APPENDIX A

BILL OF QUANTITIES

PROJECT: Date:
LOCATION:

S.No Description Qty Unit Rate (QAR) Amount (QAR)

1.0 PRELIMINARIES
Site Supervision and Administration
The Contractor shall provide sufficient staff to perform the
1.01 site administrative duties and supervision of the Works in 1 Ls -
executing the Contract.
Contractor's Plants and Equipment
The Contractor shall allow for all necessary plants and
1.02 1 Ls -
equipment including scaffolding, cranes, lifting plant etc.
Access to and use of the site.
Allow for access to the site and any related expenses, cost
1.03 1 Ls -
of gate passes etc.
Transportation
1.04 Transportation of workmen and materials 1 Ls -
Site Offices & Stores

Establish site offices including furniture, fittings,


1.05 1 Ls -
furnishings, services and survey instruments all as specified

1.06 Maintain offices 1 Ls


1.07 Remove offices on completion of the Works 1 Ls -
Protection
1.08 Supply and installation of Temporary hoarding. 1 Ls -
1.09 Removal of Temporary hoarding. 1 Ls -
All final finish materials and product installed shall be
1.10 1 Ls -
protected from dust and damage till the final hand over.
Services
Establishment of all necessary site and support services
1.10 1 Ls -
including electricity & water, security, welfare etc.

1.11 Removal of services on completion 1 Ls -


Safety / Executions
Allow charges for the safety requirements (Helmet, Cloth,
1.12 Gloves, and Shoes) during the construction. Provide skip 1 Ls -
for safe disposal of construction waste.
Demobilization
1.13 Remove rubbish from site at regular intervals 1 Ls -
Clearing and preparation of site for occupancy. Allow for
1.14 thorough cleaning of the entire site, disposing of all surplus 1 Ls -
materials.
Statutory Approvals
1.15 Civil Defense fees 1 Ls -

APPENDIX A - BOQ
Page 1 of 2
APPENDIX A
BILL OF QUANTITIES

PROJECT: Date:
LOCATION:

S.No Description Qty Unit Rate (QAR) Amount (QAR)

1.16 Fit-out permit fees 1 Ls -


1.17 Land Lord review fees 1 Ls -
1.18 KHARAMA connection fees 1 Ls -
1.19 Grade A Consultant Review & Approval Fees 1 Ls -
Materials samples
Allow for submitting all samples of material and
1.20 1 Ls -
workmanship to obtain the approval
Inspection and Handing Over
Allow for final testing and handing over procedures as
required by the authorities or as specified and allow for
1.20 1 Ls -
provision of all necessary documents including O & M
manuals etc. as specified in the contract.
Preparation of as-built drawings for the architectural Fit- 1
1.21 Ls -
out & MEP works.
Insurance
Construction Insurance / Builders Risk Policy protects the
1.21 developing structure and the materials purchased for the 1 Ls -
structure from loss due to damage or theft.
Bank Charges
Bank charges for performance bond and advance payment
1.22 1 Ls -
guarantee.

TOTAL AMOUNT 0.00

APPENDIX A - BOQ
Page 2 of 2