03 - Infrastructure Development Report, Nanded
03 - Infrastructure Development Report, Nanded
DISCLAIMER
This document (the “Document”) has been prepared by ARINEM Consultancy Services Pvt. Ltd.
ARINEM has relied upon the information collected from the client (‘Client Inputs’) for the purpose of
inferences presented in this report.
The information, statements, statistics, and commentary (together the ‘information’) contained in
this Document have been prepared by ARINEM from primary and secondary research, ARINEM’s
internal database and to large degree, from Client Inputs and details collected from the competent
authorities. ARINEM does not express an opinion as to the accuracy or completeness of the
information provided, the assumptions made by the parties that provided the information, or any
conclusions reached by those parties. The facts quoted and inferences drawn in this Document have
been prepared based on the information received or obtained, on the basis that such information is
accurate and, where it is represented to ARINEM as such, complete.
Neither ARINEM or any of its associates, nor any of their respective Directors, employees or advisors
make any expressed or implied representation or warranty and no responsibility or liability is
accepted by any of them with respect to the accuracy, completeness or reasonableness of the facts,
opinions, estimates, forecasts, based and nothing contained herein is, or shall be relied upon as
promise or representation regarding the performance of the project. This Document is divided into
chapters and sub- sections only for the purpose of reading convenience. Any partial reading of this
Document may lead to inferences, which may be at divergence with the conclusions and opinions
based on the entirety of this Document.
The information set forth in this Document is intended solely for the use of the Client and its potential
partners to whom it has been delivered and the recipients must undertake such investigations as they
see fir before making any commitment to entering a contract. The inferences made may not cover the
opinions and views of stakeholders exhaustively.
This Document is furnished on a strictly confidential basis. Neither this Document nor the information
contained herein, may be reproduced, or passed to any person or used for any purposes other than
that stated above. By accepting a copy of this Report, the recipient accepts the terms of this Notice,
which forms an integral part of this Document.
i
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
Table Of Contents
CHAPTER 1- INTRODUCTION ...................................................................................................... 1
1.1 Background ...............................................................................................................2
1.2 Purpose of this report .............................................................................................. 2
1.3 Structure of the report ............................................................................................. 2
CHAPTER 2- METHODOLOGY ..................................................................................................... 4
2.1 Methodology ............................................................................................................ 5
CHAPTER 3- INFRASTRUCTURE ASSESSMENT ............................................................................ 7
3.1 Traffic Analysis ..........................................................................................................8
3.1.1 Summary ...................................................................................................................8
3.2 Current Site Infrastructure ....................................................................................... 8
3.2.1 Station Building ........................................................................................................ 8
3.2.1.1 Station Building ........................................................................................................ 8
3.2.1.2 Platforms .................................................................................................................. 9
3.2.2 Ancillary Development ........................................................................................... 10
3.2.3 Residential Quarters ...............................................................................................11
3.2.5.1 Power Supply ..........................................................................................................13
3.2.5.2 Water Supply .......................................................................................................... 14
3.3 Estimation of Required Site Infrastructure ............................................................ 14
3.3.1.1 Station Area Requirement ......................................................................................14
3.3.1.2 Parking area requirement ...................................................................................... 14
3.3.2.1 Water Demand ....................................................................................................... 16
CHAPTER 4 – DEVELOPMENT SEQUENCING ............................................................................ 19
4.1 Development Sequencing ...................................................................................... 20
4.2 Relocation of Buildings and other structures .........................................................20
4.3 Proposed Site plan for Relocation ..........................................................................21
CHAPTER 5 – TOPOGRAPHICAL SURVEY .................................................................................. 22
5.1 Topographical Survey Report ................................................................................. 23
5.2 Zoning for existing Building assessment ................................................................ 24
5.3 Brief Assessment .................................................................................................... 24
CHAPTER 6 – BUILDING CONDITION ASSESSMENT ..................................................................25
6.1 Assessment of structures on site ........................................................................... 26
CHAPTER 7– GEOTECHNICAL SURVEY ......................................................................................34
7.1 Geotechnical Survey ...............................................................................................35
ANNEXURES ..............................................................................................................................36
ii
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
List of Figures
Figure 1 Station Building and ancillary structures ..................................................................................8
Figure 2 Station Building ........................................................................................................................ 9
Figure 3 Platforms .................................................................................................................................. 9
Figure 4 Existing Station infrastructure ..................................................................................................9
Figure 5 Ancillary Buildings .................................................................................................................. 10
Figure 6 Trolly Hut and Vyapari Room ................................................................................................. 10
Figure 7 Residential Building ................................................................................................................ 11
Figure 8 Residential Building . 11
Figure 9 Offices .....................................................................................................................................12
Figure 10 Offices ...................................................................................................................................12
Figure 11 Power Supply Map ................................................................... Error! Bookmark not defined.
