
3.0000 kg Besi Beton 7,500.00 22,500.00
0.0450 kg Kawat Beton 13,500.00 607.50
4.0000 kg Semen Portland 1,120.00 4,480.00
0.0060 m3 Pasir Beton 155,000.00 930.00
0.0090 m3 Koral Beton 245,000.00 2,205.00
0.1800 oh Pekerja 76,643.70 13,795.87
0.0200 oh Tukang Batu 80,000.00 1,600.00
0.0200 oh Tukang Kayu 80,000.00 1,600.00
0.0200 oh Tukang Besi 80,000.00 1,600.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0090 oh Mandor 100,000.00 900.00
Total : 20,005.87 34,852.50 54,858.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
30 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X
15 CM)
0.0030 m3 Kayu Kelas III 2,000,000.00 6,000.00
0.0200 kg Paku Biasa 5' - 12' 13,000.00 260.00
3.6000 kg Besi Beton 7,500.00 27,000.00
0.0500 kg Kawat Beton 13,500.00 675.00
5.5000 kg Semen Portland 1,120.00 6,160.00
0.0090 m3 Pasir Beton 155,000.00 1,395.00
0.0150 m3 Koral Beton 245,000.00 3,675.00
0.2970 oh Pekerja 76,643.70 22,763.18
0.0330 oh Tukang Batu 80,000.00 2,640.00
0.0330 oh Tukang Kayu 80,000.00 2,640.00
0.0330 oh Tukang Besi 80,000.00 2,640.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0150 oh Mandor 100,000.00 1,500.00
Total : 33,033.18 45,165.00 78,198.18

31 1 M3 MEMBUAT KOLOM BETON BERTULANG (150 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III 2,000,000.00 800,000.00
4.0000 kg Paku Biasa 5' - 12' 13,000.00 52,000.00
2.0000 ltr Minyak Bekisting 20,000.00 40,000.00
152.0000 kg Besi Beton 7,500.00 1,140,000.00
4.5000 kg Kawat Beton 13,500.00 60,750.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
0.1500 m3 Kayu Kelas II balok 4,750,000.00 712,500.00
3.5000 lbr Plywood 9 mm 90,000.00 315,000.00
20.0000 btg Dolken Kayu 8" /4 m 11,500.00 230,000.00
7.0500 oh Pekerja 76,643.70 540,338.09
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.6500 oh Tukang Kayu 80,000.00 132,000.00
2.1000 oh Tukang Besi 80,000.00 168,000.00
0.4030 oh Kepala Tukang 85,000.00 34,255.00
0.3530 oh Mandor 100,000.00 35,300.00
Total : 931,893.09 4,008,720.00 4,940,613.09

32 1 M3 MEMBUAT SLOOF BETON BERTULANG (100 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 2,000,000.00 540,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00 26,000.00
0.6000 ltr Minyak Bekisting 20,000.00 12,000.00
111.0000 kg Besi Beton 7,500.00 832,500.00
3.0000 kg Kawat Beton 13,500.00 40,500.00
336.0000 kg Semen Portland 1,120.00 376,320.00
0.5400 m3 Pasir Beton 155,000.00 83,700.00
0.8100 m3 Koral Beton 245,000.00 198,450.00
5.6500 oh Pekerja 76,643.70 433,036.91
0.2750 oh Tukang Batu 80,000.00 22,000.00
1.5600 oh Tukang Kayu 80,000.00 124,800.00
1.4000 oh Tukang Besi 80,000.00 112,000.00
0.3230 oh Kepala Tukang 85,000.00 27,455.00
0.2830 oh Mandor 100,000.00 28,300.00
Total : 747,591.91 2,109,470.00 2,857,061.91
VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 2,100.00 52,500.00
20.0000 bh Genteng Karang Pilang setara Good Year 5,500.00 110,000.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0600 oh Tukang Kayu 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0080 oh Mandor 100,000.00 800.00
Total : 17,606.56 52,500.00 70,106.56
1.a 1 M2 PEKERJAAN ATAP GENTENG KODOK KARANG PILANG Total : 17,606.56 110,000.00 127,606.56

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat 2,500.00 62,500.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0600 oh Tukang Kayu 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0080 oh Mandor 100,000.00 800.00
Total : 17,606.56 62,500.00 80,106.56
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


3.5000 bh Bubungan Plentong 7,500.00 26,250.00
3.5000 bh Genteng Bubungan Karangpilang 15,500.00 54,250.00
8.0000 kg Semen Portland 1,120.00 8,960.00
0.0320 m3 Pasir Pasang 165,000.00 5,280.00
0.4000 oh Pekerja 76,643.70 30,657.48
0.2000 oh Tukang Kayu 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0020 oh Mandor 100,000.00 200.00
Total : 48,557.48 40,490.00 89,047.48
3.a 1 M1 PEKERJAAN BUBUNGAN KARANG PILANG Total : 48,557.48 68,490.00 117,047.48

4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM


0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 35,000.00 26,250.00
0.1200 kg Paku Pancing 60 x 230 45,000.00 5,400.00
0.1400 oh Pekerja 76,643.70 10,730.12
0.0700 oh Tukang Kayu 80,000.00 5,600.00
0.0070 oh Kepala Tukang Kayu 85,000.00 595.00
0.0070 oh Mandor 100,000.00 700.00
Total : 17,625.12 31,650.00 49,275.12

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 35,000.00 84,000.00
6.0000 kg Paku Skrup 3,5" 45,000.00 270,000.00
0.0840 oh Pekerja 76,643.70 6,438.07
0.1250 oh Tukang Kayu 80,000.00 10,000.00
0.0130 oh Kepala Tukang 85,000.00 1,105.00
0.0040 oh Mandor 100,000.00 400.00
Total : 17,943.07 354,000.00 371,943.07
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 1,700.00 102,000.00
0.2000 kg Paku Biasa 1/2" - 1" 14,300.00 2,860.00
0.1660 oh Pekerja 76,643.70 12,722.85
0.2500 oh Tukang Kayu 80,000.00 20,000.00
0.0250 oh Kepala Tukang 85,000.00 2,125.00
0.0080 oh Mandor 100,000.00 800.00
Total : 35,647.85 104,860.00 140,507.85

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 38,500.00 15,400.00
0.0600 kg Paku biasa 1/2" - 1" 14,300.00 858.00
0.0500 kg Paku biasa 2" - 5" 13,000.00 650.00
0.0040 m3 Kayu papan 3 cm 7,000,000.00 28,000.00
0.1250 oh Pekerja 76,643.70 9,580.46
0.2500 oh Tukang kayu 80,000.00 20,000.00
0.0250 oh Kepala Tukang 85,000.00 2,125.00
0.0080 oh Mandor 100,000.00 800.00
Total : 32,505.46 44,908.00 77,413.46

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 35,000.00 227,500.00
0.5000 glg Tali pengikat 10,500.00 5,250.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.0100 oh Mandor 100,000.00 1,000.00
Total : 16,328.74 232,750.00 249,078.74

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 42,500.00 29,750.00
0.0200 kg Paku Biasa 1/2" - 1" 14,300.00 286.00
0.1200 oh Pekerja 76,643.70 9,197.24
0.0600 oh Tukang Kayu 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0060 oh Mandor 100,000.00 600.00
Total : 15,107.24 30,036.00 45,143.24

10 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 12,700.00 13,335.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0080 oh Mandor 100,000.00 800.00
Total : 16,721.56 13,335.00 30,056.56
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 38,500.00 11,550.00
0.0400 kg Paku biasa 1/2" - 1" 14,300.00 572.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0700 oh Tukang Kayu 80,000.00 5,600.00
0.0080 oh Kepala Tukang 85,000.00 680.00
0.0060 oh Mandor 100,000.00 600.00
Total : 18,376.56 12,122.00 30,498.56

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4
MM, 5 MM DAN 6 MM
1.1000 lbr Asbes semen 45,000.00 49,500.00
0.0100 kg Paku Biasa 1/2" - 1" 14,300.00 143.00
0.0300 oh Pekerja 76,643.70 2,299.31
0.0700 oh Tukang Kayu 80,000.00 5,600.00
0.0070 oh Kepala Tukang 85,000.00 595.00
0.0040 oh Mandor 100,000.00 400.00
Total : 8,894.31 49,643.00 58,537.31

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr Tripleks tbl 6 mm uk 120 x 240 78,000.00 29,250.00
0.0300 kg Paku Biasa 1/2" - 1" 14,300.00 429.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.1000 oh Tukang Kayu 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 17,014.37 29,679.00 46,693.37

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan kamper 7,000,000.00 105,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,300.00 143.00
0.8000 oh Pekerja 76,643.70 61,314.96
0.8000 oh Tukang Kayu 80,000.00 64,000.00
0.0800 oh Kepala Tukang 85,000.00 6,800.00
0.0400 oh Mandor 100,000.00 4,000.00
Total : 136,114.96 105,143.00 241,257.96

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil 9,500.00 9,975.00
0.1000 kg Paku list SQ 14,300.00 1,430.00
0.0500 oh Pekerja 76,643.70 3,832.19
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0030 oh Mandor 100,000.00 300.00
Total : 8,557.19 11,405.00 19,962.18

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm 6,500,000.00 78,000.00
0.0600 kg Paku Biasa 2" - 5" 14,200.00 852.00
1.1000 lbr Asbes 45,000.00 49,500.00
0.1800 oh Pekerja 76,643.70 13,795.87
0.3200 oh Tukang Kayu 80,000.00 25,600.00
0.0320 oh Kepala Tukang 85,000.00 2,720.00
0.0090 oh Mandor 100,000.00 900.00
Total : 43,015.87 128,352.00 171,367.87

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 45,000.00 4,950.00
0.3640 lbr Gypsum Board (120x240x0,9 ) 75,000.00 27,300.00
0.3640 lbr Kalsyboard ( 120 x 240 x 0,45 ) 89,500.00 32,578.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0050 oh Mandor 100,000.00 500.00
Total : 12,589.37 64,828.00 77,417.37
2.4000 m' Hollow Galvalum 10,000.00 24,000.00
3.3000 m' Penggantung 7,000.00 23,100.00
1.8500 BT Conwood 90,000.00 166,500.00 166,500.00
6.a 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM RANGKA HOLLOW GALVALUM 91,939.37
6.b 1 M2 PASANG LANGIT-LANGIT KALSY BOARD UKURAN (1200X2400X4,5) MM RANGKAHOLLOW GALVALUM 97,217.37
6.c 1 M2 PASANG LANGIT-LANGIT CooNWOOD RANGKA HOLLOW GALVALUM 231,139.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 45,000.00 4,950.00
0.3640 lbr Kalsiboard 4.5 mm 89,500.00 32,578.00
0.1000 oh Pekerja 76,643.70 7,664.37
0.0500 oh Tukang Kayu 80,000.00 4,000.00
0.0050 oh Kepala Tukang 85,000.00 425.00
0.0050 oh Mandor 100,000.00 500.00
Total : 12,589.37 37,528.00 50,117.37

8 1 M1 PASANG LIST PLAFOND GYPSUM


1.1000 m1 List Plapond Gypsum 9/9 15,000.00 16,500.00
0.0020 kg Paku Gypsum 82,000.00 164.00
0.0200 oh Tukang Kayu 80,000.00 1,600.00
0.0020 oh Kepala Tukang Kayu 85,000.00 170.00
0.0500 oh Pekerja 76,643.70 3,832.19
0.0050 oh Mandor 100,000.00 500.00
Total : 6,102.18 16,664.00 22,766.18

8a 1 M1 PASANG LIST PLAFOND Conwood


1.1000 m1 List Plapond Conwood 45,000.00 49,500.00
0.0020 kg Paku Gypsum 82,000.00 164.00
0.0200 oh Tukang Kayu 80,000.00 1,600.00
0.0020 oh Kepala Tukang Kayu 85,000.00 170.00
0.0500 oh Pekerja 76,643.70 3,832.19
0.0050 oh Mandor 100,000.00 500.00
Total : 6,102.18 49,664.00 55,766.19

