Professional Documents
Culture Documents
Final Print Sheet For Beam at 3.5m Combined
Final Print Sheet For Beam at 3.5m Combined
250
250
250
250
STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12 3-T12
SECTION 1-1 (B1) SECTION 2-2 (B1) SECTION 1-1 (B2) SECTION 2-2 (B2) SECTION 3-3 (B2)
250
250
250
250
250
250
STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12 3-T12 3-T12
SECTION 1-1 (B3) SECTION 2-2 (B3) SECTION 3-3 (B3) SECTION 1-1 (B4) SECTION 2-2 (B4) SECTION 3-3 (B4)
F D A
B10 3 12 E
B 10000 150 170 9065 40 10 650 48
C
A
S11 14 8 B 995 200 200 32
A
S12 8 8 B 995 200 200 32
A
S13 14 8 B 995 200 200 32
A
S14 27 8 B 995 200 200 32
A
S15 27 8 B 995 200 200 32
A
S16 18 8 B 995 200 200 32
A
S17 10 8 B 995 200 200 32 STRUCTURAL DRAWING:
300
300
300
STP 2L-T8 STP 2L-T8 STP 2L-T8
300
300
STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12 3-T12
250 250
3-T16 3-T12
300
300
WT(kg) 50 97 24 171
Project:
Bijanbari Resort
Reception
DATE:
SCALE:----- @ ___ 31-12-2022
1 2 B 1 C 1 2 D 1 2 E
250 250 250 250 250
4083 4083 4083 5251
3-T12
C6 1 2 1 1 2 C7 1 2 C8
F D A
B6 3 12 E
B 10005 150 220 9020 40 10 650 48
C
A
S7 25 8 B 1095 200 250 32
A
S8 7 8 B 1095 200 250 32
A
S9 22 8 B 1095 200 250 32
STRUCTURAL DRAWING:
A TOP BEAM LAYOUT
S10 8 8 B 1095 200 250 32
Project:
A Bijanbari Resort
S11 24 8 B 1095 200 250 32 Reception
A DATE:
S12 28 8 B 1095 200 250 32 SCALE:----- @ ___ 31-12-2022
300
300
300
300
300
STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12 3-T12
SECTION 1-1 (B9) SECTION 2-2 (B9) SECTION 1-1 (B10) SECTION 2-2 (B10) SECTION 3-3 (B10)
300
300
300
300
300
STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12 3-T12 3-T12
SECTION 1-1 (B11) SECTION 2-2 (B11) SECTION 3-3 (B11) SECTION 1-1 (B12) SECTION 2-2 (B12) SECTION 3-3 (B12)
WT(kg) 62 92 43 197
STRUCTURAL DRAWING:
TOP BEAM LAYOUT
Project:
Bijanbari Resort
Reception
DATE:
SCALE:----- @ ___ 31-12-2022
3-T12
F D A
B10 3 12 E
B 10000 150 220 9015 40 10 650 48
C
A
S11 37 8 B 1095 200 250 32
A
S12 13 8 B 1095 200 250 32
A
S13 6 8 B 1095 200 250 32
A
S14 13 8 B 1095 200 250 32
A
S15 13 8 B 1095 200 250 32
A
S16 6 8 B 1095 200 250 32 STRUCTURAL DRAWING:
250 250
3-T12 3-T12
STP 2L-T8 STP 2L-T8
250
250
3-T12 3-T12
B13 B14
250 250
3-T12 3-T16
250
STP 2L-T8
250
STP 2L-T8
3-T12 3-T12
250 250
250
3-T12 3-T16
3-T16
STP 2L-T8
250
250
STP 2L-T8
250
STP 2L-T8
3-T12 3-T12
3-T12
3-T12
F D A
B7 3 12 E
B 10000 150 170 9065 40 10 650 48
C
A
S8 14 8 B 995 200 200 32
A
S9 18 8 B 995 200 200 32
A
S10 14 8 B 995 200 200 32
A
S11 18 8 B 995 200 200 32
A STRUCTURAL DRAWING:
S12 14 8 B 995 200 200 32
TOP BEAM LAYOUT
A
S13 18 8 B 995 200 200 32 Project:
Bijanbari Resort
A
S14 23 8 B 995 200 200 32 Reception
DATE:
A SCALE:----- @ ___
S15 17 8 995 200 200 32
31-12-2022
B
DRAWN, DESIGNED & APPROVED by:
Indranil Bhattacharya 3.
TOP BEAM BBS
250
250 250
3-T12
STP 2L-T8
250
3-T12 3-T16
3-T12 STP 2L-T8 STP 2L-T8
250
250
3-T12 3-T12
250
250
3-T16 3-T12
STP 2L-T8
250
STP 2L-T8
250
3-T12 3-T12
1 1 2 1 2 3 1 2 5
350 350 400 350
2150 3375 3375
865 865
3-T12
250 250
3-T16 3-T12 3-T16
350
350
350
STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T16
3-T12 3-T12 3-T12
350
350
STP 2L-T8 STP 2L-T8
3-T12 3-T12 SECTION 1-1 (B21) SECTION 2-2 (B21) SECTION 3-3 (B21)
SECTION 1-1 (B20) SECTION 2-2 (B20)
WT(kg) 27 47 25 99
DRAWN, DESIGNED & APPROVED by:
Indranil Bhattacharya 3.
TOP BEAM BBS
1 1 2 2 1 2 3 4
350 400 550
2125 6875
3-T12
2292 2292
C15 1 2 C10 1 2 3 C2
B20:250x350 B21:250x350
STRUCTURAL DRAWING:
TOP BEAM LAYOUT
Project:
Bijanbari Resort
Reception
DATE:
SCALE:----- @ ___ 31-12-2022
350
STP 2L-T8 STP 2L-T8
3-T12 3-T12 WT(kg) 29 47 25 101
SECTION 1-1 (B22) SECTION 2-2 (B22)
1 1 2 2 1 2 3 4
350 400 550
2125 6875
250 250 250
865 1720 1720
350
350
350
STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T12 3-T12 3-T12 3-T12
5-2L-T8 5-2L-T8 19-2L-T8 9-2L-T8 19-2L-T8
@235 C/C 5-2L-T8 @235 C/C @130 C/C @235 C/C @130 C/C SECTION 1-1 (B23) SECTION 2-2 (B23) SECTION 3-3 (B23)
708 @130 C/C 708 2292 2292
C16 1 2 C11 1 2 3 C3
B22:250x350 B23:250x350
A
S11 19 8 1195 200 300 32
B DRAWN, DESIGNED & APPROVED by: