You are on page 1of 80

Lembar Identitas :

Desa : Batay

Kecamatan : Gumay Talang

Batay : November 2017

KEPALA DESA BATAY,

Kepala Desa : HERLI JUNAIDI


PENGHITUNGAN PAJAK-PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2016
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Gedung Posyandu

NAMA VOLUME HARGA NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB Pagu di
NOMOR BAHAN / MATERIAL / TERPAKAI SAMPAI TRANSAKSI TARIF PMLB / LKA
DPP PPN PPh PMLB
BARANG / PERALATAN KE DESA M³
1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 11

1. - Gerobak sorong 1.00 100,000.00 - - - - - 455,000.00


2 - Ember aduk besar 15.00 0.00 0.00 0.00 0.00 - - 10,000.00
3 - Benang nilon 5.00 0.00 0.00 - 0.00 16,000.00 80,000.00 6,000.00
4 - Papan kelas IV untuk kotak aduk 10.00 0.00 0.00 0.00 0.00 - - 55,000.00
5 Besi Dia. 10 0.00 0.00 - 0.00 22,000.00 0.00
Besi Dia. 6
Pasir Urug
Batu Gunung/Batu Belah 15/20 Cm
Semen PC (50 kg)
Pasir Pasang
Batu Bata
Kayu Klas II
Paku biasa 2"-5"
Paku Triplek
Baut driling
Lem Kayu
Kebutuhan
Pasir Beton
Koral / Kerikil
Minyak utk bekisting
Kawat baja (bendrat) / kawat beton
Plywood Tbl. 9 mm
Kayu Dolken Dia. 8-10 cm / 4m
0
0
Kunci tanam Kualitas Biasa
Grendel Kupu-kupu
Grendel 30 Cm dan 15 Cm
Grendel 4"
Engsel 4"
Engsel 3"
Handel Pintu
Tarikan Jendela
Kait angin / Tunjang angin
Kaca 5 mm polos
Sealant
Keramik uk. 40x40 cm
Cat Meni
Plamir
Plamir
Cat Dasar
Cat Minyak
Cat tembok (setara Danabrite)
Kebutuhan
Kebutuhan
Kebutuhan
Bahan
Kebutuhan
Bahan
0
Kebutuhan
Kebutuhan
Pintu Rolling Door
6 Pintu PVC 0.00 0.00 0.00 0.00 - -
7 Kebutuhan 0.00 0.00 - 0.00 18,700.00 0.00
8 Keramik uk.25 x 25 cm 0.00 0.00 - 0.00 12,000.00 0.00
9 0.00 0.00 - 0.00 16,500.00 0.00
10 375,000.00 - - - - -
11 1,000,000.00 909,090.91 90,909.09 27,272.73 - -
12 0.00 0.00 0.00 0.00 - -
13 150,000.00 - - - - -
14 60,000.00 - - - - -
15 500,000.00 - - - - -
16 700,000.00 - - - - -
17 0.00 - - - - -
18 28,690,000.00 - - - - -

Jumlah 31,575,000.00 90,909.09 27,272.73 80,000.00 526,000.00

Batay,
KEPALA DESA

HERLI JUNAIDI
GGARAN 2016

(dalam rupiah)
Kelebihan /
Kekurangan

12

0.00
10,000.00
-74,000.00
55,000.00
0.00
0.00
0.00
0.00
0.00
-375,000.00
-1,118,181.82
0.00
0.00 9750
0.00 13,500.00
0.00 34,200.00
0.00 57450
0.00
-28,690,000.00 -31,247,181.82

-30,192,181.82 1,581,000.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 #REF!
0.00 0.00
0.00 0.00 #REF!
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00

77,166,000.00

0.00 0.00 #REF!


Selisih 0.00 #REF!
0.00
0.00
0.00
0.00

#REF!
PENGHITUNGAN PAJAK-PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2016 1
Desa : Batay
Kecamatan : Gumay Talang
Objek PPh : Pembayaran Honor Narasumber (dalam rupiah)

JUMLAH PPh Final Pasal 21


NOMOR URAIAN HONOR
5 atau 15 %
SESUAI LKA
1 2 3 4

1 Honor narasumber kegiatan musdes - APBDesa TA . 2016 1,000,000.00 150,000.00


2 Honor narasumber kegiatan musdes - APBDesa TA. 2017 1,000,000.00 150,000.00
3 Honor narasumber kegiatan renbang - Penyusunan RPJMDesa TA.2016 600,000.00 90,000.00
4 Honor narasumber kegiatan renbang - Penyusunan APBDesa TA. 2016 600,000.00 90,000.00
5 Honor narasumber kegiatan pembangunan jalan - Penyusunan RAB 700,000.00 105,000.00
6 Honor narasumber kegiatan pembangunan Gedung Posyandu- Penyusunan RAB 2,500,000.00 375,000.00
7 Honor narasumber kegiatan pelatihan - Penatausahaan 600,000.00 90,000.00
8 Honor narasumber kegiatan pelatihan - Laporan Realisasi 600,000.00 90,000.00
9 Honor narasumber kegiatan pelatihan - Laporan Pertanggungjawaban APBDesa TA. 2016 600,000.00 90,000.00

Jumlah 8,200,000.00 1,230,000.00

Batay
KEPALA DESA BATAY,

HERLI JUNAIDI
PENGHITUNGAN PAJAK-PAJAK KEGIATAN ALOKASI DANA DESA (ADD) TAHUN ANGGARAN 2017 1
Desa : Batay
Kecamatan : Gumay Talang
Objek PPh : Pembayaran Penghasilan (Honor dan Uang Sidang)
(dalam rupiah)
PERHITUNGAN JUMLAH PPh Final Pasal 21 PPh
NOMOR URAIAN PENGHASILAN HONOR (5%) (6%)
PER TAHUN

1 2 3 3 (3 x 3) 4

1 Honor bendahara desa 1 orang x 3 bulan x Rp 350.000,00 1,050,000.00 52,500.00 - 210,000.00


2 Honor operator komputer desa 1 orang x 3 bulan x Rp 300.000,00 900,000.00 - 45,000.00 180,000.00
3 Honor kader Posyandu 0.00 194,400.00
- Ketua 1 orang x 3 bulan x Rp 50.000,00 150,000.00 9,000.00 36,000.00
- Sekretaris 1 orang x 3 bulan x Rp 45.000,00 135,000.00 8,100.00 32,400.00 584,400.00
- Anggota 5 orang x 3 bulan x Rp 35.000,00 525,000.00 31,500.00 126,000.00
4 Honor Pelaksana Kegiatan
'- PKPKDes (1 orang x 4 Triwulan) 1 Orang x 4 Triwulan x 400.000,00 1,600,000.00 96,000.00 96,000.00 195,780.00
'- KPKDes (1 orang x4 Triwulan) 1 Orang x 4 Triwulan x 300.000,00 900,000.00 45,000.00 45,000.00 105,780.00
'- Pelaksana Teknis Kegiatan (3 orang x 4 Triwulan) 1 Orang x 4 Triwulan x 200.000,00 600,000.00 36,000.00 36,000.00
'- Pembantu Pelaksana Teknis Kegiatan 1 Orang x 4 triwulan x 200.000,00 600,000.00 36,000.00 36,000.00
(6 orang x 4 Triwulan) 1 Orang x 4 Triwulan x 200.000,00 600,000.00 216,000.00 216,000.00

5 Honor Panitia Penerima Hasil Pekerjaan

'- Ketua (1 orang x 4 kegiatan) 1 Orang x 4 Kegiatan x 250.000,00 1,000,000.00 60,000.00 60,000.00
'- Sekretaris (1 orang x 4 kegiatan) 1 Orang x 4 Kegiatan x 200.000,00 800,000.00 48,000.00 48,000.00
'- Anggota (1 orang x 4 kegiatan) 1 Orang x 4 Kegiatan x 200.000,00 800,000.00 48,000.00 48,000.00
6 Uang Lembur Kepala Desa (1 orang x 3 hari x 4 jam x 4 triwulan x 13.000,00) 624,000.00 37,440.00 37,440.00
7 Uang Lembur Sekretaris Desa (1 orang x 3 hari x 4 jam x 4 triwulan x 13.000,00) 624,000.00 37,440.00 37,440.00
8 Uang Lembur Kasi Pembangunan (1 orang x 3 hari x 4 jam x 4 triwulan x 13.000,00) 624,000.00 37,440.00 37,440.00
9 Uang Lembur Kasi Pemerintahan (1 orang x 3 hari x 4 jam x 4 triwulan x 13.000,00) 624,000.00 37,440.00 37,440.00
10 Uang lembur operator komputer desa 1 orang x 5 hari x 2 jam x 4 Triwulan x Rp 6.800,00 272,000.00 16,320.00 16,320.00
11 Uang sidang BPD 5 orang x 6 Kali sidang x Rp 50.000,00 1,500,000.00 90,000.00 90,000.00 690,720.00

Jumlah xxxxxx xxxxx 1,425,480.00

Batay, Desember 2016

Kepala Desa Batay

HERLI JUNAIDI
CATATAN PENGGUNAAN DANA DESA - Tahap I / II / III Halaman 1
HARGA
NOMOR TANGGAL URAIAN VOLUME SATUAN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 7 (4 x 6)

I PENERIMAAN (pencairan dana desa)

II PENGELUARAN :

A. Pembelian Bahan/Material, Pembayaran Upah, Pembelian Peralatan


dan Pembayaran Biaya-biaya Lainnya yang Terkait dengan kegiatan :

Jumlah Halaman 1
Halaman 2
1 2 3 4 5 6 7

Jumlah Halaman 2
Halaman 3
1 2 3 4 5 6 7

Jumlah Halaman 3
Halaman 4
1 2 3 4 5 6 7

B. Pengeluaran Biaya Lain-lain yang BUKAN merupakan bagian


dari kegiatan :

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Jumlah Halaman 4
Halaman 5
1 2 3 4 5 6 7

Jumlah sebelum Pajak (1 + 2 + 3 + 4)

III PAJAK-PAJAK :
1. PPN
2. PPh
3. Pajak Mineral bukan Logam dan Batuan
4.
Jumlah setelah Pajak

IV SALDO BKU

V CATATAN :
PENGHITUNGAN PAJAK-PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2017
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Barang Ekonomi Produktif (dalam rupiah)
NAMA VOLUME HARGA NILAI PENGHITUNGAN PPN & PPh Kelebihan /
NOMOR BAHAN / MATERIAL / TERPAKAI SAMPAI TRANSAKSI Pagu LKA Kekurangan
DPP PPN PPh
BARANG / PERALATAN KE DESA
1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9)

I. Belanja Modal Peralatan dan Mesin


- Kabel Listrik 0,5 mm 2.00 0.00 0.00 0.00 0.00 300,000.00 300,000.00
- Rampel meja prasmanan 3.00 0.00 0.00 0.00 0.00 700,000.00 700,000.00
- Pecah belah prasmanan 3.00 0.00 0.00 0.00 0.00 2,000,000.00 2,000,000.00
- Piring makan bahan beling 24.00 0.00 0.00 0.00 0.00 200,000.00 200,000.00
- Dispenser kopi / teh panas 2.00 0.00 0.00 0.00 0.00 600,000.00 600,000.00
- Dispenser air dingin 2.00 0.00 0.00 0.00 0.00 500,000.00 500,000.00
- Pelaminan 1.00 0.00 0.00 0.00 0.00 76,578,393.10 76,578,393.10
- Tenda 3.00 0.00 0.00 0.00 0.00 5,600,000.00 5,600,000.00
- Kipas Angin Uap 2.00 0.00 0.00 0.00 0.00 4,500,000.00 4,500,000.00
- Kipas Angin 10.00 0.00 0.00 0.00 0.00 400,000.00 400,000.00
- Plafon Tenda 10.00 0.00 0.00 0.00 0.00 400,000.00 400,000.00
- Rempel Tiang 17.00 0.00 0.00 0.00 0.00 100,000.00 100,000.00
- Rampel Tenda 100.00 0.00 0.00 0.00 0.00 70,000.00 70,000.00
- Terpal Tenda 250.00 0.00 0.00 0.00 0.00 50,000.00 50,000.00
II. Belanja Barang dan Jasa
12.00 6,000.00 72,000.00 - - - 72,000.00 0.00
16.00 5,000.00 80,000.00 - - - 80,000.00 0.00
Jumlah 152,000.00 0.00 0.00 92,150,393.10 91,998,393.10

Batay, 2016
Kepala Desa Batay

HERLI JUNAIDI
II.

III. PAKAIAN SERAGAM LINMAS 2.00 0.00 0.00 0.00 0.00 0.00 707,000.00 707,000.00

IV. PAKAIAN SERAGAM ADAT 5.00 265,000.00 1,325,000.00 1,204,545.45 120,454.55 36,136.36 18,409.09 1,500,000.00

V. PAKAIAN SERAGAM PERANGKAT 12.00 110,000.00 1,320,000.00 1,200,000.00 120,000.00 36,000.00 24,000.00 1,500,000.00

VI. PAKAIAN SERAGAM KADER POSYANDU 14.00 175,000.00 2,450,000.00 2,227,272.73 222,727.27 66,818.18 60,454.55 2,800,000.00

VII. PAKAIAN SERAGAM BPD 5.00 265,000.00 1,325,000.00 1,204,545.45 120,454.55 36,136.36 18,409.09 1,500,000.00

VIII MAKAN MINUM POSYANDU - - 4,150,000.00 3,772,727.27 377,272.73 113,181.82 1,545.45 4,642,000.00

960,909.09 288,272.73 829,818.18

Batay,
Kepala Desa Batay

HERLI JUNAIDI
PENGHITUNGAN PAJAK-PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2016
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pajak Barang Ekpro dan Renbang (dalam rupiah)
NAMA VOLUME HARGA NILAI PENGHITUNGAN PPN & PPh
Kelebihan /
NOMOR BAHAN / MATERIAL / TERPAKAI SAMPAI TRANSAKSI Pagu LKA
DPP PPN PPh
BARANG / PERALATAN KE DESA Kekurangan
1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9)
I. EKONOMI PRODUKTIF
Belanja Modal Peralatan dan Mesin
- Bentor Gajah 150CC 1.00 29,800,000.00 29,800,000.00 27,090,909.09 2,709,090.91 812,727.27 178,181.82 33,500,000.00

Jumlah 29,800,000.00 29,800,000.00 2,709,090.91 812,727.27 178,181.82

Batay, Agustus 2016

BENDAHARA DESA Kepala Seksi Pembangunan

MENGETAHUI
DEDI FERNANDA KEPALA DESA BATAY MARDIANSYAH

HERLI JUNAIDI
Pagu Anggaran
Kelebihan Kekurangan

300,000.00
700,000.00 0.00
2,000,000.00
200,000.00 92,150,393.10
600,000.00
500,000.00 23,636.37
76,578,393.10 29,072.73
5,600,000.00 0.00
4,500,000.00
400,000.00 0.00
400,000.00
100,000.00 0.00
70,000.00 0.00
50,000.00

Selisih
Pajak 0.00

-92,150,393.10
0.00
0.00 0.00
0.00
0.00
0.00

selisih 0.00
Pajak 0.00 0.00

156,590.91

156,000.00

289,545.45

33517961.8 156,590.91

490,454.55
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Rehab Jembatan Gantung
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Balok Kayu 7/7 Kelas II 2.50 3,700,000.00 9,250,000.00 8,409,090.91 840,909.09 252,272.73 0.00 0.00 10,483,000.00 139,818.18
2 Papan 3/20 Kelas II 4.50 3,700,000.00 16,650,000.00 15,136,363.64 1,513,636.36 499,500.00 0.00 0.00 18,869,400.00 206,263.64
3 Besi Ø 6 mm 51.00 30,000.00 1,530,000.00 1,390,909.09 139,090.91 45,900.00 0.00 0.00 1,540,200.00 -174,790.91
4 Paku Biasa 2" - 5" 22.00 19,000.00 418,000.00 380,000.00 38,000.00 12,540.00 0'00 0'00 418,000.00 -50,540.00
5 Kawat Ikat 2 mm 6.00 38,500.00 231,000.00 210,000.00 21,000.00 6,300.00 0'00 0'00 231,600.00 -26,700.00

6 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
7 Papan Proyek 1.00 177,000.00 177,000.00 160,909.09 16,090.91 4,827.27 0.00 0.00 200,000.00 2,081.82
8 Foto copy RAB dan Gambar 1.00 10,500.00 10,500.00 - - - 0.00 0.00 10,500.00 0.00
9 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 - - - 0.00 0.00 60,000.00 0.00

Upah Pekerjaan -
10 Pekerja 33.00 70,000.00 2,310,000.00 2,310,000.00 0.00
11 Tukang 34.00 100,000.00 3,400,000.00 3,400,000.00 0.00
12 Kepala Tukang 4.00 110,000.00 440,000.00 440,000.00 0.00
13 Mandor 7.00 110,000.00 770,000.00 770,000.00 0.00
- - -

35,546,500.00 2,596,000.00 829,521.82 0.00 39,068,200.00 96,178.18

Batay,
Bendahara Desa Batay Kepala Desa Batay
RONI PARSLAH HERLI JUNAIDI
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Rehab Polindes 6 x 9 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Balok Kelas II 1.75 3,400,000.00 5,950,000.00 5,409,090.91 540,909.09 162,272.73 0.00 0.00 7,338,100.00 684,918.18
2 Balok Kelas III 0.75 3,000,000.00 2,250,000.00 2,045,454.55 204,545.45 61,363.64 0.00 0.00 3,144,900.00 628,990.91
3 Papan Kelas II 0.75 3,400,000.00 2,550,000.00 2,318,181.82 231,818.18 69,545.45 0.00 0.00 3,144,900.00 293,536.36
4 Triplek 4 mm 23.00 64,000.00 1,472,000.00 1,338,181.82 133,818.18 40,145.45 0.00 0.00 823,400.00 -822,563.64
5 Paku 2" - 5" 7.00 19,000.00 133,000.00 120,909.09 12,090.91 3,627.27 0.00 0.00 133,000.00 -15,718.18
6 Paku Triplek 2.00 30,000.00 60,000.00 54,545.45 5,454.55 1,636.36 0.00 0.00 56,000.00 -11,090.91
7 Cat Tembok 80.00 13,000.00 1,040,000.00 945,454.55 94,545.45 28,363.64 0.00 0.00 951,400.00 -211,509.09
8 Cat Minyak 16.00 55,000.00 880,000.00 800,000.00 80,000.00 24,000.00 0.00 0.00 532,000.00 -452,000.00
9 Tiner 4.00 32,000.00 128,000.00 116,363.64 11,636.36 3,490.91 0.00 0.00 93,800.00 -49,327.27
10 Plamir Tembok 27.00 10,000.00 270,000.00 245,454.55 24,545.45 7,363.64 0.00 0.00 348,300.00 46,390.91
11 Besi strip 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 448,000.00 448,000.00
12 Seng 8 Feet 75.00 56,000.00 4,200,000.00 3,818,181.82 381,818.18 114,545.45 0.00 0.00 4,695,000.00 -1,363.64
13 Seng Bubungan 10.00 31,000.00 310,000.00 281,818.18 28,181.82 8,454.55 0.00 0.00 313,000.00 -33,636.36
14 List Plafon 32.00 19,000.00 608,000.00 552,727.27 55,272.73 16,581.82 0.00 0.00 161,000.00 -518,854.55
15 Terali Jendela 10.00 400,000.00 4,000,000.00 3,636,363.64 363,636.36 109,090.91 0.00 0.00 4,649,568.00 176,840.73
16 Grendel Jendela 6.00 10,000.00 60,000.00 54,545.45 5,454.55 1,636.36 0.00 0.00 67,200.00 109.09
17 Grendel Pintu 3.00 18,000.00 54,000.00 49,090.91 4,909.09 1,472.73 0.00 0.00 50,400.00 -9,981.82
18 Engsel Pintu 18.00 17,000.00 306,000.00 278,181.82 27,818.18 8,345.45 0.00 0.00 302,400.00 -39,763.64
19 Engsel Jendela 22.00 11,000.00 242,000.00 220,000.00 22,000.00 6,600.00 0.00 0.00 246,400.00 -24,200.00
20 Kunci Tanam 2.00 130,000.00 260,000.00 236,363.64 23,636.36 7,090.91 0.00 0.00 268,400.00 -22,327.27
21 Tunjang Angin 12.00 10,000.00 120,000.00 109,090.91 10,909.09 3,272.73 0.00 0.00 134,400.00 218.18

22 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
23 Papan Proyek 1.00 176,000.00 176,000.00 160,000.00 16,000.00 4,800.00 0.00 0.00 200,000.00 3,200.00
24 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
25 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

Upah Pekerja
26 Pekerja 59.00 70,000.00 4,130,000.00 4,130,000.00 0.00
27 Tukang 74.00 100,000.00 7,400,000.00 7,400,000.00 0.00
28 Kepala Tukang 11.00 110,000.00 1,210,000.00 1,210,000.00 0.00
29 Mandor 10.00 110,000.00 1,100,000.00 1,100,000.00 0.00

39,279,500.00 2,306,272.73 691,881.82 0.00 42,347,568.00 69,913.45

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


0.00
0.00
0.00
0.00
0.00
42,347,568.00

42,347,568.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Rehab dan Pembuatan Siring P: 75 M X 0,3 X 0,3 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 85.00 60,000.00 5,100,000.00 4,636,363.64 463,636.36 139,090.91 0.00 0.00 5,797,000.00 94,272.73
2 Batu Koral 11.00 120,000.00 1,320,000.00 1,200,000.00 120,000.00 36,000.00 30,000.00 330,000.00 1,573,000.00 -233,000.00
3 Pasir Beton 8.00 80,000.00 640,000.00 581,818.18 58,181.82 17,454.55 20,000.00 160,000.00 1,064,000.00 188,363.64
4 Pasir Pasang 3.00 80,000.00 240,000.00 218,181.82 21,818.18 6,545.45 20,000.00 60,000.00 266,000.00 -62,363.64
5 Pasir Urug 3.00 80,000.00 240,000.00 218,181.82 21,818.18 6,545.45 20,000.00 60,000.00 368,100.00 39,736.36
6 Papan Kelas IV 1.00 2,600,000.00 2,600,000.00 2,363,636.36 236,363.64 70,909.09 0.00 0.00 3,382,500.00 475,227.27
7 Kayu Balok Kelas IV 0.20 2,600,000.00 520,000.00 472,727.27 47,272.73 14,181.82 0.00 0.00 676,500.00 95,045.45
8 Paku 1.00 19,000.00 19,000.00 17,272.73 1,727.27 518.18 19,000.00 -2,245.45
9 Dolken 30.00 10,000.00 300,000.00 272,727.27 27,272.73 8,181.82 237,300.00 -98,154.55

10 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
11 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
12 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
13 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

Upah Angkut Material


Kelokasi
14 Air 4.00 70,000.00 280,000.00 280,000.00 0.00

Upah Angkut dari


Toko/Pangkalan ke Desa
15 Semen 85.00 2,000.00 170,000.00 170,000.00 0.00
16 Pasir Beton 8.00 160,000.00 1,280,000.00 1,280,000.00 0.00
17 Pasir Urung 3.00 160,000.00 480,000.00 480,000.00 0.00
18 Batu Koral 11.00 160,000.00 1,760,000.00 1,760,000.00 0.00
19 Pasir Pasang 3.00 160,000.00 480,000.00 320,000.00 -160,000.00

Upah Pekerjaan
20 Pekerja 114.00 70,000.00 7,980,000.00 7,980,000.00 0.00
21 Tukang 40.00 100,000.00 4,000,000.00 4,000,000.00 0.00
22 Kepala Tukang 4.00 110,000.00 440,000.00 440,000.00 0.00
23 Mandor 9.00 110,000.00 990,000.00 990,000.00 0.00

29,384,500.00 1,041,272.73 312,381.82 610,000.00 31,689,400.00 341,245.45

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Rehab dan Pembuatan Siring P: 14,3 M X 0,5 X 0,4 Meter

NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB


KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 33.00 60,000.00 1,980,000.00 1,800,000.00 180,000.00 54,000.00 0.00 0.00 2,250,600.00 36,600.00
2 Batu Koral 5.00 120,000.00 600,000.00 545,454.55 54,545.45 16,363.64 30,000.00 150,000.00 715,000.00 -105,909.09
3 Pasir Beton 4.00 80,000.00 320,000.00 290,909.09 29,090.91 8,727.27 20,000.00 80,000.00 532,000.00 94,181.82
4 Pasir Pasang 1.00 80,000.00 80,000.00 72,727.27 7,272.73 2,181.82 20,000.00 20,000.00 133,000.00 23,545.45
5 Pasir Urug 1.00 80,000.00 80,000.00 72,727.27 7,272.73 2,181.82 20,000.00 20,000.00 122,700.00 13,245.45
6 Papan Kelas IV 1.00 2,600,000.00 2,600,000.00 2,363,636.36 236,363.64 70,909.09 0.00 0.00 3,382,500.00 475,227.27
7 Besi Beton Ø 8 mm 7.00 47,000.00 329,000.00 299,090.91 29,909.09 8,972.73 0.00 0.00 250,000.00 -117,881.82
8 Kawat ikat 1.00 28,000.00 28,000.00 25,454.55 2,545.45 763.64 0.00 0.00 28,000.00 -3,309.09
9 Kayu Balok Kelas IV 0.04 2,600,000.00 104,000.00 94,545.45 9,454.55 2,836.36 0.00 0.00 135,300.00 19,009.09
10 Paku 1.00 19,000.00 19,000.00 17,272.73 1,727.27 518.18 19,000.00 -2,245.45
11 Dolken 23.00 10,000.00 230,000.00 209,090.91 20,909.09 6,272.73 259,900.00 2,718.18
12 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
13 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
14 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
15 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00
Upah Angkut Material
Kelokasi
16 Air 2.00 110,000.00 220,000.00 220,000.00 0.00
Upah Angkut dari
Toko/Pangkalan ke Desa
17 Semen 33.00 2,000.00 66,000.00 66,000.00 0.00
18 Pasir Beton 4.00 160,000.00 640,000.00 640,000.00 0.00
19 Pasir Urung 1.00 160,000.00 160,000.00 160,000.00 0.00
20 Batu Koral 5.00 160,000.00 800,000.00 800,000.00 0.00
21 Pasir Pasang 1.00 160,000.00 160,000.00 160,000.00 0.00