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK
1.0000 bh Kloset duduk 2,200,000.00 2,200,000.00
6% x harga kloset Perlengkapan 132,000.00
3.3000 oh Pekerja 76,643.70 252,924.21
1.1000 oh Tukang batu 80,000.00 88,000.00
0.0010 oh Kepala Tukang 85,000.00 85.00
0.1600 oh Mandor 100,000.00 16,000.00
Total : 357,009.21 2,332,000.00 2,689,009.21

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 225,000.00 225,000.00
6.0000 kg Semen Portland 1,120.00 6,720.00
0.0100 m3 Pasir Pasang 165,000.00 1,650.00
1.0000 oh Pekerja 76,643.70 76,643.70
1.5000 oh Tukang batu 80,000.00 120,000.00
1.5000 oh Kepala Tukang 85,000.00 127,500.00
0.1600 oh Mandor 100,000.00 16,000.00
Total : 340,143.70 233,370.00 573,513.70

2a MEMASANG 1 BUAH KLOSET JONGKOK Toto


1.0000 bh Kloset jongkok porselen 275,000.00 275,000.00
6% x harga closet Perlengkapan 16,500.00
3.3000 oh Pekerja 76,643.70 252,924.21
1.1000 oh Tukang batu 80,000.00 88,000.00
0.0010 oh Kepala Tukang 85,000.00 85.00
0.1600 oh Mandor 100,000.00 16,000.00
Total : 357,009.21 291,500.00 648,509.21

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 2,475,000.00 2,475,000.00
6% x harga Urin Perlengkapan 148,500.00
6.0000 kg Semen Portland 1,120.00 6,720.00
0.0100 m3 Pasir Pasang 165,000.00 1,650.00
1.0000 oh Pekerja 76,643.70 76,643.70
1.0000 oh Tukang batu 80,000.00 80,000.00
0.1000 oh Kepala Tukang 85,000.00 8,500.00
0.1000 oh Mandor 100,000.00 10,000.00
Total : 175,143.70 2,631,870.00 2,807,013.70

4 MEMASANG 1 BUAH WASHTAFEL TYPE DINDING EX TOTO


1.0000 bh Washtafel 750,000.00 750,000.00
12% x harga wast Perlengkapan 90,000.00
6.0000 kg Semen Portland 1,120.00 6,720.00
0.0100 m3 Pasir Pasang 165,000.00 1,650.00
1.2000 oh Pekerja 76,643.70 91,972.44
1.4500 oh Tukang batu 80,000.00 116,000.00
0.1500 oh Kepala Tukang 85,000.00 12,750.00
0.1000 oh Mandor 100,000.00 10,000.00
Total : 230,722.44 848,370.00 1,079,092.44

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 325,000.00 325,000.00
18% x harga wast Perlengkapan 58,500.00
1.8000 oh Pekerja 76,643.70 137,958.66
2.7000 oh Tukang batu 80,000.00 216,000.00
0.5400 oh Kepala Tukang 85,000.00 45,900.00
0.1100 oh Mandor 100,000.00 11,000.00
Total : 410,858.66 383,500.00 794,358.66
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 50,000.00 60,000.00
35% x harga pipa Perlengkapan 17,500.00
0.0540 oh Pekerja 76,643.70 4,138.76
0.0900 oh Tukang Pipa 80,000.00 7,200.00
0.0090 oh Kepala Tukang 85,000.00 765.00
0.0270 oh Mandor 100,000.00 2,700.00
Total : 14,803.76 77,500.00 92,303.76

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 168,000.00 201,600.00
35% x harga pipa Perlengkapan 58,800.00
0.1080 Oh Pekerja 76,643.70 8,277.52
0.1800 Oh Tukang Pipa 80,000.00 14,400.00
0.0180 Oh Kepala Tukang 85,000.00 1,530.00
0.0054 Oh Mandor 100,000.00 540.00
Total : 24,747.52 260,400.00 285,147.52

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5"


1.2000 m1 Pipa PVC 0,5" 4,100.00 4,920.00
35% x harga pipa Perlengkapan 1,435.00
0.0360 oh Pekerja 76,643.70 2,759.17
0.0600 oh Tukang Pipa 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0018 oh Mandor 100,000.00 180.00
Total : 8,249.17 6,355.00 14,604.17

8.a MEMASANG 1 M1 PIPA PVC TYPE AW f 0,75"


1.2000 m1 Pipa PVC 0,75" 6,200.00 7,440.00
35% x harga pipa Perlengkapan 2,170.00
0.0360 oh Pekerja 76,643.70 2,759.17
0.0600 oh Tukang Pipa 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0018 oh Mandor 100,000.00 180.00
Total : 8,249.17 9,610.00 17,859.17

8.b MEMASANG 1 M1 PIPA PVC TYPE AW f 1"


1.2000 m1 Pipa PVC 1" 8,500.00 10,200.00
35% x harga pipa Perlengkapan 2,975.00
0.0360 oh Pekerja 76,643.70 2,759.17
0.0600 oh Tukang Pipa 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0018 oh Mandor 100,000.00 180.00
Total : 8,249.17 13,175.00 21,424.17

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 2" 18,700.00 22,440.00
35% x harga pipa Perlengkapan 6,545.00
0.0540 oh Pekerja 76,643.70 4,138.76
0.0900 oh Tukang Pipa 80,000.00 7,200.00
0.0090 oh Kepala Tukang 85,000.00 765.00
0.0027 oh Mandor 100,000.00 270.00
Total : 12,373.76 28,985.00 41,358.76

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3"


1.2000 m1 Pipa PVC 3" 9,625.00 11,550.00
35% x harga pipa Perlengkapan 3,368.75
0.0810 oh Pekerja 76,643.70 6,208.14
0.1350 oh Tukang Pipa 80,000.00 10,800.00
0.0135 oh Kepala Tukang 85,000.00 1,147.50
0.0041 oh Mandor 100,000.00 410.00
Total : 18,565.64 14,918.75 33,484.39

10.a MEMASANG 1 M1 PIPA PVC TYPE AW f 4"


1.2000 m1 Pipa PVC 4" 63,400.00 76,080.00
35% x harga pipa Perlengkapan 22,190.00
0.0810 oh Pekerja 76,643.70 6,208.14
0.1350 oh Tukang Pipa 80,000.00 10,800.00
0.0135 oh Kepala Tukang 85,000.00 1,147.50
0.0041 oh Mandor 100,000.00 410.00
Total : 18,565.64 98,270.00 116,835.64
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air setara Onda 38,000.00 38,000.00
0.0250 bh Seal tape 2,500.00 62.50
0.0100 oh Pekerja 76,643.70 766.44
0.1000 oh Tukang Pipa 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 10,116.44 38,062.50 48,178.94
12 Memasang 1 buah Floor Drain 2" Toto TX 1 BN
1.0000 Bh. Floor Drain 2 " Type TX 1 BN setara TOTO 450,000.00 450,000.00
0.0100 Oh. Pekerja 76,643.70 766.44
0.1000 Oh. Tukang Batu 80,000.00 8,000.00
0.0100 Oh. Kepala Tukang 85,000.00 850.00
0.0050 Oh. Mandor 100,000.00 500.00
Floor Drain 2" Toto TX 1 BN Total : 10,116.44 450,000.00 460,116.44
13 1 Unit Pekerjaan Septictank & Peresapan
1.9625 M3 Galian tanah 59,982.77 117,716.20
0.7000 M3 Urugan pasir 185,993.11 130,195.18
0.6070 M3 Beton rabat 1 : 3 : 5 800,524.41 485,918.31
18.9000 M2 Pasangan batu bata 1 : 3 122,537.51 2,315,958.94
2.4000 bh Buis beton 84,750.00 203,400.00
24.3000 M2 Plesteran 1: 3 46,440.05 1,128,493.09
12.0000 M2 Acian 28,818.74 345,824.88
0.7284 M3 Beton plat T.12 cm (K 250) 859,770.65 626,256.94
109.0000 kg Besi beton 9,273.51 1,010,812.14
5.0000 m2 Begisting 138,144.92 690,724.61
Upah Kerja (Lumpsum) 300,000.00
Total : 300,000.00 5,353,763.54 5,653,763.54
`
XI PEKERJAAN BESI DAN ALUMINIUM
(SNI 7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 9,250.00 10,637.50
0.0060 oh Pekerja 76,643.70 459.86
0.0600 oh Tukang besi 80,000.00 4,800.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0003 oh Mandor 100,000.00 30.00
Total : 5,799.86 10,637.50 16,437.36

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 765,000.00 841,500.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 14,300.00 143,000.00
7.0000 m' Besi strip 14,000.00 98,000.00
0.2000 oh Pekerja 76,643.70 15,328.74
0.2000 oh Tukang besi 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0010 oh Mandor 100,000.00 100.00
Total : 33,128.74 1,082,500.00 1,115,628.74

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 38,500.00 40,425.00
0.0150 kg Paku biasa 0,5" - 1" 14,300.00 214.50
0.0190 m3 Kayu papan kelas II/III (kamper) 7,000,000.00 133,000.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.4000 oh Tukang besi 80,000.00 32,000.00
0.0250 oh Kepala Tukang 85,000.00 2,125.00
0.0013 oh Mandor 100,000.00 130.00
Total : 45,751.56 173,639.50 219,391.06
XII PEKERJAAN KUNCI DAN KACA (SNI 2002)
1 1 BH PASANG KUNCI Tanam 2 Slaag
1.0000 bh Kunci tanam 2 slag 175,000.00 175,000.00
0.0100 oh Pekerja 76,643.70 766.44
0.5000 oh Tukang besi 80,000.00 40,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 42,116.44 175,000.00 217,116.44

2 1 PS PASANG ENGSEL PINTU SETARA DEKSON


1.0000 ps Engsel pintu 4 " 4x3x3, 2BB ES/EL setara Deks 75,000.00 75,000.00
0.0150 oh Pekerja 76,643.70 1,149.66
0.1500 oh Tukang besi 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0008 oh Mandor 100,000.00 80.00
Total : 14,504.66 75,000.00 89,504.66

3 1 PS PASANG ENGSEL JENDELA SETARA DEKSON


1.0000 ps Engsel jendela 3 " 3x2 BB setara Dekson 39,000.00 39,000.00
0.0100 oh Pekerja 76,643.70 766.44
0.1000 oh Tukang besi 80,000.00 8,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0005 oh Mandor 100,000.00 50.00
Total : 9,666.44 39,000.00 48,666.44

4 1 BH PASANG KAIT ANGIN SETARA DEKSON


1.0000 ps Kait angin 25,000.00 25,000.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.0150 oh Pekerja 76,643.70 1,149.66
0.1500 oh Tukang besi 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0008 oh Mandor 100,000.00 80.00
Total : 14,504.66 25,000.00 39,504.66
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 155,000.00 155,000.00
0.0200 oh Pekerja 76,643.70 1,532.87
0.2000 oh Tukang besi 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0010 oh Mandor 100,000.00 100.00
Total : 19,332.87 155,000.00 174,332.87
5.a 1 Bh Pasang Espagnoilet setara DEKSON
1.0000 Bh Espagnoilet TanamType FB 040. 8" + 12 SS setara D 137,000.00 137,000.00
0.0100 Oh Pekerja 76,643.70 766.44
0.5000 Oh Tukang besi 80,000.00 40,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0500 Oh Mandor 100,000.00 5,000.00
Total : 46,616.44 137,000.00 183,616.44
5.b 1 Bh Pasang Grendel Jendela setara DEKSON
1.0000 Bh Grendel Jendela Rabuncis Type CHW 4 LHNH set 84,000.00 84,000.00
0.0200 Oh Pekerja 76,643.70 1,532.87
0.2000 Oh Tukang besi 80,000.00 16,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0010 Oh Mandor 100,000.00 100.00
Total : 19,332.87 84,000.00 103,332.87

6 1 M2 PASANG KACA, TEBAL 5 MM


1.1000 bh Kaca 5 mm 97,000.00 106,700.00
0.0150 oh Pekerja 76,643.70 1,149.66
0.1500 oh Tukang besi 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0008 oh Mandor 100,000.00 80.00
Total : 14,504.66 106,700.00 121,204.66

