You are on page 1of 30

TESDA CIRCULAR Page J_ofaO pages

Subject-2024 Sdwdule of CMtt of TESOA ScfeoteraMp Program Number ®|, series of 2024
Date Issued; EifttiMtr. Supersedes:
TESDA Qrcular No. 004, series of 2023
TESDA arcular No. 004-A, series of 2023
Immediately
0 5 JAN im TESDA Circular No. 004-B, series of 2023
TESDA arcular No. 004-C, series of 2023

To meet the objectives of Traning for Work Scholarship Program (WISP), Private Education Student Financial Assistance (PESFA), Special Training Emptoyment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayar Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualificalion ate hereby adopted. The foltowing training costs relalive to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, fadlties,
equipment and tools maintenance: honoraria of traineis; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of
scholarship programs with errtrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the sctwlarship program.

1
Allowance fPhol Per Capita Cost (Php)

T|
i
e
No. of No. of National Book
Quimcatfon Traming TWSP, BKSTP. Tsuper Moter
Sector No. TVET Quattfication Tide Training Training Aflosmnce
Code Cost(PhP) and PESFA (Php350.0QWay for TWSP and Tsuper
Hours Days Fee(PhP) Tor PESFA PESFA
(Phpiee.OQMay maximum of 35 BKSTP Iskolar
only
• hours) days 8 Hours)

a b c d « f=a^hnper
tJav)
9 h
rrfPfp16O0Op9
^
pr(Pbp35000per
dsienu or 35 date!
k P=g*b*i

TWSP, BKSTP, P ESFA, and TSUPER ISKOLAR


Agriculture, Forestry, 302 38 12.690.00 3.377.00 6,080.00 12,250.x 5X.X 22,147.x 2Z647.X 28,317.x
1 AFFACP105 Agrtulurai Crops Production NC1
and Fishery
Agncuture, Forestry, 15.390.00 995.00 6.720.00 12.250.x 5X.X 23.10S.X 23,605.x 28,635.x
2 AFFACP213 Agriculural Crops Production NCII 336 42
and Fishery
Agriculure. Forestry, 445 56 18,670.00 8,96000 12,250.x 5X.X 27.630.X 28.1X.X X,920.x
3 AFFACP306 Agricuhirai Crops Production NC III
and Fishery
Agriculure. Forestry, 239 30 10,085.00 854.00 4,800.00 10.5X.X 5X.X 15J39.X 16,239.x 21,439.x
4 AFFAGE217 Agroentrepreneurship NC II
and Fishery
Agriculure, Forestry, 20.810.00 853.00 8,960 00 1Z2XX 5X.X 30,623.x 31,123.x 33,913.x
5 AFFAGE317 Agroentrepreneurship NC Itl 445 56
aivi Fishery
Agriculure, Forestry, 715 90 8,218.80 853.00 14,400.00 12,250.x 5XX 23,471.x 23.971.x 21.321.x
6 AFFAGE417 Agroentrepreneurship NC IV
and Fishery
Agriculure, Forestry, Animai Healh Care and Management 4,160.00 9.1X.X 5X.X 19.779.x 20,279.x 24.719.x
7 AFFAHC307 208 26 12,241.00 3,378.00
and Fishery NC III

Agriculure. Forestry, Animai Production (Poulry-Chicfcen) NC 897.00 4,640.00 10,150.x 500.x 16.X1.X 17,461.x 22.471.x
B AFFAPP213 226 29 11,424.00
and Fishery II-Without Electees

Agriculure. Forestry, 306 39 20,634.00 1,629.00 6.240.00 12,250.x 5oax 28.X3.X 29.003.x 34.513.x
9 AFFAPR213 Animal Production (Ruminants) NC 11
and Fishery
Agriculure, Forestry, 306 39 14.003.00 2,015.00 6.24000 12.250.x 5X.X 22.258.x 22,758.x 28,268.x
10 AFFAPS213 Animal Production (Seme) NC II
and Fishery
Agriculure. Forestry, 1276 160 10,000.00 350.00 25,600 00 1Z250.X 5X.X 35.950.x 36.4X.X 22.6X.X
11 AFFAQC204 Aquaculure NC II (Superseded)
and Fishery
Agncdture, Forestry, Artificial Insemination (Large Ruminants) soax
12 AFFAIR212 220 28 7,340.00 moo 4,48a00 9,80a00 12.648.00 13,148.x 17,968.x
and Fishery NC II
Agriculure, Forestry, 22 7,637.00 833.00 3,520.00 7.7X.X sx.x 11.9X.X 12.4X.X 16,170.x
13 AFFAIS212 Artificial Insemination (Swine) NC II 175
and Fishery
Agriculure. Forestry, 195 25 4,800.00 1,109.00 4,000.00 8.7X.X sx.x 9.909.x 10.409.x 14,659.x
14 AFFBPN217 Bamboo Production NC II
and Fishery
Agncdture, Forestry, 3.092.00 5,120.00 11.2X.X 5X.X 23,559.13 24,059.13 29,639.13
15 AFFDMS317 Drying and MKng Plant Servicing NC HI 256 32 15,347.13
and Fishery
Agriculure, Forestry, 352 44 9,757.00 400.00 7,040.00 12,250.x 5X.X 17.197.x 17,697.x 22,407.x
16 AFFFSC105 Fish Capture NC I
and Fishery
Agriculure. Forestry, 318 40 9,000.00 400.00 6,400.00 12,250.x 5X.X 15.BX.X 16.3X.X 21.6X.X
17 AFFFSC206 Fish Capture NC II
and Fishery
Agriculure, Forestry, Fishing Gear Repair and Maintenance 3.040.00 6,650.00 5X.X 13,540.x 14.040.x 17,1M.X
18 AFFFGR307 152 19 10,000.00 500.00
and Fishery NC III
Agriculure, Forestry, 96 12 3,500.00 500.00 1,920.00 4.2X.X SX.X 5,920.x 6,420.x 8,2X.X
19 AFFFWO107 Rshport/Wharf Operation NC 1
and Fishery
Agriculure. Forestry, 423 53 19,222.00 939.00 8,480.00 12,250.x 5X.X 28,641.x 29,141.x 32,411.x
20 AFFGRP215 Grains Production NC IP
and Fishery
Agriculure. Forestry. AFFGRP215 Grains Production NCir 423 53 19,222.00 944.00 8,480.00 12.250X soax 28.646X 29.146X 32,416.x
21
Agncuture. Forestry, AFFKTC306 Horticufture NC III 445 56 16,659.00 300.00 8,960.00 1Z2S0.X 5X.X 25.919.x 26.419.x 29,209.x
22
and Fishery
Agriculure. Forestry, landscape hw talfPirw and Maintenance 21,590.00 500.00 4,320.00 9,45aX sx.x 26,410.x 26,910.x 31,540-X
23 AFFLIM208 212 27
and Fishery (Sottscape) NC II
Agriculure, Forestry,
24 AFFML0217 Ulung Operation NC II 160 20 5,134.05 1,387.00 3,200.00 7.0X.X sx.x 9.721.05 10,22105 13,521.05

Agncuture, Forestry. 232 29 23,391.00 979.00 4,640.00 10.1XX SX.X 29,010.x 29,510.x 34,520.x
25 AFFOAP212 Organic A^iculure Production NC II

Agriculure, Forestry, Organic Agricuttue Production NC II - 13,355.00 979.00 3,680.x 8.050.00 soax 18,014.x 18,514.x 22,384.x
26 AFFOAP212 178 23
and Fishery Wihout Electees

Agriculure. Forestry, AFFPMV207 Pest Management (Vegetables) NC II 312 39 13,74a00 500.00 6,240.x 12Z50.X 5X.X 20.4X.X 20.9X.X 26.496.x
27
and Fishery
Agriculure. Foreshy.
28 AFFRM0207 Rice Machinery Operations NC II 232 29 22,339.00 1,323.00 4,640.x laixx sx.x 28302.x 28,802.x 33,812.x
and Fishery
TESDA CIRCULAR Pa^e ,2. of ^ pages
Sal^ect 2624 Sdwdule of Coalt of TESfM SchoMrip Program*
dumber series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
TESDA Circular No. 004-B, series of 2023
0 5 lAfJ onor TESDA Qrcular No. 004-C, series of 2023
--------------------
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Progrant (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualificalion are hereby adopted. The following training costs reiabve to the implementation of TESDA Scholarship Programs arc based on the following cost factors: Variable Costs (consumables, utilities, tadlties,
equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SiL) is not covered under the scholarship program.

Allowance (Phoi
Per Capita Cost (Php)
Traaeing Support Fund IISH
No. of No. of National Book
QuaHhcatlon Training TWSP, BKSTP. Tsuper Ishoiar
Sector No. TVET QuaMication Tide Training Training Assessment ANowance Tsuper
Code Cost(PhP) and PESFA (Php350.00May for TWSP and
Hours Days Fee(PhP) (Php160.00May Tor PESFA PESFA
maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
r=r(Ptv16000 per j=T(Rv3S000per
a b c d • dav)
9 b
dwJ dmdtim ot 35 dan)
Jr

Agricuiture. Forestry, 19,797.00 500.00 2.560.00 5,600.00 500.00 2Z857.00 23,357.00 25,897 00
29 AFFRPC212 Rubber Processing NCII 122 16
andFisherv
Agricuture, Forestry, 10,000.00 1,645.00 6,560.00 1Z2S0.W soaoo 18,205.00 18,705.00 23,895.00
30 AFFRPT221 Rubber Production NCn 321 41
and Fishery
Agriculture, Forestry, 10.000.00 500.00 4,960.00 10,850.00 50000 15,460.00 15,960.00 21,350.00
31 AFFRPT212 Rubber Production NC II (Sitoerseded) 242 31
and Fishery
Agriculture, Forestry, 11.476.61 1.035.00 13,120.00 1Z2S0.00 50000 25,631.61 26,131.61 24,761.61
32 AFFSWP215 Seaweed Production NC II 652 82
and Fishery
Agriculture. Forestry, 6,900.00 3,520.00 7,700.00 500.00 10,420.00 10,920.00 14,600.00
33 Coffee Production Level It 176 22
and Fisherv
Agricufture. Forestry, 28.098.78 2.560.00 5,600.00 500.00 30,658.78 31,158.78 33,698.78
34 Mango Production Level H 128 16
andFisherv
Automotiwe and Land 400.00 2.40000 5.250.00 soaoo 7,8oaoo 8.300.00 10,650.00
35 ALTABP106 Automotive Body Painting/FinisNng NC 1 120 15 5,000.00
Trarrsoortation
Autornotrre and Land Automotive Body Painting/Finishing NC 500.00
36 ALTABP306 183 23 7,000.00 400.00 3,680.00 8,050.00 11,080.00 11,580.00 15,450.00
Transportation III
Automotive and Land 12,250.00
37 ALTABR220 AutamotM Body Reparing NC II 547 69 5,000.00 1,036.00 11,040.00 500.00 17,076.00 17,576.00 18,286.00
Transportation
Automotive and Land 500.00 10.487.00
38 ALTAEA207 Automotive Electrical Assembly NC II 143 18 6,607.00 500.00 ZB80.00 6,300.00 9,967.00 13,407.00
Transportation
Automotive and Land 500.00 4,800.00 10.500.00 500.00 1Z300.00 1Z800.00 18,000.00
39 ALTAEA306 Automotive Electrical Assembly NC III 240 30 7,000.00
Transportation
Automotive and Land Z880.00 6,300.00 500.00 8,380.00
40 ALTAMA207 Automotive Mechanic^ Assembly NC II 143 18 5,000.00 500.00 8,880.00 11,800.00
Transportation
Automotive and Land
41 ALTAMA308 Automotive Mechanical Assembly NC III 480 60 7,000.00 500.00 9,600.00 1Z250.00 500.00 17,100.00 17,600.00 19,750.00
Transportation
Automotnre and Land 9,440.00 1Z2S0.00 500.00 25,255.00 25,755.00 28,065.00
42 ALTATS118 Automotwe Servicing NC 1 469 59 14.674.00 1,141.00
Transportation
AtAomotive and Land 4.000.00 450.00 3,200.00 7,000.00 500.00 7,650 00 8,150.00 11,45000
43 ALTATS113 Automotive Servicing NC 1 (Superseded) 156 20
Transportation
Automotive and Land Automotwe Servicing NC II 30000 13,600.00 1Z250.00 500.00 39.565.00 40,065.00 38,215-00
44 ALTATS213 676 85 25,665.00
Transportation (Superseded)
Automotive and Land 20,44800 300.00 1ZOOO.OO 1Z250.00 500.00 32.748.00 33.248.00 3Z998.00
45 ALTATS313 Automotive Servicing NC III 596 75
Transportation
Automotive and Land 804 32,182.00 300.00 16,160.00 1Z2S0.00 500.00 48.64Z00 49,142.00 44,73200
46 ALTATS413 Automotive Servicing NC IV 101
Transportation
AiAomotive and Land Automotive Wiring Harness Assembly 500 00 Z720.00 5,950 00 500.00 10,541.00 11,041.00 13,771.00
47 ALTWHA209 134 17 7,321.00
Transportation NC II
Automo^ and Land ALTDRA311 Driving (Artndated Vehide) NC 111' 108 14 7,095.00 2.856.00 Z240.00 4,900.00 500.00 12,191.00 1Z691.00 14,851.00
48
Transportation
Auti)motM and Land 14 7,095.00 1,239.00 2.240.00 4.900.00 500.00 10.574.00 11,074.00 13,234.00
49 ALTDRA311 Driving (Aiticulatod Vehicle) NC IIP 108
Transportation
Automotive and Land Driving (Passenger Bus/Straight Truck) 2,164.00 Z560.00 5,600.00 500.00 30.071.00 30.571.00 33.11100
50 ALTDRB311 122 16 25,347.00
Transportation NC HP
Automotive and Land Driving (Passenger Bus/Straight Truck) Z560.00 5,600.00 500.00 29.070 00 29,570.00 3Z110.00
51 ALTDRB311 122 16 25,347.00 1,163.00
Transportation NC IIP
AutomotM and Land 5,450.00 1,034.00 Z40000 5,250.00 500.00 8,884 00 9,384.00 11.734.00
52 ALTDRV204 Driving NC IP lie 15
Transportation
Automotive and Land ALTDRV204 Driving NC IP 5,450.00 819.00 Z400.00 5,250.00 500.00 8,66900 9,169.00 11,519.00
53 118 15
Transportation
AutomiAive and Land 82 21.660.M 1,491.00 13,120.00 1Z250.00 500.00 36.271.00 36.771.00 35,401-00
54 ALTMSE215 Motorcyde/Smal Engine Servicing NC II 650
Transportation
Automotive and Land 23 6.500.00 500.00 3,680.00 8,050.00 500.00 10,680 00 11,180.00 15.050.00
55 ALTPMO208 Pambng Machine Operation NC II 178
Transportation
Automotive and Land 143 18 10.000.00 500.00 Z880.00 6,300.00 500.00 13,380.00 13,880.00 16,800.00
56 ALTPL0208 Plastic Machine Operation NC II
Transportation
Automotive and Land 145 19 1Z000.00 500.00 3,040.00 6,650.00 500.00 15.540.00 16,040.00 19,150.00
57 ALTPLO308 Plastic Machine Operation NC 111
Transportation
Automotive and Land Tinsmilhing (Aidomotive Manrdacturing) 500.00 Z560.00 5.600.W 500.00 13,060.00 13.560.00 16,100.00
58 ALTTAM20e 126 16 10,000.00
NC II
Construction 59 CONCAR218 Carpentry NC II 301 38 16,938.00 1,539.00 6,080.00 1Z250 00 500.00 24,557 00 25.057.00 30.727.00
60 CONROC205 Carpentry NC II (Superseded) 162 21 7,000.00 600.00 3,360.00 7.350.00 500.00 10,960.00 11.460.00 14,950-00
61 CONCAR316 Carpentry NC III 224 28 31,640.00 1,424.00 4,480.00 9,800.00 500.00 37.544.00 38.044 00 42.864.00
62 CONFIC306 Carpentry NC ill (Superseded) 364 46 50,830.00 40000 7,360.00 1Z250 00 500.00 58.590.00 59,090.00 63.480.00
63 CONCOP215 Construction Paintina NC II 178 23 5.856.00 1,156.00 3,680 00 8,050.00 500.00 10,694.00 11,194.00 15,064.00
Construction 64 CONCOP306 Construction Paintina NC III 1 202 26 7.777.00 400.00 4.160.00 9,100.00 500 00 1Z337.00 1Z837.00 17,277.00
TESDA CIRCULAR Page 2_ of 3D pages
Subject; 2024 Sctwdule of Costs o< TESDA ScManMp Programi
Number ®1, series of 2024
Date Issued: EffecBvity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN Immedialely
TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Trairting for Wortr Scbolarshtp Program (TWSP), Private Education Student Rnancial Assistance (PESFA), Special Training Employment Program (STEP), Tutong Trabatx) Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualificalion are hereby adopted. The following training costs relative to the implementalion of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, facilties.
equipment and tools maintenance: honoraria of trainers; and living allowance): and Fixed Costs (miscetlaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry teaming (SIL) is not covered under the scholatship program
Allowanca (Pho)
Training Support Fund (1SF) Per Capita Cost (Php)
No. of No. of National Book
QueWication Training TWSP, BKSTP, Tsuper hho tar
Sector No. TVET QuiKficMion Tide Training Training ABowancs
Code Cost (PtiP) and PESFA (PhpSSO.OOfday for TWSP and Tsuper
Hours Days Fee(PhP) Tor PESFA PESFA
(PhpISO.OQWay maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
f=«/fltiaper i=rff9^19000fm i=r(Rp35000ptr k rn-yihfMk rr=y*h*)
a b c d e 9 h
otv) dm^max at 35 dmni

hteavy Equipment Operation (Artaitaled


Construction 65 CONART207 122 16 15,000.00 4.710.00 Z560.00 5,600.00 500.00 2Z270.00 2Z 770.00 25,31000
Off46ghway Dump Truck) NCII1

Heavy Equipment Operation (Articulated


Construction 66 CONART207 122 16 15,000.00 760.00 Z560.00 5,600.00 500.00 18.320.00 18,820 00 21,360.00
Off46ghway Durtp Truck) NC IP
Heavy Equipment Operation (Backhoe
Construction 67 CONBLO207 122 16 15,000.00 2,537.00 Z560.00 5,600.00 500.00 20,097.00 20,597.00 23,137.00
Loader) NC II1
Heavy Equpment Operation (Backhoe
Construction 68 CONBLO207 122 16 15,000.00 760.00 Z560.00 5,600.00 500.00 18,320.00 18,820.00 21,360.00
Loader) NC IP
Heavy Equipment Operation (Bulldozer)
Construction 69 CONBUL207 156 20 15,000.W 3,779.00 3,200.00 7,000.00 500.00 21.979.00 22,479.00 25.779.00
NC II1
Heavy Equipment Operation (BukJozer)
Construction 70 CONBU1207
NC IP
156 20 15,000.00 760.00 3,20000 7,ooaoo 5oaoo 18,960.00 19,460.00 22,760.00
Heavy Equipment Operation (Corxrote
Construction 71 CONCPO207 122 16 10,000.00 3,364.00 Z560.00 5,600.00 500.00 15,924.00 16,424.00 18,964.00
Pump) NC II1
Heavy Equipment Operation (Concrete
Construction 72 CONCPO207 122 16 10,000.00 760.00 Z560.00 5,600.00 500.00 13.320.00 13,820.00 16.360.00
Pump) NC IP
Heavy Equipment Operation (Container
Construction 73 CONCSO207 122 16 10,000.00 2,534.00 Z560.00 5,600.00 500.00 15,094.00 15,594.00 18,134 00
Stacker) NC IP
Heavy Equyiment Operation (Container
Construction 74 CONCSO207 122 16 10,000.00 760.00 Z560.00 5,600.00 500.00 13.320.00 13,820.00 16.360.00
Stacker) NC IP
Heavy Equipment Operation (Cramrler
Construction 75 CONCCO207 156 20 15,000.00 500.00 3.200.00 7,000.00 500.00 18,700.00 19,200.00 22,500.00
Crane) NC II (Superseded)
Heavy Equipment Operation (Forkfitt)
Construction 76 CONFOR207 156 20 10,000.00 500.00 3,200.00 7,000.00 500.00 13,700.00 14,200.00 17.500.00
NC II (Superseded)
Heavy Equipment Operation (ForUift)
Construction 77 CONFOR219 181 23 43,967.00 1,473.00 3,680.00 8,05000 50000 49,120.00 49,620.00 53,490.00
NC IP
Heavy Equipment Operation (Forldtt)
Construction 78 CONFOR219 181 23 43.967.00 76000 3,680.00 8,050.00 500.00 48,407.00 48,907.00 5Z 777.00
NC IP
Heavy Equipment Operation (Gantry
Construction 79 CONGCO207 106 14 10,000.00 500.00 2,240.00 4,900.00 500 00 12,740.00 13,240 00 15,400.00
Crane) NC II (Superseded)
Heavy Equipment Operation (Hydrauic
Construction 80 CONHEO207 156 20 16,380.00 500.00 3.200.M 7,000.00 500.00 20,080.00 20,580.00 23,880 00
ExcavaloO NC II (Superseded)
Heavy Equipmertf Operation (Hydrauic
Construction 81 C0NHE0219 181 23 35,909.00 3.39ZOO 3,680.00 8.050.00 500.00 42,981.00 43,481 00 47.351.00
Excavator) NC IP
Heavy Equipment Operation (Hydrauic
Construction 82 C0NHE0219 181 23 35.909.00 760.00 3,680 00 8,050 00 500.00 40,349.00 40.849 00 44,719.00
Excavator NC IP
Heavy Equipment Operation (Motor
Construction 83 CONMGO207 156 20 15,000.00 3,227.00 3,200.00 7,000.00 500.00 21,427 00 21,927.00 25,227.00
Grader) NC IP
He^ Equipment Operation (Motor
Construction 84 CONMGO207 156 20 15,000.00 760.00 3.200.00 7,000.00 500 00 18,960.00 19,460.00 22.760.00
Grader) NC IP
He^ Equipment Operation (Paver) NC
Construction 85 CONPAV207 122 16 10,000.00 Z204.00 2,560.00 5,600.00 50000 14,764.00 15,264.00 17,804.00
IP
Heavy Equipment Operation (Paver) NC
Construction 66 CONPAV207 122 16 10,000.00 760.00 Z560.00 5,600 00 500.00 13,320.00 13.820.00 16,360.00
IP
Heavy Equipment Operation (Rigid Off-
Construction 87 CONRK5207 162 21 15.000.00 6.645.00 3,360.00 7,350.00 500.00 25,005 00 25,505.00 28,995.00
Hiqhway Dump Truck) NC IP
Heavy Equipment Operation (Rigid Off- 7,350.00 500.00
Construction 88 CONRIG207 162 21 15.000.00 760.00 3.360.00 19,120.00 19,620 00 23,110.00
Hktfwrav Dumo Truck) NC IP
Heavy Equipment Operation (Rigid On-
Construction 89 CONROH207 Higtiway Dump Truck) NC II 122 16 12,600.00 500.00 ZS60.00 5,600.00 500.00 15,660.00 16,160.00 18,700.00
(Superseded)
Heavy Equipment Operation (Road 3.360.00 7,350.00 50000 22,745.00 a24S.00 26,73500
Construction 90 CONRRO207 162 21 16,231.00 3,154.00
Roler) NC IP
Heavy Equipment Operation (Road 3.360.00 7.350.00 500.00 2a351.00 20,851.00 24,341.00
Construction 91 CONRRO207 162 21 16,231.00 760.00
Roler) NC IP
Heavy Equipment Operation (Rough 7,000.00 500.00 19,34000 19,840.00 23.140.00
Construction 92 CONRTC207 156 20 15,640.00 500.00 3,200.00
Terrain Crane) NC II (Superseded)
Heavy Equipment Operation (Screed) Z204.00 2.080 00 4,550.00 500.00 14,284.00 14,784.00 16,754.00
Construction 93 CONSCR107 100 13 10,000.00
NC P
Heavy Equipment Operation (Screed) 2.080.00 4,S5a00 500.00 12,840.00 13,340.00 15,310.00
Construction 94 CONSCR107 100 13 10,000.00 760.00
NC P
Heavy Equipment Oper^xm (Tower laooooo 3,200.00 7,000.00 soaoo 13.700.00 14.200.00 17,500.00
Construction 95 CONTCO207 156 20 500.00
Crane) NC II (Superseded)
TESDA CIRCULAR PageiLof!C pages
Subject-2024 Sdwduls of Cntt of TESDA SdwIanWp Programs Number XI, series of 2024
Date Issued: EffecMvity: Supetsedes:
TESDA Orcular No. 004, series of 2023
TESDA Orcular No. 004-A, series of 2023
0 5 JAH 2024 Immediately
TESDA Circular No. 004-B. series of 2023
TESDA Circular No. OOAC, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA). Special Training Employment Program (STEP), Tulong Trabaho Scholatship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualification are hereby adopted. The following training costs relative to the implemenlalion of TESDA Scholarship Programs ate based on the following cost factors: Variable Costs (consumables, utilities, fadlties,
equipment and tools maintenance; honoraria of trainers: and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances). Training duration of
scholarship programs wilh entrepreneurship are mdustve of 3-day entrepreneurship training. Further, implementation of supervised industry learning (SIL) is not covered under the scholaship program
Allowance (Pho) Per Capita Cost (Php)
Trawing Sopport Fund (TSFj
No. of No. of National Book
Quairfication Traintng TWSP, BKSTP, Tsuper Isholar
Sector No. TVET Quaftfication rttie Trtening Training Asaessmsnt Atiowsncs
Coda Cost (PhP) and PESFA (Php350.00May for TWSP and Tsuper
Hours Days Fee (PhP) Tor PESFA PESFA
(Php160.00/day maximum of 35 BKSTP iekolsr
only
6 hours) days 8 Hoars)
t=r(Php19000par F^PhpSSaoOpm
• b c d • f^haper
da,) 9 h
2a2 dan^irm ol 35 dam)
k ffFgffrOtlC rr=g*it*{

