GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN M.METERS


UNLESS NOTED OTHERWISE
2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATIONS.
3. CHARACTERISTIC CUBE STRENGTH OF REINFORCED CONCRETE
AFTER 28 DAYS IS 35MPa WITH MINIMUM CEMENT CONTENT
400 Kg/m 3 .
4. CHARACTERISTIC CUBE STRENGTH OF PLAIN CONCRETE AFTER
28 DAYS IS 20MPa WITH MINIMUM CEMENT CONTENT 250 Kg/m 3.
5. YIELD STRENGTH OF REINFORCED BARS IS 420 N/mm2.
6. THE CLEAR COVER FOR REINFORCEMENT SHALL BE

G F E J AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:


a.
b.
-- FOUNDATION COVER= 70 mm
--WALLS 50 mm
c. -- COLUMNS 30 mm
d. -- BEAMS AND SLABS 25 mm
7. FOUNDATIONS ARE DESIGNED BASED ON BEARING
CAPACITY IS 300 kPa AS PER GEOTECHNICAL REPORT
8. ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT SHOULD BE
49000 IMPLEMENTED.
9. SOIL BELOW FOUNDATION (FORMATION LEVEL) TO BE COMPACTED
UP TO 95%.
10. ALL FIXATION DETAILS AND EMBEDDED PARTS SHOULD BE
COORDINATED WITH FINAL SUPPLIER DRAWINGS.
14200 1200 33600 11.
12.
203
SPLICE LENGTH CALCULATED AS PER ECP 2020 4-2-5-4-1 / C&D
BAR BENDING RADIUS CALCULATED AS PER DETAILS CODE 2001 203
3-3

8550 5650 31960 2840 Y


Mark [mm]
Shape
[mm]
Length
[mm] QTY Mass
[kg]
% of
total Notes

500
1 Y16 11158 11634 258 4737.48 7.8% H.Z-O.F; H.Z-I.F

2 Y16 12000 12000 740 14015.66 23.1% H.Z-O.F; H.Z-I.F

500
3 Y16 7999 8475 40 535.08 0.9% HZ-OF

500

500
4 Y16 4433 102 713.73 1.2% H.Z-I.F
3481

5 Y16 12000 1601 12000~1601 42 450.81 0.7% H.Z-I.F

6 Y16 9823 12000 9823~12000 8 137.78 0.2% H.Z-I.F

700
7 Y16 2400 42 159.09 0.3% H.Z-I.F
1724

8 Y16 12000 12000 38 719.71 1.2% H.Z-I.F

500
10 Y16 11524 12000 102 1931.83 3.2% H.Z-I.F

513 513

499

500
11 Y16 2400 102 386.32 0.6% H.Z-I.F
470

12 Y16 3000 3000 102 482.97 0.8% H.Z-I.F

13 Y18 6000 6000 284 3403.73 5.6% VL-I.F

14 Y18 8000 8000 150 2396.95 4% VL-I.F

15 Y16 6000 6000 260 2462.16 4.1% VL-I.F

106
16 Y16 12000 36 681.82 1.1%

800
H.Z-I.F

( +75.430)
11142

3590mm
Slab Thickness 300 mm

784
783
17 Y16 5000 36 284.12 0.5% H.Z-I.F
3481

T.O.C(+75.43)
(+74.43)

224
789

470
18 Y16 2400 36 136.39 0.2% H.Z-I.F
789

224
19 Y16 3500 3500 36 198.87 0.3% H.Z-I.F

1.00m
500

3 Y16/100 N=10 L=8475 E=1m 960mm

500
20 Y16 2000 8 25.25 0% H.Z-I.F
1524

7999
11 Y16/100

800
21 Y16 12000 38 719.74 1.2% HZ-OF
12 Y16/100 N=51 11224

N=51 L=2400
L=3000 E=5.07m 4 Y16/100 22 Y16 9863 1343 9863~1343 38 336.03 0.6% HZ-OF

E=5.07m N=51
L=4433

5.07m
960mm

500

500
500
23 Y16 12000~2653 36 416.27 0.7% HZ-OF
960mm E=5.07m 12000 2653

970mm
11524 3481
500

12000

5.07m
5.07m
24 Y16 8000 8000 150 1893.89 3.1% VL-O.F
12000

6.86m
2 Y16/100 10 Y16/100
11158 2 Y16/100 N=51
1 Y16/100 N=62 N=69 25 Y16 5477 7905 5477~7905 286 3020.33 5% VL-O.F
L=12000
6.11m
6.12m

N=62 L=12000 L=12000


L=11634 E=6.11m E=5.07m
E=6.86m H.Z-I.F
E=6.12m H.Z-I.F H.Z-I.F
26 Y16 5425 7928 5425~7928 286 3013.79 5% VL-I.F

H.Z-I.F
8650

27 Y18 6000 6000 260 3116.17 5.1% VL-I.F

106 17 Y16/100

1.80m
(+68.31)
224 224 N=18

1.80m

784
800
L=5000

783
10134
28 Y16 11186 16 282.48 0.5% HZ-OF

800
300

1.80m
E=1.8m

789

789
16 Y16/100 N=18 L=12000 E=1.8m
3500 1050

11142 3481 29 Y16


10640
11692~2102 36 391.89 0.6% HZ-OF

800
800
300

19 Y16/100 N=18 L=3500 E=1.8m 470 18 Y16/100 N=18 L=2400 E=1.8m


300

20 Y16/100 N=4 L=2000 E=0.38m 960mm 5 Y16/100


500

30 Y16 3684~1420 12 48.34 0.1% HZ-OF


N=21 3684 1420
0.38m

L=12000~1601
1524 12000
700

E=2.02m

2.02m

800
31 Y16 3000 36 170.45 0.3% HZ-OF
2 Y16/100 12000 H.Z-I.F
960mm 2224

(+65.78)
8 Y16/100 N=19 L=12000 E=1.89m H.Z-I.F
1.89m

1724 N=25 6 Y16/100 EVERY STEP (496.31 mm) Variable


2.43m

500
7 Y16/100 L=12000 N=4
32 Y16 6000 102 965.98 1.6% HZ-OF
2.05m

5524

N=21 E=2.43m L=9823~12000


L=2400 H.Z-I.F E=0.4m 33 Y22 3000 3000 180 1611.38 2.7% STARTER BAR

E=2.05m H.Z-I.F
0.40m

Variable
H.Z-I.F 2347

34 Y18 3000 436 2612.81 4.3% VL-I.F

680
900

3351

35 Y18 4000 284 2269.24 3.7% VL-I.F

676
1807

36 Y18 2400 260 1246.32 2.1%

620
VL-I.F

37 Y16 6000 6000 284 2689.37 4.4% VL-O.F

2584

38 Y16 3000 284 1344.7 2.2% VL-O.F

440
1513

39 Y16 2000 2 6.31 0% VL-O.F

510
1037

40 Y16 1500 260 615.46 1% VL-O.F

487
21650 14350 15260
Total mass = 60631 kg

8550 5650 31960 2840 REFERENCE DRAWINGS:


DOCUMENT NO. DOCUMENT TITLE REV.

G F E J

Hydro . Envir & Infra str . Studies

Wall elevation - Wall NO 02 ‫سا‬

H.Z-IF-Reniforcment PS (04)

NO = 2 00 FIRST ISSUE FOR APPROVAL/FOR CONSTRUCTION

PS04 - PUMP HOUSE N.T.S


Wall reinforce detail-NO 02
7/30
1053-SHD-PUS-RF-005315 00

You might also like