6b 1 M2 PASANG KACA, TEBAL 5 MM


1.1000 bh Kaca 5 mm bevel 225,000.00 247,500.00
0.0150 oh Pekerja 76,643.70 1,149.66
0.1500 oh Tukang besi 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0008 oh Mandor 100,000.00 80.00
Total : 14,504.66 247,500.00 262,004.66

6c 1 M2 PASANG KACA ES, TEBAL 5 MM


1.1000 bh Kaca es 5 mm 165,000.00 181,500.00
0.0150 oh Pekerja 76,643.70 1,149.66
0.1500 oh Tukang besi 80,000.00 12,000.00
0.0150 oh Kepala Tukang 85,000.00 1,275.00
0.0008 oh Mandor 100,000.00 80.00
Total : 14,504.66 181,500.00 196,004.66

7 1 BH PASANG KUNCI PINTU DOUBLE + HANDLE COMPLIT 4 BH


1.0000 bh Kunci Bulat KCBL 8587 BK SSS setara Dekson 148,000.00 148,000.00
4.0000 bh Handle LHTR 0016 SSS setara Dekson 237,000.00 948,000.00
0.0100 oh Pekerja 76,643.70 766.44
0.5000 oh Tukang besi 80,000.00 40,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.0050 oh Mandor 100,000.00 500.00
Total : 42,116.44 1,096,000.00 1,138,116.44

XIII PEK. PENUTUP LANTAI DAN DINDING


(SNI 7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


1.1000 m2 Keramik 30 x 30 cm (warna muda) 42,000.00 46,200.00
10.0000 kg Semen Portland 1,120.00 11,200.00
0.0450 m3 Pasir Pasang 165,000.00 7,425.00
1.5000 kg Semen warna/semen grouting 6,500.00 9,750.00
0.7000 oh Pekerja 76,643.70 53,650.59
0.3500 oh Tukang batu 80,000.00 28,000.00
0.0350 oh Kepala Tukang 85,000.00 2,975.00
0.0350 oh Mandor 100,000.00 3,500.00
Total : 88,125.59 74,575.00 162,700.59

1a 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM


1.1000 m2 Keramik 40 x 40 cm (warna muda) 43,000.00 47,300.00
10.0000 kg Semen Portland 1,120.00 11,200.00
0.0450 m3 Pasir Pasang 165,000.00 7,425.00
1.5000 kg Semen warna/semen grouting 6,500.00 9,750.00
0.3500 oh Pekerja 76,643.70 26,825.30
0.3500 oh Tukang batu 80,000.00 28,000.00
0.0350 oh Kepala Tukang 85,000.00 2,975.00
0.0350 oh Mandor 100,000.00 3,500.00
Total : 61,300.30 75,675.00 136,975.29

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


1.1000 m2 Keramik 20 x 20 cm 46,000.00 50,600.00
1.1000 m2 Keramik 20 x 25 cm 46,000.00 50,600.00
10.4000 kg Semen Portland 1,120.00 11,648.00
0.0450 m3 Pasir Pasang 165,000.00 7,425.00
1.6500 kg Semen warna/semen grouting 6,500.00 10,725.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.7000 oh Pekerja 76,643.70 53,650.59
0.3500 oh Tukang batu 80,000.00 28,000.00
0.0350 oh Kepala Tukang 85,000.00 2,975.00
0.0350 oh Mandor 100,000.00 3,500.00
Total : 88,125.59 80,398.00 168,523.59
2a 1 M2 PASANG LANTAI KERAMIK 20 X 25 CM 88,125.59 80,398.00 168,523.59
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3 1 M1 PASANG PLIN KERAMIK 10 X 40 CM


0.7500 bh Keramik 40 x40 cm 1,791.67 1,343.75
1.3300 bh Keramik 30 x30 cm 1,272.73 1,692.73
5.0000 bh Keramik 10 x 20 cm 5,000.00 25,000.00
1.1400 kg Semen Portland 1,120.00 1,276.80
0.0030 m3 Pasir Pasang 165,000.00 495.00
0.1000 kg Semen warna/semen grouting 6,500.00 650.00
0.0900 oh Pekerja 76,643.70 6,897.93
0.0900 oh Tukang batu 80,000.00 7,200.00
0.0090 oh Kepala Tukang 85,000.00 765.00
0.0050 oh Mandor 100,000.00 500.00
Total : 15,362.93 3,765.55 19,128.48
3b 1 M1 PASANG PLIN KERAMIK 10 X 20 CM Total : 15,362.93 27,421.80 42,784.73
3c 1 M1 PASANG PLIN KERAMIK 10 X 30 CM Total : 15,362.93 4,114.53 19,477.46

4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 1,840.00 48,760.00
20.0000 bh Keramik 20 x 25 cm 2,300.00 46,000.00
9.3000 kg Semen Portland 1,120.00 10,416.00
0.0180 m3 Pasir Pasang 165,000.00 2,970.00
0.9400 kg Semen warna/semen grouting 6,500.00 6,110.00
0.9000 oh Pekerja 76,643.70 68,979.33
0.4500 oh Tukang batu 80,000.00 36,000.00
0.0450 oh Kepala Tukang 85,000.00 3,825.00
0.0450 oh Mandor 100,000.00 4,500.00
Total : 113,304.33 68,256.00 181,560.33
4.a 1 M2 PASANG DINDING KERAMIK 20 X 25 CM Total : 113,304.33 65,496.00 178,800.33

4b 1 M2 PASANG DINDING KERAMIK 20 X 30 CM


16.6667 bh Keramik 20 x 30 cm -
9.3000 kg Semen Portland 1,120.00 10,416.00
0.0180 m3 Pasir Pasang 165,000.00 2,970.00
1.9400 kg Semen warna/semen grouting 6,500.00 12,610.00
0.9000 oh Pekerja 76,643.70 68,979.33
0.4500 oh Tukang batu 80,000.00 36,000.00
0.0450 oh Kepala Tukang 85,000.00 3,825.00
0.0450 oh Mandor 100,000.00 4,500.00
Total : 113,304.33 25,996.00 139,300.33

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II (kamper) 7,000,000.00 21,000.00
0.0500 kg Paku sekrup 3,5' 45,000.00 2,250.00
0.1200 oh Pekerja 76,643.70 9,197.24
0.1200 oh Tukang kayu 80,000.00 9,600.00
0.0120 oh Kepala Tukang 85,000.00 1,020.00
0.0060 oh Mandor 100,000.00 600.00
Total : 20,417.24 23,250.00 43,667.24

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 24,000.00 4,800.00
0.1500 kg Dempul 45,000.00 6,750.00
0.1700 kg Cat dasar 33,000.00 5,610.00
0.2600 kg Cat Penutup 2x (emcolux) 67,000.00 17,420.00
0.0700 oh Pekerja 76,643.70 5,365.06
0.0090 oh Tukang cat 80,000.00 720.00
0.0060 oh Kepala Tukang 85,000.00 510.00
0.0025 oh Mandor 100,000.00 250.00
Total : 6,845.06 34,580.00 41,425.06

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 55,000.00 8,250.00
0.0500 kg Dempul 45,000.00 2,250.00
0.1000 lbr Amplas 3,000.00 300.00
0.0100 bh Kuas 6,500.00 65.00
0.1600 oh Pekerja 76,643.70 12,262.99
0.1600 oh Tukang cat 80,000.00 12,800.00
0.0160 oh Kepala Tukang 85,000.00 1,360.00
0.0025 oh Mandor 100,000.00 250.00
Total : 26,672.99 10,865.00 37,537.99
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 22,000.00 2,200.00
0.1000 kg Cat dasar 44,300.00 4,430.00
0.2600 kg Cat Penutup 2x ex.Duluk 28,900.00 7,514.00
0.0200 oh Pekerja 76,643.70 1,532.87
0.0630 oh Tukang cat 80,000.00 5,040.00
0.0063 oh Kepala Tukang 85,000.00 535.50
0.0025 oh Mandor 100,000.00 250.00
Total : 7,358.37 14,144.00 21,502.37
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 44,300.00 5,316.00
0.1800 kg Cat Penutup 2x 28,900.00 5,202.00
0.0280 oh Pekerja 76,643.70 2,146.02
0.0420 oh Tukang cat 80,000.00 3,360.00
0.0042 oh Kepala Tukang 85,000.00 357.00
0.0025 oh Mandor 100,000.00 250.00
Total : 6,113.02 10,518.00 16,631.02

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 24,000.00 2,400.00
0.0100 lbr Kuas 6,500.00 65.00
0.0200 oh Pekerja 76,643.70 1,532.87
0.2000 oh Tukang cat 80,000.00 16,000.00
0.0200 oh Kepala Tukang 85,000.00 1,700.00
0.0100 oh Mandor 100,000.00 1,000.00
Total : 20,232.87 2,465.00 22,697.87

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 45,600.00 13,680.00
0.0060 oh Pekerja 76,643.70 459.86
0.0600 oh Tukang cat 80,000.00 4,800.00
0.0120 oh Kepala Tukang 85,000.00 1,020.00
0.0060 oh Mandor 100,000.00 600.00
Total : 6,879.86 13,680.00 20,559.86

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 55,000.00 28,710.00
2.0000 lbr Amplas 3,000.00 6,000.00
0.0600 oh Pekerja 76,643.70 4,598.62
0.0600 oh Tukang cat 80,000.00 4,800.00
0.0160 oh Kepala Tukang 85,000.00 1,360.00
0.0025 oh Mandor 100,000.00 250.00

Total : 11,008.62 34,710.00 45,718.62

7a 1 M2 PEKERJAAN POLITURAN ULTRAN


0.1500 ltr Politur dasar ( ultran penetran ) 55,000.00 8,250.00
0.3720 ltr Politur finish ( ultran lasur ) 55,000.00 20,460.00
0.1500 kg Clear ( natural / dop ) 55,000.00 8,250.00
2.0000 lbr Amplas 3,000.00 6,000.00
0.0100 bh Kuas 6,500.00 65.00
0.0600 oh Pekerja 76,643.70 4,598.62
0.0600 oh Tukang cat -
0.0160 oh Kepala Tukang -
0.0025 oh Mandor -
Total : 4,598.62 43,025.00 47,623.62

8 1 M2 PEKERJAAN WATERPROFING
1.0000 Kg Masterseal 440 65,000.00 65,000.00
0.0400 oh Pekerja 76,643.70 3,065.75
0.0400 oh Tukang cat 80,000.00 3,200.00
0.0040 oh Mandor 100,000.00 400.00

Total : 6,665.75 65,000.00 71,665.75


XV PEKERJAAN TEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 3,000.00 330,000.00
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 339,408.00 489,408.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan - -
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 9,408.00 159,408.00

2.a 1 M2 PASANGAN PARAS SARWA GENEP 1 MUKA


13.7500 bh Paras Sarwa Genep - -
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 9,408.00 159,408.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2.b 1 M2 PASANGAN TEMPELAN PARAS PALIMANAN 1 MUKA


13.7500 bh Paras palimanan - -
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 9,408.00 159,408.00
2.c 1 M' PASANGAN BATU TULUNG AGUNG 1 MUKA
13.7500 bh Batu Tulung agung - -
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 9,408.00 159,408.00
2.d 1 M' PASANGAN BATU CANDI HITAM 1 MUKA
16.6667 bh Batu Candi Hitam 9,166.67 152,777.78
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 162,185.78 312,185.78

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 3,000.00 165,000.00
4.2000 kg Semen 50 Kg 1,120.00 4,704.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 169,704.00 319,704.00

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras - -
4.2000 kg Semen 50 Kg 1,120.00 4,704.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 4,704.00 154,704.00

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 3,000.00 165,000.00
4.4917 bh Batu paras - -
5.2500 kg Semen 50 Kg 1,120.00 5,880.00
Upah Kerja ( Lumpsum) 150,000.00 150,000.00
Total : 150,000.00 170,880.00 320,880.00

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 3,000.00 165,000.00
4.2000 kg Semen 50 Kg 1,120.00 4,704.00
Upah Kerja ( Lumpsum) 400,000.00 400,000.00
Total : 400,000.00 169,704.00 569,704.00