Heavy Equipment C^^erabon (Transit 5,600.00 500.00 20,136.00 20,636.x


Construction 96 COKTMO207 122 16 15.000.00 2,576.00 2,560.00 23,176.x
Mixer) NC IP
Heavy Equipment Operation (Trans! 760.00 Z56000 5,600.00 500.00 18.320.00 18,820.x 21,360.x
Construction 97 COWTWO207 122 16 15,000 00
Merer) NC IP
Heavy Equipment Operation (Truck 3,200.00 7,000.00 500.00 17,053-00 17.553.x 20,853.x
Construction 98 CONTMC207 156 20 13.353.00 500.00
Mounted Crane) NC II (Superseded)
Heavy Equipment Operation (Wheel 500.00 21.711.00 22,211.x 25,511.x
Construction 99 CONWLO207 156 20 15,000.00 3,511.00 3,200.00 7,000.00
Loader) NC IP
Heavy Equipment Operation (Wheel 76000 7,000.00 500.00 18.960.00 19,460.x 2Z7M.X
Construction 100 CONWLO207 156 20 15,000.00 3,200.00
Loader) NC IP
Heavy Equipment Servicing 500.00
Construction 101 CONHEM206 362 46 15,180.00 1,943.00 7,360.00 12,250.00 24,483.00 24,983.x 29,373.x
(Mechanical) NC IP
Heavy Equipment Servicing 500.00 23.30000
Construction 102 CONHEM206 362 46 15,180.00 760.00 7,360.00 1Z250.00 23.8X.X 28.1X.X
(Mechanical) NC IP
Construction 103 CONMAS118 Masonry NC 1 123 16 8,174.00 1,153.00 2.560.00 5,600.00 500.00 11,887,00 12,387.x 14.927.x
Construction 104 CONMAS106 Masonry NC 1 (Superseded) 104 13 5.000.00 1,100.00 2,080.00 4,550.00 500.00 8,180 00 8.6X.X 10,650.x
Construction 105 CONMAS218 Masonry NC II 181 23 10,585.00 1,535.00 3,680.00 8,050.00 500.00 15,800.00 16.3X.X 20,170.x
Construction 106 CONMAS205 Masonry NC II (Superseded) 258 33 8,540.00 500.00 5,280.00 11,550 00 500.00 14,320.00 14,820.x 20.5X.X
Construction 107 CONMAS318 Masonry NC III 144 18 8,000.00 1,410.00 2,880.00 6,300.00 500.00 1Z290 00 12.7XX 15,710.x
Construction 108 CONMAS306 Masonry NC III (Superseded) 364 46 18,060.00 500.00 7,360.00 12.250.00 500.00 25,920.00 26,420.x 30.810X
Construction 109 CONPIP218 Pipefittnq (Met^) NC 1) 221 28 11,610.00 1,427.00 4.480.00 9,800.00 500.00 17,517.00 18.017.x 22,837.x
Construction 110 CONPIP208 Pioefittina NC II (Superseded) 202 26 10,660.00 500.00 4,160.00 9.100.00 500.00 15,32000 15.820.x 20.2XX
Construction 111 CONPLM114 Pkmtxnq NC 1 166 21 19,629.00 1,609.00 3,360.00 7,350.00 500.00 24,598.00 25,098.x 28.588X
Construction 112 C0NPuyr2i4 PhimbinQ NC II 202 26 13,576.00 1,888.00 4,160.00 9,100.00 500.00 19,624 00 20.124 X 24.564.x
Construction 113 CONPLM314 Plumbinq NC III 248 31 19,982.00 2.051.00 4,960.00 10,850.00 500.00 26,993.00 27,493.x 32.883.x
Construction 114 CONPVD308 PV System Desiqn NC III 148 19 7,000.00 500.00 3,040.00 6,650.00 500.00 10,540.00 11,040.x 14,150.x
Construction 115 CONPVI208 PV Systems InstaRation NC II 284 36 7,468.00 500.00 5,760.00 12,250.00 500.00 13.728 00 14,228.x 20.218.x
Construction 116 CONPVS308 PV Systems Servicinq NC III 158 20 9,000.00 500.00 3,200.00 7,000.00 500 00 1Z7X.00 13.2X.X 16.5X.X
Construction 117 CONRSW213 Reinforcinq Steel Works NC II 162 21 9,000.00 1.006 00 3,360 00 7,350.00 500.00 13,366.x 13,866.x 17,356.x
Construction 118 CONRGG107 Riqqinq NC 1 116 15 15,000.00 2,144.00 2,400.00 5,250.00 500.W 19,544.x 20,044.x 22,394.x

Construction 119 CONSCA207 ScaflbU Erection NC II (Superseded) 162 21 7,50000 50000 3,360.00 7.350.00 500.00 11,360.x 11.860.x 15,350.x

ScafloUng Works NC II (Supported 3,680.00 8.050.00 500.00 11,476.x 11,976.x 15,846.x


Construction 120 CONSCA218 181 23 6,520.00 1,276.00
Type Scaffokf)
Construction 171 CONSSW208 Structural Erection NC II 162 21 6.500.00 500.00 3,360.00 7,35000 500 00 10.360.x 10,860.x 14,350.x
Construction 17? CONTEC210 Technic^ Drafting NC II 206 26 10,194.00 500.00 4.160.00 9,100.00 500.00 14,854.x 15.354.x 19,794.x
Construction 173 CONTIL218 Tie Setting NC 11 117 15 10,605.00 1,415.00 2,400.00 5,250.00 500.00 14,420 X 14,920.x 17,270.x
Construction 124 CONTIL207 Tie Siting NC II (Superseded) 82 11 6,000.00 500.00 1.760.00 3,850.00 500.00 8,260.x 8.7X.X 10.350.x

Construction 125 Construction Site Supervision Level IV 192 24 15,000.00 3,840.00 8,400.00 500.00 18,840.x 19,340.x 23.4X.X

Construction 126 Construction Trade Supervision Level IV 192 24 15,000.00 3,840.00 8,400.00 500.00 18,840.x 19,340.x 23.4X.X

Electricat and 280 35 37.190.00 1,049.00 5,600.00 1Z2S0.00 500.00 43.839.x 44,339.x 50,489.x
127 aCCSS213 Computer Systems Servicing NC II
Electronics
Eiectiical and 176 22 6.000.00 400 00 3.520.00 7,700.00 500.00 9,920.x 10.420.x 14.1X.X
128 ELCCES306 Consumer Electronics Servicing NC Hi
Electroncs
Electrical and 176 22 6,000.00 400.00 3,520.00 7,700.00 5oaoo 9.920.x 10,420.x 14.1XX
129 ELCCES406 Consumer Electronics Servicing NC IV

Electrical and Electrical Installation and Maintenance 6,215.00 1,849.00 4,000.00 8,750 00 500.00 1Z064.X 1Z564.X 16.814.x
130 ELCEIM215 196 25
Electronics NC II
Electrical and Electrical Installation and Majrrtenance 1,896.00 3,200.00 7.000.00 500.00 11,096.x 11,596.x 14,896.x
131 ELCEIM315 160 20 6.000.00
NC III
Electrical and Electrical Installation and Maintenance 500.00 io.4oaoo 1Z2S0.00 soaoo 19.9X.X 20.4X.X 21.750.x
132 aCE84408 516 65 9,000.00
Electronics NC IV
Electrical and Electronic Products Assembly and 9.747.00 1,089.00 5,280.00 11,550.TO 500.00 16,116.x 16.616.x 22.386.x
133 aCEPA213 260 33
Senricina NC II
Electrical and Instrumentation and Control Sennong 4,800.00 io.soaoo 500.00 15,2X.X 15.7X.X 20.9XX
134 aCXS206 238 30 10,000.00 400.00
NC II
Electrical and IntJiumentetion and Control Servicing 13.423.00 500.00 3.520.00 7,700.00 500.00 17,443.x 17,943.x 21,623.x
135 ELDCS306 176 22
NC III
Electrical and Instnmentation and Control Servicing 500.00 3,520.00 7.700.00 500.00 17,0XX 17.5X.X 21,270.x
136 ELCJCS406 170 22 13,070.00
NC IV
Electrical and 158 20 14,854 00 1,»1.00 3.200 00 7,000.00 500.00 19.355.x 19,855.x 23.155.x
137 aCMEC215 Mtxhationics Servicing NC 8

Electrical and 196 25 13.345.00 1,504.00 4,000.00 8.750.00 500.00 18.849.x 19,349.x 23,599.x
138 aCMEC315 Mechatroncs Servcmg NC til
Electronics
TESDA CIRCULAR Paget of 30 pages
Subject-2024 Schedule of Costs of TESM SdwinMp Pngnmi
Number CDl series of 2024
Date Issued; Effecthiity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN 2024 Immedalely TESDA Circular No. 004-B. series of 2023
TESDA Ciicuiar No. 004^C, series of 2023

To meet the objectives of Traning far Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the fallowing schedule of costs per
quallficalion are hereby adopted. The fallowing training costs relative to the implementation of TESDA Scholaiship Programs are based cxi the following cost factors: Variable Costs (consumables, utilities, facilties,
equipiTtent and tools maintenance: honoraria of trakrers: and living allowance): and Fixed Costs (miscellanerxis tees, natfanal assessment tees, instructionat materials, and other akowarces.). Training duration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementalicxi of supervised industry teaming (SIL) is not covered under the scholarship program.
Allowance (PhD) Per Capita Cost (Php)
Training Support Fund (ISF)
Na of No. of NMional Book
Qualification Training TWSP, BKSTP. Tsuper Isholar
Sector No. TVET Quatficabon Tide Training Training Assessment Atowance
Code Cost(PhP) and PESFA (Php350.00/day for TWSP and Tsuper
Hours Days Fee(PhP) (Php160.(KMay Tor PESFA PESFA
maximum of 35 BKSTP iskolar
only
Shouts) days 8 Hours)
i=r(Phpieo.OOpef
a b c d • f=ef(8hnper
0 h
aw)
prfPhpJSOOOpef
dawtmx or 35
k

Electrical and
139 ELCMEC415 Mechatronics Servicing NCIV 200 25 13,610.00 2.141.00 4,000.00 8,750.00 500.00 19,751.00 20,251.00 24,501.00
Electronics
Electrical and Semiconductor Back-End Operation NC
140 ELCSB0215 80 10 4,839.38 852.00 i,6oaoo 3,500.00 500.00 7.291.38 7,791.38 9,191.38
Electronics II
Electrical and Semiconductor Front-of-Line Operation
141 ELCSF0215 80 10 4.839.38 877.00 1,600.00 3,500.00 500.00 7,316.38 7,816.38 9,216.38
Electronics NC II
Electrical and Electronics Production Line - Back End
142 72 9 5,800.00 1,440.00 3,150.00 500.00 7,240.00 7,740.00 8,950.00
Electronics Operation Level 1
Electrical and Etectronics Production Line - SMT
143 80 10 5,800.00 1.600.00 3,50000 500.00 7,400.00 7,900.00 9.300.00
Electronics Operation Level 1
Furniture and Fixtures 144 FURFIN207 Fumture Making (Finishing) NC II 212 27 11,390.00 500,00 4,320.00 9,450.00 500.00 16,210.00 16.710.00 21.340.00

Garments and Textiles 145 GRMORM205 Dressmaking NC H 275 35 6.295.00 1,348.00 5,600.00 12,250.00 500.00 13,243.00 13.743.00 19,893.00

Garments and Textiles 146 GRMFA0311 Fashion Design (AppareO NC III 397 50 16,252.19 500.00 8,000.00 12,250.00 500.00 24.75Z19 25.25Z19 29,00219

Garments and Texties 147 GRMTLR205 Tailoring NC II 275 35 14.071.00 1,684.00 5,600.00 12,250.00 500.00 21,355.00 21,855.00 28,005.00

Garments and Texties 148 Industrial Sewing Machine Operadon 120 15 6,000.00 2,40000 5,250.00 soaoo 8,400.00 8,90000 11,250.00
Heatxrg, Ventilation.
AircoraMoning and 149 HVCADS206 Air Duct Servicing NC II 596 75 10,000.00 300.00 uooo.oo 1Z2SO.OO 500.00 22,300 00 2Z800.Q0 22,550.00
Refrioeration
Heating. Ventilation.
Airconditioning and 150 HVCIPR306 Ice Plant Refrigeration Servicing NC III 672 84 10,000.00 400.00 13,440.00 1Z250.00 500.00 23,840.00 24,340.00 2Z650.00
Refrioeration
Heating, Ventilation.
RAC Servicing (OomRAC) NC II
Airconditioning and 151 HVCWAC211 240 30 14,272.00 500.00 4,800.00 iasoo.00 soaoo 19,57Z00 20.07Z00 2S.27Z00
(Superseded)
Refrioeration
Heating. Ventilation.
RAC Servicing (PACU-CRE) NC III
Airconditioning and 152 HVCPCR312 226 29 17.926.00 500.00 4,640.00 10,150.00 soaoo 23,06600 23,566.00 28,576.00
(Superseded)
Refrigeration
Heating. Ventilation,
Transport RAC Servicing NC II
Airconditioning and 153 HVCTAC205 212 27 12,085.00 750.00 4,320.00 9,450.00 500.00 17,155.00 17.655.00 2Z285.00
(Superseded)
Refrigeration
Human Health / Heatt)
154 HHCBHS219 Barangay Heath Services NC II 463 58 16,276.00 935.00 9,280.00 1Z250.00 500.00 26,491.00 26,991 00 29.461.00
Care
Human Health/He^ Barangay Heath Services NC II
155 HHCBHS206 560 70 5,000.00 400.00 11,200 00 1Z250.00 500 00 16.600.00 17,100 00 17.650 00
Care (Superseded)
Human Health / Heath 1Z2S0.00
156 HHCBES206 Biomedical Equipment Services NC ii 960 120 10,000 00 350.00 19,200.00 500.00 29,550 00 30,050.00 22,600.00
Care
Human Health / HeaNh Caregiving (Cients with Special Needs)
157 HHCCGC220 653 82 20,950.00 1,481.00 13,120.00 12,250.00 500.00 35,551 00 36,051.00 34,681.00
Care NC II
Human Health / Health
158 HHCCGE220 Caegwing (EUerty) NC II 401 51 19,895.00 1,620.00 8,160.00 iZ2saoo 500.00 29,675 00 30.175.00 33.765 00
Care
Human Health / Health Caregiving (Grade Schooler to 1Z250.00 500 00
159 HHCCGG220 389 49 9,502.00 1.268.00 7,840.00 18,61000 19,110.00 23.020.00
Cae Adotescent) NC 11
Human Heath / Healh (Caregiving (Newborn to Pre-Schooler) 1Z250.00
160 HHCCGN220 465 59 31,117.00 1,358.00 9,440.00 500.00 41.915.00 4Z415.00 44.725.00
Care NC II
Human Heath / Heath 1Z2S0.00
161 HHCCGV207 Caregering NC II (Superseded) 786 99 23.687.00 350.00 15,840.00 500.00 39,877.00 40,377.00 36,287 00
Care
Humai Heath / Heath 48,960.00 1Z250 00 500.00 88,960.00 89,460.00 52.250.00
162 HHCOHY410 Dental Hygiene Level IV (Superseded) 2443 306 40,000.00
Care
Human Heath/Heath Dental Latx)iatory Technology Services 1Z250.00 500 00 26,660.00 27.160.00 2Z 750.00
163 HHCOSF210 808 101 10,000.00 500.00 16,160.00
Care (Fixed Dentures/Restorations) NC II

Human Heath / Heath Dertal Latxxatory Technology Services 28,960.00 1Z25600 500.00 39.46000 39,960.00 2Z750.00
164 HHCDSR210 1446 181 10,000.00 500.00
Care (Removable Dentures/Appiiances) NC II
Human Heath/Heath Dental Laboratory Technology Services 500,00 1Z250.00 500.00 3a020.00 30.520.00 22,750.00
165 HHCDLT108 976 122 10,000.00 19,520.00
Care NCI
Human Heath / Heath 70,080.00 1Z250.00 500.00 120,060.00 120.580.00 62,250.00
166 HHCOTK410 Dental Technology NC fV 3499 438 50,000.00
Care
Human Heath / Heath 35 17,000.00 400.00 5.6oaoo iZ2saoo soaoo 23.000.00 23,500.00 29,650.00
167 HHCEMS213 Emergency Medcal Services NC II 280
Care
Human Heath / Heath 37,730.00 878.00 20,000.00 1Z2S0.00 500.00 58,608.00 59,108.00 50,858.00
168 HHCHCS205 Heath Care Services NC II 996 125
Care
TESDA CIRCULAR Page 6_ of20 pages
Subject: 2024 Schedule of C(Mti of TESDA Sdiatanhip Program Number ®[ series of 2024
Date Issued: Eftectivity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Qrcular No. 004A series of 2023
Immedialely
TESDA Circular No. 004-B, series of 2023
0 5 JAN 2024 TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Rnancial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the foltowing schedule of costs per
qualification are hereby adopted. The following Paining costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, facilties,
equipment and tools maintenance: honoraria of Painets: and living allowance): and Fixed Costs (miscellaneous fees, national assessment fees, insPucPonal materials, and oPier allawances.). Training duration of
scholarship programs wife entrepreneurship are inclusive of 3-day enPepreneurship Paming. Further, implemenlalion of supervised induspy teaming (SIL) is not covered under Pie scholarship program.
Allowance IPhol
Per Capita Cost (Php)
Training Support Fund (1SF1
No. of No. of National Book
Qualification Training TWSP, BKSTP, Tsupsriskolv
Sector No. TVET Qualification TKIe Training Traming Assessment Alowance
Code Cost (PhP) and PESFA (Php350.00/day for TWSP and Tsuper
Hours Day* Fee (PhP) (PhpieOOQMay Tor PESFA PESFA
maximum of 35 BKSTP Iskolar
only
8 hours) days 8 Hours)

• b c tf « h^/(Sfnper
**) 0 h
rfpVartSOOOper
d»f)
f=rfPhp35000pm
dmi^nax ot 36 dmfsf
* t=y*h*l

Human Health / Health 500.00 500.00


169 HHCHM-208 Htot (Wetness Massage) NCII 120 15 6,449.00 2.400.00 5,250.00 9,349.00 9,849.00 1Z 199.00
Care
Human Health / Heath 12,250.00 500.00
170 HHCMAT217 Massage Therapy NCII 700 88 14,541.00 814.00 14,080.00 29,435.00 29,935.00 27,605.00
Cae
Human Heath / Heath 50000
171 HHCOLS207 Ophthahnic Lens Services NC II 254 32 8.000.00 500.00 5,120.00 11,200.00 13,620.00 14,120.00 19,700.00
Care
Human Heath / Heath
172 HHCPHA315 Pharmacy Services NC III 848 106 10,000.00 1,243.00 16,960.00 12,250.00 500.00 28,203.00 28,703.00 23,49300
Care
Human Heath / Heath Barangay Infectious Disease 500.00
173 88 11 4,914.00 1,760.00 3,850.00 6,674.00 7.174.00 8,764.00
Care Management Services Level II
Human Heath / He^ 500.00
174 Contact Tracing Level II 120 15 5.000.00 2,400.00 5,250.00 7,400.00 7,900.00 10,250 00
Care
Inform^ion and
Communication 175 ICT2DA318 2D Animation NCm 968 121 43.355.00 978.00 19,360.00 1Z2SO.OO 50000 63,693.00 64,193.00 56,583.00
Technotoqv
Information and
Communication 176 ICT2DA307 20 Animation NC HI (Supemeded) 840 105 31,820.00 500.00 16,800.00 1Z2SO.OO 500 00 49,120.00 49,62000 44,570.00
Technotoqv
Inform^nn and
Communication 177 ICT2GA312 2D Game Art Dewtopment NC III 934 117 56,375.00 500.00 18,72a00 1Z250.00 500.00 75,595.00 76.095.00 69,125-00
Technotoqv
Information and
Communication 178 ICT30A318 30 Animation NC III 1100 138 60,019.00 Z078.00 22,060.00 12,250.00 500.00 84,177.00 84,677.00 74,347.00
Technotoqv
Infonnahon and
Communication 179 ICT3DA307 3D Animation NC III (Superseded) 840 105 31,820.00 500.00 16,800.00 1Z250.00 500.00 49,120.00 49,620.00 44.570.00
Technotoqv
Infonnation and
Communication 180 ICT3GA312 30 Game Alt DmtopmeiP NC HI 1364 171 69.163.110 500.00 27,360.00 iZ2saoo 5oaoo 97,02100 97,523.00 81.91100
Technotoqv
Infonnation and
Communication 181 ICTANM218 Animation NC II 616 77 31,380.00 1,200.00 12,320.00 1Z2S0.00 500.00 44.900.00 45.400.00 44,830.00
Technotoqv
Information and
Communication 182 ICTANM207 Animation NC II (Superseded) 516 65 26,210.00 500.00 10,400.00 1Z25Q.00 500.00 37,110.00 37,610.00 38,960.00
Technotoqv
Information and
Broadband InstaAabon (Fixed Wireless 500.00
Communication 183 ICTB8I208 116 15 5,000.00 500.00 2.400.00 5,250.00 7.900.00 8,400.00 10.750.00
Systems) NC II
Technotoqv
Inform^ion and
Communication 184 ICTCTV207 Catiie TV kistalation NC II 362 46 20,734.00 500.00 7,360.00 12,250.00 500.00 28,594.00 29,094.00 33.484.00
Technotoqv
Information and
Catito TV Operation and Maintenance
Communication 185 ICTCTV307 692 87 9.000.00 500.00 13,920.00 12,250.00 500.00 23.420.00 23.920.00 21,750.00
NC III
Technotoqv
Information arxj
Communication 186 CTCCS214 Contact Center Services NC II 144 18 6,169.ro 2.880.00 6,3oaoo 500.00 9,049.00 9,549.00 12,469.00
Technotoqv
Infonnation and
Communication 187 ICTGPR312 Game Programming NC IN 934 117 52,18a00 500.00 18.720.00 1Z250.00 500.00 71.400.00 71,900.00 64,930.00
Technotoqv
Information and
Comrmjncabon 188 ICTMDT206 Medicat Transcription NC II 396 50 10,000.00 250.00 8,000.00 1Z250.00 500.00 16.2S0.W 18,750.00 22,500.00
Technotoqv
Information and
Communication 189 ICTPRN313 Programming ( Net Technology) NC III 200 25 17,440.00 4,000.00 6,750.00 500.00 21,44000 21.940.00 26,190.00
Technotoqv
Information and
Communication 190 ICTPRJ321 Programming (Java) NC III 240 30 30,000.00 4,800.00 10,500.00 5oaoo 34,800.00 35,300.00 40,500.00
Technotoqv
Information and
Programming (Jav^ NC III 30,000.00 4,600.00 10.500.W 500.00 34,800 00 35,300.00 40,500.00
Communication 191 ICTPRJ313 240 30
(Superseded)
Technotoqv
Information and
Communication 192 ICTPR0313 Programming (Oracle Database) NC III 240 30 7,580.00 4,8oaoo 10,500.00 soaoo 1Z380.00 1Z880.00 18,080.00
Technotoqv
TESDA CIRCULAR Page T of 2£) pages
Subject 2024 Schedule of C(»li of TESOA SciioiinMp Program NiimbeKPl ■ series of 2024
Date Issued: EffecMvity: Superaedes:
TESDA Qrajlar No. 004, series of 2023
TESDA Circular No. 004A series of 2023
Imnedialely
TESDA Circular No. 004-B, series of 2023
0 5 JAN 2074 TESDA Circular No. 004-C. series of 2023