Figure 12 Water Supply Map ................................................................................................................14
Figure 13 Parking Zones ...........................................................................Error! Bookmark not defined.
Figure 14 Structures to be dismantled/Relocated ................................... Error! Bookmark not defined.
Figure 15 Relocation plan .....................................................................................................................21
Figure 16 Topographical Survey Map ...................................................... Error! Bookmark not defined.
Figure 17 Site zoning for further assessment of Land use ....................................................................24
Figure 18 Zone 1 .......................................................................................Error! Bookmark not defined.
Figure 19 Zone 2 .......................................................................................Error! Bookmark not defined.
Figure 20 Zone 3 .......................................................................................Error! Bookmark not defined.
Figure 21 Zone 4 ................................................................................................................................... 32
Figure 22 Zone 5 .......................................................................................Error! Bookmark not defined.
Figure 24 Religious Structures ..................................................................Error! Bookmark not defined.
Figure 25 Recommendations on basis of survey .................................................................................. 35
List of Tables
Table 1 Report Coverage ........................................................................................... 2
Table 2 Parking details Within the Junction Railway Station Premises ............................................... 16
Table 3 Water demand calculation ...................................................................................................... 18
Table 4 Water Requirement Calculation .............................................................................................. 18
Table 5 Topographical survey points ....................................................................................................23
Table 6 Zone 1 - Building Condition Assessment ....................................Error! Bookmark not defined.
Table 7 Zone 2 - Building Condition Assessment ....................................Error! Bookmark not defined.
Table 8 Zone 3 - Building Condition Assessment ....................................Error! Bookmark not defined.
Table 9 Zone 4 - Building Condition Assessment ....................................Error! Bookmark not defined.
Table 10 Zone 5 - Building Condition Assessment ................................... Error! Bookmark not defined.
iii
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 1- INTRODUCTION
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
1.1 Background
The project aims for re-development and construction of the railway station building and supporting
Facilities, including its surroundings, on the entire Railway land along with commercial exploitation
of land parcels.
The Consultants have already submitted the Inception Report, the Situation Analysis report, & the
Preliminary Land Due Diligence Report of the first deliverable KD1 of the Mandate. This document,
the Infrastructure Development Report, is a part of the second deliverable KD2.
2
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
The infrastructure development report has been structured across the following chapters:
Chapter 1: Introduction
Chapter 2: Methodology
Chapter 3: Infrastructure Assessment
Chapter 4: Development Sequencing
Chapter 5: Topographical Survey
Chapter 6: Building Condition Assessment
3
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 2- METHODOLOGY
4
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
2.1 Methodology
The Infrastructure Development Report has been created with the objective of reviewing the existing
assets at the Station in terms of condition assessment, capacity, location, etc. and then suggesting
improvement, upgradation and/or relocation of the infrastructure. Inputs from topography survey,
geo-technical survey, building condition survey and utility assessment has been taken into
consideration before suggesting the infrastructural development.
Estimation of traffic
The future traffic projection at Nanded City Railway Station is a key determinant of the requirement
of infrastructure facilities at the station, as the passenger facilities, station amenities and utilities
would primarily cater to the passenger traffic. The future footfall at the station has been projected
based on historical traffic numbers at the Station as well as growth factors with various other
relevant factors considered. The growth of traffic at Nanded Railway Station has been estimated,
driven primarily based on the organic growth which the station would witness due to growth of the
city, along with the increased tourism due to the development of better basic and tourism
infrastructure, improved upon by the planned capacity augmentation of the railway station itself.
Proposed Interventions
As per the assessment by following above steps, the Consultant has suggested improvements and
upgradation by assessing the impact on infrastructure demand including the services for the station.
The Consultant suggested to maximize the commercial returns from the land & air space after
assessing the requirements.
