Optical Power Budget Calculation Document No.

YN5H13178000-63
Rev-0

PROJECT: C-90-830525 (BALANCH S/S, UPPER SANIGAD HEP),


C-90-830524 (KALANGAGAD HEP) & C-90-830521 (UPPER KALANGA GAD HEP)

Fiber Length = Link Fiber Splice loss =


Optical
Length + 5% attenuation 0.05 Optical Path Maintenance Tx power Rx Available Additional
Sr. No. From To Link Distance Interface Connector Total loss
additional Link = 0.21 dB/Splice, Penalty = 1 Margin = 2.5 End Of Life Sensitivity Power Margin
Type loss = 1 dB
Length + 1 km dB/km @ Splice at dB dB/100 km
1550 nm every 3 km
(km) (km) (dB) (dB) (dB) (dB) (dB) (dB) (dBm) (dBm) (dB) (dB)
1 Balanch S/S Sayalu S/S 70 74.5 L4.2 SFP 15.65 1.20 1.00 1.00 1.86 20.71 -3.00 -28.00 25.00 4.29
Upper Sanigad
2 Balanch S/S 20.4 22.42 1GBE SFP 4.71 0.35 1.00 1.00 0.56 7.62 -9.00 -21.00 12.00 4.38
HEP(USHEP)
Upper Sanigad Upper Kalangagad
3 6.8 8.14 1GBE SFP 1.71 0.15 1.00 1.00 0.20 4.06 -9.00 -21.00 12.00 7.94
HEP(USHEP) HEP(UKHEP)
Upper Sanigad Kalnagagad HEP
4 13.4 15.07 1GBE SFP 3.16 0.25 1.00 1.00 0.38 5.79 -9.00 -21.00 12.00 6.21
HEP(USHEP) (KGHEP)

By QNFSal02 at 4:23 pm, May 04, 2021