To trieel the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Emptoyment Program (STEP), Tukxig Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, faciltles,
equipment and tools maintenance: honoraria of trainers; and Hving allowance): and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other alkNrances.). Training duration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementalion of supervised industry learning (SIL) is not covered under the scholarship program.
Allowance fPho) Per Capita Cost (Php)
Tram mg Support Fund |TSr)
No. of No. of National Book
QuaHficatton Training TWSP. BKSTP, Tsuper Mwtar
Sector No. TVET Qualification Tide Training Training ARowance
Code Coat(PhP) and PESFA (Php350.00Mayfbr TWSP and Tsuper
Hour* Day* Fee(PhP) Tor PESFA PESFA
(PhpieO.OQMay maximum of 35 BKSTP Iskolar
only
1 hours) days 8 Hours)
p^fFfipIdOOOpv pT(Php350.00per
■ b c d • dvJ
g h
tvl dawtmx or 35 dws)
k nFg»r»i»iit

Inlormabon and Telecom OSP and Subscriber Line


Communication 193 ICTTCC211 Instalabon (Copper Cabte/POTS and 192 24 12,000.00 500.00 3,840.00 8,400.00 500.00 16,340.00 1884000 20,900.00
Technotoqv DSL) NCII
Inform^ion and
Telecom OSP htstalabon (Ffeer Qpbc
Communcabon 194 ICTTF0211 136 17 12,000.00 500.00 2,720.00 8950.00 500.00 18220.00 15,720.00 18,450.00
Cable) NC II
Tectmotoov
Information and
Communication 195 ICTVGD318 Visual Graphic Design NC III 501 63 17,497.00 932.00 10,080 00 12,250.00 500.00 28,509.00 29,009.00 30,679.00
Technotoqv
Information and
Visual Graphic Design NC III
Communication 196 ICTVGD307 487 61 10,000.00 500.00 9,760.00 12,250.00 500.00 20,260.00 20,760 00 22.750.00
(Superseded)
Technotoqv
Infonnation and
Communicabon 197 ICTWB03t8 Web Development NC III 1188 149 40,649.00 968.00 23,840.00 12,250.00 500.00 68457.00 65.957.00 53,867.00
Technotoqv
Infonnation smd
Compiler Security Incident Hanting
Communication 198 243 31 28,288.00 4.960.00 10,850.00 500.00 33,248.00 33,748.00 39.138.00
Level 1
Technotoqv
Infonnation and
Communication 199 CreatM Web Design 102 13 30.000.00 2,080.00 4,550.00 500.00 32,080.00 32,580.00 34.550.00
Technotoqv
Information and
Communication 200 Web Devetopment 108 14 30,000.00 2.240.00 4,900.00 500.00 32,240.00 32,740.00 34,900.00
Technotoqv
Language and Cuture 201 Arabic Language and Saud^Gulf Culure 100 13 4,052.23 2,080.00 4,550.00 500.00 8132.23 8,60223
English Language and other English
Language and Culture 202 100 13 7,314.00 2.080.00 4,550.00 500.00 9,394.00 11.864.00
NTRs
Language and Culure 203 German Language and Culure 100 13 4,052.23 2,080.00 4.550.00 500.00 8132.23 8,60223

Language and Cdture 204 Nafian Language and CiAure 100 13 4,052.23 2,080.00 4,55000 500.00 813Z23 8,602.23
Japanese Language and Cuture (150
Language and Cufture 205 ISO 19 7.525.00 3,040 00 6,650.00 500.00 10,565.00 14,175.00
hours)
Japanese Language And Cutiae (300 12.250.00 500.00
Language and Culture 206 300 38 14,920.00 6,080 00 21,000 00 27,170 00
hours)
Language and Culture 207 Korean Language and Culure 100 13 4,250.00 2,080.00 4,550.00 500 00 6,330.00 8,800.00

Language and Cuture 208 Mandarin Chinese Language and Culure 100 13 4,052.23 2,080.00 4,550.00 500.00 8132.23 860223

Language and Culture 209 Spanish for Differed Vocations 10O 13 4,052.23 2,080.00 4,550.00 500.00 8132.23 8,60223

Maritime 210 MTMSCS113 Ship's CaterinQ Services NC 1 so 7 3.439.00 600.00 1,120.00 2,450.00 500.00 8159.00 5.659.00 8489.00

Maritime 211 MTMSCC314 Ships' Catering NC III (Ships' Cooks) 160 20 10,172.00 1,300.00 3,200.00 7,000.00 500.00 14,672.00 15,172.00 18,47200

Metals and 234 13,938.00 500 00 4,800.00 10,500.00 500 00 19,238.00 19,738 00 24,938 00
212 MEECCO309 CAD/CAM Operation NC III 30
Enqineerinq
Metals and 26,497.00 500 00 4,800.00 10,500.00 500.00 31,797.00 32.297.00 37.497.00
213 MEECLO209 CNC Lathe Machine Operation NC II 236 30
Engineering
Metals and 234 30 32,886.00 50000 4,800.00 10.500 00 500.00 38186 00 38.686.00 43,886.00
214 MEECLO309 CMC Lathe Machine Operation NC III
Enqmeenfxj
Metals a)d 236 30 27,862.00 500 00 4,800.00 10,500.00 500 00 33.162.00 33,66200 38.86200
215 MEECMO209 CNC MMng Machine Operation NC II
Enqineerinq
Metals and 234 30 29,060.00 500.00 4,800.W 10,500.00 50800 34,36800 34,860.00 40,060.00
216 MEECMO309 CNC Mttng Machine Operation NC III
Enqineerinq
Metals and 10,000.00 600.00 3.200.00 7,000.00 500.00 18800.00 14,300.00 17.600.00
217 MEEFCW106 FkJX-Cored Arc Welding (FCAW) NC 1 156 20
Enqineerinq
Metals and 268 34 10,000.00 3,353.00 5,44000 11,900.00 500.00 18,793.00 19.293.00 28253.00
218 MEEFCW206 Flux-Cored Arc Welding (FCAW) NC II
Enqineerinq
Metals and 148 19 15,000.00 500.00 3.040.W 8650.00 500.00 18540.00 19,040.00 22150.00
219 MEEFCW306 Flux-Cored Arc WeUing (FCAW) NC III
Enqineerinq
Metals and 34 14,110.00 500.00 5,440.00 11.900.00 500.00 20.050.00 20.550W 26,510.00
220 MEEMIG106 Gas Metal Arc Wekfing (GMAW) NC 1 268
Engineering
Metals and 268 34 26,68800 3.361.00 844800 11,90800 50800 38489.00 38989.00 41,949.00
221 MEEMIG206 Gas Melaf Aic WeUrig (GUAW) NC H
Metals and 148 19 15.000.00 500.00 3,040.00 8650.00 500 00 18,540.00 19,040.00 22,150 00
222 MEEMIG306 Gas Metal Arc Welding (GMAW) NC III
Enqtoeering
TESDA CIRCULAR Page of 30 pages
Saiiject 2024 Schedule of Coitt of TESOA ScMnMp Prognim NiimherOPl series of 2024
Date Issued: Effecthrity; Supersedes:
TESDA Qrculaf No. 004, series of 2023
TESDA Qrcular No. 004-A, series of 2023
Immediately
0 5 JAN 2m TESDA Ciraitar No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training far Work Scholatsbip Program (TWSP), Private Education Student Fmandai Assistance (PESFA), Special Training Emptoyment Program (STE P). Tutong Trabario Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Batangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, Ihe fallowing schedule of costs per
qualificalion are hereby adopted. The falloering training costs relative to the implementation of TESDA Scholarship Pnjgrams ate based on the folkMring cost factors: Variable Costs (consumables, utilities, laciittes.
equipment aid tools maintenance: honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, aid other aIfawances). Training duration of
scholarship programs with entrepreneurship are inclusive of Sday entrepreneurship training. Further, implementalion of supervised industry learning (SIL) is not covered under the scholarship program.

AHowanct (PhDi Per Capita Cost (Pbp)


Training SuDOort Fund ilSr)
No. Of No. of NaHonsI Book
Training TWSP, BKSTP, Ttttptr Iskolar
QvaMcMion Training Assssiment ABoursnet
Sector No. TVET QuMr5cjtk>n Tide Training »id PESFA (PhpSSO.OOMay for TWSP and Tsuper
Code Cost(PhP) •For PESFA PESFA
Hours Days Fee(PhP) (PhpIM.OMay maximufflof 35 BKSTP Iskolar
only
8 hours) days 8 Hours)
i=fynp16Q.OO pet f=fYRfp35Q00 per
« b c d a 9 h
2a! dmrfmax of 3S
k

Metals and Gas Tungsten Arc Welding (GTAW) NC 34 22.872.00 2,126.00 5,440.00 11,900.00 500.00 30,438.x X.938X 36.898.x
223 MEEDG206 268
II
Metals and Gas Tungsten Arc Welding (GTAW) NC 294 37 laooooo 500.00 5,920.00 12.250.00 500.00 16,420.x 16,920.x 2Z750.X
224 MEET1G406
IV
Metals and 156 20 10,385.00 500.00 3,200.00 7,000.00 500.00 14,065.x 14,585.x 17,885.x
225 MEEGSW106 Gas Welding NC 1
Metals and MEEGSW206 Gas Wekfing NC II 312 39 12,227.00 600.00 6,240.00 12.290.00 500.00 19,X7.X 19,567.x 25,077.x
226
Metals and 966 121 7,000.00 2.252.00 19.360.00 12,250.00 500.00 28.61ZX 29.11ZX 21,50ZX
227 MEEMCG119 Machining NCI
Metals and 374 47 7,000.00 500,00 7,520.00 12,250.00 500.00 15.020.00 1S.520.X 19,750.x
228 MEEMCG106 Machining NC 1 (Superseded)
Metals and
229 MEEMCG205 Machining NC II 337 43 15,77a00 600.00 6.880.00 12.2Sa00 soaoo 23,250.x 23.750.x 28.620.x

Metals and 342 43 18,137.00 500.00 6,880.00 12.250.00 500.00 25,517.x 26,017.x X.887.X
230 MEEMCG306 Machining NC III
Metals and 218 28 3,500.00 500.00 4,480.00 9,600.00 500.00 8.4X.X 8,980.x 13,800.x
231 MEEDFT108 Mechanical Drafting NC 1
Metals and 358 45 7,000.00 500.00 7,200.00 12,250.00 500.00 14.7X.X 15.2X.X 19.7X.X
232 MEEPMM108 Plant Maintenance NC 1
Metals and MEEPMO106 Press Machine Operation NC 1 294 37 7,000.00 500.00 5,920.00 1Z2S0.Q0 500.00 13.420.x 13.920.x 19.7M.X
233
Metals and Shielded Metal Arc Welding (SMAW) NC 14.594.00 2,234.00 5,440.00 11,900.00 500.00 2Z268.X 22,768.x 28.726.x
234 MEEEAW106 268 34
1 (Superseded)
Me^ and Shielded Metal Arc Welding (SMAW) NC 34 15,460.00 2,697.00 5,440.00 11,900.00 500.00 23.597.x 24.TO7.X 30.057.x
235 MEEEAW206 268
II (Superseded)
Metals and Shielded Metal Arc Welding (SMAW) NC 17,665.00 3,723.00 2,400.00 5,250.00 500.00 23.788.x 24.288.x 26,638.x
236 MEEEAW306 120 15
Ml (Superseded)
Metals and Shielded Metal Arc Welding (SMAW) NC 36.212.00 5,129.00 3,360.00 7,350.00 500.00 44.701.x 45.201.x 48.691.x
237 MEEEAW406 168 21
IV (Superseded)
Metals and 124 16 10,000.00 500.00 2,560.00 5.600.00 500.00 13.0X.X 13.5X.X 16.1X.X
238 MEESAW106 Submerged Arc Welding (SAW) NC 1
Metals and 194 25 10,000.00 60000 4,000.00 8,750.00 500.00 14.6X.X 15.1X.X 19.350.x
239 MEESAW206 Submerged Arc Welding (SAW) NC II

Metals and 598 75 9,000.00 500.00 liOOO-00 1Z250.00 500.00 21.5X.X 22.0X.X 21.7X.X
240 MEETDM208 Tool and Die Making NC II

Processed Food & 152 19 5.000.00 500.00 3,040.00 6,650.00 500.00 8,540.x 9.040.x 12,150.00
241 PFBFPP207 Fish Products Packaging NC II

Processed Food & 197 25 5,719.00 1,506.00 4,000.00 8,750.00 500.00 11,225.x 11,725.x 15,975.x
242 PFBFOP119 Food Processing NC 1

Processed Food & 552 69 22.252.00 500.00 11,040.00 1Z250.00 500.00 33,792.x 34,292.x 35.X2.X
243 PFBFOP215 Food Processing NC II

Processed Food & PFBFOP307 Food Processing NC III 900 113 34,090.00 500.00 18,080.00 1Z250.00 500.00 5Z 670.x 53,170.x 46.840.x
244
Processed Food & 576 72 21,810.00 50000 11,520.00 12,250.00 500.00 33,830.x 34,330.x 34.5X.X
245 PFBFOP407 Food Processing NC IV
Processed Food & Slaughtering Operations (Large Animal) 20,000.00 946.00 7,200.00 1Z2S0.00 500.00 28,146.x 28,646.x 33.1X.X
246 PFBSLL216 360 45
NC II
Processed Food & 280 35 20,000.00 949.00 5,600.00 1Z2S0.00 500.00 26.549.x 27,049.x 33,199.x
247 PFBSLS216 Slaughtering Operations (Swine) NC II

Social. Community
SOCBRB220 BwteringNCn 285 36 11.217.00 938.00 5,760.00 1Z2S0.00 500.00 17,915.x 18,415.x 24,405.x
Development and 248

Social. Community
SOC8CN220 Beauty Care (Nai Care) Services NC II 341 43 21.88000 876.00 6,880.00 1Z25000 500.00 29,636.x X.136.X 35,0X.X
De^lopmenl and 249

Social. Community
277 35 7,743.00 1,410.00 5,600.00 1Z250.00 500.x 14,753.x 15,253.x 21,403.x
Development and 250 SOCBEC219 Beauty Care (Skin Care) Services NC II

Social. Community
Developmat and 251 SOCBEC205 Beauty Care NC II (Superseded) 1098 138 28.41000 600.00 22,080.00 iZ2saoo 5XX 51.0X.X S1.5X.X 41.2X.X

Social. Community Beauty Cae Senas (Nai Can) NC H


186 24 7.320.00 500.00 3.840.00 8.400.00 50000 ii.68ax 1Z1X.X 16,220.x
Dev^opment and 252 SOC8CN211
(Superseded)
Odier Services
TESDA CIRCULAR Page9_of2C pages
Subject; 2024 Schedule of Costs of TESQA SdiotiriMp Programs
Number CO. series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Orcular No. 004, series of 2023
TESDA Orcular No. 004-A, series of 2023
0 5 JAN 2024 Irnmediately
TESDA Orcular No. 004-B, series of 2023
TESDA Orcular No. 004-0, series of 2023

To meet the objectives of Traning for Work Schotarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Emptoyment Program (STEP), Tulong Ttabaho Scholarship Program
(nSP), Rice Extension Service Program (RESP), Coconut Farmeis Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the foUoieing schedule of costs per
qualification ae hereby adopted. The following training costs relative to the implementalion of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables, utilities, faciities,
equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instnjctional materials, and other allowances.). Training duration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised Industry teaming (SIL) is not covered under the scholarship program.

Allowance {Pnei Per Capita Cost (Php)


Traning Support Fund ITSR
No. of No. Of National Book
QiuMication Training TWSP, BKSTP, Tsuper Isfcoter
Sector No. TVET QuaWicteion TMe Training TraiiiiAg AsMSSwent ABouwncs
Coat(PhP) and PESFA (Php350.0QMay for TWSP ml Tsuper
Cod# Fee(PhP) (PhpIM.OOMay •For PESFA PESFA
Hours Days mnimum of 35 BKSTP Iskolar
only
6 hours) days 8 Hours)
t^t/(8hnp9f i=r(npf6000ptr /=f‘fPhp350 00per
k ^g*h*i rr=gHt*]
a b c a a
dart 9 h
daurtrua of 35 dan)

Soct^, Community
Beauty Care Services (Nal Cam) NC III 6,000.00 500.00 3,360.00 7,350.x 50000 9,660.x 10.3X.X 13,850.x
Dewiopment and 253 SOCBCN311 168 21
[Superseded)

Sodai. Community
Devetopment and 254 SOCBKP307 Bookkeeping NC III 292 37 9,195.00 841.x S,920.X 12.250.x 300.00 15,956.x 16,456.x 22,286.x

Soci^ Community Domestic Work NCII (Superseded)-


SOCDOW217 218 28 11,285.00 1,347.x 4.4X.X 9.8X.X 300.00 17.112X 17,612.x 22,432.x
Devebpment and 255
Without Electiires

Social. Community
Development and 256 SOCDOW214 Domestic Work NC II (Superseded) 218 28 11,285.00 635.x 4,4X.X 9.8X.X 300.00 16.4X.X 16.9X.X 21.720.x

Social. Community
257 SOCHDR210 Hanhessing NC II (Superseded) 656 82 13,000.00 6X.X 13,120.x 12,250.x 300.00 26,720.x 27,220.x 25,850.x
Development and

Social Community
SOCHOR320 Hairdressing NC III 204 26 14,029.00 1,019.x 4.1X.X 9.1X.X 500.00 19,20aX 19.7X.X 24,148.x
De^iopment and 258

Social. Comrmaiity
SOCHDR310 Hanfressing NC III (Superseded) 638 80 24,280.x 500.00 12.8X.X 12,2SD.X 500.00 37,580.x 38,0X.X 37,030.x
Development and 259

Social Community
SOaGS215 Lifeguard Services NC li 960 123 11.232.36 1,029.x 19.6X.X 12.2X.X 500.00 31.941.36 32,441.36 24,511.36
Development and 260

Social. Community
SOaCS315 Lifeguanl Services NC III 980 123 20,341.53 1.058.x 19.6X.X 12,250.x 5X.X 41,079.53 41,579.53 33,649.53
Development and 261

Social Community
SOCMIC210 Mcroknance Technology NC H 403 51 9.910.x 5XX 8.1X.X 12,250.x SX.X 18,57aX 19,070.00 22.6X.X
Development and 262

Social, Community
SOCSES105 Security Services NC I 170 22 6,314.00 200.00 3,520.00 7.7X.X 5X.X 10,034.x 10,534.x 14,214.x
Development and 263

Social. Community
264 SOCSES207 Security Services NC H 223 28 5.0X.X 2X.X 4,4X.X 9,000.00 500.00 9.6K.X 10,1X.X 15.0X.X
Development and

Social Community
Development and 265
(Cooperative Dcwlopmcnt and
885 111 13,032.x 17.7X.X iZ2sax sxx X.792.X 31.292.x 25,282.88
Management Level IV

Tourism (Hotel and 178 23 6,454.x 1,295.x 3.6X.X 8.050.x 5X.X 11,429.x 11,929.x 15.799.x
266 TRSBRT213 Barista NCI)

Tourism (Hotel and TRS8AR213 Bartending NC It 438 55 13.336.x 1,399.x B.8X.X 12.2X.X SX.X 23,535.x 24,035.x 26,985.x
267
Tourism (Hotel and 326 41 1Q.151X 1,399.x 6,560.x 1Z250.X 5X.X 18,112.x 18.61ZX 23,802.x
268 TRS8AR213 Bartending NC II - Wlhout Elecbres

Tourism (Hotel and Bread and Pastry Production NC II 16,968.x 40000 2.8X.X 6.3X.X SX.X 20,248.x 20.748.x 23,668.x
269 TRS8PP209 141 18

Tourism (Hotel and (Commercial (Cooking NC III 244 31 17.254.x 5X.X 4,96aX 10,850.x SXX 22,714.x 23.214.x 28,604.x
270 TRSCOK307

Tourism (Hotel and Commercial Cooking NC IV 18,741.x 5X.X S,2X.X 11,5S0.X 5X.X 24,521.x 25.021.x 30,791 X
271 TRSCOK407 260 33

Tourism (Hotel and TRSCOK214 Cookery NC II 316 40 20,315.00 1,300.00 6.4X.X 12.2S0.X 5X.X 28.015.x 28,515.x 33,865.x
272
Tourism (Hotel and 108 14 14,776.x 905,00 2,240.x 4.9X.X 5X.X 17,921.x 18,421.x 20,581.x
273 TRSEVM307 Events Management Services NC III

Tourism (Hotel and 356 45 15,710.x 88200 7,2X.X 12.250.x SX.X 23,792.x 24,292.x 28.84ZX
274 TRSFBS213 Food and Beverage Services NC II

Tourism (Hotel and 350 44 9.2X.X 1,078.x 7,040.x 12,250.x 5X.X 17,386.x 17,886.x 22, SX.X
275 TRSFBS318 Food and Beverage Services NC III

Tourism (Hotel and Food and Beverage Services NC III 29 8,830.x 500.x 4.640.x 10,150.x SX.X 13,970.x 14,470.x 19.4X.X
276 TRSFBS313 230

Tourism (Hotel and 392 49 14,245.x 915.x 7,840.00 12,250.x 5XX 23.0X.X 23.5X.X 27,410.x
277 TRSFBS418 Food and Beverage Services NC IV

Tourism (Hotel and 56 19,40a00 907.00 8.960.00 12,250.x 500.x 29,267.x 29,767.x 32.557.x
278 TRSFOS213 Front Office Services NC II 442

Tourism (hioteiand 15,796.x 1,1X.X 8.8X.X 12,250.x 5X.X 25,704.x 26,204.x 29,154.x
279 TRSHSK213 Housekeeping NC li 436 55
Restaurant)
TESDA CIRCULAR Page ID of 2C pages
Subject 2024 Schedule of Colts of TESOA SchobnMp Programs Number QD[ series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Qrcular No. 004-A, series of 2023
0 5 JAN 2024 Immediately
TESDA Circular No. 004-B. series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong Trabaho Scholarship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Baiangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar, the following schedule of costs per
qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Prcigrams are based on the following cost factors: Variable Costs (consumables, utilities, facilties,
equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duraSon of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry teaming (SIL) is not covered under the scholarship program.

