MATERIAL SUBMITTAL LOG - LONG LEAD ITEMS

S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF SPECIFIED MANUFACTURER / LOCAL SUPPLIER PLANNED ANTICIPATED ACTUAL SUBMITETD ACTUAL RECEIVED STATUS LPO NO. ANTICIPATED MANUFACTURING SHIPPING ARRIVING AT PORT ARRIVING PLANNED DELIVERY REMARKS
ORGIN SUBMISSION DATE APPROVAL DATE DATE DATE LPO DATE. PERIOD TIME AT SITE DATE
FORECAST PLAN (B.L)

ELECTRICAL
LONG LEAD ITEMS

1 GAC-7878-MAS-E-14 TS ELE 0 BUSBAR TRUNKING NO TURKEY EAE 30-Jul-20 TBC 20-Aug-20 2-May-20 6-May-20 C
0
LV-MDB/SMDB/DB/CONTROL PANELS / ATS / CAPACITOR BANK & HARMONIC FILTERS 20-May-20 2-Jun-20
2 to 4 GAC-7878-MAS-E-15 TS ELE 1 NO SWISS ABB 26-Apr-20 TBC 17-May-20 C
LV-MDB/SMDB/DB/CONTROL PANELS / ATS / CAPACITOR BANK & HARMONIC FILTERS 2-Jul-20 2-Jul-20
2
LV-MDB/SMDB/DB/CONTROL PANELS / ATS / CAPACITOR BANK & HARMONIC FILTERS 5-Jul-20 22-Jul-20

UR
5 GAC-7878-MAS-E-21 TS ELE 0 UPS NO CHINA SCHNEIDER 25-Oct-20 15-Nov-20 15-Nov-20 18-Aug

0 LIGHTING CONTROL SYSTEM 2-Jul-20 15-Jul-20


6 GAC-7878-MAS-E-24 MAS ELE YES SWISS ABB 15-Jun-20 27-Oct-20 6-Jul-20 UR
1 LIGHTING CONTROL SYSTEM 13-Aug-20
Rating is change as per
7 GAC-7878-MAS-E-25 TS ELE 0 DIESEL GENERATORS NO UK ULTIMATE / PERKINS 7-Oct-20 New IFC's 28-Oct-20

8 GAC-7878-MAS-E-25 MAS ELE 0 BOH LIGHT FITTINGS YES ITALY / EUROPE GEWISS / SYLVANIA 21-Aug-20 15-Nov-20 11-Sep-20
2-Apr-20 6-Apr-20
0 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE AAN
(SAMPLE AND REPLY
GAC-7878-MAS-FA-130 TS ELE 15-Mar-20 5-Apr-20 8-Jul-20 4-Aug-20 B
1 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE TO COMMENTS
26/10/2020)
17-Aug-20 8-Sep-20
9 2 FIRE ALRAM & VOICE EVACUATION SYSTEM YES GERMANY HONEY WELL / FARANHYTE
0 SAMPLE WILL BE 2-Apr-20 6-Apr-20
CENTERAL BATTERY SYSTEM YES SHEILD UK
GAC-7878-MAS-FA-131 TS ELE 15-Mar-20 SUBMITTED 5-Apr-20 C
1 28/10/2020 8-Jul-20 20-Jul-20
10 CENTERAL BATTERY SYSTEM YES SHEILD UK