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras - -
4.2000 kg Semen 50 Kg 1,120.00 4,704.00
Upah Kerja ( Lumpsum) 400,000.00 400,000.00
Total : 400,000.00 4,704.00 404,704.00

7a 1 M2 PASANGAN PARAS MALAM DIUKIR


18.3333 bh Batu paras 12,000.00 220,000.00
4.2000 kg Semen 50 Kg 1,120.00 4,704.00
Upah Kerja ( Lumpsum) 400,000.00 400,000.00
Total : 400,000.00 224,704.00 624,704.00

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 3,000.00 165,000.00
4.4917 bh Batu paras - -
5.2500 kg Semen 50 Kg 1,120.00 5,880.00
Upah Kerja ( Lumpsum) -
Total : - 170,880.00 170,880.00

8a 1 M2 PASANGAN PARAS PALIMANAN 1 MUKA DIUKIR


13.7500 bh Paras Palimanan - -
8.4000 kg Semen 50 Kg 1,120.00 9,408.00
Upah Kerja ( Lumpsum) 400,000.00 400,000.00
Total : 400,000.00 9,408.00 409,408.00

8c 1 M2 TEMPELAN BATU GUNUNG ( EX KARANGASEM )


20.0000 Bj Bj Batu gunung - - -
2.4000 kg Zak semen 50 kg 1,120.00 2,688.00 2,688.00
Upah Kerja ( Lumpsum) 400,000.00 400,000.00 - 400,000.00
400,000.00 2,688.00 402,688.00

9 1 UNIT PEMBUATAN PAPAN NAMA KANTOR


0.8820 M3 Pek.galian Tanah Pondasi 59,982.77 52,904.81 52,904.81
0.1050 M3 Pek.Pasir Urug 185,993.11 19,529.28 19,529.28
0.4200 M3 Pek. Batu Kosong 378,517.09 158,977.18 158,977.18
1.1813 M3 Pek. Pondasi Batu kali 1 : 6 634,445.55 749,438.81 749,438.81
0.1725 M3 Pek. Beton 1: 2 : 3 2,958,826.61 510,397.59 510,397.59
6.9800 M2 Pek.Batu tulung agung 159,408.00 1,112,667.84 1,112,667.84
0.9500 M2 Pek.Paras jogja Putih 159,408.00 151,437.60 151,437.60
3.2470 m2 Granit hitam - - -
3.2470 m2 Ongkos kerja (memotong dan memahat) - -
1.0000 ls Ongkos pasang - -
Total : - 2,755,353.10 2,755,353.10
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

10 I UNIT CANDI BENTAR TINGGI 2,50M


1.900 m3 Galian tanah pondasi 59,982.77 113,967.27
0.055 m3 Urugan pasir 185,993.11 10,229.62
0.110 m3 Batu kosong 378,517.09 41,636.88
1.635 m3 Pasangan batu kali 652,920.55 1,067,525.10
0.532 m3 Beton tumbuk ( pengeresek ) 800,524.41 425,878.98
0.090 m3 Beton kolom 150 kg 2,958,826.61 266,294.39
15.241 m2 Tempelan batu gunung ex karangasem 402,688.00 6,137,367.81
1.000 unit Steger -
8,062,900.06

11 I UNIT CANDI BENTAR TINGGI 4,25 M


2.5650 m3 Galian tanah pondasi 59,982.77 153,855.82
0.0700 m3 Urugan pasir 185,993.11 13,019.52
0.1400 m3 Batu kosong 378,517.09 52,992.39
2.1020 m3 Pasangan batu kali 652,920.55 1,372,439.00
0.9580 m3 Beton tumbuk ( pengeresek ) 800,524.41 766,902.38
0.5715 m3 Beton kolom 150 kg 2,958,826.61 1,690,969.41
27.7930 m2 Pek.Batu tulung agung 159,408.00 4,430,426.54
2.3700 m2 Pek.Paras jogja Putih 159,408.00 377,796.96
1.0000 unit Steger -
8,858,402.02

11 I UNIT CANDI BENTAR 3 TINGKAT TINGGI 14.2 M - PARAS PALIMANAN


501.3000 m2 Paras Palimanan diukir 409,408.00 205,236,230.40
12.0000 unit Karang Gajah besar uk. 0.5 x 1.3 m -
8.0000 unit Karang Simbar besar -
120.0000 unit Karang Simbar kecil -
192.0000 unit Karang Tapel -
4.0000 unit Ikut Celedu -
30.0000 unit Tempelan daun -
4.0000 unit Murda 1/2 uk. 0.8 x 0.25 m -
4.0000 unit Murda uk. 0.4 x 0.4 m -
68.0000 unit Murda uk. 0.2 x 0.2 m -
1.0000 ls Pekerjaan pemasangan -
21.9600 m3 Pengresek karang 800,524.41 17,579,515.97

222,815,746.37

12 1 UNIT PEKERJAAN PINTU PAGAR TYPE 1


13.5500 m1 Piva Galvanis Ø 1 1/4" -
3.9500 m1 Piva Galvanis Ø 1" -
16.1963 kg Besi kotak 10/10 -
22.0000 bh Besi tuang motif bunga -
129.0000 bh Besi tuang motif lingkaran -
0.0629 m3 Papan bingkirai -
160.0000 bh Kawat las -
2.0000 bh Roda komplit -
1.0000 bh Roda kecil komplit -
8.5000 m1 Rel -
12.7500 m1 Plat siku -
4.2500 m1 Plat strip -
86.0000 bh bout -
1.0000 bh kunci -
6.6000 oh Tukang las -
0.6600 oh Kepala tukang las -
1.2000 oh Pekerja -
0.0800 oh mandor -
6.4600 m2 Pengecatan besi -
6.2900 m2 Polituran -
- - -

13 1 UNIT PEKERJAAN PINTU PAGAR TYPE 2


4.7900 m1 Piva Galvanis Ø 1" - -
2.1595 kg Besi kotak 10/10 -
3.0000 bh Besi tuang motif bunga -
18.0000 bh Besi tuang motif lingkaran -
0.0085 m3 Papan bingkirai - -
15.0000 bh Kawat las -
2.0000 bh Engsel Piva -
1.0000 bh Grendel besi -
1.7000 m1 Plat siku -
12.0000 bh bout -
2.5000 oh Tukang las - -
0.2500 oh Kepala tukang las - -
0.6600 oh Pekerja - -
0.0600 oh mandor - -
0.9900 m2 Pengecatan besi - -
0.8000 m2 Polituran - -
- - -
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

14 1 UNIT PEKERJAAN PADMASARI


0.8500 m3 Galian tanah pondasi 59,982.77 50,985.36
0.0800 m3 Urugan pasir 185,993.11 14,879.45
0.3200 m3 Pasangan batu kosong 378,517.09 121,125.47
0.9000 m3 Pasangan batu kali 652,920.55 587,628.50
0.2805 m3 Urugan tanah kembali 19,994.26 5,608.39
1.7950 m2 Plesteran 44,032.01 79,037.45
1.7950 m2 Acian 28,818.74 51,729.64
3.8500 m2 Tempelan batu gunung ex karangasem 402,688.00 1,550,348.80
4.0000 bh Karang gajah -
16.0000 bh Karang simbar -
4.0000 bh Karang tapel -
1.0000 bh Ulon -
2.0000 bh Tabing ulon motif naga -
1.0000 bh Karang garuda -
1.0000 bh karang wisnu -
1.0000 bh Karang angsa -
0.0240 m3 Beton kolom 150 kg 2,958,826.61 71,011.84
0.2500 m3 Beton pengeresek 800,524.41 200,131.10
2,732,485.99

15 1 UNIT PEKERJAAN PENUNGGU KARANG


0.7300 m3 Galian tanah pondasi 59,982.77 43,787.43
0.1200 m3 Urugan pasir 185,993.11 22,319.17
0.2400 m3 Pasangan batu kosong 378,517.09 90,844.10
0.6100 m3 Pasangan batu kali 652,920.55 398,281.54
0.2920 m3 Urugan tanah kembali 19,994.26 5,838.32
0.2420 m2 Plesteran 44,032.01 10,655.75
0.2420 m2 Acian 28,818.74 6,974.14
4.1040 m2 Tempelan batu gunung ex karangasem -
4.0000 bh Karang gajah -
4.0000 bh ikut celedu -
1.0000 bh murda -
24.0000 bh Karang simbar -
28.0000 bh Karang tapel -
0.0376 m3 Beton kolom 2,958,826.61 111,177.91
0.3200 m3 Beton pengeresek 800,524.41 256,167.81
946,046.16

16 1 UNIT PEKERJAAN PILAR PADURAKSA ( EX BATU TULUNG AGUNG )


0.5100 m3 Galian tanah pondasi 59,982.77 30,591.22
0.0600 m3 Urugan pasir 185,993.11 11,159.59
0.1300 m3 Pasangan batu kosong 378,517.09 49,207.22
0.2300 m3 Pasangan batu kali 652,920.55 150,171.73
0.2040 m3 Urugan tanah kembali 19,994.26 4,078.83
1.1200 m2 Plesteran 44,032.01 49,315.85
0.0400 m3 Beton kolom 150 kg 2,958,826.61 118,353.06
1.5200 m3 Beton pengeresek 800,524.41 1,216,797.10
2.3688 m2 Tempelan paras ex batu tulung agung 159,408.00 377,605.67
0.0616 m2 Tempelan paras jogja 159,408.00 9,819.53
16.0000 bh Karang simbar -
8.0000 bh Karang tapel -
1.0000 bh Murda -
4.0000 bh Ikut celedu -
2,017,099.79

16a 1 UNIT PADURAKSA STYLE BALI PILAR - TIPE 1


0.8000 m2 Tempelan Tulung Agung 159,408.00 127,526.40
14.7200 m2 Tempelan Palimanan 159,408.00 2,346,485.76
16.0000 bh Karang simbar - -
8.0000 bh Karang tapel - -
1.0000 bh Murda -
4.0000 bh Ikut celedu -
2,474,012.16

16b 1 UNIT PADURAKSA STYLE BALI PILAR - TIPE 2


2.2400 m2 Tempelan Tulung Agung 159,408.00 357,073.92
28.0000 m2 Tempelan Palimanan 159,408.00 4,463,424.00
18.0000 bh Karang simbar - -
8.0000 bh Karang tapel - -
1.0000 bh Murda Besar - -
8.0000 bh Murda Kecil -
4,820,497.92

17 1 M1 PEKERJAAN TEMBOK PARAS ( EX TULUNG AGUNG )


0.4900 m3 Galian tanah pondasi 59,982.77 29,391.56
0.0700 m3 Urugan pasir 185,993.11 13,019.52
0.1400 m3 Pasangan batu kosong 378,517.09 52,992.39
0.3600 m3 Pasangan batu kali 652,920.55 235,051.40
0.1617 m3 Urugan tanah kembali 19,994.26 3,233.07
1.4000 m2 Plesteran 44,032.01 61,644.81
0.0600 m3 Beton kolom 150 kg 2,958,826.61 177,529.60
0.0400 m3 Beton pengeresek 800,524.41 32,020.98
4.6134 m2 Tempelan paras ex batu tulung agung 159,408.00 735,412.87
0.1200 m2 Tempelan paras jogja 159,408.00 19,128.96
1,359,425.15
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

17a 1 M' PEKERJAAN TEMBOK PENYENGKER - TIPE 1


0.8000 m2 Tempelan Tulung Agung 159,408.00 127,526.40
3.2000 m2 Tempelan Palimanan 159,408.00 510,105.60
2.0000 bh Loaster 25 x 25 cm -

637,632.00

17b 1 M' PEKERJAAN TEMBOK PENYENGKER - TIPE 2


0.8000 m2 Tempelan Tulung Agung 159,408.00 127,526.40
5.6000 m2 Tempelan Palimanan 159,408.00 892,684.80

1,020,211.20
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

18 1 UNIT PEKERJAAN PILAR PADURAKSA ( BATU GUNUNG EX KARANGASEM )


