You are on page 1of 68

No.

Periode Ramalan Permintaan Hasil Ramalan Permintaan


1 1 636 128
2 2 638 128
3 3 736 148
4 4 638 128
5 5 736 148
6 6 738 148
7 7 736 148
8 8 638 128
9 9 636 128
10 10 738 148
11 11 736 148
12 12 638 128
13 13 736 148
14 14 638 128
15 15 738 148
16 16 636 128
17 17 738 148
128 128 148 128 148 148 148 128 128
148 148 128 148 128 148 128 148
Current
No Nama Komponen Schedule Receipt
Inventory(Unit)

1 Hyrdotiller 5 50 80 110
2 Plat Penutup Body Samping Kanan 4 45 70 95
3 Rakitan 24 4 55 75 95
4 Rakitan 18 5 50 80 110
5 Rakitan 19 4 45 70 95
6 As Roda Belakang 8 55 75 95
7 Plat Landasan Kopling 5 50 80 110
8 Rakitan 4 2 45 70 95
9 Rakitan 8 3 55 75 95
10 Besi U Pemegang Roda 7 50 80 110
11 Pipa Dudukan Mesin 4 45 70 95
12 Alas Dudukan Mesin 3 55 75 95
13 Besi Strip Jari - Jari Lengkung 1 7 50 80 110
14 Besi Lingkaran Roda 3 6 45 70 95
15 Plat Alas Rangka 8 55 75 95
16 Rangka Utama 2 50 80 110
17 Cincin Penguat 3 45 70 95
18 Besi Lingkaran Roda 4 5 55 75 95
19 Mata Pembajak 4 4 50 80 110
20 Penyangga Mata Pembajak 1 4 45 70 95
21 Sarang As A 3 55 75 95
22 Penyangga Mata Pembajak 4 6 50 80 110
23 Strip Mata Pembajak 2 5 45 70 95
24 Sarang As B 4 55 75 95
25 Besi Pemutar As Pembajak B 5 50 80 110
No. Level Part Number Nama Komponen Kuantitas Rakitan
1 0 HT-0001 Hydrotiller 1
2 1 HT-1001 Rakitan 26 2
3 1 HT-1002 Rakitan 27 4
4 2 HT-2001 Plat Body Utama 2
5 2 HT-2002 Plat Penutup Body Samping Kanan 2
6 2 HT-2003 Plat Penutup Body Samping Kiri 3
7 2 HT-2004 Rakitan 22 4
8 2 HT-2005 Rakitan 23 3
9 2 HT-2006 Rakitan 24 3
10 2 HT-2007 Rakitan 25 2
11 3 HT-3001 Rakitan 15 2
12 3 HT-3002 Rakitan 16 1
13 3 HT-3003 Rakitan 17 1
14 3 HT-3004 Rakitan 18 3
15 3 HT-3005 Rakitan 19 2
16 3 HT-3006 Rakitan 20 2
17 3 HT-3007 Rakitan 21 4
18 3 HT-3008 As Roda Belakang 2
19 4 HT-4008 Rakitan 1 1
20 4 HT-4009 Rakitan 2 2
21 4 HT-4010 Rakitan 3 2
22 4 HT-4001 Plat Landasan Kopling 4
23 4 HT-4002 Plat Rangka Kopling Kanan 4
24 4 HT-4003 Plat Rangka Kopling Kiri 2
25 4 HT-4011 Rakitan 4 1
26 4 HT-4012 Rakitan 5 3
27 4 HT-4013 Rakitan 6 2
28 4 HT-4014 Rakitan 7 3
29 4 HT-4015 Rakitan 8 2
30 4 HT-4016 Rakitan 9 4
31 4 HT-4017 Rakitan 10 2
32 4 HT-4018 Rakitan 11 2
33 4 HT-4019 Rakitan 12 4
34 4 HT-4020 Rakitan 13 2
35 4 HT-4021 Rakitan 14 2
36 4 HT-4004 As Roda Depan 1
37 4 HT-4005 Pipa Ring As Roda Depan 4
38 4 HT-4006 Besi U Pemegang Roda 2
39 4 HT-4007 Besi Bulat Pemegang Roda 2
40 5 HT-5001 Plat Segi Empat 1

