G F E J 3.
OF THE SPECIFICATIONS.
CHARACTERISTIC CUBE STRENGTH OF REINFORCED CONCRETE
AFTER 28 DAYS IS 35MPa WITH MINIMUM CEMENT CONTENT
400 Kg/m 3 .
4. CHARACTERISTIC CUBE STRENGTH OF PLAIN CONCRETE AFTER
28 DAYS IS 20MPa WITH MINIMUM CEMENT CONTENT 250 Kg/m 3.
5. YIELD STRENGTH OF REINFORCED BARS IS 420 N/mm2.
6. THE CLEAR COVER FOR REINFORCEMENT SHALL BE
49000 AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:
a. -- FOUNDATION COVER= 70 mm
b. --WALLS 50 mm
c. -- COLUMNS 30 mm
d. -- BEAMS AND SLABS 25 mm
14200 1200 33600 7. FOUNDATIONS ARE DESIGNED BASED ON BEARING
CAPACITY IS 300 kPa AS PER GEOTECHNICAL REPORT
8. ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT SHOULD BE
IMPLEMENTED.
9. SOIL BELOW FOUNDATION (FORMATION LEVEL) TO BE COMPACTED
8550 5650 30960 3850 UP TO 95%.
10. ALL FIXATION DETAILS AND EMBEDDED PARTS SHOULD BE
COORDINATED WITH FINAL SUPPLIER DRAWINGS.
203
11. SPLICE LENGTH CALCULATED AS PER ECP 2020 4-2-5-4-1 / C&D
203
12. BAR BENDING RADIUS CALCULATED AS PER DETAILS CODE 2001 3-3
500
1 Y16 11158 11634 258 4737.48 7.8% H.Z-O.F; H.Z-I.F
500
3 Y16 7999 8475 40 535.08 0.9% HZ-OF
500
500
4 Y16 4433 102 713.73 1.2% H.Z-I.F
3481
700
7 Y16 2400 42 159.09 0.3% H.Z-I.F
1724
500
FC1*
10 Y16 11524 12000 102 1931.83 3.2% H.Z-I.F
499
500
11 Y16 2400 102 386.32 0.6% H.Z-I.F
planted on pier
470
pier Started from level 74.43 12 Y16 3000 3000 102 482.97 0.8% H.Z-I.F
TO level 79.03
33 30Y22 L=3000 STARTER BAR ( +75.430) 13 Y18 6000 6000 284 3403.73 5.6% VL-I.F
1680mm
(+74.43)
14 Y18 8000 8000 150 2396.95 4% VL-I.F
3000
15 Y16 6000 6000 260 2462.16 4.1% VL-I.F
1680mm
1680mm
33 30Y22 L=3000 STARTER BAR 33 30Y22 L=3000 STARTER BAR 510 487
106
16 Y16 12000 36 681.82 1.1%
800
380mm 1320mm
H.Z-I.F
E=12.99m
21.71m
L=2000
11142
1037
12.99m
40 Y16/100
L=1500
3000
3000
N=130
1513
39 Y16
N=1
960mm
440
784
783
17 Y16 5000 36 284.12 0.5% H.Z-I.F
620mm 700mm
620mm 700mm
3481
1320mm
224
38 Y16/100
E=14.2m
789
L=3000
470
18 Y16 2400 36 136.39 0.2%
N=142
H.Z-I.F
789
224
14.20m
2584
H.Z-I.F
500
20 Y16 2000 8 25.25 0% H.Z-I.F
960mm
6000
1524
800
21 Y16 11224
12000 38 719.74 1.2% HZ-OF
8000
23 Y16 12000 2653 12000~2653 36 416.27 0.7% HZ-OF
8650
37 Y16/100
E=14.2m
L=6000
960mm
(+68.31)
N=142
8000
6000
910mm
5477 7905
960mm
790mm
Starter bars
26 Y16 5425 7928 5425~7928 286 3013.79 5% VL-I.F
860mm
27 Y18 6000 6000 260 3116.17 5.1% VL-I.F
Starter bars
10134
960mm
(+65.78)
28 Y16 11186 16 282.48 0.5% HZ-OF
800
960mm
980mm
300
1050
10640
29 Y16 11692~2102 36 391.89 0.6% HZ-OF
800
800
300
Starter bars
Starter bars
300
780mm
760mm
800
31 Y16 3000 36 170.45 0.3% HZ-OF
2224
500
32 Y16 5524
6000 102 965.98 1.6% HZ-OF
2347
680
3351
676
1807
620
VL-I.F
2584
440
1513
510
8550 5650 30960 3850 40 Y16
1037
487
Total mass = 60631 kg
REFERENCE DRAWINGS:
DOCUMENT NO. DOCUMENT TITLE REV.
G F E J
NO = 2 PS (04)
N.T.S
PS04 - PUMP HOUSE
Wall reinforce detail-NO 02
10/30
1053-SHD-PUS-RF-005315 00