- m3 Galian tanah pondasi 59,982.77 -
- m3 Urugan pasir 185,993.11 -
- m3 Pasangan batu kosong 378,517.09 -
- m3 Pasangan batu kali 652,920.55 -
- m3 Urugan tanah kembali 19,994.26 -
- m3 Beton kolom 150 kg 2,958,826.61 -
1.5200 m3 Beton pengeresek 800,524.41 1,216,797.10
2.3688 m2 Tempelan batu gunung ex karangasem - -
16.0000 bh Karang simbar -
8.0000 bh Karang tapel -
1.0000 bh Murda -
- bh Ikut celedu -
1,216,797.10

19 1 M1 PEKERJAAN TEMBOK ( BATU GUNUNG EX KARANGASEM )


0.4900 m3 Galian tanah pondasi 59,982.77 29,391.56
0.0700 m3 Urugan pasir 185,993.11 13,019.52
0.1400 m3 Pasangan batu kosong 378,517.09 52,992.39
0.3600 m3 Pasangan batu kali 652,920.55 235,051.40
0.1617 m3 Urugan tanah kembali 19,994.26 3,233.07
0.0600 m3 Beton kolom 150 kg 2,958,826.61 177,529.60
0.0400 m3 Beton pengeresek 800,524.41 32,020.98
4.7210 m2 Tempelan batu gunung ex karangasem -
543,238.51

20 1 M1 PEKERJAAN TEMBOK ( BATU PALIMANAN )


0.4900 m3 Galian tanah pondasi 59,982.77 29,391.56
0.0700 m3 Urugan pasir 185,993.11 13,019.52
0.1400 m3 Pasangan batu kosong 378,517.09 52,992.39
0.3600 m3 Pasangan batu kali 652,920.55 235,051.40
0.1617 m3 Urugan tanah kembali 19,994.26 3,233.07
0.0600 m3 Beton kolom 150 kg 772,424.49 46,345.47
0.0400 m3 Beton pengeresek 800,524.41 32,020.98
4.7210 m2 Tempelan batu palimanan -
412,054.38

21 I UNIT PELETASAN TINGGI 4,25 M


2.5650 m3 Galian tanah pondasi -
0.0700 m3 Urugan pasir -
0.1400 m3 Batu kosong -
2.1020 m3 Pasangan batu kali -
0.9580 m3 Beton tumbuk ( pengeresek ) -
0.5715 m3 Beton kolom 150 kg -
27.7930 m2 Pek.Batu tulung agung -
2.3700 m2 Pek.Paras jogja Putih -
1.0000 unit Steger -
-

21a I UNIT PELETASAN TINGGI 3.30 M


4.4000 m2 Tempelan Tulungagung 159,408.00 701,395.20
31.2800 m2 Tempelan Palimanan 159,408.00 4,986,282.24
2.0000 unit Murda - -
4.0000 unit Ikut Celedu Besar -
24.0000 unit Ikut Celedu Kecil - -
8.0000 unit Karang Simbar Besar -
28.0000 unit Karang Simbar Kecil - -
56.0000 unit Karang Tapel - -
1.0000 unit Steger -

5,687,677.44

22 1 M1 PEKERJAAN TEMBOK ALING-ALING


0.4900 m3 Galian tanah pondasi -
0.0700 m3 Urugan pasir -
0.1400 m3 Pasangan batu kosong -
0.3600 m3 Pasangan batu kali -
0.1617 m3 Urugan tanah kembali -
0.0600 m3 Beton kolom 150 kg -
0.0400 m3 Beton pengeresek -
4.7210 m2 Tempelan batu palimanan -
-

22a 1 M1 PEKERJAAN TEMBOK ALING-ALING


21.2800 m2 Tempelan batu palimanan 159,408.00 3,392,202.24
3.4800 m2 Tempelan tulung agung 159,408.00 554,739.84
16.0000 bh Karang simbar - -
16.0000 bh Karang tapel - -
4.0000 bh Loaster 25 x 25 cm - -
2.0000 bh Murda - -

3,946,942.08
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

23 1 M' PASANGAN DINDING PALENTER


4.4160 kg Semen Portland 1,120.00 4,945.92
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
12.5000 bh Batako 1,600.00
7.5000 kg Semen Portland 1,120.00
0.0270 m3 Pasir Pasang 165,000.00
1.9500 kg Besi Beton 8 mm 7,500.00
0.3200 oh Pekerja 76,643.70
0.1000 oh Tukang Batu 80,000.00
0.0100 oh Kepala Tukang 85,000.00
0.0150 oh Mandor 100,000.00
Total : - 9,400.92 9,400.92
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

24 1 M' PASANGAN TANGGA


4.4160 kg Semen Portland 1,120.00 4,945.92
0.0270 m3 Pasir Pasang 165,000.00 4,455.00
12.5000 bh Batako 1,600.00
1.0000 m' Pek. Batu tulung agung -
7.5000 kg Semen Portland 1,120.00
0.0270 m3 Pasir Pasang 165,000.00
1.9500 kg Besi Beton 8 mm 7,500.00
0.3200 oh Pekerja 76,643.70
0.1000 oh Tukang Batu 80,000.00
0.0100 oh Kepala Tukang 85,000.00
0.0150 oh Mandor 100,000.00
Total : - 9,400.92 9,400.92

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 67,500.00 67,500.00
0.2500 oh Tukang Batu 80,000.00 20,000.00
0.0250 oh Kepala Tukang 85,000.00 2,125.00
0.5000 oh Pekerja 76,643.70 38,321.85
0.0250 oh Mandor 100,000.00 2,500.00
Total : 62,946.85 67,500.00 130,446.85
2 Paving 10 x 20 cm tebal 6 cm K350 67,500.00 62,946.85 67,500.00 130,446.85
4 Paving 10 x 20 cm tebal 8 cm K225 77,800.00 62,946.85 77,800.00 140,746.85
5 Paving 10 x 20 cm tebal 8 cm K350 77,800.00 62,946.85 77,800.00 140,746.85
5 Paving 10 x 20 cm tebal 8 cm K425 77,800.00 62,946.85 77,800.00 140,746.85
7 Paving 20 x 20 cm tebal 6 cm K225 67,500.00 62,946.85 67,500.00 130,446.85
8 Paving 20 x 20 cm tebal 6 cm K350 67,500.00 62,946.85 67,500.00 130,446.85
10 Paving 20 x 20 cm tebal 8 cm K225 77,800.00 62,946.85 77,800.00 140,746.85
11 Paving 20 x 20 cm tebal 8 cm K350 77,800.00 62,946.85 77,800.00 140,746.85
12 Paving 20 x 20 cm tebal 8 cm K425 77,800.00 62,946.85 77,800.00 140,746.85
14 Paving 20 x 20 cm tebal 10 cm K225 87,900.00 62,946.85 87,900.00 150,846.85
15 Paving 20 x 20 cm tebal 10 cm K350 87,900.00 62,946.85 87,900.00 150,846.85
16 Paving 20 x 20 cm tebal 10 cm K425 87,900.00 62,946.85 87,900.00 150,846.85
18 Paving Tiga Berlian tebal 6 cm K225 67,800.00 62,946.85 67,800.00 130,746.85

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 87,900.00 87,900.00
0.0690 m3 Pasir Urug 135,000.00 9,315.00
0.5000 oh Tukang Batu 80,000.00 40,000.00
0.0500 oh Kepala Tukang 85,000.00 4,250.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.0500 oh Mandor 100,000.00 5,000.00
Total : 125,893.70 97,215.00 223,108.70

21 1 M2 PASANGAN KORAL SIKAT


1.5000 zak Koral Sikat 55,000.00 82,500.00
9.2800 zak Semen 1,120.00 10,393.60
0.2000 m3 Pasir pasang 165,000.00 33,000.00
0.2500 oh Tukang Batu 80,000.00 20,000.00
0.0100 oh Kepala Tukang 85,000.00 850.00
0.6250 oh Pekerja 76,643.70 47,902.31
0.0310 oh Mandor 100,000.00 3,100.00
Total : 71,852.31 125,893.60 197,745.91

22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225


1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 67,800.00 67,800.00
0.4500 zak Semen 50 Kg 1,120.00 504.00
0.0023 m3 Pasir Pasang 165,000.00 379.50
0.3500 oh Tukang Batu 80,000.00 28,000.00
0.0350 oh Kepala Tukang 85,000.00 2,975.00
0.9500 oh Pekerja 76,643.70 72,811.52
0.0950 oh Mandor 100,000.00 9,500.00
Total : 113,286.52 68,683.50 181,970.02
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 67,800.00 113,286.52 111,193.60 224,480.12
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 78,750.00 113,286.52 122,143.60 235,430.12

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 55,000.00 15,620.00
0.0710 kg Thiner 24,500.00 1,739.50
0.0300 oh Tukang Cat 80,000.00 2,400.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 15,651.55 17,359.50 33,011.05

25.a 1 M2 COATING BATU


0.5680 kg Cat Coating 55,000.00 31,240.00
0.0710 kg Thiner 24,500.00 1,739.50
0.0300 oh Tukang Cat 80,000.00 2,400.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 15,651.55 32,979.50 48,631.05

26 1 M2 RUMPUT MUTIARA
1.0000 m2 Rumput Mutiara -
0.0300 m3 Tanah Subur 70,000.00 2,100.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 13,251.55 2,100.00 15,351.55

27 1 M1 TANAMAN CROCOT
11.0000 m1 Tanaman Crocot -
0.0300 m3 Tanah Subur 70,000.00 2,100.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 13,251.55 2,100.00 15,351.55

28 1 BH TANAMAN SOKA
1.0000 bh Tanaman Soka -
0.0300 m3 Tanah Subur 70,000.00 2,100.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 13,251.55 2,100.00 15,351.55

29 1 M2 RUMPUT MUTIARA
1.0000 bh Tanaman Soka -
0.0300 m3 Tanah Subur 70,000.00 2,100.00
0.0030 oh Kep. Tukang 85,000.00 255.00
0.1500 oh Pekerja 76,643.70 11,496.55
0.0150 oh Mandor 100,000.00 1,500.00
Total : 13,251.55 2,100.00 15,351.55

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 13,000.00 104,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 5,000.00 10,000.00
15.0000 bj Klem clipsal 20 mm hitam 500.00 7,500.00
3.0000 bj Sock clipsal 20 mm hitam 1,500.00 4,500.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang 30,000.00
Total : 30,000.00 162,000.00 192,000.00
a 1 Bh. Pasang Saklar/ Stop Kontak
1.0000 bh Saklar tunggal [1 way 1 gang] setara clipsall 25,000.00 25,000.00
1.0000 bh Saklar double [1 way 2 gang] setara clipsall 30,000.00 30,000.00
1.0000 bh Stop kontak setara clipsall 30,000.00 30,000.00
1.0000 bh bok MK
Saklar tunggal [1 way 1 gang] setara clipsall - 25,000.00 25,000.00
b Saklar double [1 way 2 gang] setara clipsall - 30,000.00 30,000.00
c Stop kontak setara clipsall - 30,000.00 30,000.00
1 Bh. Pasang Lampu
1.0000 bh Lampu TL 2x18 Watt + kap lampu setara saka 750,000.00 750,000.00
1.0000 bh Lampu down light 14 Watt philip 80,000.00 80,000.00
1.0000 bh Material Bantu 25,000.00 25,000.00
d Lampu TL 2x18 Watt + kap lampu setara saka Total : 25,000.00 750,000.00 775,000.00
e Lampu down light 14 Watt philip Total : 25,000.00 80,000.00 105,000.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 13,000.00 130,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 10,000.00 30,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 5,000.00 5,000.00
15.0000 bj Klem clipsal 20 mm hitam 500.00 7,500.00
4.0000 bj Sock clipsal 20 mm hitam 1,500.00 6,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 10,000.00 10,000.00
1.0000 ttk Biaya pasang - - -
Total : - 194,500.00 194,500.00
2b PEKERJAAN PIPA REFRIGERANT, DRAIN AC dan POWER LISTRIK
1.0000 ls Pipa Refrigerant (1/4" X 1/2" ) -
1.0000 ls Kabel Control (3X2.5mm ) / Remote -
Instalasi Kabel Power (3X2.5mm )
16.0000 m - Kabel NYM 3x4 mm² -
5.0000 m - Conduit PVC dia 20 mm² 10,000.00 50,000.00
1.0000 bh - Tee doos 5,000.00 5,000.00
1.0000 bh - Inbow Dus 6,000.00 6,000.00
5.0000 bh - Sock 1,500.00 7,500.00
9.0000 bh - Klem conduit 500.00 4,500.00
1.0000 bh Instalasi Stop Kontak AC -
10.0000 m Pipa Pembuangan Air PVC AW 3/4" 6,200.00 62,000.00
2.0000 oh Pekerja 76,643.70 153,287.40
1.0000 oh Tukang AC 80,000.00 80,000.00
0.7500 oh Kepala Tukang 85,000.00 63,750.00
0.5000 oh Mandor 100,000.00 50,000.00
Total : 347,037.40 135,000.00 482,037.40