Further, the Consultant has suggested improvements and upgradation in the form of relocation of
structures and their uses, land acquisition, diversion of services, trees to be felled or transplantation.
The proposed interventions have been suggested with the following key considerations –
i. Clean-up of the site and aggregating of site facilities which are presently spread across the
site.
ii. Station building on both North and South side of the station road to reduce congestion on
Station Road, facilitate easier pedestrian and multi modal access and to encourage
uni-directional circulation in the Site.
5
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
iii. Two-level terminal building suggested for segregation of arrival and departure with
concourse spanning across east and west station building.
Summary of existing land situation – Topography and Building Condition Assessment Survey
A team from the Consultant organized a topographical survey of the Project Site to establish the
GTS benchmark, Triangulation Network points, detail survey of the site and the surrounding areas,
and the boundaryextents.
After having studied the topographical survey of the site, a visual inspection and a general review
of the Site was conducted to establish Building condition survey. The inspection addressed
conditions of the built structures based on the existing building uses, recent construction, type of
properties and any apparent encroachments.
The findings from the surveys have been provided in the report.
6
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 3- INFRASTRUCTURE
ASSESSMENT
7
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
3.1.1 Summary
Based on the above, the most likely values are the CRIS values; hence the same has been considered for peak
hour calculation for future, based on the CAGR values following growth of passenger is assumed :
Hazur Sahib Nanded railway station is located on the Secunderabad–Manmad line of Nanded railway
division of the South Central Railway Zone (SCR). The station building is G+1 structure partially. The
station building consists of GRP office, RPF Office, toilet,Booking Office, Parcel office.
8
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
3.2.1.2 Platforms
The Station currently has 4 platforms. Platform connected via 03 no.s existing FOB.
3.2.1.3 Parking
Front side of the Station is used for parking and for taxi stand and on the right and left side of station
building it caters parking for 2-wheeler and cars.
9
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
The site consists of various offices and structures like Mahila carriage work, trolly hut & Vyapari
room etc. Eastern part of the site also has a railway hospital.
10
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
11
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
3.2.4 Offices
12
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
3.2.5 Utilities
13
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
Water Supply
3.3.1 Station
Existing station building and FOBs are being proposed for demolition, while new concourse and
Departure blocks are proposed, on both North and South sides.
Arriving passengers would be kept segregated from departing passengers with separate passages
and Foot Over Bridges.
The area planning has been done as follows –
Concourse 9504 sq m
Main station block - South 15840 sq m
Main station Block – North 11880 sq m
Total 37224 sq m
Different types of parking are observed within station premises and around the vicinity of Junction
Railway Station, i.e., off street parking and on street parking. the Off- Street parking is seen within
the existing Railway premises compound accommodated daily around 336 Equivalent car spaces
comprising of Two wheelers, Cars & Auto rickshaws, apart from this unauthorized and haphazard On
Street parking can be noticed on almost all roads of the study area. Unauthorized parking can be
noticed within the premises. Off-street Parking is unscientifically managed. The dedicated parking
14
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
slot to a respective mode is not utilized. The existing parking management adopts null intelligent
system.
According to parking analysis the designated area for parking amounts to total of 336 Equivalent Car
Space parking. It has been provided in existing scenario, as follows;
Sl no Type of parking Type of Vehicle Area (Sqmtr) Capacity (ECS) Vehicle
parked during
peak hr. (ECS)
Car 12
Auto 6
Bus 20
Car 5
15
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
Car 6
Auto 20
Auto 7
Car 6
Total 7750 336 237
Table 2PARKING DETAILS WITHIN THE JUNCTION RAILWAY STATION PREMISES
As per the analysis the present parking capacity is insufficient and the same can be seen through the
vehicles parked in private site and also Auto rickshaws parked outside the gate.
3.3.2 Utilities
This Section provides the indicative demand assessment for water supply, sewerage and electricity for
the project. As several aspects of the study, including the existing supply assessment have not been
finalized, the analysis is limited to broad estimation of the Utility demand.
Water Demand is calculated for Portable as well as Recycled water. Piped water supplies for
communities should provide adequately for the following as applicable: Domestic needs such as
drinking, cooking, bathing, washing, gardening and individual air conditioning. Recycled water can be
used for flushing of toilets and gardening.