Psr Capita Cost (Php)


Training SuDP^'pund (Vi?)
No. of No. of National Book
Qualification Training TWSP, BKSTP. Tsuper Iskolar
Sector No. TVET QuaHficatton Tide Training Training Asaessment ABowica
Code Cost(PhP) and PESFA (Php3S0.00fday for T¥fSP and Tsuper
Hours Days Fse(PhP) (Php160.00May Tor PESFA PESFA
matimumof 3$ BKSTP Iskolar
only
8 hours) days 8 Hours)
rr(npi9o.oo pv F^rfptptdsaooper
• b c d • dV)
g h
tu,) davfmax of 35 dtifSi
Jr t=g*h*i

Tourism (Hotel and 200 25 6.514.00 834.00 4,000.00 8,750.00 500.00 11,348.00 11.848.00 16,098.00
280 TRSHSK319 Housekeeping NC III
Restaurant)
Tourism (Hotel and 6,000.00 500.00 1,600.00 3.500.00 500.00 8,100.00 8.600.00 10,000.00
281 TRSHSK307 Housekeeping NC HI (Superseded) 76 10
Restaurant)
Tourism (Hotel and 112 14 7,000.00 500.00 2,240.00 4,900.00 500.00 9,740.00 10.240.00 12,400.00
282 TRSHSK407 Housekeeping NCIV (Superseded)
Restaurant)
Tourism (Hotel and 25 3,500.00 1,327.00 4,000.00 8,750.00 500.00 8,827.00 9,327.00 13.577.00
283 TRSLOG213 Local Guiding Services NC II f96
Restaurant)
Tourism (Hotel and 10 5,000.00 87000 1,600.00 3,500.00 500.00 7,470.00 7,970.00 9,370.00
284 TRSTPS215 Tourism Pronwfan Services NC II 76
Restaurant)
Tourism (Hotel and 137 18 3,500.00 921.00 2,880.00 6.300.00 500.00 7.M1.00 7,801.00 10.721.00
285 TRSTVS219 Travel Services NC 11
Restaurant)
Tourism (Hotel and 41 3.500.00 500.00 6,560.00 12,250.00 soaoo 10,560.00 11,060.00 16,250.00
286 TRSTVS213 Travel Services NC II (Superseded) 328
Restaurant)
Trainers Methodology Level 1 5,280.00 11,550.00 500.00 20,645.00 21,145.00 26,915.00
TVET 287 TVETRM111 264 33 12,042.00 3,323.00
(Trainer/Assessor)
Trainers Methodology Level II (Traning 11,360.00 1Z2S0.00 500.00 39.086.00 39,586.00 39,976.00
TVET 288 TVETRM211 568 71 17,990.00 9,736.00
Desioner/Devetoper)
(Conduct Trair^ Need Arralysis
TVET 289 TVT232307 (Leading to Trainers Methodology Level 40 5 3,626.00 1,658.00 800.W 1,750.00 500.00 6,064.00 6,584.00 7,034.00
II)
Develop Training Curriculum (Leading to 500 00 5,901.00 6.351.00
TVET 290 TVT232308 40 5 3,000.00 1,601.00 800.00 1.750.M 5,401.00
Trainers Methodology Lewi II)

Develop Learning Materials (Leading to


TVET 291 TVT232309 120 15 5,440.00 i,6oaoo 2,40000 5.250.00 500.00 9,440.00 9,940.00 12,290.00
Trainers Methodology Level II)
Develop Competency Assessment Tools
TVET 292 TVT232310 (Leading to Trainers Methodology Lewi 40 5 3.000.00 1.601.00 800.00 1.75a00 500.00 5,401.00 5,901.00 6.351.00
II)
Design and Develop Maintenance
TVET 293 TVT232311 System (Leading to Trainers 40 5 3,000.00 1,675.00 800.00 1,750.00 soaoo 5,475.00 5,975.00 6.425.00
Methodokxjv Level 11}
Develop Learning Materials ior e-
TVET 294 TVT232312 Leamng (Leading to Trainers 120 15 5,781.00 1,601.00 2,400.00 5,250.00 soooo 9.78Z00 10,282.00 12,632.00
Mothodoloqv Lewi II)
Facitate Development of Compentency
TVET 295 TVT232313 Standards (Leading to Trainers 40 5 Z305.00 800.00 1,750.00 soaoo 3,105.00 3,605.00 4,055.00
Methodology Level II)
Line Construction (Electric Power 5.120.00 11,200.00 50000 18.610.00 19,110.00 24,690.00
Ut*bes 296 UTLDLC210 250 32 12.990.TO 500.00
OistritMJtion) NC II (Superseded)
Transmission Line Installation and 10,000.00 1,950.00 6.560.00 1Z250.00 500.00 18,510.00 19.010.00 24,200.00
Utilities 297 UTLTXL217 324 41
Maintenance NC II
Transmission Line ImtaMahnn and 500.00 12.960.00 1Z250.00 500.00 23.460.00 23,960.00 22,750 00
UtNbes 298 UTLTXL208 646 81 10,000.00
Maintenance NC II (Superseded)
Transmission Line Instaiation and 4,160.00 9,100.00 50000 16,070.00 16,570.00 21,010.00
Utilities 299 UTLTXL317 208 26 10,000.00 1,910.00
Maintenaice NC III
Transmission Line Installation and 4,320.00 9,450.00 50000 14,820.00 15,320.00 19,950.00
Utilities 300 UTLTXL308 210 27 10,000.00 500.00
Maintenance NC III (Superseded)
301 VSAB.U208 Wustrabon NC II 234 30 9,418.00 500.00 4,800.00 10,50000 500.00 14.718.00 15.218.00 20,418.00
Visud Arts 30? VSAPHO207 Photooraohy NC II 132 17 7.000.00 500.00 2.720.00 5,950.00 500.00 10,220.00 10.720.00 13,450.00
Whoiesale and Retai 236 30 5,430.00 500.00 4,800.00 10,500.00 500.00 10,730.00 11,230.00 16,430.00
303 WRTCSR208 Customer Services NC II
Tradino
'Assesment Fees with rental cost for the use of equipment/vehicle during the conduct of assessment
2Assesment Fees without rental cost for the use of equipment/vehicle during the conduct of assessment.
3Com is being used during assessment.
^Fiice is being used during assessment.
TESDA CIRCULAR Page LL of pages
Subject 2024 Schedule of Costs of TESDA Scholaiship Programs Number series of 2024
Date Issued; Effecthritv; Supersedes;
TESDA Circular No. (X)4, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN 2024 Immediately
TESDA Circular No. 004-6, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program {TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Progran (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Prog ram (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Progrims are based on
the following cost factors; Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (nliscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs wHh entrepreneurship are inclusive of T^Jay entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


Qualffication No. of Training Training Coat Per Capita Cost
Sector Ho. TVET Qualification True Training Assessment Support Fund
Code Days (PhP) (PhP)
Hours Fee(PhP) (PhP)
pr(Ptpmoopa^
(f e f^8hnperday) g h
a b C
___
TTSP
Agiicultiire, Forestry, Agricultural Crops Production NC1 302 38 12,690.00 3,377.00 6,080.00 22,147.00
1 AFFACP105
and Fishery
Agriculture. Forestry, Support Horticultural Crop Work (Leading to 72 9 1,900.00 821.00 1,440.00 4,161.00
2 AGR611306
and FIsherv Aaricultural Crops Production NC 1)
Agriculture, Forestry, Support Nursery Work (Leading to Agricultural 54 7 1,400.00 837.00 1,120.00 3,357.00
3 AGR611307
Rsherv Crops Production NC 1)
Agriculture, Forestry, Support Agronomic Crop Work (Leading to 9 1,900.00 838.00 1,440.00 4,178.00
4 AGR611308 72
and Fishery Aaricultural Crops Production NC 1)
Agriculture, Forestry, Agricultural Crops Production NC II 336 42 15,390.00 995.00 6,720.00 23,105.00
5 AFFACP213
arid Fishery
Agriculture, Forestry, Plant Crops (Leading to Agricultural Crops 2,100.00 844.00 1,120.00 4,064.00
6 AFF610302 52 7
and Fishery Production NC ill
Agriculture. Forestry, 445 56 18,670.00 8,960.00 27,630.00
7 AFFACP306 Agricultural Crops Production NC III
and Fishery
Agriculture, Forestry, Prepare Land for Agricultural Crop Production 1,120.00 2,020.00
8 AGR611310 52 7 900.00
and Fishery (Leading to Agricultural Crop Production NC III)
Agriculture, Forestry, Implement Post-Harvest Program (Leading to 800.00 960.00 1,760.00
9 AGR611311 44 6
and Fishery Aaricultural Crops Production NC III)
Agriculture, Forestry, Implement Plant Nutrition Program (Leading to 960.00 3,060.00
to AGR611312 44 6 2,100.00
and Fishery Aaricultural Crops Production NC III)
Agriculture, Forestry, Control Weeds (Leading to Agricultural Crops 2,100.00 960.00 3,060.00
11 AGR611313 44 6
and Rsherv Production NC III)
Agriculture, Forestry, Establish Agronomic Crops (Leading to AgricuNural 900.00 1,120.00 2,020.00
12 AGR611320 52 7
and Rsherv Crops Production NC III)
Agriculture, Forestry, Undertake Agronomic Crop Maintenance Program 700.00 800.00 1,500.00
13 AGR611321 40 5
and Fishery (Leading to Agricultural Crops Production NC III)

Agriculture, Forestry, Undertake Agronomic Crop Harvesting Activities 600.00 800.00 1,400.00
14 AGR611322 36 5
and Fishery (Leading to Agricultural Crops Production NC III)
Agricuthxe, Forestry, Keep Records tor Farm Business (Leading to 600.00 800.00 1,400.00
15 AGR611331 36 5
and Fishery Aaricultural Crops Production NC III)
Agriculture, Forestry, 239 30 10,085.00 854.00 4,800.00 15,739.00
16 AFFAGE217 AgroentrepreneursNp NC II
and Fishery
Agriculture, Forestry, 445 56 20,810.00 853.00 8,960.00 30,623.00
17 AFFAGE317 Agroenlrepreneurship NC III
and Rsherv
Agriculture, Forestry, Agroentrepreneurship NC IV 715 90 8,218.80 853.00 14,400.00 23,471.80
18 AFFAGE417
and Fishery
Agriculture, Forestry, Animal Health Care and Management NC III 208 26 12,241.00 3,378.00 4,160.00 19,779.00
19 AFFAHC307
and Fishery
Agriculture, Forestry, Animai Production (Poultry-Chicken) NC II - 29 11,424.00 897.00 4,640.00 16,961.00
20 AFFAPP213 226
and Rsherv Without Electives
Agriculture, Forestry, Maintain Poultry House (Leading to Animal 2.970.00 778.00 1,440.00 5,188.00
21 AFF622101 70 9
and Fishery Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Breed and Grow Chicks (Leading to Animal 10,400.00 796.00 4,800.00 15,996.00
22 AFF622102 236 30
and Fishery Preduclion (Poultry-Chicken) NC II)
Agriculture. Forestry, Perform Pre-Lay and Lay Activities (Leading to 3,058.00 777.00 1,440.00 5,275.00
23 AFF622103 70 9
and Fishery Animal Production (Poultry-Chicken) NC II)
Agriculture, Forestry, Animal Production (Ruminaits) NC II 306 39 20,634.00 1,629.00 6,240.00 28,503.00
24 AFFAPR213
and Fishery
Maintain Housing, Farm Implements and
Agriculture, Forestry, Sunounding Area (Leading to Animal Production 42 6 1,400.00 835.00 960.00 3,195.00
25 AFF621901
and Rshery
(Ruminants) NC II)
Agriculture. Forestry, Provide Forage (Leadirig to Animal Production 52 7 3,526.00 785.00 1,120.00 5,431.00
26 AFF621902
and Fishery (Ruminants) NC II)
Agriculture, Forestry, Perform Breeding of Ruminants (Leading to Animal 62 8 5,739.00 790.00 1.280.00 7,809.00
27 AFF621903
and Fishery Preduction (Ruminants) NC II)
TESDA CIRCULAR Page 12. of 33 pages
Subject 2024 Schedule of Costs of TESDA Scholarship Programs Number QX series of 2024
Date Issued: Effecthfitv: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately TESDA Circular No. 004-B, series of 2023
0 5 MH TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training fer Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers; and living adowarce); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


Qualification No. of Training Training Cost Per Capita Cost
Sector No. TVET Quaiificalion Tide Training Assessment Support Fund
Code Days (PhP) (PhP)
Hours Fee (PhP) (PhP)
FrfPtpIGOOOper
d e f=e^8 frs per day) g h
a b C day)

Agriculture, Forestry. Raise Dairy Animals (Leading to Animal 236 30 8,271.00 822.00 4,800.00 13,893.00
28 AFF621904
Production (Ruminants) NCII)
Agriculture, Forestry, Raise Meat-Type Animals (Leading to Animal 42 6 3,625.00 829.00 960.00 5.414.00
29 AFF621905
Production (Ruminants) NC II)
Agriculture, Forestry, Animal Productiori (Swine) NC II 306 39 14,003.00 2,015.00 6,240.00 22,258.00
30 AFFAPS213
Agriculture, Forestry, Handle Breeders (Leading to Animal Production 30 7,700.00 805.00 4,800.00 13,305.00
31 AFF621216 236
ISwine) NC II)
Agriculture, Forestry, Aquaculture NC II (Superseded) 1276 160 10,000.00 350.00 25,600.00 35,950.00
32 AFFAQC204
Agriculture, Forestry, Artificial Insemination (Large Ruminants) NC II 220 28 7,340.00 828.00 4,480.00 12,648.00
33 AFFAIR212
Agriculture, Forestry, Artificial Insemination (Swine) NC II 175 22 7,637.00 833.00 3,520 00 11,990.00
34 AFFAIS212
Agriculture, Forestry, Bamboo Production NC II 195 25 4,800.00 1,109.00 4,000.00 9,909.00
35 AFFBPN217
Agriculture, Forestry, Drying and Milling Plant Servicing NC III 256 32 15,347.13 3,092.00 5,120.00 23,559.13
36 AFFDMS317
Agriculture, Forestry, Service Grain Drying Plant Facilities (Leading to 48 6 4,200.00 1,025.00 960.00 6,185.00
37 AFF723301
Drying and Milling Plant Servicing NC III)
Agriculture, Forestry, Service Rice Milling Rant Facility (Leading to 80 10 4,500.00 1,033.00 1.600.00 7,133.00
38 AFF723302
Drvtnd and Millind Rant Servicing NC 1111
Agriculture, Forestry, 352 44 9,757.00 400.00 7,040.00 17,197.00
39 AFFFSC105 Fish Capture NC 1
Agriculture, Forestry, 318 40 9,000.00 400.00 6,400.00 15,800.00
40 AFFFSC206 Fish Capture NC II
Agriculture, Forestry, Fistiing Gear Flepair and Maintenance NC III 152 19 10,000.00 500.00 3,040.00 13,540 00
41 AFFFGR307
Agriculture, Forestry, 96 12 3,500.00 500.00 1,920.00 5,920.00
42 AFFFWO107 Fishport/Wharf Operation NC 1

Agriculture, Forestry, 423 53 19,222.00 939.00 8,480.00 28,641.00


43 AFFGRP215 Grains Production NC IP

Agriculture, Forestry, 423 53 19,222.00 944.00 8.480.00 28,646.00


44 AFFGRP215 Grains Production NC II4

Agriculture, Forestry, 445 56 16,659.00 300.00 8,960.00 25,919.00


45 AFFHTC306 Horfculluie NC III

Agriculture, Forestry, Establish Horticultural Crops (Leading to 36 5 600.00 800.00 1,400.00


46 AGR611315
Horticulture NCIII)
Agriculture, Forestry, Coordinate Horticultural Maintenance Program 70 9 1,300.00 1,440.00 2,740.00
47 AGR611316 (Leading to Horticulture NC 111)
Agriculture, Forestry, Coordinate Horticultural Crop Harvesting (Leading 70 9 1,300.00 1,440.00 2,740.00
48 AGR611317
to Horticutture NCIII)
Agriculture, Forestry, Undertake Field Budding and Grafting (Leading to 70 9 1,300.00 1,440.00 2,740.00
49 AGR611318
Agriculture, Forestry, Undertake Propagation Activities (Leading to 70 9 1,300.00 1,440.00 2,740.00
50 AGR611319
Agriculture, Forestry, Maintain and Monitor Environmental Wortc 9 1,300.00 1,440.00 2,740.00
51 AGR611330 70
Practices (Leading to Horticulture NC III)
AgricultuiB, Forestry, Landscape Installation and Maintenance 212 27 21,590.00 500.00 4,320.00 26,410.00
52 AFFUM208
Agriculture, Forestry, 160 20 5,134.05 1,387.00 3,200.00 9,721.05
53 AFFML0217 Milking Operation NC II

Agriculture, Forestry, 232 29 23,391.00 979.00 4,640.00 29,010.00


54 AFFOAP212 Organic Agriculture Production NC 11

Agriculture, Forestry, Organic Agrtouttore Production NC tl - WHtxxit 23 13,355.00 979.00 3,680.00 18,014.00
55 AFFOAP212 178

Agriculture, Forestry, Raise Organic Chicken (Leading to Organic 9 3,601.00 808.00 1,440.00 5,849.00
56 AGR612301 72

Agriculture, Forestry, Produce Organic Vegetables (Leading to Organic 8 6,604.00 814.00 1,280 00 8,698.00
57 AGR611306 64
arid Fishery Agriculture Productkjn NC 111
TESDA CIRCULAR Page Li of JO pages
Subject; 2024 Schedule of Cost* of TESOA Schotarahip Programs Number QPI. series of 2024
Date Issued: Effectivity: Supersedes:
TESDA Qrcular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN m ImmecSately TESDA Circular No. 004^, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Trying for Work Schotarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the follcwring schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of irainets: and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materia, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry teaming (SIL) is not covered under the scholarship program.

No. of Natkmal Training


QuaMctfon No.ofTraMng Training Cost Per Capita Cost
Sector No. TVET QuaKfication Title Traintng Assessment Support Fund
Code Days (PhP) (PhP)
Hours Fee (PhP) (PhP)
^r(Pbpl60.00per
b C a e hrsperday) 9 h
8 day)

Agricutture, Forestry, Produce Organic Fertilizer (Leading to Organic 64 a 800.00 810.00 1,280.00 2,890.00
58 AGR611301
and Rshery Aariculture Production NCII)
Agriculture. Forestry, Produce Organic Concoctions and Extracts a 3,400.00 816.00 1,280.00 5,496.00
59 AGR611302 64
and Ftshety (Leading to Organic Agriculture Production NC II)

Agriculture, Forestry, Raise Organic Hogs (Leading to Organic 10 5.688.00 815.00 1,600.00 8,103.00
60 AGR612302 80
Aoricuiture Production NC II)
Agricutture. Forestry, Raise Organic Small Ruminants (Leading to 64 8 4,854.00 803.00 1,280.00 6,937.00
61 AGR612303
Oroanic Aariculture Production NC II)
Agriculture, Forestry, AFFPMV207 Pest Management (Vegetables) NC II 312 39 13,746.00 500.00 6,240.00 20,486.00
62
Agriculture, Forestry, Conduct Fteld Assessment (Leading to Pest 40 5 1,000.00 800.00 1.800.00
63 AGR321320
Manaoement (Veoetables) NC II)
Agricutture, Forestry, Apply Bio-Control Measures (Leading to Pest 52 7 1,300.00 1,120.00 2,420.00
64 AGR321321
Manaoement (Veoetables) NC II)
Agriculture, Forestry, Apply Cultural Management Strategies (Leading to 1,600.00 1,280.00 Z880.00
65 AGR321322 64 8
and Fishery Pest Management (Vegetables) NC II)

Agricutture, Forestry, Apply Physical Control Measures (Leading to Pest 52 7 1,300.00 1,120.00 2,420.00
66 AGR321323
Manaoernent (Veoetables) NC II)
Monitor Results of Control Activities and Provide
Agriculture. Forestry, AGR321325 Feedback (Leading to Pest Management 52 7 1,300.00 1,120.00 2,420.00
67
and Fishery (Veoetables) NC II)
Agriculture, Forestry, AFFRMO207 Rice Machinery Operations NC II 232 29 22,339.00 1,323.00 4,640.00 28,302.00
68
Operating Rice Land Preparation Machinery and
Agriculture, Forestry, AGR611361 Equipment (Leading to Rice Machinery Operations 72 9 4,000.00 838.00 1,440.00 6,278.00
69
and Fishery NC II)
Operating Rice Crop Establishment Machinery and
Agriculture, Forestry, Equipment (Leading to Rice Machinery Operations 64 8 4,800.00 868.00 1,280.00 6,948.00
70 AGR611362
and Fishery
NC II)
Operating Rice Crop Care Machinery and
Agriculture, Forestry, AGR611363 Equipment (Leading to Rice Machinery Operations 32 4 4,700.00 898.00 640.00 6,238.00
71
and Fishery
NC II)
Operating Rice Harvesting and Threshing
Agriculture, Forestry, AGR611364 Machinery and Equipment (Leading to Rice 32 4 4,700.00 820.00 640.00 6,160.00
72
and Fishery Machinery Operations NC II)
Agriculture, Forestry, Operating Rice Drying Machinery and Equipment 32 4 4.400.00 850.00 640.00 5,890.00
73 AGR611365
and Fishery (Leading to Rice Machinery Operations NC 10

Agriculture, Forestry, Operating Rice Milt Machinery and Equipment 32 4 4,700.00 1,070.00 640.00 6,410.00
74 AGR611366
and Fishery (Leading to Rice Machinery Operations NC II)
Agriculture, Forestry. AFFRPC212 Rubber Processing NC II 122 16 19,797.00 500.00 2,560.00 22,857.00
75
Agriculture, Forestry, AFFRPT221 Rubber Production NC II 321 41 10,000.00 1,645.00 6,560.00 18,205.00
76
Agriculture, Forestry, AFFRPT212 Rubber Production NC U (Superseded) 242 31 10,000.00 500.00 4,960.00 15,460.00
77
Agriculture, Forestry, Seaweed Prrxluction NC II 652 82 11,476.61 1,035.00 13,120.00 25,631.61
78 AFFSWP215
Agriculture, Forestry, CoHee Production Level It 176 22 6,900.00 3,520.00 10,420.00
79
Agriculture, Forestry, Com Production 88 11 2,600.00 1,760.00 4,360.00
80
Agriculture, Forestry, Digital Agriculture Course 40 5 1,732.00 800.00 2,532.00
81
Agriculture, Forestry, 48 6 1,800.00 960.00 2,760.00
82 Edible Landscapping wito Farm Branding
and Fishery
TESDA CIRCULAR Page (i of 20 pages
Subject: 2024 Schedule of Costs of TESDA Scholarship Programs Numbered, series of 2024
Date Issued: Effectririty; Suoersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
0 5 JAN 2024 TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004.C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Emttloyment Prograrr (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skiis Trainmg Proc ram (BKSTP), and
Tsuper Iskoiar, the foliowing schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA S>cholarshrp Programs are based on
the following cost factors: Variable Costs (consumables, utilities, faculties, equipment and tools maintenance: honoraria of trainers; and living allowance): arid Fixed Costs (nliscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of NxtkMul Training