Upah Pekerjaan -- -
22 Pekerja 46.00 70,000.00 3,220,000.00 3,220,000.00 0.00
23 Tukang 15.00 100,000.00 1,500,000.00 1,500,000.00 0.00
24 Kepala Tukang 1.00 110,000.00 110,000.00 110,000.00 0.00
25 Mandor 2.00 110,000.00 220,000.00 220,000.00 0.00

14,011,500.00 12,737,727.27 622,272.73 186,681.82 270,000.00 15,530,000.00 439,545.45

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


15,530,000.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Siring P: 250 M X 0,5 X 0,6 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 446.00 60,000.00 26,760,000.00 24,327,272.73 2,432,727.27 729,818.18 0.00 0.00 30,417,200.00 494,654.55
2 Batu Koral 56.00 120,000.00 6,720,000.00 6,109,090.91 610,909.09 183,272.73 30,000.00 1,680,000.00 7,722,000.00 -1,472,181.82
3 Pasir Beton 43.00 80,000.00 3,440,000.00 3,127,272.73 312,727.27 93,818.18 20,000.00 860,000.00 5,320,000.00 613,454.55
4 Pasir Pasang 10.00 80,000.00 800,000.00 727,272.73 72,727.27 21,818.18 20,000.00 200,000.00 1,330,000.00 235,454.55
5 Pasir Urug 6.00 80,000.00 480,000.00 436,363.64 43,636.36 13,090.91 20,000.00 120,000.00 490,800.00 -165,927.27
6 Papan Kelas IV 8.00 2,700,000.00 21,600,000.00 19,636,363.64 1,963,636.36 589,090.91 0.00 0.00 24,962,850.00 810,122.73
7 Besi Beton Ø 10 mm 70.00 70,000.00 4,900,000.00 4,454,545.45 445,454.55 133,636.36 0.00 0.00 6,452,800.00 973,709.09
8 Kawat Beton 10.00 28,000.00 280,000.00 254,545.45 25,454.55 7,636.36 0.00 0.00 280,000.00 -33,090.91
9 Kayu Balok Kelas IV 0.50 2,600,000.00 1,300,000.00 1,181,818.18 118,181.82 35,454.55 0.00 0.00 1,657,425.00 203,788.64
10 Paku 25.00 19,000.00 475,000.00 431,818.18 43,181.82 12,954.55 171,000.00 -360,136.36
11 Dolken 156.00 10,000.00 1,560,000.00 1,418,181.82 141,818.18 42,545.45 1,762,800.00 18,436.36
12 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
13 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
14 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00
15 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00
Upah Angkut Material Kelokasi
16 Air 17.00 70,000.00 1,190,000.00 1,190,000.00 0.00
Upah Angkut Material dari
Toko/Pangkalan ke Desa
17 Semen 446.00 2,000.00 892,000.00 892,000.00 0.00
18 Pasir Beton 43.00 160,000.00 6,880,000.00 6,400,000.00 -480,000.00
19 Pasir Urung 6.00 160,000.00 960,000.00 640,000.00 -320,000.00
20 Batu Koral 56.00 160,000.00 8,960,000.00 8,640,000.00 -320,000.00
21 Pasir Pasang 10.00 160,000.00 1,600,000.00 1,600,000.00 0.00

Upah Pekerjaan -- - -
22 Pekerja 613.00 70,000.00 42,910,000.00 42,910,000.00 0.00
23 Tukang 191.00 100,000.00 19,100,000.00 19,100,000.00 0.00
24 Kepala Tukang 19.00 110,000.00 2,090,000.00 2,090,000.00 0.00
25 Mandor 46.00 110,000.00 5,060,000.00 5,060,000.00 0.00

158,502,500.00 6,253,636.36 1,876,090.91 2,860,000.00 169,694,875.00 202,647.73

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


169,694,875.00
1,500,000.00
270,500.00
171,465,375.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Jalan Usaha Tani P : 361 M, L : 1 M, T : 0,15 M
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 209.00 60,000.00 12,540,000.00 11,400,000.00 1,140,000.00 342,000.00 0.00 0.00 14,458,400.00 436,400.00
2 Koral 34.00 120,000.00 4,080,000.00 3,709,090.91 370,909.09 111,272.73 30,000.00 1,020,000.00 4,719,000.00 -863,181.82
3 Pasir Beton 25.00 80,000.00 2,000,000.00 1,818,181.82 181,818.18 54,545.45 20,000.00 500,000.00 3,325,000.00 588,636.36
4 Pasir Urug 7.00 80,000.00 560,000.00 509,090.91 50,909.09 15,272.73 20,000.00 140,000.00 736,200.00 -29,981.82
5 Krokos 53.00 80,000.00 4,240,000.00 3,854,545.45 385,454.55 115,636.36 20,000.00 1,060,000.00 6,783,000.00 981,909.09
6 Papan Kelas IV 2.00 2,600,000.00 5,200,000.00 4,727,272.73 472,727.27 141,818.18 0.00 0.00 16,574,250.00 10,759,704.55
7 Paku 32.00 19,000.00 608,000.00 552,727.27 55,272.73 16,581.82 0.00 0.00 608,000.00 -71,854.55
8 Dolken 180.00 6,000.00 1,080,000.00 981,818.18 98,181.82 29,454.55 0.00 0.00 2,813,700.00 1,606,063.64

Upah Angkut Material dari Toko ke Desa

9 Semen 209.00 2,000.00 418,000.00 424,000.00 6,000.00


10 Pasir Beton 25.00 160,000.00 4,000,000.00 4,000,000.00 0.00
11 Pasir Urug 7.00 160,000.00 1,120,000.00 960,000.00 -160,000.00
12 Batu Koral 34.00 160,000.00 5,440,000.00 5,280,000.00 -160,000.00
13 Krokos 53.00 160,000.00 8,480,000.00 8,160,000.00 -320,000.00

Upah Angkut Material dari Desa ke Lokasi


14 Semen 209.00 20,000.00 4,180,000.00 5,320,000.00 1,140,000.00
15 Pasir Beton + Urug 32.00 450,000.00 14,400,000.00 14,070,000.00 -330,000.00
16 Batu Koral 34.00 450,000.00 15,300,000.00 1,540,000.00 -13,760,000.00
17 Air 45.00 70,000.00 3,150,000.00 3,500,000.00 350,000.00
18 Krokos 53.00 450,000.00 23,850,000.00 22,890,000.00 -960,000.00
19 Papan Kelas IV 2.00 600,000.00 1,200,000.00 2,170,000.00 970,000.00
Upah Pekerjaan -- - -
20 Pekerja 529.00 70,000.00 37,030,000.00 37,030,000.00 0.00
21 Tukang 65.00 100,000.00 6,500,000.00 6,500,000.00 0.00
22 Kepala Tukang 7.00 110,000.00 770,000.00 770,000.00 0.00
23 Mandor 96.00 110,000.00 10,560,000.00 10,560,000.00 0.00

24 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
25 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
26 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
27 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

167,251,500.00 2,798,454.55 839,536.36 2,720,000.00 173,797,550.00 188,059.09

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


167,251,500.00
2,798,454.55
839,536.36
2,720,000.00
188,059.09
173,797,550.00

270,500.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Jalan Cor 50 X 3 X 0,10 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Papan Kelas IV 0.50 2,600,000.00 1,300,000.00 1,181,818.18 118,181.82 35,454.55 0.00 0.00 1,353,000.00 -100,636.36
2 Kayu Balok Kelas IV 0.12 2,600,000.00 312,000.00 283,636.36 28,363.64 8,509.09 0.00 0.00 405,900.00 57,027.27
3 Paku 5 cm - 10 cm 2.00 19,000.00 38,000.00 34,545.45 3,454.55 1,036.36 0.00 0.00 38,000.00 -4,490.91
4 Pasir Urug 9.00 80,000.00 720,000.00 654,545.45 65,454.55 19,636.36 20,000.00 180,000.00 1,104,300.00 119,209.09
5 Semen 171.00 60,000.00 10,260,000.00 9,327,272.73 932,727.27 279,818.18 0.00 0.00 11,662,200.00 189,654.55
6 Batu Koral 25.00 120,000.00 3,000,000.00 2,727,272.73 272,727.27 81,818.18 30,000.00 750,000.00 3,575,000.00 -529,545.45
7 Pasir Beton 19.00 80,000.00 1,520,000.00 1,381,818.18 138,181.82 41,454.55 20,000.00 380,000.00 2,527,000.00 447,363.64
8 Dolken 20.00 10,000.00 200,000.00 181,818.18 18,181.82 5,454.55 0.00 192,100.00 -31,536.36

