Contractor :

Assignor : Supervision Consultant :

TIME SCHEDULE
Project : CONSTRUCTION OF SCHOOLS AND HEALTH FACILITIES IN SIGI AND SIGI KULAWI DISTRICTS, CENTRAL SULAWESI
Location : SMK NEGERI 1 SIGI dan SD INPRES JONO OGE
Year : 2023

August 2023 September 2023 October 2023 November 2023 Desember 2023 January 2024 Feberuary 2024 March 2024 April 2024 May 2024
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33 W34 W35 W36 W37 W38 W39 W40 W41 W42
NO. WORK DESCRIPTION PERCENTAGE
13-Aug 20-Aug 27-Aug 3-Sep 10-Sep 17-Sep 24-Sep 1-Oct 8-Oct 15-Oct 22-Oct 29-Oct 5-Nov 12-Nov 19-Nov 26-Nov 3-Dec 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan 14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr 14-Apr 21-Apr 28-Apr 5-May 12-May 19-May 26-May
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 2-Mar 9-Mar 16-Mar 23-Mar 30-Mar 6-Apr 13-Apr 20-Apr 27-Apr 4-May 8-May 18-May 25-May 31-May

SMK NEGERI 1 SIGI


I PREPARATION WORK 1.287% 0.257% 0.515% 0.513% 0.001% 100
II CLASSROOM 10x8 (3 ROOMS) - A1
A PREPARATION WORK 0.008% 0.008%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.015% 0.338% 0.338% 0.338%
III CLASSROOM 10x8 (3 ROOMS) - A2
A PREPARATION WORK 0.014% 0.014%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.773% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.001% 0.334% 0.334% 0.334%
IV CLASSROOM 10x8 (3 ROOMS) - A3
A PREPARATION WORK 0.022% 0.022%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.028% 0.343% 0.343% 0.343%
V CLASSROOM 10x8 (3 ROOMS) - A4
A PREPARATION WORK 0.023% 0.023%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.773% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.186% 0.395% 0.395% 0.395%
VI CLASSROOM 10x8 (3 ROOMS) - A5
A PREPARATION WORK 0.029% 0.029%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 90
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.226% 0.409% 0.409% 0.409%
VII CLASSROOM 10x8 (3 ROOMS) - A6
A PREPARATION WORK 0.011% 0.011%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.196% 0.399% 0.399% 0.399%
VIII CLASSROOM 10x8 (3 ROOMS) - A7
A PREPARATION WORK 0.011% 0.011%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.196% 0.399% 0.399% 0.399%
IX CLASSROOM 10x8 (3 ROOMS) - A8
A PREPARATION WORK 0.020% 0.020%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.773% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197% 0.197%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 1.212% 0.404% 0.404% 0.404%
X CLASSROOM 10x8 (3 ROOMS) - A9
A PREPARATION WORK 0.010% 0.010%
B ARCHITECTURAL WORKS
B.1 1ST FLOOR 1.711% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190% 0.190%
B.2 ROOF WORKS 0.974% 0.487% 0.487%
C STRUCTURAL WORK 0.936% 0.312% 0.312% 0.312%
D MECHANICAL AND ELECTRICAL WORKS
D.1 CLASSROOM ELECTRICAL WORKS
I. LOW VOLTAGE PANEL WORKS 0.046% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 80
II. LIGHTING WORKS
a. CLASSROOM A1 ( 3 ROOMS ) 0.043% 0.022% 0.022%
b. CLASSROOM A2 ( 3 ROOMS ) 0.043% 0.022% 0.022%
c. CLASSROOM A3 ( 3 ROOMS ) 0.043% 0.022% 0.022%
d. CLASSROOM A4 ( 3 ROOMS ) 0.043% 0.022% 0.022%
e. CLASSROOM A5 ( 3 ROOMS ) 0.043% 0.022% 0.022%
f. CLASSROOM A6 ( 3 ROOMS ) 0.043% 0.022% 0.022%
g. CLASSROOM A7 ( 3 ROOMS ) 0.043% 0.022% 0.022%
h. CLASSROOM A8 ( 3 ROOMS ) 0.043% 0.022% 0.022%
i. CLASSROOM A9 ( 3 ROOMS ) 0.043% 0.022% 0.022%
III. Lightning Rod Installation 0.254% 0.127% 0.127%
XI PRACTICE ROOM 24x8 -B
A PREPARATION WORK 0.007% 0.007%
B ARCHITECTURAL WORKS
B.1 1ST LEVEL 1.551% 0.222% 0.222% 0.222% 0.222% 0.222% 0.222% 0.222%
B.2 ROOF WORKS 0.833% 0.416% 0.416%
C. STRUCTURAL WORK 1.227% 0.409% 0.409% 0.409%
D. MECHANICAL & ELECTRICAL WORKS 0.165% 0.083% 0.083%
XII WORKSHOP ROOM 22,5x6 - C
A PREPARATION WORK 0.109% 0.109%
B ARCHITECTURAL WORKS
B.1 1ST LEVEL 1.276% 0.182% 0.182% 0.182% 0.182% 0.182% 0.182% 0.182%
B.2 ROOF WORKS 0.671% 0.469% 0.201%
C. STRUCTURAL WORK 0.884% 0.295% 0.295% 0.295%
D. MECHANICAL & ELECTRICAL WORKS
D.1 MECHANICAL WORKS 0.033% 0.033%
D.2 ELECTRICAL WORKS 0.120% 0.120%
XIII WAREHOUSE 12x8,5 -D
A PREPARATION WORK 0.006% 0.006% 70
B ARCHITECTURAL WORKS
B.1 1ST LEVEL 0.847% 0.106% 0.106% 0.106% 0.106% 0.106% 0.106% 0.106% 0.106%
B.2 ROOF WORKS 0.478% 0.239% 0.239%
C. STRUCTURAL WORK 0.129% 0.065% 0.065%
D. MECHANICAL AND ELECTRICAL WORKS 0.104% 0.052% 0.052%
XIV SCIENCE LABORATORY 23,5x10 -E
A PREPARATION WORK 0.007% 0.007%
B ARCHITECTURAL WORKS
B.1 1ST LEVEL 1.801% 0.225% 0.225% 0.225% 0.225% 0.225% 0.225% 0.225% 0.225%
B.2 ROOF WORKS 0.949% 0.316% 0.316% 0.316%