The main driver of Demand Assessment is Railway infrastructure
Primarily the demand is assessed based on two criteria: Population and Area. Population is estimated
based on certain benchmarks and assumptions. The design population estimation is a combination of
both residing and floating population on the site.
16
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
17
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
DEMAND
TOTAL FRESH 171 KLD RAW WATER TANK (50% OF 2 KL MUNICIPAL 461 MM
WATER DEMAND 9.4 1.5 DAY REQ.) 1 CONNECTION .43 DIA
6 MET
8 ER
FLOW TO 305 KLD TREATED FRESH WATER 2 KL BOREWELL 429 CUM
SEWER/SEWAGE 0.6 TANK (50% OF 1.5 DAY 1 FLOW RATE .84 /HR.
TREATMENT PLANT REQ.) 6 REQ.
8
18
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 4 – DEVELOPMENT
SEQUENCING
19
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
Whereas sequencing/ phasing must be taken up by the concessionaire as per their feasibility and
convenience.
Majorly Station building and Parking areas will need to be dismantled for the purpose of
redevelopment. Apart from these, most of the structures requiring dismantling are structures with
dilapidated condition while some offices and ancillary buildings will also need relocation with utility
structures i.e., DG shed, power grid, fire buckets, dustbin sheds, pump houses will need to be
relocated. Residential quarters will also be relocated providing better living standards.
20
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
21
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 5 – TOPOGRAPHICAL
SURVEY
22
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
(Refer Annexure 1)
23
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
24
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 6 – BUILDING
3. CONDITION ASSESSMENT
25
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
6.1.1 Zone 1
Figure 18 Zone-1
26
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
27
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
6.1.2 Zone 2
Figure 19 Zone 2
28
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
29
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
6.1.3 Zone 3
Figure 20 Zone 3
30
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
31
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
6.1.4 Zone 4
Figure 21 Zone 4
32
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
33
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
CHAPTER 7– GEOTECHNICAL
SURVEY
34
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
Note: For detailed technical data, refer Geo technical Investigations Report.
35
INFRASTRUCTURE DEVELOPMENT REPORT
Part-2 of KD2 REPORT For Redevelopment of Nanded City Railway Station
ANNEXURES
36
Annexure - 1
362.93
362.90
362.85
362.80
362.75 362.83
362.70 362.91
363.12
362.65
363.25
362.55
363.45
362.50
363.75
362.45 364.20
364.45
362.40
364.65
362.33
365.09
362.27
365.23
362.31 365.85
365.95
362.21
359.87
359.84
359.93
359.83
359.76
359.88
359.69
359.78
368.92
359.71