Upah Angkut Material dari Desa ke


Lokasi
9 Semen 0.00 0.00 0.00 0.00
10 Pasir Beton + Urug 0.00 0.00 0.00 0.00
11 Batu Koral 0.00 0.00 0.00 0.00
12 Air 8.00 70,000.00 560,000.00 560,000.00 0.00

Upah Pekerjaan -- - -
13 Pekerja 123.00 70,000.00 8,610,000.00 8,610,000.00 0.00
14 Tukang 27.00 100,000.00 2,700,000.00 2,700,000.00 0.00
15 Kepala Tukang 3.00 110,000.00 330,000.00 330,000.00 0.00
16 Mandor 17.00 110,000.00 1,870,000.00 1,870,000.00

17 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
18 Papan Proyek 1.00 177,000.00 177,000.00 160,909.09 16,090.91 4,827.27 0.00 0.00 200,000.00 2,081.82
19 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
20 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00
Upah Angkut Material dari
Toko/Pangkalan ke Desa
21 Semen 171.00 2,000.00 342,000.00 342,000.00
22 Pasir Beton 19.00 160,000.00 3,040,000.00 3,040,000.00
23 Pasir Urug 9.00 160,000.00 1,440,000.00 1,440,000.00
24 Batu Koral 25.00 160,000.00 4,000,000.00 4,000,000.00

40,789,500.00 1,620,636.36 486,190.91 1,310,000.00 44,355,500.00 149,172.73

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Rehab Jalan Cor 104,8 X 1,5 X 0,10 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Papan Kelas IV 0.60 2,600,000.00 1,560,000.00 1,418,181.82 141,818.18 42,545.45 0.00 0.00 2,029,500.00 285,136.36
2 Paku 5 cm - 10 cm 3.00 19,000.00 57,000.00 51,818.18 5,181.82 1,710.00 0.00 0.00 57,000.00 -6,891.82
3 Semen 113.00 60,000.00 6,780,000.00 6,163,636.36 616,363.64 184,909.09 0.00 0.00 7,706,600.00 125,327.27
4 Batu Koral 16.00 120,000.00 1,920,000.00 1,745,454.55 174,545.45 52,363.64 30,000.00 480,000.00 2,288,000.00 -338,909.09
5 Pasir Beton 13.00 80,000.00 1,040,000.00 945,454.55 94,545.45 28,363.64 20,000.00 260,000.00 1,596,000.00 173,090.91
6 Dolken 20.00 10,000.00 200,000.00 181,818.18 18,181.82 5,454.55 271,200.00 47,563.64

Upan Angkut Material Ke lokasi


7 Air 10.00 60,000.00 600,000.00 350,000.00 -250,000.00

Upah Pekerjaan -- - -
8 Pekerja 81.00 70,000.00 5,670,000.00 5,670,000.00 0.00
9 Tukang 25.00 100,000.00 2,500,000.00 2,500,000.00 0.00
10 Kepala Tukang 3.00 110,000.00 330,000.00 330,000.00 0.00
11 Mandor 11.00 110,000.00 1,210,000.00 1,210,000.00

12 Perasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
13 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
14 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
15 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

Upah Angkut Material dari


Toko/Pangkalan ke Desa
16 Semen 113.00 2,000.00 226,000.00 226,000.00
17 Pasir Beton 12.00 160,000.00 1,920,000.00 1,920,000.00
18 Batu Koral 16.00 160,000.00 2,560,000.00 2,560,000.00

27,118,500.00 1,093,818.18 328,300.91 740,000.00 29,320,300.00 39,680.91


Batay,
Bendahara Desa Batay Kepala Desa Batay
RONI PARSLAH HERLI JUNAIDI
29,590,800.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Jalan Cor 14 X 1,5 X 0,10 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Papan Kelas IV 0.24 2,600,000.00 624,000.00 567,272.73 56,727.27 17,018.18 0.00 0.00 811,800.00 114,054.55
2 Kayu Balok Kelas IV 0.16 2,600,000.00 416,000.00 378,181.82 37,818.18 11,345.45 0.00 0.00 541,200.00 76,036.36
3 Paku 5 cm - 10 cm 1.00 19,000.00 19,000.00 17,272.73 1,727.27 518.18 0.00 0.00 19,000.00 -2,245.45
4 Pasir Urug 1.00 80,000.00 80,000.00 72,727.27 7,272.73 2,181.82 20,000.00 20,000.00 122,700.00 13,245.45
5 Semen 19.00 60,000.00 1,140,000.00 1,036,363.64 103,636.36 31,090.91 0.00 0.00 1,295,800.00 21,072.73
6 Batu Koral 3.00 120,000.00 360,000.00 327,272.73 32,727.27 9,818.18 30,000.00 90,000.00 429,000.00 -63,545.45
7 Pasir Beton 3.00 80,000.00 240,000.00 218,181.82 21,818.18 6,545.45 20,000.00 60,000.00 266,000.00 -62,363.64
8 Dolken 6.00 10,000.00 60,000.00 54,545.45 5,454.55 1,636.36 0.00 0.00 67,800.00 709.09

Upan Angkut Material Ke lokasi


9 Air 2.00 70,000.00 140,000.00 70,000.00 -70,000.00

Upah Pekerjaan -- - -
10 Pekerja 28.00 70,000.00 1,960,000.00 1,960,000.00 0.00
11 Tukang 6.00 100,000.00 600,000.00 600,000.00 0.00
12 Kepala Tukang 1.00 110,000.00 110,000.00 110,000.00 0.00
13 Mandor 3.00 110,000.00 330,000.00 330,000.00 0.00

14 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
15 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
16 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
17 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00
Upah Angkut Material dari
Toko/Pangkalan ke Desa
18 Semen 19.00 2,000.00 38,000.00 38,000.00 0.00
19 Pasir Beton 2.00 160,000.00 320,000.00 320,000.00 0.00
20 Pasir Urug 1.00 160,000.00 160,000.00 160,000.00 0.00
21 Batu Koral 3.00 160,000.00 480,000.00 480,000.00 0.00

7,622,500.00 310,363.64 93,109.09 170,000.00 8,227,300.00 31,327.27

Batay,
Bendahara Desa Batay Kepala Desa Batay

RONI PARSLAH HERLI JUNAIDI


8,227,300.00 0.00

0.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 20
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Jalan Cor 37 X 2,5 X 0,10 Meter

NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh


NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI DPP PPN
BARANG / PERALATAN
1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6)
1 Papan Kelas IV 0.32 2,600,000.00 832,000.00 749,549.55 82,450.45
2 Kayu Balok Kelas IV 0.12 2,600,000.00 312,000.00 283,636.36 28,363.64
3 Paku 5 cm - 10 cm 2.00 19,000.00 38,000.00 34,545.45 3,454.55
4 Pasir Urug 6.00 80,000.00 480,000.00 436,363.64 43,636.36
5 Semen 107.00 60,000.00 6,420,000.00 5,836,363.64 583,636.36
6 Batu Koral 16.00 120,000.00 1,920,000.00 1,745,454.55 174,545.45
7 Pasir Beton 12.00 80,000.00 960,000.00 872,727.27 87,272.73
8 Dolken 13.00 10,000.00 130,000.00 118,181.82 11,818.18
9 Air 0.00 0.00 350,000.00
Upah Pekerjaan --
10 Pekerja 79.00 70,000.00 5,530,000.00
11 Tukang 17.00 100,000.00 1,700,000.00
12 Kepala Tukang 2.00 110,000.00 220,000.00
13 Mandor 11.00 110,000.00 1,210,000.00

14 Perasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73


15 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09
16 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00
17 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00

Upah Angkut Material dari


Toko/Pangkaln ke Desa
18 Semen 107.00 2,000.00 214,000.00
19 Pasir Beton 12.00 160,000.00 1,920,000.00
20 Pasir Urug 6.00 160,000.00 960,000.00
18 Batu Koral 16.00 160,000.00 2,560,000.00