QinWiciHan No. of Training Training Cost Per Capita Cost
TVET Qualification Tide Trakring Assessment Support Fund
Sector No. Days (PUP) (PhP)
Code Hours Fee(PhP) (PhP)
i=r(PtpmOOper pg*h*i
d e f^Strsper day) g h
a b C day)

Agriculture, Forestry, Mango Production Level II 128 16 28,098.78 2560.00 30,658.78


83
AgricultutE. Forestry, on Palm Production 128 16 3,800.00 2560.00 6,360.00
84
Agriculture, Forestry, Organic Aiabica Coffee Production 232 29 6,900.00 4,640.00 11,540 00
85
Agriculture, Forestry, Organic Rice Production 96 12 2,900.00 1,920.00 4,820.00
86
Agriculture, Forestry, Oyster Mushroom Production wttti Farm Branding 48 6 1,400.00 960.00 2,360.00
87
Agriculture, Forestry, 40 5 1,627.00 800.00 2,427.00
88 Pest and Nutrient Management

Autorrxttive and Land Automotive Body Painting/Fmishing NC1 120 15 5,000.00 400.00 2,400.00 7,800.00
89 ALTABP106
Automotive and Land 183 23 7,000.00 400.00 3,680.00 11,080.00
90 ALTABP306 Automotive Body Painting/Finishing NC III

Automotive and Land 547 69 5,000.00 1,03800 11,040.00 17,076.00


91 ALTABR220 Automotive Body Repairing NC II

Automotive and Land 143 18 6,607.00 500.00 2880.00 9,987.00


92 ALTAEA207 Automotive Electricai Assembly NC II
Automotive and Land 240 30 7,000.00 500.00 4,800.00 12300.00
93 ALTAEA308 Automotive Electrical Assembly NC III

Automotive and Land 143 18 5,000.00 500.00 2880.00 8,380.00


94 ALTAMA207 Automotive Mechanical Assembly NC II
Automotive and Land 480 60 7.000.M 500.00 9,600.00 17,100.00
95 ALTAMA308 Automotive Mechanical Assembly NC III

Automotive and Land 469 59 14,674.00 1,141.00 9,440 00 25,255.00


96 ALTATS118 Automotive Servicing NC 1

Automotive and Land 156 20 4,000.00 450.00 3,200.00 7,650.00


97 ALTATS113 Automotive Servicing NC 1 (Superseded)
Automotive and Land Automotive Servicing NC II (Superseded) 676 85 25,665.00 300.00 13,600.00 39,565.00
98 ALTATS213
Automotive and Land 596 75 20,44800 300.00 12,000.00 32,748.00
99 ALTATS313 Automotive Servicing NC III
Automotive and Land 804 101 32,18200 300.00 16,160.00 48,642,00
too ALTATS413 Automotive Servicing NC IV

Automotive and Land 134 17 7,321.00 500 00 2,720.00 10,541.00


101 ALTWHA209 Automotive Wiring Harness Assembly NC II

Automotive and Land 108 14 7,095.00 2856.00 2240.00 12,191.00


102 ALTDRA311 □riving (Articulaled Vehicle) NC III'

Automotive and Land 108 14 7,095.00 1.239.00 2240.00 10,574.00


103 ALTDRA311 Driving (Articulated Vehicle) NC IIP

Automotive and Land 122 16 25,347.00 2164.00 2560.00 30,071.00


104 ALTDRB311 Driving (Passenger Bus/Straight Truck) NC IIP

Automotive and Land 122 16 25,347.00 1,163.00 2560.00 29,070.00


105 ALTDRB311 Driving (Passenger Bus/Straight Truck) NC III*

Automotive and Land 118 15 5,450.00 1,034.00 2,400.00 8.884.00


106 ALTDRV204 Driving NC IP
Automotive and Land 118 15 5,450.00 819.00 2,400.00 8,669.00
107 ALTDRV204 Driving NC IP

Automotive and Land 650 82 21,660.00 1,491.00 13,120.00 36,271.00


108 ALTMSE215 Motorcycle/Small Engine Servicing NC II

Automotive and Land Service Motorcyde/Small Engine System (Leading 120 15 3,164.00 2,400.00 5,564.00
109 ALT723372 to Motorcyde/Small Engine Servidng NC II)
Transportation
Automotive and Land Service Electrical System (Leading to 70 9 1,300.00 1,440.00 2,740.00
110 ALT723373 Motorcyde/Small Engine Setvidna NC 111
Automotive and Land Overhaul Motorcyde/Small Engine (Leading to 224 28 4,000.00 4,480.00 8.480.00
111 ALT723375 Motorcyde/Small Engine Servicing NC 11)
Transoortation
TESDA CIRCULAR Page £ of £ pages
Subject: 2024 Schedule of Costs of TESDA Scholarship Programs Number0^ series of 2024
Date Issued; Effectivtty: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Qrcular No. 0O4-A, series of 2023
Immediately TESDA Qrcular No. 004-6, series of 2023
0 5 JAN 2024 TESDA Qrcular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Rnancial Assistance (PESFA), Special Training Employment Program (STEP), Tutong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the folloiiiring schedule of costs per qualification are hereby adopted. The foBoering training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors- Vaiable Costs (consumables, utilities, tedlties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


No. of Training Training Cost Per Capita Cost
Quelificebon TVET Qualification Title Training Assessment Support Fund
Sector No. Days (PhP) (PhP)
Code Hours Fee (PhP) (PhP)
i=r(Pt^>m.oopef pgtlm
f=^8 tws per day) day!

Automotive and Land Painting Machine Operation NCII 178 23 6.500.00 500.00 3,680.00 10,680.00
112 ALTPMO208
Transportation
Automotive and Land 143 18 10,000.00 500.00 2,880.00 13,380.00
113 ALTPL0208 Plastic Machine Operation NC II
Transportation
Automotive and Land 145 19 12,000.00 500.00 3,040.00 15,540.00
114 ALTPL0308 Plastic Machine Operation NC II
Transportation
Aulomotive and Land 126 16 10,000.00 500.00 2,560.00 13,060.00
115 ALTTAM206 Tarsmithing (Aulomotive Manufacturing) NC II
Transportation 1,539.00 6,080.00 24,557.00
CONCAR218 Camentry NC II 301 38 16,938.00
Construction 116 3.36000 10,960.00
Carpentry NC II (Superseded) 162 7,000.00 600.00
Construction 117 CONROC205 37,544.00
224 28 31,640.00 1,424.00 4,480 00
Construction 118 CONCAR318 Carpentry NC III
364 46 50,830.00 400.00 7,360.00 58,590.00
Construction 119 CONFIC306 Carpentry NC III (Superseded)
178 23 5,858.00 1,156.00 3,680.00 10,694 00
Construction 120 CONCOP215 Construction Painting NC II
202 26 7,777.00 400.00 4,160.00 12,337.00
Conslmction 121 CONCOP306 Construction Paintinq NC III
Heavy Equipment Operation (Articulated Off- 122 16 15,000.00 4,710.00 2,560.00 22,270.00
Constniction 122 CONART207
Hiqhway Dump Truck) NC 11*
Heavy Equipment Operation (Articulated Off- 122 16 15,000.00 760.00 2,560.00 18,320.00
Construction 123 CONART207
Hiqhwav Dump Truck) NC IP
Heavy Equipment Operation (Backhoe Loader) NC 122 16 15,000.00 2,537.00 2,560.00 20,097.00
Constniction 124 CONBLO207
Heavy Equipment Operation (Backhoe Loader) NC 16 15,000.00 760.00 2.560.00 18,320.00
Constniction 125 CONBLO207 122

156 20 15,000.00 3,779.00 3,200.00 21,979.00


Construction 126 CONBUL207 Heavy Equipment Operation (Bulldozer) NC II’

156 20 15,000.00 760.00 3,200.00 18,960.00


Constniction 127 CONBUL207 Heavy Equipment Operation (Bulldozer) NC IP
Heavy Equipment Operatirxi (Concrete Pump) NC 122 16 10,000.00 3,364.00 2,560.00 15,924.00
Constniction 128 CONCPO207
Heavy Equipment Operation (Concrete Pump) NC 122 16 10,000.00 760.00 2,560.00 13,320.00
Constniction 129 CONCPO207
Heavy Equipment Operation (Container Stacker) 122 16 10,000.00 2,534.00 2.560.00 15,094.00
Constniction 130 CONCSO207
NCI
Heavy Equipment Operation (Container Stacker) 122 16 10,000.00 760.00 2,560.00 13,320.00
Construction 131 CONCSO207
NC IP
Heavy Equipment Operation (Crawler Crane) NC II 156 20 15,000.00 500.00 3,200.00 18,700.00
Constniction 132 CONCCO207
(Superseded)
Heavy Equipment Operation (Forklift) NC II 20 10,000.00 500.00 3,200.00 13,700.00
133 CONFOR207 156
Constniction (Superseded)
23 43,967.00 1,473.00 3,680.00 49,120.00
134 CONFOR219 Heavy Equipment Operation (Forklift) NC II1 181
Construction 43,967.00 760.00 3,680.00 48.407.00
CONFOR219 Heavy Equipment Operation (Forklift) NC IP 181 23
Construction 135
Heavy Equipment Operation (Gantry Crane) NC II 14 10,000.00 500.00 2,240.00 12,740.00
CONGCO207 106
Constniction 136 (Superseded)
Heavy Equipment Operation (Hydraulic Excavator) 20 16.380.00 500.00 3,200.00 20,080.00
137 CONHEO207 156
Construction NC II (Superseded)
Heavy Equipment Operation (Hydraulic Excavakx) 23 35,909.00 3,392.00 3,680.00 42,981.00
C0NHE0219 181
Cfonslruction 138 NC II
Heavy Equipment Operation (Hydraulic Excavator) 23 35,909.00 760.00 3.680.00 40,349.00
C0NHE0219 181
(Construction 139 NCll
15,000.00 3.227.00 3,200.00 21,427.00
(XINMGO207 Heavy Equipment Operation (Motor Grader) NC IP 156 20
(Constniction 140
15,000.00 760.00 3,200.00 18,960.00
CONMGO207 Heavy Equipment Operation (Motor Grader) NC IP 156 20
Construction 141
16 10,000.00 2,204.00 2,560.00 14,764.00
CONPAV207 Heavy Equipment Operation (Paver) NC IP 122
Construction 142 10.000.00 760.ro 2,560.00 13,320.00
CONPAV207 Heavy Equipment Operation (Paver) NC IP 122 16
(Constniction 143
Heavy Equipment Operation (Rigid Off-Highway 15,000.00 6,645.00 3,360.00 25,005.00
CONR1G207 162 21
Construction 144 DumpTnick) NC II1
Heavy Equipment Operation (Rigid Off-Highway 15.000.00 760.00 3,360.00 19,120.00
CONRIG207 162 21
Construction 145 DumpTnick)NCIP
Heavy Equipment Operation (Rigid On-Highway 12,600.00 500.00 2,560.00 15,660.00
CONROH207 Qumo Truck) NC II (Superserled)__________ 122 16
Constmcdon 146
TESDA CIRCULAR Page Ifc of 20 pages
Subject; 2024 Schedule of Costs of TESDA SchoUfship Programs
Number®!, series of 2024
Date Issued; Effecthritv; Supersedes;
TESDA Ocular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
0 5 JAN 20U TESDA Qrcular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the foltowing schedule of costs per qualification are hereby adopted. The folloiinng training costs relative to the imptementatiar of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance: honoraria of trainers: and living allowance): and Fixed Costs (misceilaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

Naof National Trabimg


^,,H|gr ^t,i,,
UUMnlCIIIOn No. of Training Training Coat Par Capita Cost
Sector No. TVET Qualification Title Training Assessment Support Fund
Code Days (PhP) (PhP)
Hours Fee (PhP) (PhP)
r^r(Ptip160.00pv
a b C d e f=e^8 hrs per day) 9 ft Tb,'r*i

Construction 147 CONRRO207 Heavy Equipment Operation (Road Roller) NC H' 162 21 16,231.00 3,154.00 3,360.00 22,745.00

Construction 148 CONRRO207 Heavy Equipment Operation (Road Roller) NC IP 162 21 16,231.00 760.00 3,360.00 20,351.00
Heavy Equipment Operation (Rough Terrain 500.00 3,200.00 19,340.00
Construction 149 CONRTC207 156 20 15,640.00
Crane) NC II (Superseded)
Construction 150 CONSCR107 Heavy Eouipment Operation (Screed) NC 1' 100 13 10,000.00 2,204.00 2.080.00 14,284.00
Consbuction 151 CONSCR107 Heavy Equipment Operation (Screed) NC P 100 13 10,000.00 760.00 2.080.00 12,840.00
Heavy Equipment Operation (Tower Dane) NC II 13,700.00
Construction 152 CONTCO207 156 20 10,000.00 500.00 3,200.00
(Superseded)
Consbuction 153 CONTMO207 Heavy Equipment Operation (Transit Mixer) NC II1 122 16 15,000.00 2,576.00 2,560.00 20,136.00

Consbuction 154 CONTMO207 Heavy Equipment Operation (Transit Mixer) NC IP 122 16 15,000.00 760.00 2,560.00 18,320.00
Heavy Equipment Oper^ion (Truck Mounted
Consbuction 155 CONTMC207 156 20 13,353.00 500.00 3,200.00 17,053.00
Crane) NC II (Superseded)
Consbuction 156 C0NWLO207 Heavy Equipment Operation (Wheel Loader) NC IP 156 20 15,000.00 3,511.00 3,200.00 21,711.00

Construction 157 CONWLO207 Heavy Equipment Operation (Wheel Loader) NC IP 156 20 15,000.00 760.00 3,200.00 18,960.00

Construction 158 CONHEM206 Heavy Equipment Servicing (Mechanical) NC IP 362 46 15,180.00 1,943.00 7,360.00 24,483.00

Consbuction 159 CONHEM206 Heavy Equipment Servicing (Mechanical) NC IP 362 46 15,180.00 760.00 7,360.00 23,300.00
Consbuction 160 CONMAS118 Masonry NCI 123 16 8,174.00 1,153.00 2,560.00 11,887.00
Consbuction 161 CONMAS106 Masonry NC 1 (Superseded) 104 13 5,000.00 1.100.00 2,080.00 8,180.00
Consbuction 162 CONMAS218 Masonry NC II 181 23 10,585.00 1,535.00 3,680.00 15,800.00
Consbuction 163 CONMAS205 Masonry NC II (Superseded) 258 33 8,540.00 500.00 5,280.00 14,320.00
Plaster Concrete/Masonry Surface (Leading b> 5,220.00
Consbuction 164 CON712304 136 17 2,500.00 2,720.00
Masonry NC II)
Consbuction 165 CONMAS318 Masonry NC III 144 18 8,000.00 1,410.00 2,880.00 12.290.00
Consbuction 166 CONMAS306 Masonry NC III (Superseded) 364 46 18,060.00 500.00 7,360.00 25,920.00
Consbuction 167 CONPIP218 Pipelitbnq (Metallic) NC II 221 28 11,610,00 1,427.00 4,480.00 17,517.00
Consbuction 168 CONPIP208 Rpefitbna NC II (Superseded) 202 26 10,660.00 500.00 4,160.00 15,320 00
Consbuction 169 CONPLM114 Plumbinq NC 1 168 21 19,629.00 1,609.00 3,360 00 24,598.00
Consbuction 170 CONPLM214 Plumbinq NC II 202 26 13,576.00 1,888.00 4,160 00 19,624.00
Consbucbon 171 CONPLM314 Plumbing NC III 248 31 19,982.00 2,051.00 4,960.00 26,993.00
Construction 172 CONPVD308 PV System Design NC III 148 19 7,000.00 500.00 3,040.00 10,540.00
Consbuction 173 CONPVI208 PV Systems Installation NC II 284 36 7,468.00 500.00 5,76000 13,728.00
Construction 174 CONPVS308 PV Systems Servicinq NC III 158 20 9,000.00 500.00 3,20000 12,700 00
Construction 175 CONRSW213 Reinforcinq Steel Works NC II 162 21 9,000.00 1.006,00 3,360.00 13,366.00
Construction 176 CONRGG107 Riqqtnq NC 1 116 15 15,000.00 Z144 00 2,400.00 19,544 00
Consbuction 177 CONSCA207 Scaffold Erection NC II (Superseded) 162 21 7,500.00 500.00 3,360.00 11,360.00

Consbuction 178 CONSCA218 Scaffolding Works NC II (Supported Type Scaffold) 181 23 6,520.00 1,276.00 3.680.00 11,476.00

Construction 179 CONSSW208 Sbuctural Erecbon NC II 162 21 6,500.00 500 00 3,360.00 10.360.00
Consbuction 180 CONTEC210 Technical Drafting NC II 206 26 10,194.00 500.00 4,160.00 14,854.00
Consbuction 181 CONTIL218 Tile Setbnq NC II 117 15 10,605.00 1,415.00 2.400 00 14.420.00
Consbuction 182 CONTIL207 Tile Settinq NC II (Superseded) 82 11 6,000.00 500 00 1,760.00 8,260.00
Consbuction 183 Construction Site Supervision Level IV 192 24 15.000.00 3,840.00 18,840 00
Construction 184 Consbucbon Trade Supervision Level IV 192 24 15,000.00 3,840.00 18,840.00
Electncal and 280 35 37,190.00 1,049.00 5,600.00 43,839.00
185 ELCCSS213 Computer Systems Servicing NC II
Elecbonics
Elecbicaland Consumer Elecbonics Servicing NC III 176 22 6,000.00 400.00 3,520 00 9,920.00
186 ELCCES306
Elecbonics
Electrical and Consumer Elecbonics Servicing NC IV 176 22 6,000.00 400.00 3,52000 9,920.00
187 ELCCES406
Electronics
Elecbicaland Electncd Installation and Maintenance NC It 196 25 6,215.00 1,849.00 4,000.00 12.064.00
188 ELCEIM215
Elecbonics
TESDA CIRCULAR Page Hof 20 pages
Subject: 2024 Schedule of Costs of TESDA Schobwship Programs Number CPI, series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
0 5 JAN 202i TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the followring schedule of costs per qualificatton are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Tratntng


QuakflcaUon No. of Training Training Cost Per Capite Cost
Sector No. TVET Qualification TrUe Training Assessment Support Fund
Code Days (PhP) (PhP)
Hours Fee(PhP) (PhP)
i=r(Php160.00pef
d e ^^Btrsperday) h
8 b C 9
^
Eiectricai and Electrical Installation and Maintenance NC III 160 20 6,000.00 1,896.00 3,200.00 11,096.00
189 ELCEIM315
Electronics
Etectricai and Electrical Installation and Maintenance NC IV 516 65 9,000.00 500.00 10,400.00 19,900.00
190 ELCEIM406
Electronics
Electrical and Elecironic Products Assembly and Senricing NC It 260 33 9,747.00 1,089.00 5,280.00 16,116.00
191 ELCEPA213
Electronics
Electrical and Assemble Electronic Products (Leading to ERAS 2,000.00 917.00 1,600.00 4,517.00
192 ELC724335 80 10
Electronics NC II)
Eiectricai and Service Consumer Electronic Products and 96 12 3,000.00 881.00 1,920.00 5,801.00
193 ELC724336
Systems (Leading to ERAS NC II)
Electrical and nstrumentation and Control Servicing NC II 238 30 10,000.00 400.00 4,800.00 15,200.00
194 ELCICS206
Electrical and ELCICS306 Instnimentation and Control Servicing NC III 176 22 13,423.00 500.00 3,520.00 17,443.00
195
Electrical and ELQCS406 Instrumentation and Control Senricing NC IV 170 22 13,070.00 500.00 3,520.00 17,090.00
196
Electrical and ELCMEC215 Mechabonics Senricing NC II 158 20 14,854.00 1,301.00 3,200.00 19,355.00
197
Electrical and ELCMEC315 Mechatronics Servicing NC III 196 25 13,345.00 1,504.00 4,000.00 18,849.00
198
Electrical and ELCMEC415 Mechatronics Servicing NC IV 200 25 13,610.00 2,141.00 4.000.00 19,751.00
199
Eiectricai and ELCSB0215 Semiconductor Back-End Operation NC II 80 10 4,839.38 852.00 1,600.00 7,291.38
200
Electrical and Semiconductof Front-of-Line Operation NC II 80 10 4,839.38 877.00 1,600.00 7,316.38
201 ELCSF0215
Electrical and Assembly of Solar Nightlight and Post Lamp 40 5 5,000.00 800.00 5,800.00
202
Electrical and Electronics Production Line - Back End Operation 72 9 5,800.00 1,440.00 7,240.00
203 Level 1
Electrical and Electronics Production Line - SMT Operatjon Level 10 5,800.00 1,600.00 7,400.00
204 80
1
Furniture Making (Finishing) NC II 212 27 11,390.00 500.00 4.320.00 16,210.00
205 FURRN207
275 35 6.295.00 1,348.00 5,600.00 13,243.00
Garments and Textiles 206 GRMDRM205 Dressmaking NC II

397 50 16,252.19 500.00 8,000.00 24,752.19


Garments and Textiles 207 GRMFAD311 Fashion Design (Apparel) NC III

275 35 14,071.00 1,684.00 5,600.00 21,355.00


Garments and Textiles 208 GRMTLR205 Tailoring NC II

120 15 6,000.00 2,400.00 8,400.00


Garments and Textiles 209 Industrial Sewing Machine Operation

Heating, Ventilation, 22,300.00


596 75 10,000.00 300.00 12,000.00
Airconditioning and 210 HVCADS206 Air Duct Servicing NC II

Heating. Ventilation. 23,840.00


Ice Plant Refrigeration Senricing NC III 672 84 10,000.00 400.00 13,440.00
Airconditioning and 211 HVCIPR306

Heating, Ventilation, 19,572.00


RAC Servicing (DomRAC) NC II (Superseded) 240 30 14,272.00 500.00 4,800.00
Aiiconditioning and 212 HVCWAC211

Heating, Ventilation, 4.640.00 23,066.00


RAC Servicing (PACU-CRE) NC III (Superseded) 226 29 17,926.00 500.00
Airconditioning and 213 HVCPCR312

Heating, Ventilation, 750.00 4.320.00 17,155.00


HVCTAC205 Transport RAC Servicing NC II (Superseded) 212 27 12,085.00
Airconditioning and 214

Human Health / Healih 463 58 16,276.00 935.00 9,280.00 26,491.00


215 HHCBHS219 Barangay Health Services NC II

Human Health / Health 560 70 5,000.00 400.00 11,200.00 16,600.00


216 HHCBHS206 Barangay Health Services NC II (Superseded)
Care
TESDA CIRCULAR Page ifi of 20 pages
Subject 2024 Schedule of Costs of TESDA SchoUiship Programs VumbetODf. series of 2024
Date Issued; Effecthritv: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
0 5 JAN 202i TESDA arcular No. 004-B, series of 2023
TESDA Circular No. 0O4-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Prog ram (BKSTP), and
Tsuper Iskolar, the foliowing schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Prognims are based on
the following cost factors; Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (rr iscellaneous fees,
national assessment fees, instructional materials, aid other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


QuaWHciBoti No. of Training Training Coat Per Capita Cost
Sector No. TVET Qualification Tide Training Assessment Support Fund
Code Days (PUP) (PhP)
Hours Fee(PhP) (PhP)
pr(Pfp160.00per
d e f=^8tvsperday) 9 h
8 b C