No. Level Part Number Nama Komponen Kuantitas Rakitan


41 5 HT-5002 Pipa Dudukan Mesin 1
42 5 HT-5003 Alas Dudukan Mesin 2
43 5 HT-5004 Penyangga Dudukan Mesin 3
44 5 HT-5005 Plat Dudukan Mesin 4
45 5 HT-5006 Plat Penahan Depan 1
46 5 HT-5007 Pipa Dudukan Tengah 1 2
47 5 HT-5008 Besi Trip Jari-jari Lengkung 1 3
48 5 HT-5009 Besi Lingkaran Roda 1 2
49 5 HT-5010 Besi Lingkaran Roda 2 4
50 5 HT-5011 Plat Roda Pembajak 1 2
51 5 HT-5012 Besi Lingkaran Roda 3 4
52 5 HT-5013 Pipa Dudukan Ujung 1 2
53 5 HT-5014 Plat Alas Rangka 3
54 5 HT-5015 Rangka Utama 4
55 5 HT-5016 Rangka Bawah 4
56 5 HT-5017 Rangka Penguat Bawah 1
57 5 HT-5018 Cincin Penguat 4
58 5 HT-5019 Besi Strip Jari-jari Roda Pembajak 1 1
59 5 HT-5020 Mata Pembajak 1 1
60 5 HT-5021 Mata Pembajak 3 3
61 5 HT-5022 Mata Pembajak 2 4
62 5 HT-5023 Plat Roda Pembajak 2 2
63 5 HT-5024 Besi Lingkaran Roda 4 2
64 5 HT-5025 Pipa Dudukan Ujung 2 3
65 5 HT-5026 Mata Pembajak 4 2
66 5 HT-5027 Besi Strip Jari-jari Roda Pembajak 2 1
67 5 HT-5028 Penyangga Mata Pembajak 1 1
68 5 HT-5029 Penyangga Mata Pembajak 2 2
69 5 HT-5030 Plat Pintu Dudukan 1 2
70 5 HT-5031 Sararng As A 3
71 5 HT-5032 Besi Pemutar As Pembajak A 1
72 5 HT-5033 Penyangga Mata Pembajak 3 2
73 5 HT-5034 Penyangga Mata Pembajak 4 3
74 5 HT-5035 Strip Mata Pembajak 2 3
75 5 HT-5036 Plat Penutup Pipa Dudukan 2 3
76 5 HT-5037 Sarang As B 2
77 5 HT-5038 Besi Pemutar As Pembajak B 1
Lead Time Lot Size MFG
5 2 MFG
3 2 MFG hydrotiller
3 2 MFG hydrotiller
3 3 MFG r27
2 2 MFG r27
2 5 MFG r27
2 2 MFG r26
2 5 MFG r26
1 3 MFG r26
1 3 MFG r26
2 3 MFG r22
2 5 MFG r22
1 2 MFG r22
2 5 MFG r23
1 5 MFG r23
1 3 MFG r24
1 3 MFG r25 kel 9
2 5 MFG r25 kel 9
2 5 MFG r15
3 5 MFG r15
3 2 MFG r15
3 2 MFG r15
2 2 MFG r15
2 5 MFG r15
3 3 MFG r16
3 3 MFG r16
3 2 MFG r16
1 5 MFG r17
1 2 MFG r17
3 2 MFG r17
3 2 MFG r18
2 3 MFG r18
3 3 MFG r18
1 3 MFG r19
1 5 MFG r19
1 2 MFG r20
3 3 MFG r20
3 3 MFG r21
3 2 MFG r21
5 2 MFG r1