26,301,500.00 1,058,359.54

Bendahara Desa Batay

RONI PARSLAH
DESA TAHUN ANGGARAN 2019

(dalam rupiah)
HITUNGAN PPN & PPh PENGHITUNGAN PMLB KELEBIHAN /
PPh TARIF PMLB / PMLB PAGU LKA
M³ KEKURANGAN

8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9
22,486.49 0.00 0.00 947,100.00 10,163.06
8,509.09 0.00 0.00 405,900.00 57,027.27
1,036.36 0.00 0.00 38,000.00 -4,490.91
13,090.91 20,000.00 120,000.00 736,200.00 79,472.73
175,090.91 0.00 0.00 7,297,400.00 118,672.73
52,363.64 30,000.00 480,000.00 2,288,000.00 -338,909.09
26,181.82 20,000.00 240,000.00 1,596,000.00 282,545.45
3,545.45 146,900.00 1,536.36
350,000.00 0.00
- -
5,530,000.00 0.00
1,700,000.00 0.00
220,000.00 0.00
1,210,000.00

8,181.82 0.00 0.00 335,500.00 45.45


4,772.73 0.00 0.00 200,000.00 4,318.18
0.00 0.00 10,500.00 0.00
0.00 0.00 60,000.00 0.00

214,000.00 0.00
1,920,000.00 0.00
960,000.00 0.00
2,560,000.00 0.00

315,259.21 840,000.00 28,725,500.00 210,381.24 28,725,500.00


Batay, 28,996,000.00
Kepala Desa Batay

HERLI JUNAIDI
0.00
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Plat Deuker P: 5,4 M L : 1 M T : 0,15 M
(dalam rupiah)
NAMA VOLUME HARGA NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI SAMPAI TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN KE DESA M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 5.00 60,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 341,000.00 5,545.45
2 Batu Koral 1.00 120,000.00 120,000.00 109,090.91 10,909.09 3,272.73 30,000.00 30,000.00 143,000.00 -21,181.82
3 Pasir Beton 1.00 80,000.00 80,000.00 72,727.27 7,272.73 2,181.82 20,000.00 20,000.00 133,000.00 23,545.45
4 Besi Beton Ø 8 mm 8.00 47,000.00 376,000.00 341,818.18 34,181.82 10,254.55 0.00 0.00 500,000.00 79,563.64
5 Kawat Beton 1.00 28,000.00 28,000.00 25,454.55 2,545.45 763.64 0.00 0.00 28,000.00 -3,309.09
6 Paku 5 cm - 12 cm 2.00 19,000.00 38,000.00 34,545.45 3,454.55 1,036.36 0.00 0.00 38,000.00 -4,490.91
7 Papan cor 2/25 0.21 2,600,000.00 546,000.00 496,363.64 49,636.36 14,890.91 0.00 0.00 710,325.00 99,797.73
8 Dolken 23.00 10,000.00 230,000.00 209,090.91 20,909.09 6,272.73 259,900.00 2,718.18

9 Prasati 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
10 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
11 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
12 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

Upah Angkut Material ke lokasi


13 Air 1.00 70,000.00 70,000.00 70,000.00 0.00
Upah Angkut dari Toko/Pangkalan ke Desa
14 Semen 5.00 2,000.00 10,000.00 10,000.00
15 Batu Koral 1.00 160,000.00 160,000.00 160,000.00
16 Pasir 1.00 160,000.00 160,000.00 160,000.00
Upah Pekerjaan -- - -
17 Pekerja 10.00 70,000.00 700,000.00 700,000.00
18 Tukang 6.00 100,000.00 600,000.00 600,000.00
19 Kepala Tukang 1.00 110,000.00 110,000.00 110,000.00
20 Mandor 1.00 110,000.00 110,000.00 - - - 110,000.00 -

4,183,500.00 199,363.64 59,809.09 50,000.00 4,679,225.00 186,552.27


Batay,
Bendahara Desa Batay Kepala Desa Batay
RONI PARSLAH HERLI JUNAIDI
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Plat Deuker 1 X 0,15 X 2,5 Meter
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Semen 9.00 60,000.00 540,000.00 490,909.09 49,090.91 14,727.27 0.00 0.00 613,800.00 9,981.82
2 Batu Koral 2.00 120,000.00 240,000.00 218,181.82 21,818.18 6,545.45 30,000.00 60,000.00 286,000.00 -42,363.64
3 Pasir Beton 2.00 80,000.00 160,000.00 145,454.55 14,545.45 4,363.64 20,000.00 40,000.00 266,000.00 47,090.91
4 Besi Beton Ø 10 mm 12.00 82,000.00 984,000.00 894,545.45 89,454.55 26,836.36 0.00 0.00 1,046,400.00 -53,890.91
5 Kawat Beton 1.00 28,000.00 28,000.00 25,454.55 2,545.45 763.64 0.00 0.00 28,000.00 -3,309.09
6 Paku 5 cm - 12 cm 1.00 19,000.00 19,000.00 17,272.73 1,727.27 518.18 0.00 0.00 19,000.00 -2,245.45
7 Papan cor 2/25 0.12 2,500,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 405,900.00 70,445.45
8 Dolken 12.00 10,000.00 120,000.00 109,090.91 10,909.09 3,272.73 0.00 0.00 135,600.00 1,418.18

9 Prasati 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
10 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
11 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
12 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00
Upah Angkut Material kelokasi
13 Air 1.00 70,000.00 70,000.00 70,000.00

Upah Angkut dari Toko/Pangkalan ke Desa


14 Semen 9.00 2,000.00 18,000.00 18,000.00
15 Batu Koral 2.00 160,000.00 320,000.00 320,000.00
16 Pasir 2.00 160,000.00 320,000.00 320,000.00
17 Upah Pekerjaan -- - -
18 Pekerja 12.00 70,000.00 840,000.00 840,000.00
19 Tukang 8.00 100,000.00 800,000.00 800,000.00
20 Kepala Tukang 1.00 110,000.00 110,000.00 110,000.00
21 Mandor 1.00 110,000.00 110,000.00 - - - 110,000.00 -

5,524,500.00 260,545.45 78,163.64 100,000.00 5,994,700.00 31,490.91


Batay,
Bendahara Desa Batay Kepala Desa Batay
RONI PARSLAH HERLI JUNAIDI
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 2019
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan TPT P: 10,5 M T: 20/40 cm
(dalam rupiah)
NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB
KELEBIHAN /
NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
BARANG / PERALATAN M³ KEKURANGAN

1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


1 Papan Kelas IV 0.04 2,600,000.00 104,000.00 94,545.45 9,454.55 2,836.36 0.00 0.00 135,300.00 19,009.09
2 Kayu Balok Kelas IV 0.04 2,600,000.00 104,000.00 94,545.45 9,454.55 2,836.36 0.00 0.00 135,300.00 19,009.09
3 Paku 5 cm - 10 cm 0.10 19,000.00 1,900.00 1,727.27 172.73 51.82 0.00 0.00 1,900.00 -224.55
4 Pasir Pasang 3.00 80,000.00 240,000.00 218,181.82 21,818.18 6,545.45 20,000.00 60,000.00 399,000.00 70,636.36
5 Semen 18.00 60,000.00 1,080,000.00 981,818.18 98,181.82 29,454.55 0.00 0.00 1,227,600.00 19,963.64
6 Batu Kali 6.00 120,000.00 720,000.00 654,545.45 65,454.55 19,636.36 24,000.00 144,000.00 1,130,400.00 181,309.09

7 Prasasti 1.00 300,000.00 300,000.00 272,727.27 27,272.73 8,181.82 0.00 0.00 335,500.00 45.45
8 Papan Proyek 1.00 175,000.00 175,000.00 159,090.91 15,909.09 4,772.73 0.00 0.00 200,000.00 4,318.18
9 Foto Copy RAB dan Gambar 1.00 10,500.00 10,500.00 0.00 0.00 10,500.00 0.00
10 Cetak Foto Kegiatan 1.00 60,000.00 60,000.00 0.00 0.00 60,000.00 0.00

Upah Pekerjaan -- - -
11 Pekerja 32.00 70,000.00 2,240,000.00 2,240,000.00 0.00
12 Tukang 6.00 100,000.00 600,000.00 600,000.00 0.00
13 Kepala Tukang 1.00 110,000.00 110,000.00 110,000.00 0.00
Mandor 2.00 110,000.00 220,000.00 220,000.00

Upah Angkut dari Toko ke Desa


14 Semen 18.00 2,000.00 36,000.00 36,000.00 0.00
15 Batu kali 6.00 160,000.00 960,000.00 960,000.00 0.00
16 Pasir Pasang 3.00 160,000.00 480,000.00 - - - 480,000.00 0.00

