Abdulaziz Al Sulayyim_20231127_V1

Work Permit Regist


Project : ADI

Permit Name of
S.N Area / Location Activity
Type / No. Company

1 Hot Work / HW-02 MIDAS Storage Area Fixing Steel Structure for
Backside IDAC System

2 Hot Work / HW-01 AWAJEM Building B01 Cutting Stucked Steel Pins
Backside

Storage Area Placing Rubber on Height on


3 Height / WAH-06 MIDAS
Backside Steel Structure

Pumps Room Excavation for Rectifying


4 Excavation / EX-04 AWAJEM
Parking Area Leakage from Pipe

Pumps Room Working inside the Confined


5 Confined / CS-04 AWAJEM
Parking Area Space for fixing the pipe

6 Height / WAH-07 SFCL Building B01 Cleaning Glass At Height

10

11

12

13
14
15
16
17
18
19
20
21
22

HSSE-ADI Work Permit Register


Abdulaziz Al Sulayyim_20231127_V1

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

HSSE-ADI Work Permit Register


Abdulaziz Al Sulayyim_20231127_V1

Work Permit Register


WPR23001
Work In-charge Issued
Valid up to
Date / Issued by
Name Contact. No. Date / Time
Time
26-11-23/ Muhamm 30-11-2023/
Mr.Loay 567834670
10:30 AM ad Noman 04:00PM

26-11-23/ Muhamm 30-11-2023/


Mr.Amir Sohail 535703169
02:30 PM ad Noman 04:00PM

28-11-23/ Muhamm 05-12-2023/


Mr.Loay 567834670
01:30 PM ad Noman 04:00PM

30/11/2023 Muhamm 07-12-2023/


Mr.Nafady 563432475
09:30AM ad Noman 04:00PM

30/11/2023 Muhamm 07-12-2023/


Mr.Nafady 563432475
09:30AM ad Noman 04:00PM

03/12/2023 Muhamm 10-12-2023/


Mr. Ismail 546958087
06:30AM ad Noman 04:00PM

HSSE-ADI Work Permit Register


Abdulaziz Al Sulayyim_20231127_V1

WPR23001

Permit Closed
Date / Time/By whom?
30-11-2023/03:00PM/
Mr.Loay

30-11-2023/03:00PM/
Mr.Amir Sohail

05-12-2023/02:30PM/
Mr.Loay

07-12-2023/03:00PM/
Mr.Nafady

07-12-2023/03:00PM/
Mr.Nafady