Human Health / Health HHCBES206 biomedical Equipment Services NCII 960 120 10,000.00 350.00 19,200.00 29,550.00
217
Human Health / HeaBh HHCCGC220 Caregiving (Clients with Special Needs) NC II 653 82 20,950.00 1.481.00 13,12000 35,551.00
218
Human Health / Health Caregiving (Elderly) NC II 401 51 19,895.00 1,620.00 8,160.00 29,675.00
219 HHCCGE220
Human Health / Health Caregiving (Grade Schooler to Adolescent) NC II 389 49 9,502.00 1,268.00 7,840.00 18,610.00
220 HHCCGG220
Human Health / Health Caregiving (Newborn to Pre-Schooler) NC II 465 59 31,117.00 1,358.00 9,440.00 41,915.00
221 HHCCGN220
Human Health / Health HHCCGV207 Caregiving NC II (Superseded) 786 99 23,687.00 350.00 15,840.00 39,877.00
222
Human Health / Health Dental Hygiene Level IV (Superseded) 2443 306 40,000.00 48,960.00 88,960.00
223 HHCDHY410
Human Health / Health Dental Laboratory Technology Services (Fixed 808 101 10,000.00 500.00 16,160.00 26,660.00
224 HHCDSF210 Dentunes/Restoratrais) NC II
Human Health / Health Dental Laboratory Technology Services 1446 181 10,000.00 500.00 28,960.00 39,460 00
225 HHCDSR210
(Removable Dentuies/Appliances) NC II
Human Health / Health 976 122 10,000.00 500.00 19,520.00 30,020.00
226 HHCDLT108 Dental Laboratory Technology Services NC 1
Human Health / Health 3499 438 50,000.00 70,080.00 120.080.00
227 HHCDTK410 Dental Technology NC IV
Human Health / Health 280 35 17,000 00 400.00 5,600.00 23,000.00
228 HHCEMS213 Emergency Medical Services NC II
Human Health / Health 996 125 37,730.00 878.00 20.000.00 56.608.00
229 HHCHCS205 Health Care Services NC It
Human Health / Health 120 15 6,449.00 500.00 2,400 00 9,349 00
230 HHCHIL208 Hilot (Wefiness Massage) NC II

Human Health / Health 700 88 14,541.00 814.00 14,080.00 29,435.00


231 HHCMAT217 Massage Therapy NC II

Human Health / Health 254 32 8,000.00 500.00 5,120.00 13,620.00


232 HHCOLS207 Ophthalmic Lens Services NC II
Human Health 1 Health 848 106 10,000.00 1,243.00 16,960.00 28,203.00
233 HHCPHA315 Phamacy Services NC III
Human Health / Health Barangay Infectious Disease Management 88 11 4,914.00 1,760.00 6,674.00
234 Services Level II
Human Healtti / Health 120 15 5,000.00 Z400.00 7,400.00
235 Contact Tracing Level II

Information and 19,360.00 63,693.00


2D Animation NC III 968 121 43,355.00 978.00
Communic^on 236 ICT2DA318

Infomnation and 500.00 16,800.00 49,120.00


ICT2DA307 2D Animation NC III (Superseded) 840 105 31,820.00
Communication 237

information and 500.00 18,720.00 75,595.00


ICT2GA312 2D Game Art Development NC III 934 117 56,375.00
Communication 238

Infbnnation and 2,078.00 22,080.00 84,177.00


3D Animation NC III 1100 138 60,019.00
Communicalion 239 ICT3DA318

Inkxmation and 31,820.00 500.00 16,800.00 49,120.00


ICT3OA307 3D Aromabon NC III (Superseded) 840 105
Communicalion 240

Inkxmation and 69,163.00 500.00 27,360.00 97,023.00


ICT3GA312 3D Game Art Development NC III 1364 171
Communicalion 241

Information and 31,380.00 1,200.00 12,320.00 44,900.00


ICTANM218 Animalion NC II 616 77
Communication 242
Technotodv
TESDA CIRCULAR Page a of 2Q pages
Subject 2024 Schedule of Costs of TESDA Schobnhip Programs NumbetOPf. series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circula No. 004-A, series of 2023
Immediately
JAN M TESDA Circula No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training far Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skis Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors; Variable Costs (consumables, utilities, facilties, equipment and tools maintenance; honoraria of trainers: and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship prograns with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry teaming (SIL) is not covered under the scholarship program.

No. of National Training


QuaNffcabon No. of Training Training Cost Per Capite Cost
Sector No. TVET Qualification Title Training Assessment Support Fund
Code Days (PfiP) (PhP)
Hours Fee(PhP) (PhP)
pr(Ptf>160.00per
b d e g h
3 C
dav)
Infomnaion and
Communication 243 ICTANM207 Animalian NCII (Superseded) 516 65 26,210.00 500.00 10,400.00 37,110.00
Technoloav
Information and Broadband Installation (Fixed Wireless Systems)
Communication 244 ICTBBI208 116 15 5,000.00 500.00 2,400.00 7,900.00
NCII
Technotoov
Inform^ion and
Communcabon 245 ICTCTV207 Cable TV Installalion NC II 362 46 20,734.00 500.00 7,360.00 28,594.00

Information and
Communication 246 ICTCTV307 Cable TV Operation and Maintenance NC III 692 87 9,000.00 500.00 13,920.00 23,420.00
Technokxiy
Information and
Communication 247 ICTCCS214 Contact Center Services NC II 144 18 6,169.00 2,880.00 9,049.00
Technokxiv
Information and
Communication 248 ICTGPR312 Game Programming NC III 934 117 52.180.00 500.00 18.720.00 71,400.00
Technotoov
Information and
Communication 249 ICTMOT206 Medical Tiansciipllan NC II 50 10,000.00 250.00 8,000.00 18,250.00
Technotoov
Information and
Communication 250 ICTPRN313 Prograniming (.Net Technology) NC III 200 25 17,440.00 4,000.00 21,440.00
Tectinoioqy
Information and
Communication 251 ICTPRJ321 Programming (Java) NC III 240 30 30,000.00 4,800.00 34,800.00
Technotoov
Information and
Communication 252 ICTPRJ313 Programming (Java) NC III (Superseded) 240 30 30,000.00 4,800.00 34,800.00
Technotoov
Information and
Communication 253 ICTPR0313 Programming (Oracle Database) NC III 240 30 7,580.00 4,800.00 12,380.00
Technokxjv
Information and Telecom OSP and Subscriber Line Installalion
Communication 254 ICTTCC211 192 24 12.000.00 500.00 3,840.00 16,340.00
(Copper Cable/POTS and DSL) NC II
Technoioqy
Infomration and
Communication 255 ICTTF0211 Telecom OSP Installalion (Fiber Optic Cable) NC II 136 17 12,000.00 500.00 2,720.00 15,220.00
Technotoov
Infonnation and
256 ICTVGD318 Visual Graphic Design NC III 501 63 17,497.00 932.00 10,080.00 28,509.00
Communication

Information and
257 ICTVGO307 Visual Graphic Design NC III (Superseded) 487 61 10,000.00 500.00 9,760.00 20,260.00
Communication

tnformadon and
ICTWB0318 Web Development NC III 1188 149 40,649.00 968.00 23,840.00 65,457.00
Communication 258

Information and
Computer Security Incident Handling Level 1 243 31 28,288.00 4,960.00 33,248.00
Communication 259

Information and
Creative Web Design 102 13 30,000.00 2,080.00 32,080.00
Communication 260

Information and
Web DevetopmenI 108 14 30,000.00 2,240.00 32,240.00
Communication 261

Arabic Language and Saudi/Gulf Culture 100 13 4,052.23 2080.00 6,132.23


Language and Culture 262
TESDA CIRCULAR Page 200*23 pages
Subject: 2024 Schedule of Costs of TESDA Scholarship Programs Number OP/, series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Otcular No. 004, series of 2023
05 202i Immediately
TESDA Circular No. 004-A. series of 2023
TESDA Citailar No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
he following cost factors: Variable Costs (consumables, utilities, facilties, equipnoent and tools maintenance; honoraria of trainers; and living allowance); and Rxed Costs (mrscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training,
-urther, impletrrenfation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


No. of Training Training Cost Per Capita Cost
Qualification Training Asseasment Support Fund
Sector No. TVET Qualification Title Days (PhP) (PhP)
Code Hours Fee (PhP) (PhP)
p^f{Pfjp160.00 per
d e f^^Hfnperday) Q h
a b c
dav>
English Language and other English NTRs 100 13 7,314.00 2,080.00 9,394.00
Language and Culture 263

German Language and Culture 100 13 4,052.23 2,08000 6,132.23


Language and Culture 264

lalian Language and Cultuie 100 13 4,052.23 2,080.00 6,132.23


Language and Culture 265

150 19 7,525.00 3.040.00 10,565.00


Language and Culture 266 Japanese Language arxl Culture (150 hours)

300 38 14,920.00 6,080.00 21,000.00


Language and Culture 267 Japanese Language And Culture (300 hours)

100 13 4,250.00 2,080.00 6,330.00


Language and Culture 268 Korean Language and Culture

100 13 4,052.23 2,080.00 6,132.23


Language and Culture 269 Mandarin Chinese Language and Culture

100 13 4,052.23 2,080.00 6,132.23


Language and Culture 270 Spanish for Different Vocations
50 7 3.439.00 600.00 1.120.00 5.159.00
271 MTMSCS113 Ship's Catering Services NC1
160 20 10,172.00 1,300.00 3,200.00 14,672.00
272 MTMSCC314 Ships' Caterino NC III (Ships' Cooks)
234 30 13,938.00 500.00 4,800.00 19,238.00
Metals and Engineering 273 MEECCO309 CAD/CAM Operation NC III

236 30 26,497.00 500.00 4,800.00 31,797.00


Metals and Engineering 274 MEECL0209 CNC Lathe Machine Operation NC II

234 30 32.886 00 500.00 4,800.00 38,186.00


Metals and Engineering 275 MEECLO309 CNC Lathe Machine Operation NC III

236 30 27,862.00 500.00 4.800.00 33,162.00


Metals and Engineering 276 MEECMO209 CNC MHIing Machine Operation NC II

234 30 29.060.00 500.00 4.800.00 34,360.00


Metals and Engineering 277 MEECMO309 CNC Milling Machine Operation NC III

156 20 10,000.00 600.00 3,200.00 13,800.00


Metals and Engineering 278 MEEFCW106 Flux-Cored Arc Welding (FCAW) NC 1

268 34 10.000.00 3,353.00 5,440.00 18,793.00


Metals and Engineering 279 MEEFCW206 Flux-Cored Arc Welding (FCAW) NC II

148 19 15,000.00 500.00 3.040.00 18,540.00


Metals and Engineering 280 MEEFCW306 Flux-Cored Arc Welding (FCAW) NC III

34 14,110.00 500.00 5,440.00 20,050.00


Metals and Engineering 281 MEEMIG106 Gas Metal Arc Welding (GMAW) NC 1 268

34 26,688.00 3,361.00 5,440.00 35,489.00


Metals and Engineering 282 MEEMIG206 Gas Metal Arc Welding (GMAW) NC II 268

19 15,000.00 500.00 3.040.00 18,540.00


Metals and Engineering 283 MEEMIG306 Gas Metal Arc Welding (GMAW) NC III 148

34 22.872.00 2,126.00 5,440.00 30,438.00


Metals and Engineering 284 MEETIG206 Gas Tungsten Arc Welding (GTAW) NC II 268

37 10,000.00 500.00 5,920.00 16,420.00


Metals and Engineering 285 MEETIG406 Gas Tungsten Arc Welding (GTAW) NC IV 294

20 10,385.00 500.00 3,200.00 14,085.00


Metals and Engineering 286 MEEGSW106 Gas Welding NCI 156

39 12,227.00 600.00 6,240.00 19,067.00


287 MEEGSW206 Gas Welding NC II 312
Metals and Engineering
121 7,000.00 2.252.00 19,360.00 28,612.00
MEEMCG119 Machining NC 1 966
Metals and Engineering 288
47 7,000.00 500.00 7,520.00 15,020.00
MEEMCG106 Machining NC 1 (Superseded) 374
Metals and Engineering 289
43 15,770.00 600.00 6,880.00 23,250.00
290 MEEMCG205 Machining NC II 337
Metals and Engineering
18,137.00 500.00 6.880.00 25,517.00
MEEMCG306 Machining NC III 342 43
Metals and Engineering 291
28 3.500.00 500.00 4,480.00 8.480.00
292 MEEDFT108 Mechanical DraAing NC 1 218
Metals and Engineering
7,000.00 600.00 7,200.00 14,700.00
MEEPMM108 Plant Maintenance NC 1 358 45
Metals and Engineering 293
TESDA CIRCULAR Page z(. of 2Q pages
Subject; 2024 Schedule of Costs of TESOA Scholarship Programs Number 001. series of 2024
Date Issued: Effecthrity: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immerkately TESDA Circular No. 004-B, series of 2023
0 5 JAN ?WL TESDA Qicular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskdar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance; honoraria of trainers: and living allowance); and Fixed Costs (miscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training.
Further, implementation of supervised industry learning (SIL) is not covered under the scholarship program.

No. of National Training


Qualification No. of Training Training Colt Per Capita Cost
TVET Qualification Title Training Assessment Support Fund
Sector No. Days (PhP) (PhP)
Code Hour* Fee(PhP) (PhP)
pr(Php160.00pef
e f=e/(8 hn per day) h pg*h*i
a b C d 9 day)

294 37 7,000.00 500.00 5,920.00 13,420.00


Metals and Engineering 294 MEEPMO108 Press Machine Operation NC1
Shielded Metal Arc Welding (SMAW) NC 1 268 34 14,594 00 2,234.00 5,440.00 22,268.00
Metals and Engineering 295 MEEEAW106
fSuperseded)
Shielded Metal Arc Welding (SMAW) NC II 268 34 15,460.00 2,697.00 5,440.00 23,597 00
Metals and Engineering 296 MEEEAW206
fSuoerseded)
Shielded Metal Arc Welding (SMAW) NC III 120 15 17,665.00 3,723.00 Z400.00 23,788.00
Metals and Engineering 297 MEEEAW306
fSuperseded)
Shielded Metal Arc Welding (SMAW) NC IV 168 21 38,21 ZOO 5,129.00 3,360.00 44,701.00
Metals and Engineering 298 MEEEAW406
fSuperseded)
124 16 10,000.00 500.00 Z560.00 13,060.00
Metals and Engineering 299 MEESAW106 Submerged Arc Welding (SAVV) NC 1

194 25 10,000.00 600.00 4,000.00 14,600.00


Metals and Engineering 300 MEESAW206 Submerged Arc Welding (SAW) NC II

598 75 9,000.00 500.00 12,000.00 21,500.00


Metals and Engineering 301 MEETDM208 Tool and Ole Making NC II
Processed Food & 152 19 5,000.00 500.00 3,040.00 8,540.00
302 PFBFPP207 Fish Products Packaging NC II

Processed Food & 197 25 5,719.00 1,506.00 4,000.00 11,225.00


303 PFBFOP119 Food Processing NC 1

Processed Food & 552 69 2Z25Z00 500.00 11,040.00 33,792.00


304 PFBFOP215 Food Processing NC II
Processed Food & Process Food by Salting. Curing and Smoking 80 10 ZOOO.OO 300.00 1,600.00 3,900.00
305 AGR741301
fLeadina to Food Processina NC 11)
Processed Food & Process Food by Fermentation and Pickling 196 25 5,000.00 200.00 4,000.00 9,200.00
306 AGR741302
(Leadina to Food Processing NC II)
Processed Food & Process Food by Sugar Concentration (Leading to 96 12 3,000.00 200.00 1,920.00 5,120.00
307 AGR741303
Food Processina NC II)
Processed Food & 900 113 34,090.00 500.00 18,080.00 5Z670.00
308 PFBFOP307 Food Processing NC III

Processed Food & 576 72 21,810.00 500.00 11,520.00 33,830.00


309 PFBFOP407 Food Processing NC IV

Processed Food & 360 45 20,000.00 946.00 7,200.00 28,146.00


310 PFBSLL216 Slaughtering Operations (Large Animal) NC II

Processed Foods 280 35 20,000.00 949.00 5,600.00 26,549.00


311 PFBSLS216 Slaughtoring Operations (Swine) NC II

Social, Community 938.00 5,760.00 17,915.00


SOCBRB220 Barbering NC II 285 36 11,217.00
Development and Other 312

Social, Community 876.00 6,880.00 29,636.00


SOC8CN220 Beauty Care (Nat Care) Services NC II 341 43 21,880.00
Development and Other 313

Social. Community i,4iaoo 5,600.00 14,753.00


SOCBEC219 Beauty Cate (Skin Care) Services NC II 277 35 7,743.00
Development and Other 314

Social, Community 600.00 2Z080.00 51,090.00


SOCBEC205 Beauty Care NC II (Superseded) 1098 138 28,410.00
Development and Other 315

Social. Community Beauty Care Services (Nail Care) NC II 7,320.00 500.00 3.840.00 11,660.00
316 SOCBCN211 186 24
Development and Other (Superseded)

Social, Community Beauty Care Services (Nail Care) NC III 6,000.00 500.00 3,360.00 9,860.00
317 SOCBCN311 168 21
DevelopmOTt and Other (Superseded)

Social. Community 9,195.00 841.00 5,920.00 15,956.00


SOC8KP307 Bookkeeping NC III 292 37
Development and Other 318

Social, Community Domestic Work NC II (Superseded) - Without 11,285.00 1,347.00 4,480.00 17,112.00
SOCOOW217 218 28
Development and Other 319 Electives
Services
TESDA CIRCULAR Page 22. of 20 pages
Subject: 2024 Schedule of Costs of TESDA Scholarship Programs
Number (H. series of 2024
Date Issued: Effecthrity; Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately
OS MH TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Emptoyment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance: honoraria of trainers; and living allowance); and Fixed Costs (miscellaieous fees,
national assessment lees, instructional materia, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of ^ay entrepreneurship training.
Further, implemenfation of supervised industry teaming (SIL) is not covered under the scholarship program.

Na of National Training
Quatrhcjtion No. ofTraMng Training Cost Per Capita Cost
Sector No. TVET Qualification Tide Training Assessment Support Fund
Code Days (PtiP) (PhP)
Hours Fee(PhP) (PhP)
i=r(Php16000per
b d e f=e/f8 hn per day) g h
a C

Social, Community
Development and Other 320 SOCOOW214 Domestic Work NCII (Superseded) 218 28 11,285.00 635.00 4,480.00 16,400.00

Social, Comtminity
Development and Other 321 SOCHDR210 Hairdressing NC II (Superseded) 656 82 13,000.00 600.00 13,120.00 26,720.00
Services
Social, Community
Development and Other 322 SOCHDR320 Hairdressing NC III 204 26 14,029.00 1,019.00 4,160.00 19,208.00

Social, Community
SOCHDR310 Hairdressing NC III (Superseded) 638 80 24,280.00 500.00 1Z800.00 37,580.00
Development and Other 323

Social, Community
SOCLGS215 Lifeguard Services NC II 960 123 11,232.36 1,029.00 19,660.00 31,941.36
Development and Other 324

Social, Community
Lifeguard Services NC III 980 123 20,341.53 1,058.00 19.680.00 41,079,53
Development and Other 325 SOCLGS315

Social, Community
Microfinance Technology NC II 403 51 9,910.00 500.00 8,160.00 18,570.00
Development and Other 326 SOCMIC210

Social, Community
Seourity Services NC 1 170 22 6,314.00 200.00 3,520.00 10,034.00
Development and Other 327 SOCSES105

Social, Community
Security Services NC II 223 28 5,000.00 200.00 4,480.00 9.680.00
Development and Other 328 SOCSES207

Social, Community Cooperative Development and Management Level 30,792.88


885 111 13,032.88 17,760.00
Development and Other 329
IV

Tourism (Hotel and 178 23 6,454.00 1,295.00 3,680.00 11,429.00


330 TRSBRT213 Barista NC II
Tourism (Hotel and 438 55 13,336.00 1,399.00 8,800.00 23,535.00
331 TRSBAR213 Bartending NC il
Tourism (Hotel and 326 41 10,153.00 1,399.00 6,560.00 18,112.00
332 TRSBAR213 Bartending NC II - Without Electives

Tourism (Hotel and 141 18 16,968.00 400.00 2.880.00 20,248.00


333 TRSBPP209 Bread and Pastry Production NC II (Superseded)

Tourism (Hotel and 244 31 17,254.00 500.00 4,960.00 22,714.00


334 TRSCOK307 Commercial Cooking NC III (Superseded)

Tourism (Hotel and 260 33 18,741.00 500.00 5,280.00 24,521.00


335 TRSCOK407 Commercial Cooking NC IV (Superseded)

Tourism (Hotel and 316 40 20,315.00 1,300.00 6,400.00 28,015.00


336 TRSCOK214 Cookery NC II

Tourism (Hotel and Prepare and Cook Hot Meate (Leading to Cookery 200 25 4,600.00 4,000.00 8.600.00
337
NCin
Tourism (Hotel and 104 13 3,400.00 2,080.00 5,48000
338 Prepare Cold Meals (Leading to Cookery NC II)

Tourism (Hotel and 108 14 14,776.00 905.00 2,240.00 17,921.00


339 TRSEVM307 Events Management Services NC 111

Tourism (Hotel and 356 45 15,710.00 882.00 7,200.00 23,792.00


340 TRSFBS213 Food and Beverage Services NC II

Tourism (Hotel and 44 9,268.00 1,078.00 7,040.00 17,386.00


341 TRSFBS318 Food and Beverage Services NC III 350

Tourism (Hotel arKj 29 8,830.00 500.00 4,640.00 13,970.00


342 TRSFBS313 Food and Beverage Services NC III (Superseded) 230

Tourism (Hotel and 392 49 14,245.00 915.00 7,840.00 23,000.00


343 TRSFBS418 Food and Beverage Services NC IV

Tourism (Hotel and 442 56 19,400.00 907.00 8.960.00 29,267.00


344 TRSFOS213 Front Office Services NC II
Restaurant)
TESDA CIRCULAR Page 23 of pages
Subject: 2024 Schedule of Costs of TESDA Scholarship Programs NumberQPf. series of 2024
Date Issued: Etfecthfitv: Supersedes:
TESDA Qrcular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
Immediately TESDA Circular No. 004-B, series of 2023
0 5 JAN ?m TESDA Qrcular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP), Tulong
Trabaho Scholarship Program (TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Stalls Training Program (BKSTP), and
Tsuper Iskolar, the following schedule of costs per qualification are hereby adopted. The following training costs relative to the implementation of TESDA Scholarship Programs are based on
the following cost factors: Variable Costs (consumables, utilities, fadlties, equipment and tools maintenance; honoraria of trainers; and living allowance); and Fixed Costs (mrscellaneous fees,
national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs with entrepreneurship are inclusive of 3^ay entrepreneurship training.
Further, implementation of supervised industry teaming (SIL) is not covered under the scholarehip program.