3c MEMASANG 1 UNIT AC Wall Mounted INVERTER 2 PK


1.0000 unit AC InVerter 2 PK 7,800,000.00 7,800,000.00
20% x harga pipa Perlengkapan 1,560,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.7500 oh Tukang AC 80,000.00 60,000.00
0.0625 oh Kepala Tukang 85,000.00 5,312.50
0.0375 oh Mandor 100,000.00 3,750.00
Total : 145,706.20 9,360,000.00 9,505,706.20

3d MEMASANG 1 UNIT AC Wall Mounted INVERTER 2 PK


1.0000 unit AC InVerter 1 PK 4,000,000.00 4,000,000.00
20% x harga pipa Perlengkapan 800,000.00
1.0000 oh Pekerja 76,643.70 76,643.70
0.7500 oh Tukang AC 80,000.00 60,000.00
0.0625 oh Kepala Tukang 85,000.00 5,312.50
0.0375 oh Mandor 100,000.00 3,750.00
Total : 145,706.20 4,800,000.00 4,945,706.20

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 6,500.00 162,500.00
8.0000 bt Pipa Clipsal 20 mm putih 10,000.00 80,000.00
1.0000 bh Tee dos clipsal 20 mm putih 5,000.00 5,000.00
25.0000 bj Klem clipsal 20 mm putih 500.00 12,500.00
5.0000 bj Sock clipsal 20 mm putih 1,500.00 7,500.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang - -
Total : - 273,500.00 273,500.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 35,000.00 700,000.00
6.0000 bt Pipa Clipsal 20 mm putih 10,000.00 60,000.00
2.0000 bh Tee dos clipsal 20 mm putih 5,000.00 10,000.00
20.0000 bj Klem clipsal 20 mm putih 500.00 10,000.00
6.0000 bj Sock clipsal 20 mm putih 1,500.00 9,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 6,000.00 6,000.00
1.0000 ttk Biaya pasang - -
Total : - 795,000.00 795,000.00
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

5 1 UNIT INSTALASI PENANGKAL PETIR (1 BLITZEM +2 TOMBAK)


3.0000 bh Blacksem 1" 100,000.00 300,000.00
3.0000 bh Sok Galvanis 1" 45,000.00 135,000.00
2.0000 bt GIP Galvanis 1" 200,000.00 400,000.00
47.5500 m1 Kawat BC 50 mm2 10,000.00 475,500.00
6.0000 bh Klem Begel 1" 25,000.00 150,000.00
3.0000 bh Klem sisir 50 mm2 400,000.00 1,200,000.00
1.0000 bh Kotak Kontrol 10 cm x 15 cm 200,000.00 200,000.00
1.0000 bh Perluv sok 1" 100,000.00 100,000.00
10.0000 bt Pipa Conduit PVC 3/4" 6,200.00 62,000.00
1.0000 ls Biaya pasang instalasi 300,000.00 300,000.0000
6.0000 m1 Biaya pengeboran 55,000.00 330,000.0000
Total : 630,000.00 3,022,500.00 3,652,500.00

6 1 UNIT MDP UKURAN 900 X 600 X 250


1.0000 bh MCCB 175A 3P -
1.0000 bh MCCB 125A 3P -
1.0000 bh MCCB 80A 3P -
1.0000 bh MCB 16A 3P -
1.0000 bh Pilot lamp / indikator lamp 220 V -
1.0000 bh Voltmeter 0 - 500V -
3.0000 bh Ampere meter 0 - 200A -
3.0000 bh Travo Arus / CT -
1.0000 bh selector Volt 7 position -
1.0000 bh Wiring material -
1.0000 bh Box indoor 900 x 600 x 250 -
1.0000 bh CU bars + asesoris -
-
7 1 UNIT SDP I UKURAN 700 X 500 X 200
1.0000 bh MCCB 125A 3P -
4.0000 bh MCB 6A 1P -
4.0000 bh MCB 10A 1P -
18.0000 bh MCB 16A 1P -
6.0000 bh MCB 16A 3P -
1.0000 bh Pilot lamp / indikator lamp 220 V -
1.0000 bh Voltmeter 0 - 500V -
3.0000 bh Ampere meter 0 - 200A -
3.0000 bh Travo Arus / CT -
1.0000 bh selector Volt 7 position -
1.0000 bh Wiring material -
1.0000 bh Box indoor 700 x 500 x 200 -
1.0000 bh CU bars + asesoris -
-
BILL OF QUANTITY
(BOQ)

PEKERJAAN : Pembangunan RKB SD No. 4 Mengwi


TAHUN : 2017

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT NO ANALISA SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6 7

I PEKERJAAN RKB LANTAI I


I.A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan bouwplank 87.76 m' I.2 49,298.37 4,326,424.95
2 Pek. Papan nama proyek 1.00 ls dihit. 250,000.00 250,000.00
Jumlah A 4,576,424.95
I.B PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Bore Pile 189.00 m' Dihit. 85,000.00 16,065,000.00
2 Pek. Galian tanah pondasi menerus 33.70 m3 II.1 59,982.77 2,021,373.66
3 Pek. Galian tanah pondasi Foot Plat 54.65 m3 II.1 59,982.77 3,277,938.69
4 Pek. Urugan kembali tanah Pondasi menerus 11.23 m3 II.9 19,994.26 224,597.07
5 Pek. Urugan kembali tanah Pondasi setempat 18.22 m3 II.9 19,994.26 364,215.41
6 Pek. Urugan limestone peninggian lantai 113.40 m3 II.15 123,660.93 14,023,148.90
7 Pek. Urugan pasir di bawah pondasi menerus 2.59 m3 II.11 185,993.11 481,722.15
8 Pek. Urugan pasir di bawah pondasi setempat 4.75 m3 II.11 185,993.11 883,839.26
9 Pek. Urugan pasir di bawah lantai 25.20 m3 II.11 185,993.11 4,687,026.37
10 Pek. Pasangan batu kosong 10.36 m3 III.8 378,517.09 3,921,437.01
11 Pek. Pasangan pondasi batu kali 1 : 5 31.41 m3 III.3 652,920.55 20,510,364.63
Jumlah B 66,460,663.15
I.C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pasang batu bata 1 pc : 5 ps 245.44 m2 IV.9 118,109.71 28,989,392.89
2 Pek. Pasang batu bata 1 pc : 3 ps 32.97 m2 IV.7 122,537.51 4,039,463.72
3 Pek. Plesteran dinding 1 pc : 5 ps 474.88 m2 V.5 44,032.01 20,909,885.07
4 Pek. Plesteran dinding 1 pc : 3 ps 65.93 m2 V.3 46,440.05 3,061,803.31
5 Pek. Acian dinding + beton 540.81 m2 V.18 28,818.74 15,585,447.79
Jumlah C 72,585,992.79
I.D PEKERJAAN BETON
1 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada pondasi file cap 2.38 m3 VII.4 800,524.41 1,902,045.99
2 Pek. Cor beton rabat 1 pc : 3 psr : 5 krl pada lantai 12.60 m3 VII.4 800,524.41 10,086,607.52
3 Pek. Bore Pile K300 -
a. Beton K.300 31.16 m3 VII.9 887,766.13 27,659,818.47
b. Begesting Pipa Paralon 1x pakai 441.00 m' Dihit. 100,000.00 44,100,000.00
c. Pembesian 4,987.04 kg VII.12a 9,273.51 46,247,358.91
4 Pek.File cap 1,2 x 1,5 ( F1 ) -
a. Beton K.250 17.28 m3 VII.7 859,770.65 14,856,836.83
b. Begesting Pasangan Batako 62.40 m2 IV.13 67,730.98 4,226,413.40
c. Pembesian 5,424.81 kg VII.12a 9,273.51 50,307,051.01
5 Pek.File cap 1,2 x 1,2 ( F2 ) -
a. Beton K.250 1.73 m3 VII.7 859,770.65 1,485,683.68
b. Begesting Pasangan Batako 6.24 m2 IV.13 67,730.98 422,641.34
c. Pembesian 474.31 kg VII.12a 9,273.51 4,398,538.96
5 Pek. Sloof 20/40 (K 250) -
a. Beton K.250 6.16 m3 VII.7 859,770.65 5,296,187.20
b. Pembesian 1,482.98 kg VII.12a 9,273.51 13,752,409.13
c. Begesting Sloof 2x pakai 61.60 m2 VII.15 108,414.72 6,678,347.00
6 Pek. Sloof 20/30 (K 250) -
a. Beton K.250 6.36 m3 VII.7 859,770.65 5,468,141.33
b. Pembesian 1,689.93 kg VII.12a 9,273.51 15,671,530.76
c. Begesting Sloof 2x pakai 63.60 m2 VII.15 108,414.72 6,895,176.45
7 Pek. Kolom K1 30 x 45 (K 250) -
a. Beton K.250 10.69 m3 VII.7 859,770.65 9,192,667.79
b. Pembesian 2,355.40 kg VII.12a 9,273.51 21,842,860.61
c. Begesting 2x pakai 118.80 m2 VII.16a 137,147.42 16,293,113.61
8 Pek. Kolom K2 30 x 30 (K 250) -
a. Beton K.250 2.59 m3 VII.7 859,770.65 2,228,525.52
b. Pembesian 541.18 kg VII.12a 9,273.51 5,018,621.98
c. Begesting 2x pakai 34.56 m2 VII.16a 137,147.42 4,739,814.87
9 Pek. Kolom K3 15 x 40 (K 250) -
a. Beton K.250 0.65 m3 VII.7 859,770.65 557,131.38
b. Pembesian 151.27 kg VII.12a 9,273.51 1,402,843.15
c. Begesting 2x pakai 11.88 m2 VII.16a 137,147.42 1,629,311.36
10 Pek. Kolom K4 20 x 20 (K 250) -
a. Beton K.250 0.29 m3 VII.7 859,770.65 247,613.95
b. Pembesian 90.20 kg VII.12a 9,273.51 836,437.00
c. Begesting 2x pakai 2.88 m2 VII.16a 137,147.42 394,984.57
11 Pek. Kolom KP 15 x 15 (K 250) -
a. Beton K.250 1.70 m3 VII.7 859,770.65 1,462,469.88
b. Pembesian 341.54 kg VII.12a 9,273.51 3,167,264.18
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT NO ANALISA SATUAN HARGA
( Rp ) ( Rp )
c. Begesting 2x pakai 2.16 m2 VII.16a 137,147.42 296,238.43
12 Pek. Lisplank Beton 15/80 (K 250) -
a. Beton K.250 1.20 m3 VII.7 859,770.65 1,029,145.47
b. Pembesian 45.13 kg VII.12a 9,273.51 418,527.22
c. Begesting 2x pakai 9.98 m2 VII.16a 137,147.42 1,368,045.52
13 Pek. Tangga Beton (K 250) -
a. Beton K.250 2.03 m3 VII.7 859,770.65 1,746,851.91
b. Pembesian 313.12 kg VII.12a 9,273.51 2,903,725.53
c. Begesting 2x pakai 63.77 m2 VII.20 191,689.84 12,224,425.44
14 Pek. Balok Tangga 15/20 (K 250) -
a. Beton K.250 0.11 m3 VII.7 859,770.65 91,887.99
b. Pembesian 28.11 kg VII.12a 9,273.51 260,700.51
c. Begesting 2x pakai 1.43 m2 VII.17a 164,689.84 234,683.02
15 Pek. Plat Meja wastafel Toilet (K 250) -
a. Beton K.250 0.08 m3 VII.7 859,770.65 68,093.84
b. Pek. Besi Beton Wiremesh BRC 2.11 kg VII.13 14,275.36 30,102.45
c. Begesting 2x pakai 1.22 m2 VII.17a 164,689.84 200,592.23
16 Pek. Balok Latei (bingkai Kusen) 159.62 m' VII.29 54,858.37 8,756,492.38
17 Pek. Besi Beton Wiremesh BRC Type M5 563.60 kg VII.13.b 14,275.36 8,045,563.92
Jumlah D 366,143,523.69

