DETAIL SCOPE OF WORK

REPLACEMENT FENDER JETTY -2

SCOPE OF WORK
NO. DESCRIPTION REMARKS
IDC CONTRACTOR
1 Preparation and Survey Working Area  
Mob-demob Man Power, Tools and Temporary
2  
Support
3 Drawing dan Manual Document   Dokumen Vendor Fender
All permit required for installation (HIRA, JSA, Mine
4  
Permit, ect.)
5 Worker Transport and Accommodation  
Supply Fender, Extension Piling, Adaptor dan
6  
Accessories
Mobilizing All Installation Material from Shore to Jetty
7   Est. distance 750 meter
2
All consumable required for Installation, Test and
8  
Commissioning
Dismantling existing UHMW-PE Plate dan Tire
9  
Fender
10 Install Extension Piling Pipe  
11 Modified Existing Adaptor to Suit New Fender  
12 Installation New Adaptor Fender KVF 600X2500  
13 Install Fender KVF 600 X 2500  
14 Material Painting and Touch up Painting  
15 House Keeping  
16 Power source from Existing Panel  
17 Extension cable from Panel to Contractor Panel  
18 Test and Commissioning  
19 As-built Drawing  
20 Advisor for Install   Vendor PT. Kemenangan