No. of Nabonai Training


QuattficaHan No. of Training Training Cost Per Capita Cost
TVET Qualification Title Training Assessment Support Fund
Sector No. Days (PhP) (PhP)
Code Hours Fee (PhP) (PhP)
i=r(Ptpieoooptn
f=e^8hrspefdayi pg*h*i
davl

Tourism (Hotel and Housekeeping NCII 436 55 15,796.00 1,108.00 8,800.00 25,704.00
345 TRSHSK213
Restaurant)
Tourism (Hotel and 200 25 6,514.00 834.00 4,000.00 11,348.00
346 TRSHSK319 Housekeeping NC III
Restaurant)
Tourism (Hotel and Housekeeping NC III (Superseded) 76 10 6,000.00 500.00 1,600.00 8,100.00
347 TRSHSK307
Restaurant)
Tourism (Hotel and Housekeeping NC IV (Superseded) 112 14 7,000.00 500.00 2.240.00 9,740.00
348 TRSHSK407
Restaurant)
Tourism (Hotel and 196 25 3,500.00 1,327.00 4,000.00 8,827.00
349 TRSLOG213 Local Guiding Services NC II
Restaurant)
Tourism (Hotel and 76 10 5,000.00 870.00 1,600.00 7,470.00
350 TRSTPS215 Tourism Promotion Services NC II
Restaurant)
Tourism (Hotel and 137 18 3,500.00 921.00 2,880.00 7,301.00
351 TRSTVS219 Travel Services NCII
Restaurant)
Tourism (Hotel and 328 3,500.00 500.00 6,560.00 10,560.00
352 TRSTVS213 Travel Services NC II (Superseded)
Restaurant)
264 33 12,042.00 3,323.00 5,280.00 20,645.00
TVET 353 TVETRM111 Ttalnets Methodology Level I (Trainer/Assessor)
Trainers Methodology Level II (Training 568 71 17,990.00 9,736.00 11,360.00 39,086.00
TVET 354 TVETRM211
Deskmer/Developer)
Conduct Training Need Analysis (Leading to 40 3,626.00 1,658.00 800.00 6,084.00
TVET 355 TVT232307
Trainers Methodoloqv Level II)
Develop Training Curriculum (Leading to Trainers 40 3,000.00 1,601.00 800.00 5,401.00
TVET 356 TVT232308
Methodoloqv Level II)
Develop Leaning Materials (Leading to Trainers 120 15 5,440.00 1,600.00 2.400.00 9,440.00
TVET 357 TVT232309
Methodoloqy Level II)
Develop Competency Assessment Tools (Leading 40 3,000.00 1,601.00 80000 5,401.00
TVET 358 TVT232310
to Trainers Methodologv Level II)
Design and Develop Maintenance System 40 3,000.00 1,675.00 80000 5,475.00
TVET 359 TVT232311
(Leading to Trainets Methodologv Level II)
Develop Learning Materials Ibr e-Leaming 120 15 5,781.00 1,601.00 2,400.00 9,782.00
TVET 360 TVT232312
(Leading to Trainers Methodoloav Level II)
Facilitate Development of Compentency Standards 40 2,305.00 800.00 3,105.00
TVET 361 TVT232313 (Leading to Trainers Methodology Level II)
Line Construction (Electric Power Distritxition) NC 250 32 12,990.00 500.00 5,120.00 18,610.00
Utilities 362 UTLDLC210
II (Superseded)
Transmission Line Installation and Maintenance 324 10,000.00 1,950.00 6,560.00 18,510.00
Utilities 363 UTLTXL217
NCII
Transmission Line Instailalion and Maintenance 81 10,000.00 500.00 12,960.00 23,460.00
364 UTLTXL208 646
Utilities NC II (Superseded)
Transmission Line Instailalion and Maintenance 26 10,000.00 1,910.00 4,160.00 16,070.00
365 UTLTXL317 208
Utilities NCI!!
Transmission Line Installation and Maintenance 27 10,000.00 500.00 4,320.00 14,820.00
366 UTLTXL308 210
Utilities NC III (Superseded)
234 30 9,418.00 500 00 4,800.00 14,718.00
Visual Arts 367 VSAILU208 Illustration NC II 10,220.00
132 17 7,000.00 500.00 2,720.00
Visual Arts 368 VSAPH0207 Photography NC II
Wholesale and Retail 30 5,430.00 500.00 4,800.00 10,730.00
369 WRTCSR208 Customer Services NC II 236
Trading
'Assesment Fees with rental cost for the use of equipment during the conduct of assessment.
2Assesment Fees without rental cost for the use of equipment during the conduct of assessment.
3Com is being used during assessment.
"Rice is being used during assessment.
TESDA CIRCULAR Page29of^pages
Subject 2024 SdMdule of C<Mt of TESDA SdwtaraMp PregmiK NumberCQ, Series of 2024
Effectivitv; Supersedes;
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN 2024 Immediately TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

^holarship Program
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment FTogram (STEP), Tutong Trabaho S(
rf costs per
(TTSP), Rice Extension Service Program (RESP), Coconut Fanners Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and T iuper Iskolar, Ihle foffowing schedule c
es, fadibes,
qualification are hereby adopted. The following training costs relative to the implementalion of TESDA Scholarship Programs are based on the following cost factors: Variable Costs (consumables. utCt
dtowances). Training duration of
equipment and tools maintenance; honoraria of trainers; and String allowance); and Fixed Costs (miscellaneous fees, national assessment fees, mstructnnal materels, and other.
scholarship programs with entrepreneurship are indusive of 3-day entrepreneurship training. Further, mptementabon of supenrised industry learning (SIL) is not awered under tfie scholarship program

No. of Training Pv Capita Cost


Training Asstssmonl CrtrapranwaMp Fee
OuiMcatiofi TVET QiiaMcalion Tide No. of Tramiog Hom Training Support Fund (PtiP)
Sector No. Cost (PM*) Fee(PM>) (PM*)
Code p»y» (PM*)
•sT/MowB oT ?4 AraO dV|s fcr h 1 k=g*h*ni
b c d 9
a ErdnpnneunfipTranng)

TWSP-PAFSE
Agriculture, Forestry, 326 41 12,690.x 3.377.x 6,S6aX 8X.X 23,427.x
1 AFFACP105 Agricufcjral Crops Production NC1

Agriculture. Forestry. Support Horticulturai Crop Work (Leading to 96 12 1,900.x 821.x 1,920.x 8XX 5,441.x
2 AGR611306

Agriculture. Forestry. Support Nursery Work (Leading to Agricultural Crops 10 1.4X.X 837.x 1.6X.X 8X.X 4.637.x
3 AGR611X7 78

Agriculture. Forestry, Support Agronomic Crop Work (Leading to 12 1.9X.X 838.x 1,920.x 8XX 5.458.x
4 AGR611308 96

Agriculture. Forestry. 360 45 15.3X.X 995.x 7,2X.X 8XX 24,385-X


5 AFFACP213 AgricuRural Crops Production NC II

Agriculture. Forestry. Plan! Craps (Leadng to Agncdbral Craps 10 2.1X.X 844.x 1.GX.X 8X.X 5,344.x
6 AFF610302 76

18,670.x 9,440.x 8X.X 28,910.x


Agriculture. Forestry, AFFACP306 Agriciitural Crops Production NC III 469 59
7
Prepare Land for Agricultural Crop Production 10 90000 1.6X.X 8X.X 3.3XX
Agriculture. Forestry, AGR611310 76
8
drtd F&luiy
Implement PostHareest Pro^ (Leading to 8X.X 1,440.x 8X.X 3,040.x
Agriculture, Forestry, AGR611311 68 9
9
Implement Plant Nutrition Program (Leading to 9 2.1X.X 1.440.x 8X.X 4,340.x
Agriculture. Forestry. AGR611312 68
10
Contral Weeds (Leading to Agricidtural Craps 9 ^1X.X 1.440.x 8X.X 4.340.x
Agriculture, Foresty, AGR611313 68
11
EsIaUsh Agronomic Craps (Leadiog to Agncudml 10 9X.X 1.6X.X 6X.X 3.3X.X
Agriculture. Foresky. AGR611320 76
12

Undertake Agronomic Crop Maintenance Program 7X.X 1.2X.X 8X.X Z7X.X


AgricuMure. Forestry, AGR611321 64 8
13 (Leading to Agricultural Crops Production NC 110
arNl Fishery

Undertake Agronomic Crop Harvesting Activities 6X.X 1,280.x 8X.X 2,680X


Agriculture. Forestry, AGR611322 60 8
14 (Leading to Agricultml Crops Production NC til)
and Fishery
Keep Records for Farm Business (Leading to 6X.X 1.2X.X 8X.X Z680.X
Agriculture. Forestry. AGR611331 60 8
IS
Animal Production (Poultry-Chicken) NC II - Wittxwt 32 11,424.x 897.x 5,12aX 8X.X 18,241.x
Agnciiture, Forestry. AFFAPP213 250
16
Maintain Poulky House (Leading to Animal 12 2.970X 778.x 1,920.x 8X.X 6,468.x
Agriculture, Forestry. AFF622101 94
17
Brood aid Grow Chicks (Leading to Animal 33 10.4X.X 796.x 5.280X 8X.X 17,276.x
Agriculture, Forestry. AFF622102 260
18
Perform Pre-Lay and Lay Activities (Leading to 12 3,058.x 777.x 1,920.x BX.X 6,555.x
Agriculture, Forestry, AFF622103 94
19
42 20,634.x 1,629.x 6,720.x 8X.X 29,783.x
Agriculture, Forestry, AFFAPR213 Animal Production (Rixnnants) NC II 330
20
Maintain Housing, Famn Implemerts and 8X.X 4,475.x
Agriculture. Forestry, 66 9 1.4X.X 835.x 1,440.x
21 AFF621901 Stsrounding Area (Leading to Anmal Producion
and Fishery
Provide Forage (Leadmg to Animal Production 10 3,526.x 785.x i,6oax ax.x 6.711.x
Agriculture, Foresky. AFF621902 76
22
Perform Breeding of Ruiinanls (Leading to Aninal 5,739.x 790.x 1.7X.X 8X.X 9,089.x
Agriculture. Foresky, 86 11
23 AFF621903
and Fishery
Raise Dairy Animals (Leading to Animal Production 8,271.x 822.x 5.2X.X 8X.X 15,173.x
Agricultixe. Foresky, AFF621904 260 33
24
Raise Meat-Type Animats (Leading to Animal 3.62S.X 829.x 1,440.x 8X.X 6,694.x
Agriculture, Foresky, AFF621905 66 9
25
42 14,003.x 2.015.x 6.720.x 8XX 23,538.x
Agriculture. Foresky. AFFAPS213 Animd Production (Swrine) NC II 330
26
Hande Breeders (Leading to Animal Production 7.7XX 805.x 5,280.x 8X.X 14,585.x
Agriculture. Foresky. 260 33
27 AFF621216
10.0XX 350.x 26,060.x 8X.X 37Z30.X
Agriculture. Foresky. AFFAQC204 Aquacidkae NC H (Sttooseded) 1300 163
28
9.757X 4X.X 7,520.x 8X.X 18,477.x
Agriculture. Foresky, 376 47
29 AFFFSC105 Fish Capture NCI
9.0X.X 4X.X 6.8X.X 8X.X 17.0X.X
AgrictAure. Forestry. Fish Capture NC II 342 43
X AFFFSC206
10.0XX 5X.X 3,520.x 8X.X 14,820.x
Agriculture. Foresky. Fishing Gear Repair and Maintenance NC IH 176 22
31 AFFFGRX7
3.5X.X 500.x Z4X.X 8X.X 7.2X.X
Agriculture. Forestry. RshportiWhari Operation NC 1 120 15
32 AFFFW0107
16,659.x 300.x 9,440.x 8X.X 27,1X.X
Agnoiture. Foresky. 469 59
33 AFFKTC306 Horticukure NC M
Esiabish HoiticuNrt Crops (Leadmg to Horticulture 6X.X 1.2XX 8XX 2.6X.X
Agriculture. Foresky. 60 8
34 AGR611315
and Fishery NCIII)
TESDA CIRCULAR Page IFof 3D pages
Subject: 2024 Schedule of Colt of TESDA Sctwtarahip Program* Number001. Series of 2024
Effecttvitv: SuDCfsedes;
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A, series of 2023
0 5 JAN 2024 Immediately
TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004X, series of 2023

To meet the objectives of Training for Work Scholatship Program (TWSP). Private Education Student Financial Assistance (PESFA), Special Training EmploymenI Program (STEP), Tukxig Trabaho S(3x)larship Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and T super Istolar. Ifle following schedule If costs per
qualification are hereby adopted. The following training costs relative to the implementalion of TESDA Scholarship Programs are based on the following cost factors: Variabte CosJs (consumables, ufilites, fadlties,
equipment and tools mamtenance; honoraria of trainers; and living allowance): and Fixed Costs (miscellaneous fees, national assessment fees, instructional materlafc, and other allowances.). Training duration of
scholarship programs with entrepreneurship are inclusive of Way entrepreneurship training. Further, implementalior of supervised indusliy teaming (SIL) is not arvered under the scholarship program

No. of Training Per Capita Cost


QuaWraHrw Training Assessment Enksprsnemtaip Fee
TVETOuattHcatton Title No. of Training Hours Trtoning SitoportFund
Sador No. Cost(PhP) Fan (PUP) (PM*) (PhP)
Code Days (fhP)
(V M3 dqs fer h€d(8tnptt F=rjPtp10000pei
« b c d 8 h i
BdnfnneiMshpTrmnngi dm

AgncuHure. Foresky. Coordinale HorkciAural Maintenance Program 94 12 1,300.00 1,920.00 800.00 4,020.00
35 AGR611316

Agriculture. Foresky. Ckwrdinale Horkculhaal Crop Harvesting (Leadmg to 94 12 1.300.00 1,920.00 800.00 4,020.00
36 AGR611317

Agricutture. Forestry. Undertake Field Budding and Grating (Leading to 94 12 1.300.00 1,920.00 800.00 4,02000
37 AGR611318

Agriculture. Foresky. Undertake Propagation Activities (Leading to 94 12 1,300.00 1,920.00 800.00 4,020.00
38 AGR611319
Horticulture NC III)
Agricutture. Foresky. Maintain and Monitor Environmental Work Practices 94 12 1,300.00 1,920.00 600.00 4,020.00
39 AGR611330

A^ukive. Foresky. Landscape Instattakon and Maintenance (Softscape) 236 30 21,590.00 500.00 4.800.00 800.00 27,690,00
40 AFFUM208
NCK
Agriculture. Foresky. 256 32 23391.00 979.00 5,120.00 800.00 30,290.00
41 AFFOAP212 Organic Agricutture Production NC H

Agriculture. Forestry, Organic Agricutture Production NC H - Without 202 26 13,355.00 979.00 4,160.00 800.00 19,294.00
42 AFFOAP212

AgricuHure. Forestry, Raise Organic Chicken (Leading to Organic 96 12 3,601.00 608.00 1,920.00 800.00 7.129.00
43 AGR612301
Agricutture Production NC II)
Agricutture. Foresky, Produce Organic Vegetables (Leadng to Oganic 11 6,604.00 814.00 1,760.00 800.00 9,978.00
44 AGR611306 88

Agriculture. Forestry, Produce Organic FerSizer (Leading to Organic 88 11 80000 810.00 1,760.00 800.00 4,170.00
45 AGR611301
Aoricrdtore Production NC tl)
Agriculture, Forestry, Produce Organic Concoctions and Extracts (Leading 88 11 3,400.00 816.00 1,760.00 800.00 6,776.00
46 AGR611302
and Fishery to Organic Agriculture Production NC H)

Agriculture, Foresky, Raise Organic Hogs (Leadng to Organic Agricutose 104 13 5,688.00 815.00 2.08000 80900 9,383.00
47 AGR612302
Production NC II)
AgrictMjre. Foresky. Raise Organic Smatt Ruminants (Leading to Organic 68 11 4,854.00 803,00 1,760.00 800.00 8.217.00
48 AGR612303
Agricutture Production NC II)
Agriculture. Foresky, AFFPMV207 Pest Management (Vegetables) NC H 336 42 13,746.00 500.00 6,720.00 800.00 21.766.00
49
Agricuttue. Foresky. Conduct Field Assessment (Leadng to Pest 64 8 1,000.00 1.280.00 800.00 3.080.00
50 AGR321320
Management (Vegetables) NC II)
Agriculture. Forestry. Apply Bio-Control Measures (Leading to Pest 76 10 1,300.00 1,600.00 800.00 3,700.00
51 AGR321321
Management (Vegetables) NC It)
AgricuHure, Foresky, Apply Cutturai Management Skategies (Leadng to 11 1,600.00 1,760.00 800.00 4.160.00
52 AGR321322 88
arxJ Fishery Pest Management (Vegetables) NC II)

Agriculture, Foresky, Apply Physical Conkol Measures (Leading to Pest 76 10 1,300.00 1,600.00 800.00 3,700.00
53 AGR321323
Management (Vegetables) NC II)
Monitor Results of Conkol Ackvilies and Provide
Agricutture, Foresky. Feettoack (Leadng to Pest Management 76 10 1,300.00 1,600.00 80900 3,700.00
54 AGR321325
and Fishery (Vegetables) NC II)
Agriculture. Forestry, AFFRMO207 Rice Machinery Operations NC II 256 32 22,339.00 1,323.00 5,120.00 800.00 29,582.00
55
Agricdture. Forestry, AFFRPC212 Rubber Processing NC N 146 19 19,797.00 500.00 3,040.00 600.00 24.137.00
56
Agricutture, Foresky. AFFRPT221 Rubber Production NC II 345 44 10.000.00 1,64500 7.040.00 800.00 19,485.00
57
Agriculture. Forestry, AFFRPT212 Rubber Production NC II (Superseded) 266 34 10.000.00 500.00 5,440.00 800.00 16.740.00
58
Agricutture. Foresky. CoPee Producioo Leveill 200 25 6,900.00 4,000.00 80000 11.700.00
59
Agricutture. Foresky, 112 14 2.600.00 2340.00 800.00 5,640.00
60 Com Production

Agricutture. Foresky, Edbie Landscapping vritti Fann Brandng 72 9 1.800.00 1.440.00 800.00 4,040.00
61
Agriculture, Foresky. 152 19 3,800.00 3,040 00 80000 7.640.00
62 01 Palm Production

Agncutture. Forestry, 256 32 6,900.00 5.120.00 80000 12,820.00


63 Organic Arabica Cdlfee Pnxtuctnn

Agriculture. Foresky. 120 15 2.900.00 2.400.00 800.00 6.100.W


64 Organic race nroductton

Agricutture. Forestry. 72 9 1.400.00 1,440.00 800 00 3,640.00


65 Oyster Mushroom Production with Farni Brandng

Production of High-Ouality Inbred Rice, and Seed


Agriculhie. Foresky. CertHcdion. and Farm Mechanaaion (Farmers Field 120 17 930900 2,720.00 800.00 1Z720.00
66 Sctnol on Production of Hlgh-Ouail|r Inbred Rice
and Fishery
and Seed Certlicallon. and Fam Mechanizafion)
------------------------------------------------------ —
TESDA CIRCULAR ^agejfcofJDpages
Subject: 2024 Schedule of Cost of TESQAScholmhip Programs . Series of 2024
Effecdvitv; SuDersedes:
rESDA Circular No. 004, series of 2023
rESDA Circular No. 004-A series of 2023

0 5 JAN 2024 hnnediately


FESOA Circular No. 0O4.B, series of 2023
rESDA Circular No. 004-C, series of 2023

To meet me objectives of Training for Work Scholarship Program (TWSP). Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP). Tulong Trabaho Scriolarship Program
(TTSP). Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan Skitts Training Program (BKSTP), and Tsuper Iskoiar, the following schedule of costs per
qualification are hereby adopted. The foUowing training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost foctors: Variable Costs (consumables, utBit es, facHties.
equipment and tools maintenance; honoraria of trainers; and IMng aHowarKx); and Fixed Costs (miscellaneous fees, national assessment fees, instrudional materials, arrd other allowances.). Training juration of
scholarship programs with entrepreneurship are inclusive of 3-day entrepreneurship training. Further, implementation of supervised industry teaming (SIL) is not covered under the scholarshp program

No. of Training
^ ■ »#■ - - .f - _
Trailing Asscwiwnt Entirapreneorehip Fee Pv Capita Cost
unamoBon TVETQuaificalkM Title No. of Training Hours Tntining Support Fund
Stctor No. CostfPhP) Fw(PhP) (PhP) (PhP)
Code (PM*)
D«y»
oT /nO dtos fcr k^8hnp0f Mynpido.oo pa k=g*h*t*j
b a 9 h 1
0 C Bntnfmneunftp Trmwtg)

RESP
Production of High-Quality Inbred Rice, and Seed
Agricutture, Foresky. Cerkficakon. and Fann Mechanization (Farmers Field 120 17 9.20000 2,720.00 800.00 12,720.00
1 School on Production of figh-Quakty Inbred Rice
and Fishery
and Seed CertNcalion, and Farm Mechancabon)*

Agriculture. Forestry, AFFAGE217 Agroenkepreneurslvp NC H 263 33 10.085.00 864.00 5.28000 800.00 17,019.00
2
Agriculture. Foresky, AFFAGE317 Agroentrepreneurship NC III 469 59 20.810.00 853.00 9,440.00 80000 31,90300
3
Agriculture, Foresky. AFFDMS317 Drying and Mttng Plant Servictng NC III 280 35 15,347.13 3,092.00 5,600.00 800.00 24,839.13
4
Agriculture, Foresky. Service Grain Drying Rant Fadftes (Leading to 72 9 4.200.00 1,025.00 1,440.00 800.00 7,465.00
5 AFF723301
Drying and Mttng Platt Servicing NC III)
Agriculture. Foresky, Service Rice MKng Plant Facity (Leading to Drying 104 13 4,500.00 1,033.00 Z080.00 800.00 8,413.00
6 AFF723302
and MNinq Plant Servionq NC III)
AgrioAure. Forestry. AFFRMO207 256 32 22,339.00 1,323.00 5,12000 800.00 29.582.00
7 Rice Machinery Operabons NC II
Operating Rice Land Preparation Machinery and
Agricuttire. Foresky. AGR611361 Equipment (Leading to Rice Machinery Operations 96 12 4,000.00 838.00 1.920.M 800.00 7,558.00
8
and Fishery
NC II)
Operating Rice Crop Establishment Machinery and
Agriadure. Foresky. Equipment (Leading to Rice Machinery Operations 88 11 4,800.00 868.00 1,760.00 600.00 8,228.00
9 AGR611362
and Fishery
NC II)
Agricutture, Foresky, Operating Rice Crop Care Machinery and Equipment 7 4,700.00 898.00 1,120.00 800.00 7,518.00
10 AGR611363 56
and Fishery (Leackng to Rice Machinery Operations NC II)
Operating Rice Harvesting and Threshing Machinery
Agriculture. Foresky, AGR611364 56 7 4,700.00 820.00 1,120.00 800.00 7,440.00
11 and Equipment (Leadmg to Rice Machinery
and Fishery
Operadofts NC II)
Agriculture. Foresky, Operating Rice Drying Machinery and Equipment 850.00 1.12000 800.00 7,170.00
12 AGR611365 56 7 4,400.00
and Fishery (Leading to Rice Machinery Operations NC II)
Agriculture. Foresky, Operating Rice Mi Machinery and Equipment 56 7 4,700.00 1.070.00 1,120.00 600.00 7.690.00
13 AGR611366
fLeading to Rice Machinery Operations NC II)
Agriculture, Foresky, 64 8 1.73ZO0 1,280.00 800.00 3,812.00
14 Digitai Agnaitufe Coixse
A^uNure, Foresky. Pest and Nutrient Management 64 8 1,627.00 1,280.00 800.00 3,707.00
15

Automotive and Land Service Motorcyde/Smal Engine System (Leadmg to 3,164.00 2,880.00 800.00 6,844.00
16 ALT723372 144 18
Transportation Motorcyde/Sman Engine Ser^ng NC II)

STEP
Agricuiture. Foresky, Support Horlicuiturai Crop Work (Leadmg to 12 1,900.00 821.00 1,920.00 80000 5,441.00
1 AGR611306 96
and Fishery Agricultural Crops Production NC 1)
Aghcutttfe, Foresky, Support Nursery Vltoric (Leading to Agricultural Crops 10 1,400.00 837.00 1,600.00 800.00 4,637.00
2 AGR611307 78
and Fishery Production NC I)
Agricukure. Foresky, Support Agronomic Crop WorX (Leading to 96 12 1,900.00 838.00 1,920.00 800 00 5,458.00
3 AGR611306
Aorictdturai Crops Production NC 1)
Agricuiture. Foresky. Plant Crops (Leading to Agricultural Crops 10 2,100.00 844.00 1,600.00 800 00 5,344.00
4 AFF610302 76
and Fishery Production NC II)
Agriculture. Foresky, Prepare Land for Agricultural Crop Production 900.00 1,600.00 80000 3,300.00
5 AGR611310 76 10
fLeadma to Agricultural Crop Production NC Hi)