I.E PEKERJAAN PASANG KERAMIK LANTAI & DINDING


1 Pek. Pasang lantai keramik 40 x 40 cm 172.50 m2 XIII.1a 136,975.29 23,628,238.39
2 Pek. Pasang lantai keramik Km/Wc 20 x 20 cm 4.26 m2 XIII.2 168,523.59 717,067.88
3 Pek. Pasang keramik Plat Meja wastafel Km/Wc 20 x 20 cm 1.22 m2 XIII.2 168,523.59 205,261.73
4 Pek. Pasang dinding keramik 40 x 40 cm 54.75 m2 XIII.1a 136,975.29 7,499,397.40
5 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 21.01 m2 XIII.2a 168,523.59 3,540,680.63
6 Pek. Pasang border keramik 10 x 40 cm 62.00 m' XIII.3 19,128.48 1,185,965.95
7 Pek. Pasang border keramik Km/Wc 10 x 20 cm 4.80 m' XIII.3b 42,784.73 205,366.72
8 Pek. Pasang Plint keramik tangga 10 x 30 cm 210.00 m' XIII.3c 19,477.46 4,090,266.66
9 Pek. Pasang keramik 30 x 30 cm pada tangga 22.98 m2 XIII.1 162,700.59 3,738,046.06
Jumlah E 44,810,291.40
I.F PEK. PASANG KUSEN, PINTU DAN JENDELA
1 Pek. Pasang kusen 5/14 kayu Kamper 1.08 m3 VI.1 10,048,255.90 10,813,886.78
2 Pek. Pasang daun pintu panil kayu Kamper 7.92 m2 VI.5d 633,143.70 5,014,498.10
3 Pek. Pasang daun pintu teakwood + aluminium (WC) 2.74 m2 VI.12 557,493.96 1,525,303.47
4 Pek. Pasang daun pintu marine plywood 6 mm + formika (Shaft) 1.46 m2 VI.12 557,493.96 811,711.21
5 Pek. Pasang daun jendela kaca 5 mm 23.61 m2 VI.6 444,364.96 10,489,323.75
6 Pek. Pasang ventilasi Kaca 0.23 m2 XII.6 121,204.66 27,634.66
7 Pek. Pasang kunci pintu KM/WC 2.00 bh XII.5 174,332.87 348,665.75
8 Pek. Pasang kunci pintu 2 slaag 5.00 bh XII.1 217,116.44 1,085,582.19
9 Pek. Pasang Espagnoilet tanam 6.00 bh XII.5a 183,616.44 1,101,698.62
10 Pek. Pasang engsel pintu 30.00 bh XII.2 89,504.66 2,685,139.67
11 Pek. Pasang engsel jendela 72.00 bh XII.3 48,666.44 3,503,983.46
12 Pek. Pasang grendel 36.00 bh XII.5b 103,332.87 3,719,983.46
13 Pek. Pasang kait angin 72.00 bh XII.4 39,504.66 2,844,335.20
14 Pas. Hand Railing Tangga BSP Ø 2 28.74 m' Dihit 175,000.00 5,029,500.00
15 Pek. Almari Tanam Multiplek + Teaxwood Dipolitor 3.00 m2 Dihit 3,000,000.00 9,000,000.00
16 Pek. Pintu Harmonika 33.60 m2 Dihit 875,000.00 29,400,000.00
17 Pas. Kaca Cermin atas wastafel 2.00 bh Dihit 150,000.00 300,000.00
Jumlah F 87,701,246.32
I.G PEKERJAAN PLAFOND
1 Pek. Pasang plafond Gypsum 9 mm + Rangka Hollow 164.31 m2 IX.6a 91,939.37 15,106,557.88
2 Pek. Pasang plafond Kalsiboard 4,5 mm + Rangka Hollow 14.39 m2 IX.6b 97,217.37 1,398,471.87
3 Pek. Pasang plafond Kayu Semen Lap Sidding 8' + Rangka Hollow 60.20 m2 IX.6c 231,139.37 13,914,590.07
4 Pek. List plafond kayu semen Lap Sidding 8' 85.42 m' IX.8a 55,766.19 4,763,547.52
5 Pek. List plafon Gypsum 60.00 m' IX.8 22,766.18 1,365,971.10
Jumlah G 36,549,138.45
I.H PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding + beton 540.81 m2 XIV.3 21,502.37 11,628,687.70
2 Pek. Pengecatan Plafond 178.70 m2 XIV.3 21,502.37 3,842,366.72
3 Pek. Polituran list plafond 95.10 m2 XIV.7 45,718.62 4,347,877.53
4 Pek. Polituran Kayu kusen 13.88 m2 XIV.7 45,718.62 634,362.34
5 Pek. Polituran daun pintu + daun jendela 31.85 m2 XIV.7 45,718.62 1,456,192.97
6 Pek. Pengecatan Pintu Harmonika 67.20 m2 XIV.5 22,697.87 1,525,297.13
7 Pek. Waterproofing Km/Wc 21.01 m2 XIV.8 71,665.75 1,505,697.37
Jumlah H 24,940,481.76
I.I PEKERJAAN STYLE BALI
1 Pepalihan Paras di ukir pada Pintu Utama 3.72 m2 XV.7a 624,704.00 2,325,585.58
2 Tempelan Batu Candi pada Pintu Utama 14.19 m2 XV.2d 312,185.78 4,429,916.19
3 Tempelan Batu Candi pada Kolom 61.95 m2 XV.2d 312,185.78 19,339,908.93
4 List Batu Candi Hitam Dinding 19.00 m2 XV.2d 312,185.78 5,931,529.78
5 Pas. Bata Gosok Pada Dinding 13.30 m2 XV.3 319,704.00 4,252,063.20
6 Pas. Batu Candi Pada Dinding Selasar 37.32 m2 XV.2d 312,185.78 11,650,773.23
7 Pek. Plesteran SOS 44.40 m2 V.2 52,518.99 2,331,843.16
Jumlah I 50,261,620.06
I.J PEKERJAAN SANITAIR/ PLUMBING
a Instalasi pemipaan untuk air bersih
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT NO ANALISA SATUAN HARGA
( Rp ) ( Rp )
1 Pipa PVC AW Ø 1/2" 8.21 m1 X.8 14,604.17 119,919.25
b Instalasi pemipaan untuk air kotor (dari kloset) -
1 Pipa PVC AW Ø 4" 7.65 m1 X.10a 116,835.64 893,921.16
2 CO Ø 4" 2.00 pcs Dihit 20,000.00 40,000.00
c Instalasi pemipaan untuk air buangan -
1 Pipa PVC AW Ø 3" 9.78 m1 X.10 33,484.39 327,484.03
d Pekerjaan alat-alat sanitary -
1 Closet Jongkok setara TOTO 2.00 bh X.2a 648,509.21 1,297,018.42
2 Kran air 4.00 bh X.11 48,178.94 192,715.75
3 Floor Drain TOTO 2.00 bh X.12 460,116.44 920,232.87
4 Wastafel ex. TOTO 2.00 bh X.4 1,079,092.44 2,158,184.88
e Pekerjaan Lain-lain -
1 Pekerjaan Septictank + peresapan 1.00 unit X.13 5,653,763.54 5,653,763.54
Jumlah J 11,603,239.90
I.K PEKERJAAN ELEKTRIKAL
1 Kilometer PLN 1.00 unit Dihit 1,500,000.00 1,500,000.00
2 Box Panel MCB 1.00 unit Dihit 750,000.00 750,000.00
3 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 31.00 titik XVII.1 192,000.00 5,952,000.00
4 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 6.00 titik XVII.1 192,000.00 1,152,000.00
5 Instalasi Kabel dan Stop Kontak LCD 3.00 bh Dihit 192,000.00 576,000.00
6 Saklar tunggal [1 way 1 gang] 3.00 bh XVII.1a 25,000.00 75,000.00
7 Saklar ganda[1 way 2 gang] 5.00 bh XVII.1b 30,000.00 150,000.00
8 Stop kontak 6.00 bh XVII.1c 30,000.00 180,000.00
9 Pek.Pipa Refrigerant, drain AC dan Power listrik 6.00 bh Dihit 500,000.00 3,000,000.00
10 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 bh XVII.1d 475,000.00 8,550,000.00
11 Pek. Pas. Lampu down light PL 14 Watt philips 13.00 bh XVII.1e 150,000.00 1,950,000.00
12 Pek. Exhaust Fan 2.00 bh Dihit 750,000.00 1,500,000.00
Jumlah K 25,335,000.00
SUB TOTAL RKB LANTAI I 790,967,622.47
II PEKERJAAN RKB LANTAI II
II.A PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pasang batu bata 1 pc : 5 ps 333.92 m2 IV.9 118,109.71 39,438,795.15
2 Pek. Pasang batu bata 1 pc : 3 ps 20.18 m2 IV.7 122,537.51 2,472,208.97
3 Pek. Plesteran dinding 1 pc : 5 ps 616.13 m2 V.5 44,032.01 27,129,581.90
4 Pek. Plesteran dinding 1 pc : 3 ps 40.35 m2 V.3 46,440.05 1,873,866.96
5 Pek. Acian dinding + beton 656.48 m2 V.18 28,818.74 18,919,026.72
Jumlah A 89,833,479.71
II.B PEKERJAAN BETON
1 Pek. Kolom K2 30 x 45 (K 250)
a. Beton K.250 10.69 m3 VII.7 859,770.65 9,192,667.79
b. Pembesian 2,355.40 m2 VII.12a 9,273.51 21,842,860.61
c. Begisting 2x pakai 118.80 kg VII.16a 137,147.42 16,293,113.61
2 Pek. Kolom K2' 30 x 30 (K 250) -
a. Beton K.250 2.59 m3 VII.7 859,770.65 2,228,525.52
b. Pembesian 541.18 m2 VII.12a 9,273.51 5,018,621.98
c. Begisting 2x pakai 34.56 kg VII.16a 137,147.42 4,739,814.87
3 Pek. Kolom K3 15 x 40 (K 250) -
a. Beton K.250 0.65 m3 VII.7 859,770.65 557,131.38
b. Pembesian 151.27 kg VII.12 9,273.51 1,402,843.15
c. Begesting 2x pakai 11.88 m2 VII.16a 137,147.42 1,629,311.36
4 Pek. Kolom K4 20 x 20 (K 250) -
a. Beton K.250 0.29 m3 VII.7 859,770.65 247,613.95
b. Pembesian 90.20 kg VII.12 9,273.51 836,437.00
c. Begesting 2x pakai 2.88 m2 VII.16a 137,147.42 394,984.57
5 Pek. Kolom KP 15 x 15 (K 250) -
a. Beton K.250 1.70 m3 VII.7 859,770.65 1,462,469.88
b. Pembesian 341.54 kg VII.12 9,273.51 3,167,264.18
c. Begisting 2x pakai 2.16 m2 VII.16a 137,147.42 296,238.43
6 Pek. Balok B1 30/60 (K 250) -
a. Beton K.250 11.09 m3 VII.7 859,770.65 9,533,136.97
b. Pembesian 2,828.29 kg VII.12 9,273.51 26,228,186.17
c. Begesting 2x pakai 115.50 m2 VII.17a 164,689.84 19,021,676.75
7 Pek. Balok B2 20/40 (K 250) -
a. Beton K.250 4.70 m3 VII.7 859,770.65 4,044,361.14
b. Pembesian 1,843.73 kg VII.12 9,273.51 17,097,803.20
c. Begesting 2x pakai 67.20 m2 VII.17a 164,689.84 11,067,157.38
8 Pek. Balok B3 20/35 (K 250) -
a. Beton K.250 0.74 m3 VII.7 859,770.65 632,791.20
b. Pembesian 275.60 kg VII.12 9,273.51 2,555,779.71