359.75
366.45
359.82
359.75
359.70
360
359.68
.23
359.66
359.65
362.20
359.60
359.58
359.60
359.63
359.65
359.68
359.70
364.250
359.75
359.80
366.85
359.87
360.00
360.10
360.20
360.30
360.3
360.36
5
360.38
360.40
362.19
360.45
360.50
359.51
360.57
360.60
360.45
364.850
360.70
360.75
367.22
360.80
360.25 360.12
360.91
360.15
361.00
361.15
360.28
360.01 359.41
361.25
360.3
360.18 9
360.32
361.35
361.40
361.47
360.58
359.49
ED
361.50
360.88
362.14 361.20
361.58
1006.0928.sq.mtr
361.60
366.810 SH
360.20
360.25
361.74
172.0837.sq.mtr
361.81
361.89
360.46
367.57
361.89
361.91
361.88
362.00
362.19
362.25
362.30
361.69
360.51
330.4746.sq.mtr 360.39
362.30
360.75
360.41
1287.5949.sq.mtr
362.43
360.40
72.4897.sq.mtr 360.38
362.499
360.35
361.62
368.870 363.45
360.41
360.28
360.31
359.68
360.17 360.15
143.7527.sq.mtr
45.7786.sq.mtr 359.39 367.75
363.00
360.21 360.12
359.68
36.7689.SQ.MTR 360.31
360.21
359.79
359.61
430.6788.sq.mtr
360.02 360.45
360.28 360.17
359.85
360.24 359.83
363.57 369.21 360.20
1388.5533.sq.mtr 359.86
360.32 360.12
360.23 2757.6547.sq.mtr 330.4746.sq.mtr
360.37
360.41 360.60
360.55
359.89
359.78
360.15
360.10 362.84 360.75
360.68
ed
359.98 359.86
360.54 360.47
364.21 372.30
sh
AY ION
359.81
ILWCT E
82.4280.sq.mtr 360.11
365.25
92.8652.sq.mtr 359.81
A
R T RC KS
E 359.61
361.21
361.15 361.10
360.89
88.2337.sq.mtr
360.78
360.60
372.69
360.01
O O C ER T
PR F RRA
53.1759.sq.mtr
AT N
64.0000.SQ.MTR
BA
361.21
360.34 360.19
366.45 360.21 241.2142.SQ.MTR 359.74
359.68
361.25
361.20
361.04
360.17
362.88 359.70
360.16
360.09
360.41 360.29
95.6883.sq.mtr 362.78
367.12 361.32 197.6518.sq.mtr 361.75 360.08
35
361.31 360.41 360.14 359.15
360.24 362.51
9.9
361.35
361.31
362.61 362.51 358.45
362.89
8
370.95 360.10 362.87 11.7974.SQ.MTR 372.45
35
367.45 86.7682.SQ.MTR 289.6820.SQ.MTR 25.7381.sq.mtr
360.12
89.4799.SQ.MTR 97.2172.SQ.MTR
9.8
359.91
50.6938.sq.mtr 27.1022.sq.mtr 21.1361.sq.mtr
20.1799.SQ.MTR
25.1192.SQ.MTR
362.81 362.42 361.79
359.82
360.21
45.9119.SQ.MTR
25.3364.SQ.MTR 362.80 362.71 359.87 360.10
358.49 360.19
7
30.8267.SQ.MTR
116.4563.sq.mtr 360.31 362.89 362.91 358.52
367.65
35
360.12
9.8
362.48 362.42
360.22
360.20
2
371.56 362.70 360.14
36
368.21 359.81
372.70
0.8
354 35
360.18
9.8
359.88
362.87
1
368.41 360.30
360.10
9.8
362.20
371.68 360.29
9
368.57 360.18 359.98
362.24
359.89
372.85
369.01 362.21
360.25 359.91
360.27 359.93
371.81 360.20
36
361.42
361.41
369.48 361.78 359.96
0.2
360.21
360.32
0
360.26 359.88
372.89
36
360.30
361.51
361.58
0.2
359.98
370.25 359.89
63.6667.sq.mtr 360.23
5
360.35
359.91
372.59 359.85
36
360.29
360.37
361.80
0.1
370.67 360.01
372.62-TBM.NO.4 372.45.TBM.NO.5
5
360.32
361.36
36
TBM-2
360.26 361.298
360.11
0.1
360.27
372.91
358
371.02 361.71
9
359.95
359.89
361.61
.8
360.23 360.22
360.31
1
372.41 360.05
35
370.52
360.15
361.31 360.21
9.7
360.31
360.26
8
360.21
360.34
370.81 360.27
360.28
361.40
360.31
372.95
360.30
362.66
370.92 371.58 360.23 360.10
363.38
362.65 361.45
360.26 362.34
361.738
TBM-1
TBM