Agriculture. Foresky. Undertake Agronomic Crop Maitkenance Program 64 8 700.00 1,280.00 800.00 2,780.00
6 AGR611321
and Fishery (Leading to Agricultural Crops Production NC III)

Agriodue, Foresky, Undertake Agronomic Crop Harvesting Activities 8 600.00 1,280.00 800.00 2,680.00
7 AGR611322 60
and Fishery (Leading to Agricititoral Oops Production NC III)
Agricuttire. Foresky, Animai Production (Poultry-Chicken) NC 11 - Without 250 32 11,424.00 897.00 5,120.00 80000 18,241.00
8 AFFAPP213
Bectives
Agricuiture. Foresky. Perform Pre-Lay and Lay Activates (Leading to 94 12 3,058.00 777.00 1.920.00 800.00 6,555.00
9 AFF622103
Animal Production (Poitikv-Chicken) NC II)
Agricuiture. Foresky. AFFAPR213 Animal Production (Rummants) NC II 330 42 20,634.00 1,629.00 6,720.00 800.00 29,783.00
10
Agriculture. Forestry, Perform Breeding of Rumnants (Leading to Armal 11 5,739.00 79aoo 1.760.00 800.00 9,089.00
11 AFF621903 86
Production (Rurrmants) NC II)
Agriodure. Foresky. Raise Dairy Anmais (Leading to Animal Production 260 33 8,271.00 822.00 5.260.00 800.00 15.173.00
12 AFF621904
(Rummants) NC H)
Agriculture. Forestry, Raise Meat-Type Arimais (Leading to Animal 66 9 3,625.00 829.00 1,440.00 800.00 6.694.00
13 AFF621905
and Fishery Production (Ruminants) NC II)_____________
TESDA CIRCULAR PageMofSCipages
Subject: 2024 Schadul* or Cost of TESDA Sdiolnhjp Programs Number OOl. Series of 2024
Date Issued: Effecthritv: Supersedes:
TESDA Circular No. 004, series of 2023
TESDA Circular No. 004-A series of 2023
Immediately
0 5 JAtl 2m TESDA Circular No. 004-B, series of 2023
TESDA Circular No. 004-C, series of 2023

To meet the objectives of Training for Work Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Training Employment Program (STEP) TT^ Tratiaho Sdrola^ip Program
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Iskolar. the foUorrnng schedule rrf costs^^
qualification ate hereby adopted. The following training costs relative to the implementalion of TESDA Scholarship Programs are based on the following cost factors: Variable Co^consumabte, utrlrt1^, facitnes,
equipment and tools maintenance: honoraria of trainefs: and living allowance): and Fixed Costs (miscellaneous fees, national assessment fees, instni^ materiats. and o^.alowan^T. Trammg duration of
scholarship programs with entrepreneurship are inclusive of May entrepreneurship training. Further, implementation of supervised industry teaming (SIL) is not covered under the schotarshy) program.
No. Of Tmiing EnheprwurstaipF— Pv Capita Cost
QuiMcalion Traming Support Find
TVETQuaiflcationTitte No. of Tnintng Hours TnMng Fee(PhP) (PM») (PhP)
gfftOf
Codt Cost(PhP)

•KfjnobQw 0^ 24 fn/3 d^is fcr fiynpimooptf


ErtvfnrmjahpTmrmgf dwf

Agricutture. Forestry, 2.015.00 6.72a00 23,538.x


AFFAPS213 Arwnai Productton (Swine) NC tl
andRshery
AgncuNure. Forestry, Produce Organic Fertftzer (Leading Id Organic 800.00 810.00 1,760.00 8X.X
AGR611301
andRshery Agriadture Produclion NC II)

Agricutture. Foresty, Produce Organic Concoctions and Extracts (Leacfing 3,400.00 816.00 1,760.00 8X.X 6.776.x
AGR611302
andRshery to Organic Agricutture Production NC it)

Agricutture. Forestry. Raise Organic Hogs (Leading to Organic Agricutture 104 5.688.00 815.00 2,060.00 9,383.x
AGR612302
and Rshery Production NC tl)
Agricutture. Forestry, Raise Organic Smal Ruminants (Leading to Organic 11 80100 1,760.00 SX.X 8.217.x
AGR612303
and Fishery Agricutture Production NC II)
Automotive and Land 62 14.674.00 9,92000 8X.X 26.S35.X
ALTATS118 Automotive Senhcing NC I 493
Transportation
Automottve and Land 4,000.00 450.00 3,680.00 8X.X 8.9X.X
ALTATS113 Automotive Servicing NC I (Superseded)
Transportation
Automotive and Land 142 5.450.00 1.034.00 Z880.00 SX.X 10,164.x
ALTDRV204 Driving NC II1
Trartsportation
Automotive and Land 819.00 2,880.00 SX.X
ALTDRV204 Driving NC IP
Tiansportation
Automotive and Land Service Motorcyde/SmaH Engine System (Leading to 2,880.00 6.844.x
ALT723372
Transportation Motorcyde/Smal Engine Servicing NC II)
Service Eiectricai System (Leadmg to 1,300.00 i.92aoo 4,020.x
Automotive and Land ALT723373 94
Transportation Motortvcie/Smai Engine Servidnq NC W)
Automotive and Lar>d Overhaul Motorcyde/Smafl Engine (Leading to 248 4.000.00 4.960.00 SX.X 9.7W.X
ALT723375
Transportation MotorcYCle/Smal Engine Servicing NC II) 8XX 25,837.x
325 16.938.00 1,539.00 6.56000
Construction CONCAR218 Carpentry NC H 12.240 X
186 7.000.00 600.00 3.840 00
Constitiction CONROC205 Carpentry NC II (Superseded) SX.X 11.974.x
202 26 5.858.00 1,156.00 4,160.00
Constiuction CONCOP215 Constiuction Painting NC II 8X.X 13.167.x
8,174.00 1,153.00 3,040.00
Construction CONMAS116 Masonry NCI 9,460.x
128 5.000.00 1.100.00 2,560.00
Construction CONMAS106 Masonry NC I (Superseded) 17.0X.X
205 26 10,585.00 1,535.00 4,160.00
Constiuction CONMAS216 Masonry NC II
Plaster Concrete/Masonry Surface (Leadmg to 3,200.00 6.5X.X
CON712304 160
Construction Masonry NC II)______________________
11,610.00 1,427 00 4.960.00 8X.X
CONPIP218 Pipetitling (Metatec) NC II 245
Construction 10,660.00 5X.X 4,640.x 16.6X.X
CONPIP208 Pipefitlinq NC II (Superseded) 226
Construction 19,629.00 1.609.x 3,840.x 25.678.x
35 CONPLM114 Plumbing NCI 6,240.x 8X.X 15.008.x
308 7.468.x 5X.X
Construction CONPV1208 PV Systems Installation NC II 8X.X 15.7X.X
141 10.605.x 1,415.x 2.8X.X
Construction CONTTL218 Tie Setting NC II 2,240.x 9.540.x
6.0X.X 5X.X
Construction CONTIL207 Tie Setting NC II (Superseded)
6,215.x 4.4X.X 8X.X 11344.x
Becthcai and Bectocai Instalation and Maintenance NC II 28
39 ELCEIM215
Electronics
Assemble Bectronic Products (Leadmg to EPAS NC 2.0X.X 917.x 2.080.x SX.X 5.797.x
Electrical and ELC724335
Bectrontos
Service Consumer Bectronic Products and Systems 3.0X.X 881.x 2.4X.X 8X.X 7.X1.X
Bectricaland B.C724336 120
Electronics (LeadinQ to EPAS NC II)___________________
S.0XX 1,280.x SX.X 7.0X.X
Bectricaland Assembly of Solar Nighttght and Post Lamp
Bectionics
6,295.x 1.348.x 6,060.x 8X.X 14,523.x
GRMORM205 Dressmaldng NC II 299
Garments and Textiles 43
14,071.x 1,684.x 6.0X.X 8X.X 22,635.x
299 38
Garments arrd Textiles GRMTLR205 Tailoring NCH

Heating. Verrtiation. 14,272.x SX.X 5,280.x SX.X 20,852.x


RAC Servicing (DomRAC) NC II (Superseded) 264 33
AircondNioning and 45 HVCWAC211
Refrigeration
Intonnation and 17,497.x 932.x 10,560.x 29.789.x
ICTVGD318 Visual (Sraphic Design NC HI 525
(Communication
Technology
Inlormabon xxi io,ooax SX.X 1(L24aX SX.X 21,540.x
CTVGO307 \feual Graphic Design NC IH (Superseded) 64
(Communicalion
Technology 23.548.x
Shielded Metal Arc Wekfing (SMAW) NC I 14.594.x 2,234.x 5,920.x
Metals and Engineering 48 MESAW1X
(Superseded)
Shielded Metal Arc WeWtog (SMAW) NC N 15.4X.X Z697.X 5,920.x
Metals and engineering MESAW2X
(Superseded)
5.719.x 1.SX.X 4.4X.X 8X.X 12.505.x
Processed Food & 221 28
PFBFOP119 Food Processing NC I
Beverages 8XX S.1X.X
Processed Food & Process Food by Salting, Curing and Smoking 104 2.0X.X 3oax 2.0X.X
AGR741X1 (Leadmg to Food Processing NCH)
Beverages 8X.X 10.4X.X
Processed Food & Process Food by Fermentation and Picking (Leadmg 220 28 5.0X.X 2oax 4.4X.X
52 AGR741302
Beverages to Food Processing NC II)
Process Food by Sugar Concentration (Leading to 3.0X.X 2X.X 2.4X.X SX.X 6.4X.X
Processed Food & 120
AGR741X3
Food Processing NC II) _ —
TESDA CIRCULAR Page 29 ofJO pages
Subject 2024 Schedule of Cort of TESOA SchoMiip Prognim Niimher ODI. Series of 2024
EffecUvitv; Supersedes:
TESDA Ocular No. 004, series of 2023
TESDA Circular No. 004-A. series of 2023
Immediately TESDA Ocular No. 004-B, series of 2023
0 5 JAN TESDA Circular No. 0O4-C, series of 2023

I Program (STE,P) Tulong Trabaho Scholarship Program


To meet the objectives of Training for Work Scholatship Program (TWSP), Private Education Student Financiai Assistance (PESFA), Spe^l Trammg
he following schedule 3f costs per
(TTSP), Rice Extension Service Program (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Katxjhayan Skills Training Program (BKSTP). arKi T super Iskofar, U
ris (consumables, uhiiljes, fadlties.
qualification are hereby adopted. The ^Mowing training costs relative to the implementation of TESDA Scholarship Programs are based on the following cost fa^rs: Variable Ckx
lals, and other allowances.). Training duratkxiof
equipment and tools maintenance: honoraria of trainers: and living allowance): and Fixed Costs (miscellaneous fees, national ass^snJ®[J|*e“' instnj^a^
scholarship programs with entrepreneurship are inclusive of Way entrepreneurship traintng. Further, implementation of supervised industry teaming (SIL)isnoto[rvered under tf
le scholarship prograrr ).
No. of Training Entrtpranwrship Fm Pit Capita Cost
TraMng AttassnwnI
Qujiftcation TVET Quaihcjbon Tide No. of TrWning Ho«n Training SoppoftFund
Stctor No. Cost (PUP) Fat(PhP) (PhP) (PhP)
Coda om (PliP)
cf 24 tn/3 db)m ^ f=^8fnp$f h I
c d 0 aw
a b enlripranwnfiiP Toning) dBT}

Tourism (Hotel and 21 16.968.00 400.00 3.360.00 800.00 21,528.00


54 TRSBPP209 Bread and PaskyProdudionNC II (Superseded) 165

43 20,315.00 1,300.00 6,880.00 800.00 29,295.00


Tourism (Hotel and TFSCOK214 Cookery NCII 340
55
Prepare and Cook Hot Meals (Leading k> Cookery 28 4,600.00 4,480.00 600.00 9.880.00
Tourism (Hotel and 224
56
16 3,400.00 2.560.00 800.00 6,760.00
Tourism (Hotel and Prepare Cold Meds (Leadmg k) Cookeiy NC1) 128
57
Restaurant) itrnent of Aaicuture
TESDA CIRCULAR
------------- ----------------------------------------------------------------------------------------------------------- n T p aget^oftopages
Subject Schedule ol Cost Of TESDA SchotanMpProgrm ^ umberCOf Series of 2024

Dat< Issued: E ffectivity: s n^iaracdes;


T ESOA Circular No 004, senes of 2023
1"ESDA Circular No. 004-A, series of 2023
immeoiatoiy
1TiSOA Circular No 004.8. series ol 2023
0 5 m 2024 'ESOA Circular No. 004C, series ol 2023

Tuiong Trabahc) Scholarship Program (TTSP), Rice


To meet the objectives of Traming lor Wort Scholarship Program (TWSP), Private Education Student Financial Assistance (PESFA), Special Tramv^ Employn^ ft-ogram (STEP),
luie of costs pet qualification are hereby adopted,
Extension Service Program (RESP). Coconut Farmers Scholarship Program (CFSP). Barangay Kabuhayan SkiHs Training Program (BKSTP), and Tsuper Istolar. thi fottowing schec
(ties, tacMes, eclUBiTient 9>d foiols maintenaice; horlorariaof
The following framing costs relative to the implementation of TESDA Scholarship Programs are based on the fotiowing cost factors: Variable Costs (consumabtes, ^
ams with enBepreneurship are indusjve of 3-day
trainers; and living a«o«vance); and Faed Costs (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duratioo ol schoianhip proy'
entreoreneuiship Iraminq. Further, implementaton ol supervised indushy teaming (SIL) is not covered under the scholarship program.
No. of Training Per dpHa Cost
Training Assessment fnsuranoe Entrepreneurship
QuaNncattoti Traming Support Fund Assistanca (PhP)
Sector No. TVETOuaUficabonTMe No. of Training Hours CoM(PhP) Fee (PhP) Fee (PhP) Fee(PhP)
Code Days (PhP) (Php)

• a c tf
or ?4 fnO
fcf DWrownpvThp
Mifieipv
9 H * FrfP*W*9000pm
swf
k 1
CFSP
3.377.00 100.8 6,560.00 1,000.00 800 24,527.80
Agriculkre, Foresfry. 326 41 12,690.00
1 AFFACP105 fi^icuiml Oops Production NC1
Aid Y Wi lerv
Support Horicdhral Crop Work (Leading 100.8 1,920.00 1.000.00 800 6,541.80
Agricuftjre. Foresfry, 96 12 1,900.00 621
2 AGRB11306 j
and Fishery 0 A^lcuiurai Crops Production NC 1)

Support Nursery Work (Leadng to 837 100.6 1,600.00 1,000.00 600 5,737.80
A^icufejre, Foresfry, 78 10 1,400.00
3 AGR611307

Support Agrorgmic Crop Vltork (Leading to 100.6 1.820.00 1,000.00 800 6,558.60
AghcuKure, Foresfry, 96 12 1,900.00 838
4 AGRetiSOe
andFishsTy ti^kadkaal Crops Production NC 1)

100.8 7,200.00 1,000.00 800 25.485 80


AghcuKire. Foresfry, \grn4toral Crops Fyoduction NC il 360 45 15,390.00 995
5 AFFACP213
3|anl Crops (Laadfrig to Agricuiknd Crops 100.8 1,600.00 1,000.00 800 6.444.80
AghcuMure, Foresfry, 76 10 Z100.00 644
6 AFF610302
100.8 9,440.00 1,000.00 800 30,010.80
AgricuSure. Foresfry, k^icuhaal Crops Production NC III 469 SO 18,670.00
7 AFFACP306
Prepae Land for Agncuftural Crop 1,00000 800 4,400.80
10 900 100.8 1,600.00
ATicufrLie, Foresfry, AGR611310 Production (Leading to AgricuNurai Crop 76
B
and Fishery

Implement Post-HAvest Proyam (Leadfrig 1,44000 i.ooaoo 800 4,140.80


A^icuMure, Foresfry, 68 9 800 100.6
9 Acnattatt
arxi Fishery to Aytoutom Crops Production NC III)

hnptoment Plant Nufrifeon Proyam 800 5,440.80


2,100.00 in.8 1,440.00 1,000.00
A^icutfrire, Foresfry, Leading to Ayiculknl Crops Produdton 68 9
10 AGRB11312
and Fishery
Control Weeds (Loadrig to A^icu«ural 1,440.00 1,000.00 800 5,440.80
AgricuKiae, Foresfry, 68 9 2,100.00 loas
11 AGR611313
EstaWsh A^onomic Craps (loading Id 1,600.00 1,000.00 800 4,400.60
Agriculbve. Foresfry, 10 900 100.8
12 AGRB11320 76

Underttoe Ayonomic Crop Matotonanoe 1,000.00 800 3,880.80


700 100.8 1,260.00
Agicufeae. Foresfry, Proyam (LeaAig to Ayiculkral Crops 64 8
13 AGRB11321
and Fishery
Undertake Agronomic Crop Harvesting I.ooaoo 800 3,780.80
600 100.8 1,260.00
A^icuRure. Foresfry, AGR611322 Activities (Leading to Ayiculhaal Crops 60 8
14
and Fishery

1,280.00 1,000.00 800 3,780.80


Keep Records for Farm Business (leading 8 600 100J
Agtouiure, Foresfry. AGRB11331 60
15 to Ayiculki'al Crops Production NC III)
andFishe^r
5,28000 1,000.00 800 18,11980
Agriculture, Foresfry, 33 10.065.00 854 100.8
AFFAGE217 Agroenfrepreneurship NC II 263
16
5,120.00 1,000.00 800 19,341.80
Anitnai Production (Poulfry-Chicken) NC II - 250 32 11,424.00 807 100.8
ATicuftjre. Foresfry. AFFAPP213
17

i,92aoo 1,000.00 800 7,568.80


Maintain Poufey House (Leadfrig to Animal 12 2,970.00 778 100.8
A^icuKire, Foresfry, AFFB22101 94
18 Production (Po^fry-Chicken) NC II)

5,280.00 1.000.00 800 18.376.80


frood and Grow Chicks (Leadfrig to Anfrnai 33 10,400.00 796 100.8
A(^taufen. Foresfry, AFFB22102 260
19 Production (Poutoy-Chicken) NC II)

Perform Pre-Lay and Lay Activities 1,920.00 1,000.00 800 7.665.60


12 3,058.00 777 100.8
Agriculture, Foresfry, AFFB22103 {Leading to Animal Production (Poulfry- 94
20

6,720.00 1,000.00 800 30.883.80


42 2O.634.0C 1,629.00 100.8
A^icutue, roresfry. AFFAPR213 Arwnal Production (Ruminants) NC 6 330
21
and Ftsherv
Mainhrin Housing, Faro Impteroents and 1,000 oc 800 5,575.80
1,400.a 83£ 100.8 1.440.0C
Agricutture, Foresfry, SuntMjndfrig Area (Leading to Animal 66 9
22 AFF621901

1,000.0( 800 7,811.80


Provide Forage (Leading to Animal 10 3,526.01 78!> lOOi i i,600.a
A^icuMure, Foresfry, AFF621902 76
23
and Fishsnr
Perform Breedfrig of Ruminants (Leading k 5,730.0() 791) 100. S I.TaOCK ) I.OQOOt m) 10,189.80
AgricuNue. Foresfry, 86 11
24 AFFB21903 Animal Production (Ruminants) NC II)
100. 9 5280.013 1,000.01 3 8CX3 16273.80
A^culure. Foresfry, Raise Oafry Animals (Leading to Animai 260 33 8,271.013 82;1
25 AFFB21904
andFisherv 1.440.013 1.0000 3 8013 7.794.80
Rase Msal-Type Annals (Lsadng to 9 3,625.013 8?9 100 6
Agriculhae, Foresfry, AFF621905 66
26
andFisherv
100 8 5.120.0 0 1,000.00 800 31,390.60
256 32 23,391.00 97 9
Agricuttiae. Foresfry. AFFOAP212 Organic Ayicufeae Production NC U
27
andFtshAY
100 8 4,160.00 1.000.00 800 20.394.80
Agriculture. Foresfry.
Organic Ayicufrure Production NC U - 202 26 13,355.00 979
26 AFFOAP212
and Fishery WtihuUt Ducfrvus
1BOO.O 0 800 8.229.80
Rtose Oganic CIscksn (Laadng to CSgav 12 3,601.00 806 too B 1,920.00
Agriculure, Foresfry. ' ge
29 AGRB12301
andFehery
100 B I.TOOlO 0 1,000.00 800 11,076.80
Produce Organic Vegetables (Leading to
88 11 6,604.00 814
AgricuNure. Foresfry, AGRB11306
30 Organic Aytoutiife Production NC U)
100B i.76ao 0 1.000.C » n0 5270-80
Produce Organic Ferlifaer (Leading to 88 11 6C10 81 0
A(pcuMyre, Foresfry, AGRB11301
31 Oroanic /Vmadkie Production NC II)
andFisherv
TESDA CIRCULAR pages
Subject: Schaduteol Cost of TESOASchotirship Program* Number ^Series of 2024
EftectMly: Supersedes:
Datetssied;
TESOA Circular No 004, series of 2023
TESDA Circular No. 004-A. series of 2023
Immediate^ TESOA Circular No. 004-B, series of 2023
________ °5 Jin 20U__________________ _______________ _ TESDA Circular No. 004-C, series of 2023
To meet the objectives of Training for Work Scholarship Program (TWSP), Private Ertucation Student Financial Assstance (PESFA), Special Training Employment Program (STEP) T^ Trabaho Scholat^
Extension Sa^ceP^ram (RESP), Coconut Farmers Scholarship Program (CFSP), Barangay Kabuhayan Skills Training Program (BKSTP), and Tsuper Isk^. Ihefodowng schedule of c^p^qua^^ae
The following IramMarsts relative to the implementation of TESDA Scholarship Programs are based on Ihe fallowing cost factors: Vanable Costs (consumables, uklilies. facdbes, egugxriCTt and tools mairitenance, tmnorana
trainers; and living allowance); and Fixed Cosis (miscellaneous fees, national assessment fees, instructional materials, and other allowances.). Training duration of scholarship programs wilh entrepreneurship are inclusive o Jday
«I-:» ■ -' - ‘ - r*. .*1- - - IH#v^ ■ 11ipNi wiiM xii( ■avriitctrw lAO^ninn /.Qll \ ic fml llfiripr ttkP SChoiSTShlD DfOOfSHI.

No. of Training Nsw Normal Per Capita Cost


QuaHficetton ktsursice Support Fund Assictance
Sector No. TVET Quaifcation TWe No. of Training Hours TraMng Coet(PhP) Fee(PhP) Fee(PfiP) Fee(PhP) (PhP)
Cod* Days (PhP) (Php)
^Indmiimat24ln/3dtft haVBUiftV
f^rfptpimocpm ft 1
« ft c ft
mu 9 ft 1
dm

Produce Organic Concoctions and Extracts 800 7,876.80


A^icuMure, Foresty, 11 3,400.00 816 100.8 1,760.00 1,000.00
32 AGRB113Q2 (Leading to Orgsto A^icuSure Production 88
and Fishery
Raise Orgarac Hogs (Uaktig to CXganic 815 100.8 2.060.00 1,000.00 800 10,483.80
AgricuMure, Foresfey, AGR612302 104 13 5.68a00
33

Raise Organic Smal Ruminants (Leadtog 803 100J 1.760.00 1,000.00 BOO 9,317.80
Agricufere, Foresty, AGR612303 to Organic A^icxdtore Production NCII) 88 11 4,854.00
34
andFtshvy
100.8 4.000.00 1,000.00 800 1Z800.80
A^icuRure, Foresty. Coffee Production Leveill 200 2S 6,900.00
35
and Fishery

New TESDA issuances on changes on assessment fees shall be adopted.


This Circular applies to FY 2024 implementation of TESDA Scholarship Programs.

iETCm^EBTIZ III
SPirPCharge

You might also like