c. Begesting 2x pakai 14.40 m2 VII.17a 164,689.84 2,371,533.72
9 Pek. Balok R1 20/40 (K 250) -
a. Beton K.250 13.12 m3 VII.7 859,770.65 11,280,190.93
b. Pembesian 814.11 kg VII.12 9,273.51 7,549,680.87
c. Begesting 2x pakai 39.00 m2 VII.17a 164,689.84 6,422,903.84
10 Pek. Balok R2 25/30 (K 250) -
a. Beton K.250 0.30 m3 VII.7 859,770.65 257,931.19
b. Pembesian 61.77 kg VII.12 9,273.51 572,855.06
c. Begesting 2x pakai 3.40 m2 VII.17a 164,689.84 559,945.46
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT NO ANALISA SATUAN HARGA
( Rp ) ( Rp )
11 Pek. Balok R3 20/30 (K 250) -
a. Beton K.250 5.88 m3 VII.7 859,770.65 5,055,451.42
b. Pembesian 1,102.31 kg VII.12 9,273.51 10,222,249.84
c. Begesting 2x pakai 78.40 m2 VII.17a 164,689.84 12,911,683.61
12 Pek. Pelat Lantai II (K 250) -
a. Beton K.250 29.92 m3 VII.7 859,770.65 25,728,636.70
b. Pek. Besi Beton Wiremesh BRC Type M8 1,361.59 kg VII.13b 14,275.36 19,437,150.71
c. Begesting Floordeck 249.38 m2 VII.18c 225,057.19 56,123,635.51
13 Pek. Plat Meja wastafel Toilet (K 250) -
a. Beton K.250 0.08 m3 VII.7 859,770.65 68,093.84
b. Pek. Besi Beton Wiremesh BRC Type M5 2.11 kg VII.13.b 14,275.36 30,102.45
c. Begesting 2x pakai 1.22 m2 VII.17a 164,689.84 200,592.23
14 Pek. Balok Latei 159.62 m' VII.29 54,858.37 8,756,492.38
Jumlah B 327,039,920.56
II.C PEKERJAAN PASANG KERAMIK LANTAI & DINDING
1 Pek. Pasang lantai keramik 40 x 40 cm 172.50 m2 XIII.1a 136,975.29 23,628,238.39
2 Pek. Pasang lantai keramik Km/Wc 20 x 20 cm 4.26 m2 XIII.2 168,523.59 717,067.88
3 Pek. Pasang keramik Plat Meja wastafel Km/Wc 20 x 20 cm 1.22 m2 XIII.2 168,523.59 205,261.73
4 Pek. Pasang dinding keramik 40 x 40 cm 80.36 m2 XIII.1a 136,975.29 11,007,334.71
5 Pek. Pasang dinding keramik Km/Wc 20 x 25 cm 21.01 m2 XIII.2a 168,523.59 3,540,680.63
6 Pek. Pasang border keramik 10 x 40 cm 90.00 m' XIII.3 19,128.48 1,721,563.47
7 Pek. Pasang border keramik Km/Wc 10 x 20 cm 4.80 m' XIII.3b 42,784.73 205,366.72
Jumlah C 41,025,513.52
II.D PEK. PASANG KUSEN, PINTU DAN JENDELA
1 Pek. Pasang kusen 5/14 kayu Kamper 1.08 m3 VI.1 10,048,255.90 10,813,886.78
2 Pek. Pasang daun pintu panil kayu Kamper 7.92 m2 VI.5d 633,143.70 5,014,498.10
3 Pek. Pasang daun pintu teakwood + aluminium (WC) 2.74 m2 VI.12 557,493.96 1,525,303.47
4 Pek. Pasang daun pintu marine plywood 6 mm + formika (Shaft) 1.46 m2 VI.12 557,493.96 811,711.21
5 Pek. Pasang daun jendela kaca 5 mm 23.61 m2 VI.6 444,364.96 10,489,323.75
6 Pek. Pasang ventilasi Kaca 0.23 m2 VI.12 121,204.66 27,634.66
7 Pek. Pasang kunci pintu KM/WC 2.00 bh XII.5 174,332.87 348,665.75
8 Pek. Pasang kunci pintu 2 slaag 5.00 bh XII.1 217,116.44 1,085,582.19
9 Pek. Pasang Espagnoilet tanam 6.00 bh XII.5a 183,616.44 1,101,698.62
10 Pek. Pasang engsel pintu 30.00 bh XII.2 89,504.66 2,685,139.67
11 Pek. Pasang engsel jendela 72.00 bh XII.3 48,666.44 3,503,983.46
12 Pek. Pasang grendel 36.00 bh XII.5b 103,332.87 3,719,983.46
13 Pek. Pasang kait angin 72.00 bh XII.4 39,504.66 2,844,335.20
14 Pas. Hand Railing Tangga BSP Ø 2 15.76 m' Dihit 175,000.00 2,758,000.00
15 Pek. Almari Tanam Multiplek + Teaxwood Dipolitor 3.00 m2 Dihit 3,000,000.00 9,000,000.00
15 Pas. Kaca Cermin atas wastafel 2.00 bh Dihit 150,000.00 300,000.00
Jumlah D 56,029,746.32
II.E PEKERJAAN ATAP DAN PLAFOND
1 Pek. Pasangan kap baja ringan Profil UK 75 (Luas Atap Datar) 307.40 m2 Dihit 165,000.00 50,721,000.00
2 Pek. Pasang atap genteng Pletong 379.20 m2 VIII.1 70,106.56 26,584,083.17
3 Pek. Pasang bubungan genteng Karang Pletong 53.07 m' VIII.3 89,047.48 4,725,749.76
4 Pek. Lisplank Eave 2 in 1 85.16 m' VI.22c 85,931.04 7,317,887.08
5 Pek. Pasang murda paras 2.00 bh Dihit 150,000.00 300,000.00
6 Pek. Pasang ikut celedu paras 4.00 bh Dihit 100,000.00 400,000.00
7 Pek. Pasang plafond Gypsum 9 mm + Rangka Hollow 164.31 m2 IX.6a 91,939.37 15,106,557.88
8 Pek. Pasang plafond Kalsiboard 4,5 mm + Rangka Hollow 24.37 m2 IX.6b 97,217.37 2,369,138.70
9 Pek. Pasang plafond Kayu Semen Lap Sidding 8' + Rangka Hollow 194.04 m2 IX.6c 231,139.37 44,850,283.35
10 Pek. List plafon Kayu Semen Lap Siding 8' 125.58 m' IX.8a 55,766.19 7,003,117.51
11 Pek. List plafon Kayu 222.00 m' IX.8 22,766.18 5,054,093.07
Jumlah E 164,431,910.53
II.F PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding + beton 540.81 m2 XIV.3 21,502.37 11,628,687.70
2 Pek. Pengecatan Plafond 218.82 m2 XIV.3 21,502.37 4,705,121.53
3 Pek. Polituran list plafond 53.28 m2 XIV.7 45,718.62 2,435,888.18
4 Pek. Polituran Kayu kusen 13.88 m2 XIV.7 45,718.62 634,362.34
5 Pek. Polituran daun pintu + daun jendela 49.01 m2 XIV.7 45,718.62 2,240,724.53
6 Pek. Waterproofing Km/Wc 21.01 m2 XIV.8 71,665.75 1,505,697.37
Jumlah F 23,150,481.64
II.G PEKERJAAN STYLE BALI
1 Tempelan Batu Candi di ukir pada Pintu Utama 3.72 m2 XV.7a 624,704.00 2,325,585.58
2 Tempelan Batu Candi pada Pintu Utama 14.19 m2 XV.2d 312,185.78 4,429,916.19
3 Tempelan Batu Candi pada Kolom 61.95 m2 XV.2d 312,185.78 19,339,908.93
4 List Batu Candi Hitam Dinding 19.00 m' XV.2d 312,185.78 5,931,529.78
5 Pas. Bata Gosok Pada Dinding 13.30 m2 XV.3 319,704.00 4,252,063.20
6 Pas. Batu Candi Pada Dinding Selasar Dan Balkon 81.45 m2 XV.2d 312,185.78 25,425,970.67
Jumlah G 61,704,974.35
II.H PEKERJAAN SANITAIR/ PLUMBING
a Instalasi pemipaan untuk air bersih
1 Pipa PVC AW Ø 1/2" 11.81 m1 X.8 14,604.17 172,494.27
b Instalasi pemipaan untuk air kotor (dari kloset) -
1 Pipa PVC AW Ø 4" 11.45 m1 X.10a 116,835.64 1,337,896.59
2 CO Ø 4" 2.00 pcs Dihit 20,000.00 40,000.00
c Instalasi pemipaan untuk air buangan -
1 Pipa PVC AW Ø 3" 13.58 m1 X.10 33,484.39 454,724.71
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT NO ANALISA SATUAN HARGA
( Rp ) ( Rp )
d Pekerjaan alat-alat sanitary -
1 Closet Jongkok setara TOTO 2.00 bh X.2a 648,509.21 1,297,018.42
2 Kran air 4.00 bh X.11 48,178.94 192,715.75
3 Floor Drain TOTO 2.00 bh X.12 460,116.44 920,232.87
4 Wastafel ex. TOTO 2.00 bh X.4 1,079,092.44 2,158,184.88
Jumlah H 6,573,267.50
II.I PEKERJAAN ELEKTRIKAL
1 Box Panel MCB 1.00 unit Dihit 1,500,000.00 1,500,000.00
2 Instalasi titik lampu penerangan kabel NYM 3 x 2,5 mm2 dalam konduit 31.00 titik XVII.1 192,000.00 5,952,000.00
3 Instalasi stop kontak biasa kabel NYM 3 x 2,5 mm dalam konduit 6.00 titik XVII.1 192,000.00 1,152,000.00
4 Instalasi Kabel dan Stop Kontak LCD 3.00 bh Dihit 192,000.00 576,000.00
5 Saklar tunggal [1 way 1 gang] 3.00 bh XVII.1a 25,000.00 75,000.00
6 Saklar ganda[1 way 2 gang] 5.00 bh XVII.1b 30,000.00 150,000.00
7 Stop kontak 6.00 bh XVII.1c 30,000.00 180,000.00
8 Pek. Pas. Lampu TL 2 x 18 Watt + kap lampu setara saka 18.00 bh XVII.1d 475,000.00 8,550,000.00
9 Pek. Pas. Lampu down light PL 14 Watt philips 13.00 bh XVII.1e 150,000.00 1,950,000.00
10 Pek.Pipa Refrigerant, drain AC dan Power listrik 6.00 bh Dihit 500,000.00 3,000,000.00
11 Pek. Exhaust Fan 2.00 bh Dihit 750,000.00 1,500,000.00
12 Pek. Pas. Penangkal Petir (1 Blitzem + 2 Tombak) 1.00 bh XVII.5 3,652,500.00 3,652,500.00
Jumlah I 28,237,500.00
SUB TOTAL RKB LANTAI 2 798,026,794.12
TOTAL PEKERJAAN RKB 1,588,994,416.60
E PEKERJAAN PLANTER BOX RKB
1 Pekerjaan Galian 0.518 m3 II.1 59,982.77 31,095.07
2 Pasangan Batako 17.234 m2 IV.13 67,730.98 1,167,297.45
3 Plesteran 34.469 m2 V.5 44,032.01 1,517,723.33
4 Urugan Tanah Subur 2.292 m3 II.14 127,321.85 291,769.48
5 Pasangan Batu Candi 1.072 m2 XV.2d 312,185.78 334,507.06
6 Plat Beton 0.180 m3 VII.2 748,967.79 134,814.20
7 Batu Koral Lepas 0.144 m3 XV.21 100,000.00 14,400.00
8 Pipa Pembuangan Ø2.5" 6.000 m1 X.10 33,484.39 200,906.34
9 Wastafel ex. TOTO 2.000 bh X.4 1,079,092.44 2,158,184.88
Jumlah B 5,850,697.81