7,441,400.00 247,718.18 74,315.45 204,000.00 8,281,500.00 314,066.36

Batay,
Bendahara Desa Batay Kepala Desa Batay
8,281,500.00
RONI PARSLAH HERLI JUNAIDI
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Tiang Listrik Dan Jaringan
NAMA VOLUME HARGA NILAI
NOMOR BAHAN / MATERIAL / TERPAKAI SAMPAI TRANSAKSI
BARANG / PERALATAN KE LOKASI
1 2 3 4 5 (3 x 4)
1 Tiang 5.4.3 Galfanish Grade 23.00 4,140,000.00 95,220,000.00
2 Kabel Twist 4x16 mm 600.00 20,000.00 12,000,000.00
3 kabel twist 4x25 mm 700.00 29,000.00 20,300,000.00
4 Kabel Twist 4x16mm 2,000.00 10,000.00 20,000,000.00
5 Lampu Jalan (Set) 28.00 950,000.00 26,600,000.00
6 Pipa CLV 2" 6.00 200,000.00 1,200,000.00
7 Box Panel 1.00 750,000.00 750,000.00
8 Kontactor 1.00 1,800,000.00 1,800,000.00
9 Time Switch 2.00 517,000.00 1,034,000.00
10 MCB 35 Amper 6.00 70,000.00 420,000.00
11 Kwh Meter 2.200 Va 1.00 5,500,000.00 5,500,000.00
12 Kwh Meter 4.400 Va 1.00 8,700,000.00 8,700,000.00
13 Pipa PVC 2" 4.00 45,000.00 180,000.00
14 L Bow 2" 8.00 8,000.00 64,000.00
15 Strains Cleam 4x25 mm 70.00 150,000.00 10,500,000.00
16 Strains Cleam 4x16 mm 80.00 110,000.00 8,800,000.00
17 Service Cleam 2x16 mm 300.00 10,000.00 3,000,000.00
18 Tab Conector 2x16 mm 200.00 10,000.00 2,000,000.00
19 Tab Conector 4x25 mm 60.00 35,000.00 2,100,000.00
20 Cleam Tiang 56.00 18,000.00 1,008,000.00
21 Sunvesion Cleam 28.00 30,000.00 840,000.00
22 Kabel Nym 2x2,5 mm 1.00 400,000.00 400,000.00
23 Isolasi 30.00 15,000.00 450,000.00
24 Pasir 2.00 250,000.00 500,000.00
25 Krokos 1.00 250,000.00 250,000.00
26 Semen 7.00 70,000.00 490,000.00
27 Paku 2" 1.00 20,000.00 20,000.00
28 Papan 4.00 60,000.00 240,000.00
29 Baut 14 281.00 10,000.00 2,810,000.00
30 Ground Spear 9.00 210,000.00 1,890,000.00
31 Prasasti Kegiatan 1.00 335,455.00 335,455.00
32 Papan Nama Kegiatan 1.00 279,545.00 279,545.00
33 Biaya Foto copy 105.00 300.00 31,500.00
34 Biaya Cetak Foto Kegiatan 20.00 3,000.00 60,000.00
Ketua TPK 1.00 300,000.00 300,000.00
Sekretaris TPK 1.00 250,000.00 250,000.00
Anggota TPK 1.00 200,000.00 200,000.00
Ketua PPHP 1.00 250,000.00 250,000.00
Sekretaris PPHP 1.00 250,000.00 250,000.00
Anggota PPHP 1.00 250,000.00 250,000.00
35 Dana Survei 1.00 3,500,000.00 3,500,000.00
36 Jasa Pekerja 1.00 45,000,000.00 45,000,000.00

279,772,500.00
ANA DESA TAHUN ANGGARAN 2019

(dalam rupiah)
PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB KELEBIHAN /
TARIF PMLB / PAGU LKA
DPP PPN PPh PMLB
M³ KEKURANGAN

6 (100/110 x 5) 7 (10 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


86,563,636.36 8,656,363.64 2,596,909.09 - - 95,220,000.00 0.00
10,909,090.91 1,090,909.09 327,272.73 0.00 0.00 12,000,000.00 0.00
18,454,545.45 1,845,454.55 553,636.36 0.00 0.00 20,300,000.00 0.00
18,181,818.18 1,818,181.82 545,454.55 0'00 0'00 20,000,000.00 0.00
24,181,818.18 2,418,181.82 725,454.55 0.00 0.00 26,600,000.00 0.00
1,090,909.09 109,090.91 32,727.27 0.00 0.00 1,200,000.00 0.00
681,818.18 68,181.82 20,454.55 0.00 0.00 750,000.00 0.00
1,636,363.64 163,636.36 49,090.91 0.00 0.00 1,800,000.00 0.00
940,000.00 94,000.00 28,200.00 1,034,000.00
381,818.18 38,181.82 11,454.55 420,000.00
5,000,000.00 500,000.00 150,000.00 5,500,000.00
7,909,090.91 790,909.09 237,272.73 8,700,000.00
163,636.36 16,363.64 4,909.09 180,000.00
58,181.82 5,818.18 1,745.45 64,000.00
9,545,454.55 954,545.45 286,363.64 10,500,000.00
8,000,000.00 800,000.00 240,000.00 8,800,000.00
2,727,272.73 272,727.27 81,818.18 3,000,000.00
1,818,181.82 181,818.18 54,545.45 2,000,000.00
1,909,090.91 190,909.09 57,272.73 2,100,000.00
916,363.64 91,636.36 27,490.91 1,008,000.00
763,636.36 76,363.64 22,909.09 840,000.00
363,636.36 36,363.64 10,909.09 400,000.00
409,090.91 40,909.09 12,272.73 450,000.00
454,545.45 45,454.55 13,636.36 20,000.00 40,000.00 500,000.00
227,272.73 22,727.27 6,818.18 20,000.00 20,000.00 250,000.00
445,454.55 44,545.45 13,363.64 490,000.00
18,181.82 1,818.18 545.45 20,000.00
218,181.82 21,818.18 6,545.45 240,000.00
2,554,545.45 255,454.55 76,636.36 2,810,000.00
1,718,181.82 171,818.18 51,545.45 1,890,000.00
304,959.09 30,495.91 9,148.77 - - 335,455.00 0.00
254,131.82 25,413.18 7,623.95 - - 279,545.00 0.00
0.00 0.00 0.00 - - 31,500.00 0.00
0.00 0.00 0.00 - - 60,000.00 0.00
0.00 0.00 0.00 300,000.00
0.00 0.00 0.00 250,000.00
0.00 0.00 0.00 200,000.00
0.00 0.00 0.00 250,000.00
0.00 0.00 0.00 250,000.00
0.00 0.00 0.00 250,000.00
0.00 0.00 0.00 3,500,000.00 0.00
0.00 0.00 0.00 - - 45,000,000.00 0.00

254,338,636.36 20,880,090.91 6,264,027.27 60,000.00 279,772,500.00 0.00

Batay,
#REF! Kepala Desa Batay

HERLI JUNAIDI
P Anggaran

106,473,272.73
12,327,272.73
20,853,636.36
#VALUE!

1,341,818.18
3,500,000.00

#VALUE! 306,976,618.18
Selisih 27,204,118.18

Selisih #REF!

t0tal PPn #REF!


PPh #REF!
Galian C #REF!
Setor Balik #REF!

#REF!

Seluruh PPn Err:509


PPh Err:509
Galian C Err:509
Setor Balik Err:509

Err:509
Pajak Tiang Listrik 5,947,963.63

Err:509

PPn,PPh,Galian C Err:509

Kegiatan Tidak Terlaksana 2,820,000.00


300,000.00
Seluruh Setor balik Err:509
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGARAN 20
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Hamparan Sirtu 37165,00 X 1,50 X 0,15 Meter

NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh


NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI DPP PPN
BARANG / PERALATAN
1 2 3 4 5 (3 x 4) 6 (100/110 x 5) 7 (10 % x 5 atau 6)
1 Pasir Urug 3.00 100,000.00 300,000.00 270,270.27 29,729.73
2 Kayu Balok Kelas IV 81.00 50,000.00 4,050,000.00 3,648,648.65 401,351.35
3 Paku 5 cm - 10 cm 30.00 20,000.00 600,000.00 540,540.54 59,459.46
4 Semen 93.00 65,000.00 6,045,000.00 5,445,945.95 599,054.05
5 Pasir Pasang 11.00 100,000.00 1,100,000.00 990,990.99 109,009.01
6 Batu Koral 28.00 150,000.00 4,200,000.00 3,783,783.78 416,216.22
7 sirtu 75.00 150,000.00 11,250,000.00 10,135,135.14 1,114,864.86
Upah Pekerjaan --
8 Pekerja 120.00 100,000.00 12,000,000.00
9 Tukang 47.00 120,000.00 5,640,000.00
10 Mandor 7.00 180,000.00 1,260,000.00
Alat Kegiatan
11 Benang 6.00 5,000.00 30,000.00
12 Ember 12.00 8,000.00 96,000.00
13 Cangkul+Gagang 3.00 90,000.00 270,000.00
14 Sekop 2.00 95,000.00 190,000.00
15 Gerobak Sorong 3.00 500,000.00 1,500,000.00
16 Centong 6.00 16,000.00 96,000.00
17 Linggis 2.00 50,000.00 100,000.00
18 Palu 2.00 25,000.00 50,000.00
19 Belencong 2.00 50,000.00 100,000.00
20 Meteran 1.00 30,000.00 30,000.00
21 Parang 1.00 50,000.00 50,000.00
22 Peralatan Tambahan 1.00 3,955,000.00 3,955,000.00
23 Perasasti 1.00 350,000.00 350,000.00 315,315.32 34,684.68
24 Papan Proyek 1.00 200,000.00 200,000.00 180,180.18 19,819.82
Upah Angkut Material dari
Toko/Pangkaln ke Desa
25 Pasir Urug 3.00 160,000.00 480,000.00
26 Batu Koral 28.00 160,000.00 4,480,000.00
27 sirtu 75.00 160,000.00 12,000,000.00
28 Pasir Beton 11.00 160,000.00 1,760,000.00
Desa/Lokasi
29 Pasir Urug 3.00 100,000.00 300,000.00
30 Papan Kayu Kelas IV 81.00 15,000.00 1,215,000.00
31 Batu Koral 28.00 100,000.00 2,800,000.00
32 sirtu 75.00 100,000.00 7,500,000.00
33 Semen 93.00 5,000.00 465,000.00
34 Pasir Beton 11.00 100,000.00 1,100,000.00
Pemberishan Lokasi & Pengukuran
35 Pekerja 22.00 100,000.00 2,200,000.00
36 Mandor 11.00 180,000.00 1,980,000.00
Pembersihan Akhir
37 Pekerja 1.00 2,786,000.00 2,786,000.00

92,528,000.00 2,784,189.19

Bendahara Desa Batay

RONI PARSLAH
SA TAHUN ANGGARAN 2022

(dalam rupiah)
UNGAN PPN & PPh PENGHITUNGAN PMLB KELEBIHAN /
PPh TARIF PMLB / PMLB PAGU LKA
M³ KEKURANGAN

8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9
8,108.11 20,000.00 60,000.00 368,181.82 30,343.98
109,459.46 0.00 0.00 4,528,636.36 -32,174.45
16,216.22 0.00 0.00 704,454.45 28,778.77
163,378.38 0.00 0.00 6,343,445.37 -463,987.06
29,729.73 20,000.00 220,000.00 1,463,000.00 224,261.26
113,513.51 30,000.00 840,000.00 5,274,181.92 -295,547.81
304,054.05 20,000.00 1,500,000.00 14,127,272.73 -41,646.19
- -
12,000,000.00 0.00
5,640,000.00 0.00
1,260,000.00

40,254.54 10,254.54
134,181.84 38,181.84
308,618.19 38,618.19
212,454.54 22,454.54
1,526,318.19 26,318.19
268,363.62 172,363.62
239,290.90 139,290.90
111,818.18 61,818.18
100,636.36 636.36
72,681.82 42,681.82
58,909.09 8,909.09
3,954,200.00 -800.00
9,459.46 0.00 0.00 391,363.64 -2,780.50
5,405.41 0.00 0.00 223,636.36 -1,588.87

480,000.00 0.00
4,480,000.00
12,000,000.00
1,760,000.00

300,000.00
1,215,000.00
2,800,000.00
7,500,000.00
465,000.00
1,100,000.00

2,200,000.00
1,980,000.00

2,786,055.41 55.41

759,324.32 2,620,000.00 98,417,955.33 6,441.82


Batay,
Kepala Desa Batay

HERLI JUNAIDI
-98,417,955.33
DANA DESA TAHAP I (SATU)
NILAI
NO KEGIATAN APB-DES RAB TRANSAKSI SILPA KEG
(Rp) (Rp) (Rp) (Rp)

1 REHAB JEMBATAN GANTUNG 39,068,200.00 38,797,700.00 38,974,103.64 94,096.36

2 JALAN SETAPAK 50 METER 44,355,500.00 44,085,000.00 44,208,409.11 147,090.89

3 JALAN SETAPAK 37 METER 28,725,500.00 28,455,000.00

4 REHAB GEDUNG POLINDES 42,347,568.00 42,077,068.00 42,293,945.44 53,622.56

* Perbedaan antara APB-Des dengan R A B karena ada biaya cetak dan Fotocopy Rp. 270.500,-
dalam setiap kegiatan
PENGHITUNGAN PAJAK KEGIATAN DANA DESA TAHUN ANGGAR
Desa : Batay
Kecamatan : Gumay Talang
Pekerjaan : Pembangunan Plat Deuker 210 x 120 Meter

NAMA VOLUME NILAI PENGHITUNGAN PPN & PPh


NO BAHAN / MATERIAL / TERPAKAI HARGA TRANSAKSI DPP
BARANG / PERALATAN
1 2 3 4 5 (3 x 4) 6 (100/110 x 5)
1 Batu Kali 1.50 320,000.00 480,000.00 436,363.64
2 Batu Koral 2.00 320,000.00 640,000.00 581,818.18
Pasir Pasang 2.00 310,000.00 620,000.00 563,636.36
3 Sirtu 2.00 310,000.00 620,000.00 563,636.36
4 Semen 19.00 65,000.00 1,235,000.00 1,122,727.27
5 Besi Beton 10 mm 22.00 90,000.00 1,980,000.00 1,800,000.00
6 BesiBeton 6 mm 3.00 30,000.00 90,000.00 81,818.18
7 Kawat Ikat 3.00 25,000.00 75,000.00 68,181.82
Paku 4.00 25,000.00 100,000.00 90,909.09
8 Balok Kayu Kelas IV 5.00 30,000.00 150,000.00 136,363.64
9 Papan Kelas IV 8.00 60,000.00 480,000.00 436,363.64
10 Godam 1.00 250,000.00 250,000.00 227,272.73
gergaji Besi 1.00 50,000.00 50,000.00 45,454.55
13 Pahat Beton 1.00 40,000.00 40,000.00 36,363.64
14 Linggis 1.00 95,000.00 95,000.00 86,363.64
15 Papan Proyek 1.00 200,000.00 200,000.00 181,818.18
Prasasti 1.00 350,000.00 350,000.00 318,181.82
Upah Pekerja
Pekerja 15.00 80,000.00 1,200,000.00 0.00
17 Tukang 5.00 120,000.00 600,000.00 0.00
22 Kepala Tukang 2.00 130,000.00 260,000.00 0.00
23 Air 1.00 50,000.00 50,000.00 0.00

9,565,000.00

Bendahara Desa Batay

RONI PARSLAH
KEGIATAN DANA DESA TAHUN ANGGARAN 2023

(dalam rupiah)
PENGHITUNGAN PPN & PPh PENGHITUNGAN PMLB KELEBIHAN /
PPN PPh TARIF PMLB / PMLB PAGU LKA
M³ KEKURANGAN

7 (11 % x 5 atau 6) 8 (3 % x 5 atau 6) 9 10 (3 x 9) 10 (3 x 9) 9


48,000.00 1,440.00 24,000.00 36,000.00 521,400.00 -44,040.00
64,000.00 1,920.00 30,000.00 60,000.00 707,200.00 -58,720.00
62,000.00 1,860.00 20,000.00 40,000.00 666,600.00 -57,260.00
62,000.00 1,860.00 20,000.00 40,000.00 666,600.00 -57,260.00
123,500.00 33,681.82 0.00 0.00 1,508,600.00 116,418.18
198,000.00 5,940.00 0.00 0.00 2,257,200.00 73,260.00
9,000.00 270.00 0.00 0.00 102,600.00 3,330.00
7,500.00 225.00 0.00 0.00 85,500.00 2,775.00
10,000.00 300.00 114,000.00 3,700.00
15,000.00 450.00 171,000.00 21,000.00
48,000.00 1,440.00 410,400.00 -69,600.00
25,000.00 750.00 342,000.00 66,250.00
5,000.00 150.00 57,000.00 1,850.00
4,000.00 120.00 45,600.00 5,600.00
9,500.00 285.00 125,400.00 30,400.00
20,000.00 600.00 250,000.00 29,400.00
35,000.00 1,050.00 500,000.00 113,950.00

0.00 0.00 1,200,000.00 0.00


0.00 0.00 600,000.00 0.00
0.00 0.00 260,000.00 0.00
0.00 0.00 0.00 0.00 58,900.00 8,900.00

745,500.00 52,341.82 176,000.00 10,650,000.00 189,953.18


Batay,
Kepala Desa Batay

HERLI JUNAIDI
10,728,795.00

-10,650,000.00

You might also like