Production Manager Approval Maintenance Manager Approval

Asahi Kokusai Techneion Singapore Pte Ltd. 25/10/2023 07:30 - 19:00 ASDM 2023 - Work Progress & Plan

25/10/2023 26/10/2023 Work Permit

Contractor

Production
MSRA No.

Request
Supervisor
S.No ID.No Location Equipment Tag. No & Work Title WORK Manpower
COLD HOT CONFINED Approval
Activity Progress Plan OPP AT LIFTING
WORK WORK SPACE
HEIGHT

1. To Disconnect Switch Cables

SWP #34 RA #34


E-612 2. To Remove the Existing Door
Finishing Switches
E-613 To Replace Hopper

AKTS
1 MI-05 Building O 3
E-622 Door Switches
(Level 2 & 3)
E-623

2 MI-02

You might also like