362.67 360.12
372.20
362.64 N 467.3761.sq.mtr
360.21 360.28
IO 372.60
EN T 361.62
360.17 360.19
371.87 G A
Y R
360.29
359.98
X NE NT
360.31
361.74 28.6150.sq.mtr
360.41
360.20
O E A L
A
360.41
359.91
360.90 360.91
G PL N
36
360.37 359.86
IO Y L
1.8
359.92
IS WATA
359.89 360.35
361.85 359.85
361.61 362.89 372.35
1
360.28
361.71 359.90
361.59
360.89
IVAILSPI
359.82 360.32
360.30
103.9321.sq.mtr 360.353
371.59 361.69 361.88 361.78 362.74
360.356
360.21
359.96
362.73 362.68 DR O 361.20
360.812 360.12
362.54 361.74
L
360.35
EE H CR
359.89
359.87
361.60
A
360.02 360.29
ED
360.05 360.31
360.845
362.70
AR 362.72 361.81 360.96 N 723.7548.sq.mtr S
360.29 359.81
360.20
A 360.35
362.71
SH RS IO Y L
IS WA A
360.784 360.778 360.21
CH
360.17
360.31
360.15
361.73 362.60 359.87
372.91
E
IV IL PIT
359.88
SS
361.010 361.335 360.12
RM RT
359.81
AY A
360.963
359.94
360.29
362.62 361.41
O
L 362.42
SS -C 362.45 U H SCR
359.91
T-
359.89
359.95 360.25
362.58
360.31
LA
359.89
359.92 359.85
362.40 361.69
360.28 360.24
G N G
RA ICE
359.88
MSL-362.42 361.05
SS IN -C COITIN
359.92
361.82 362.46
EN IT 361.15 360.91
223.0827.sq.mtr
360.27 360.21
372.85
IT ER G U LL 362.70
359.90
D N R A E 361.75 108.8118.sq.mtr
V TE
361.92 362.10
S A LL
360.24
E IO E CL A G FR TA
359.78
370.56
D R
359.88
R R W IN EP IN
359.98 359.71
N SE IO EE AT EG R- G C- IT L LE IT L
N W A L
359.91
S
360.37
RG N CA H A
361.81 360.81
A A IN G
359.96
N AIL EL N IN ST AN
360.30
359.95
A IO A A L S A L 519.6019.sq.mtr
460.3288.sq.mtr
N
F N JUNG PP IT L IN IO Y L PS
359.89
RC ICE W A W A 362.69
A T
359.88
361.91
359.97 O R O
E O TI M TA M E
M U A L H H 148.7980.sq.mtr 362.65
RK IS WATA O
PA FF SH
W A 372.75
IV ILSPI
359.94
IC CT EC
148.7980.sq.mtr
A S
360.14
PA
359.89
276.5473.sq.mtr
359.92
H CE H 145.0618.sq.mtr
362.60 1189.0276.sq.mtr D RA O
FF E T E O
359.92
359.92
370.21 144.1302.sq.mtr
O SP RO RC O I 360.18
H CR
190.7245.sq.mtr
361.80 362.60
359.89
L L 280.2647.sq.mtr
362.50 361.19
IN P FO PO
275.3277.sq.mtr
362.45 S
359.89
360.27
E 362.08 S 361.74
V E AY ER
361.00
359.91 341.9193.sq.mtr 359.82
362.43 361.10
TI S 361.88
348.2590.sq.mtr
W 361.04
U OU RT
360.30 359.90
361.86 372.70
361.75 361.88 IL 362.31 362.44
EC T H
360.25
A
RA
369.87 361.67 361.87
360.28
359.92
U
EX ES
360.33
360.87
360.31
359.91 361.56 362.46
362.35
Q 223.0827.sq.mtr
361.21
R 361.25 361.39
361.50 422.8521.sq.mtr
362.28 170.8067.SQ.MTR 362.38 362.25
361.19
RS
360.29 359.936
364.80 359.83 361.05
364.81 360.74
229.7229.SQ.MTR
372.60
E
RS
360.30
361.57 362.39
RT S
359.93
RS
R 106.4960.sq.mtr 369.67
359.82
361.53
ST A 362.41 ER E 361.55
359.92
E RT PS
WALL
360.012
S
RT 0 RT
201.2019.sq.mtr
U
359.89
Q A ER
359.93
359.97
364.71
RS 361.25 360.47
RS
360.41
IO 363.40 363.35 Q
U
B-
5 U Q
RS Q 60
361.41 177.0376.sq.mtr
361.27 A
361.38 E AT
359.90
E 372.72
RT B- RS
U
360.21
COMPOUND
E 361.10
RT RV E
362.39
166.5850.sq.mtr
361.48 361.35 Q 52
RT
362.25
EN
359.91
360.25
369.45 A 362.42 362.15 362.11 E
U A SE IC 361.21
RT B-
A Q U S TE
104.9779.sq.mtr
Q
