PROGRAM/

JENIS PEKERJAAN RAB 2023

Penurunan downtime/stagnasi 13,416,271,528


Peningkatan mutu hasil olah
Penekanan lossis 4,588,977,651
Total PTPN I 18,005,249,179
Penurunan downtime/stagnasi
Peningkatan mutu hasil olah
Penekanan lossis 5,600,660,955
Total PTPN VII 5,600,660,955
Penurunan downtime/stagnasi 13,416,271,528
Peningkatan mutu hasil olah -
Penekanan lossis 10,189,638,606
Total Tranche B1 23,605,910,134
Real s.d September 2023
Fisik (%) Biaya (Rp) % Biaya Thdp RAB
100% 13,416,271,528 100.00%

100% 4,588,977,651 100.00%

18,005,249,179 100.00%

100% 5,600,660,955 100.00%

5,600,660,955 100.00%
13,416,271,528 100.00%
- -
10,189,638,606 100.00%
23,605,910,134 100.00%
TIMELINE ALOKASI DANA IP PEN
Tranche B.1
PROGRAM/
JENIS PEKERJAAN

Penurunan downtime/stagnasi
- Pemasangan Baru Bulking Silo Kap. 300 Ton c/w instalasi
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
- Penggantian/Pengadaan Baru 1 (satu) unit Steam Boiler merek Takuma N-600 SA kapasitas 22 ton
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
- Pembuatan Baru Rebusan No. 3
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
- Perbaikan/Penggantian Bulking Silo Kernel
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
Jumlah Penurunan Downtime/Stagnasi
Peningkatan mutu hasil olah
Penekanan lossis
- Pengg./ Pemas. Baru Decanter Kapasitas 30 ton TBS/Jam
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
Penekanan losis
TIMELINE ALOKASI DANA IP PEN 2023
Tranche B.1
PROGRAM/
JENIS PEKERJAAN

lking Silo Kap. 300 Ton c/w instalasi

aan Baru 1 (satu) unit Steam Boiler merek Takuma N-600 SA kapasitas 22 ton/jam c/w Fuel Conveyor,

an Bulking Silo Kernel

Jumlah Penurunan Downtime/Stagnasi

Decanter Kapasitas 30 ton TBS/Jam

Penekanan losis
RAB TAHUN 2022
2023
TW I

Unit Kerja (Rp) Jan-Dec Jan Feb Mar

PKS Tanjung Seumantoh 2,107,420,470


100%
100%
10% 40% 50%
PKS Tanjung Seumantoh 5,190,713,542
100%
100%
40% 20% 20% 20%
PKS Cot Girek 3,118,637,574
100%
100%
85% 15%
PKS Cot Girek 2,999,499,942
100%
100%
18% 32% 50%
13,416,271,528

PKS Pulau Tiga 4,588,977,651


100%
100%
100%
4,588,977,651
Timeline
TAHUN 2023
Total
TW II TW III TW IV

Apr May Jun Jul Aug Sep Oct Nov Dec

100%

60%

15%

82%

0%
Realisasi TAHUN 2023

TW I TW II TW III TW IV

Jan Feb Mar Apr May Jun Jul Aug Sep Oct

40% 30% 10% 10%

20% 20% 20%

15%

52% 20% 10%

28
asi TAHUN 2023
Total % Real Terhadap RAB
TW IV
Fisik (%) Biaya (RP) Fisik (%) Biaya (%)

Nov Dec s.d s.d s.d s.d

100% 2,107,420,470 100% 100%

100% 5,190,713,542 100% 100%

100% 3,118,637,574 100% 100%

100% 2,999,499,942 100% 100%


100% 13,416,271,528

100% 4,588,977,651 100% 100%


100% 4,588,977,651
TIMELINE ALOKASI DANA IP PEN 2023
Tranche B.1
PROGRAM/
JENIS PEKERJAAN

Penurunan downtime/stagnasi
Peningkatan mutu hasil olah
Penekanan lossis
Pengadaan Decanter dan Instalasi
Proses Pengadaan Pekerjaan
Kontrak Pekerjaan
Pelaksanaan Pekerjaan
IP PEN 2023 RAB TAHUN 2022
2023
TW I

Unit Kerja (Rp) Jan-Dec Jan Feb Mar

PKS Sungai Lengi 5,600,660,955


100%
100%
80% 10% 10%
Timeline
TAHUN 2023
Total
TW II TW III TW IV

Apr May Jun Jul Aug Sep Oct Nov Dec

100%
Realisasi TAHUN 2023

TW I TW II TW III TW IV

Jan Feb Mar Apr May Jun Jul Aug Sep Oct

11% 4% 5.00%
Total % Real Terhadap RAB
TW IV Fisik (%) Biaya (RP) Fisik (%) Biaya (%)

Nov Dec s.d s.d s.d s.d s.d

100%
100%
100% 100% 5,600,660,955 100% 100% Menunggu pemasangan
Menunggu pemasangan Panel