U 230.6706.sq.mtr
361.26
361.20 Q 132.5823.sq.mtr REOFF R
361.68
361.58
ER U
A N
361.30 G 46
A
RT Q CA
tr
6.sq.m
360.42 K 362.65 59.0107.sq.mtr
53
44.606
IN B- BE
D 362.68 362.58
RS A 372.40
B-
362.81
U 54
RK
362.86 362.71
362.28 M E Q
B-
369.12 A 362.85 S
RT
1282.9371.SQ.MTR 362.39 362.69 361.69
PA EB d
362.80
H he ER
295.8960.sq.mtr
RS
363.41 A
S
G 363.40
SA IsK RT
361.85
263.2116.sq.mtr
U 55
361.75
364.78 S T E S ER Q
ER 364.81 BA U H
RT ER B-
IN
A
A KR RA
RS RT U 56
363.39
RT RS
R.B S G
D AN HA U
A E RT A 7 Q - 372.25
RK
364.45
365.45
RT
263.2116.sq.mtr
364.10
U B
364.00
A A Q B-5
363.87
Q 361.75
363.70
S AB
363.50
RS
363.47 362.80
365.35
363.30
E U 58
363.10
U 59
368.87
66
362.89
360.81 A
362.80
S
362.70
RT
365.08
365.17
362.40
263.2116.sq.mtr
Q Q
B-
362.20
362.75
362.81
B-
363.10
361.87
361.93
361.93
E 115.8707.sq.mtr
B- U
363.20
365.35
263.2116.sq.mtr
362.68
363.41
RT
362.78
PA
A Q
363.51
364.80
365.30
362.75
363.75
360.78
U
RS
363.87
362.89
365.25
RS A 172.6913.sq.mtr
363.91
263.2116.sq.mtr
Q 9 198.7745.sq.mtr
362.90 362.78
363.98
363.41 U 362.88
E
364.01
363.12 E Q -4
364.12
RT RT
371.20
303.9653.sq.mtr
364.25
363.30
B 363.45 363..38
364.35
A
364.13
206.2891.sq.mtr
364.00
368.69
U 363.14
363.75
U
363.65
r
Q 142.984
8.sq.mt
363.55
363.28 363.24 2.sq.mt
r
363.49 r
364.60
6.sq.mt
363.42
105.329 174.524
364.61
363.38
364.65
363.25
364.72
5
363.32
363.16
364.75
4.5
364.80
362.98
364.85
362.96
364.83
36
362.94
2864.1167.sq.mtr
364.86
371.85
362.92
364.87
364.79
362.90
363.12
364.75
363.35
363.45
364.89
363.50
368.56 361.19
364.80
363.61
363.75
364.70
363.80
364.62
4.4
363.85
364.45
363.90
364.35
364.12
362.63
36
364.15
364.21
364.25
364.35
360.78
364.35
364.40
5
364.45
371.45
3.4
364.52
364.58
36
364.63
368.36
364.67
364.70
364.72
8
364.75
4.8
362.61
364.80
364.80
36
364.42
364.32
364.01
5
363.45
371.18
4.9
363.13
363.23
36
363.48
368.21
364.25
364.42
364.65
36
364.78
3.2
362.59
364.90
364.91
364.86
5
371.56
R
A
0
367.69 4.8 36
K
36 3.3
1
D 362.57
BE E
M ATU
5 364.23
4.4 369.21
36
A
R. ST
367.45 363.
21
0
D 362.54
4.6
36 364.54
369.74
366.54 362.
0 98
4.7
36 362.50
364.60
365.62
5
366.35 4.6 362.
36 87
362.57
6 364.85
4.5 369.45
36
366.12 79
362.
1 362.61
4.7
36 365.45
368.21
365.71 71
362.
4
4.7
36 362.65
365.50
0 368.10
365.58 4.8 60
362.
36
362.70
4 365.61
4.8
36 367.89
365.48 51
362.
4.8
8 362.75
36 365.65
365.12 368.20
362.42
9
4.8
36
362.86
365.75
364.89
2 368.10
4.9 362.30
36
3
5.0
36 362.90
364.78
4
365.3
367.68
362.10
364.68 362.93
6
5.3
367.60
36
362.00
0
5.4
364.58
36
362.97
8
5.3
367.58
36
361.89
364.45
363.10
OFFICE OF
INSPECTOR
FORCE
RAILWAY PROTECTION
367.56
364.35 361.80
363.15
364.31 366.55
361.75 SCHOOL
363.29
RI S
363.91
366.53
361.69
363.89 363.35
T A
YA IW
366.50
361.65
363.89
363.40
363.79
361.68
366.48
N
363.45
366.46
361.60
363.50
365.45
361.52
363.55
365.44
361.4
8
363.66
365.42
361.4
6
365.38
361.4
1
364.35
361.3
8
364.30
361.3
1
364.28
361.2
4
364.20
361.2
0
364.00
361.1
8
361.1 363.91
5
361.0 364.42
9
361.0 364.35
2