Lead Time Lot Size MFG


3 5 MFG r4
2 5 MFG r4
2 3 MFG r4
2 3 MFG r4
2 2 MFG r4
1 2 MFG r5
1 3 MFG r5
3 2 MFG r5
3 2 MFG r5
1 5 MFG r6
2 2 MFG r6
3 2 MFG r6
2 3 MFG r8
2 3 MFG r8
3 2 MFG r8
2 5 MFG r8
1 2 MFG r8
1 2 MFG r9
2 5 MFG r9
2 2 MFG r9
2 2 MFG r10
3 5 MFG r10
1 2 MFG r10
3 5 MFG r10
1 3 MFG r10
3 3 MFG r10
1 3 MFG r11
1 2 MFG r11
1 5 MFG r11
2 3 MFG r11
2 2 MFG r12
2 2 MFG r13
2 5 MFG r13
2 2 MFG r13
2 3 MFG r13
3 3 MFG r13
1 2 MFG r14
Part Number : HT-0001 Level :0
Nama Komponen : Hydrotiller Lead Time :5
Periode PD 1 2 3 4 5 6
Gross requiment 128 128 148 128 148 148
Schdule receipt 50 80 110
Project on hand 5 1 1 1 1 1 1
Net requiment 73 47 37 127 147 147
Plan order receipts 74 48 38 128 148 148
Plan order release 147 147 127 127 147 147
Jumlah (Unit) :1
Current Inventory : 5
Lot Size :2
7 8 9 10 11 12 13 14 15 16
148 128 128 148 148 128 148 128 148 128

1 1 1 1 1 1 1 1 1 1
147 127 127 147 147 127 147 127 147 127
148 128 128 148 148 128 148 128 148 128
127 147 127 147 127 147 128 128 148 128
17
148
Hydrotiller
1
147
148
148
Part Number : HT-1001 Level :1
Nama Komponen : Rakitan 26 Lead Time :3
Periode PD 1 2 3 4 5 6 7
Gross requiment 294 294 254 254 294 294 254
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 294 294 254 254 294 294 254
Plan order receipts 294 294 254 254 294 294 254
Plan order release 254 294 294 254 294 254 294

Part Number : HT-1002 Level :1


Nama Komponen : Rakitan 27 Lead Time :3
Periode PD 1 2 3 4 5 6 7
Gross requiment 588 588 508 508 588 588 508
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 588 588 508 508 588 588 508
Plan order receipts 588 588 508 508 588 588 508
Plan order release 508 588 588 508 588 508 588
Jumlah (Unit) :2 Current
:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
294 254 294 254 294 256 256 296 256 296

0 0 0 0 0 0 0 0 0 0
294 254 294 254 294 256 256 296 256 296
294 254 294 254 294 256 256 296 256 296
254 294 256 256 296 256 296 294 294 254

Jumlah (Unit) :4 Current


:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
588 508 588 508 588 512 512 592 512 592

0 0 0 0 0 0 0 0 0 0
588 508 588 508 588 512 512 592 512 592
588 508 588 508 588 512 512 592 512 592
508 588 512 512 592 512 592 588 588 508
Hydrotiller

Hydrotiller
Part Number : HT-2001 Level :2
Nama Komponen : Plat Body Utama Lead Time :3
Periode PD 1 2 3 4 5 6 7
Gross requiment 1016 1176 1176 1016 1176 1016 1176
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 1016 1176 1176 1016 1176 1016 1176
Plan order receipts 1016 1176 1176 1016 1176 1016 1176
Plan order release 1016 1176 1016 1176 1016 1176 1024
508 588 588 508 588 508 588

Part Number : HT-2002 Level :2


Nama Komponen : Plat Penutup Bodi Samping Kanan Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 1016 1176 1176 1016 1176 1016 1176
Schdule receipt 45 70 95
Project on hand 4 1 1 0 0 0 0 0
Net requiment 967 1105 1080 1016 1176 1016 1176
Plan order receipts 968 1106 1080 1016 1176 1016 1176
Plan order release 1080 1016 1176 1016 1176 1016 1176

Part Number : HT-2003 Level :2


Nama Komponen : Plat Penutup Body Samping Kiri Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 1524 1764 1764 1524 1764 1524 1764
Schdule receipt
Project on hand 1 2 3 4 0 1 2
Net requiment 1524 1763 1762 1521 1760 1524 1763
Plan order receipts 1525 1765 1765 1525 1760 1525 1765
Plan order release 1765 1525 1760 1525 1765 1525 1765
254 294 294 254 294 254 294

Part Number : HT-2004 Level :2


Nama Komponen : Rakitan 22 Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 1016 1176 1176 1016 1176 1016 1176
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 1016 1176 1176 1016 1176 1016 1176
Plan order receipts 1016 1176 1176 1016 1176 1016 1176
Plan order release 1176 1016 1176 1016 1176 1016 1176
Part Number : HT-2005 Level :2
Nama Komponen : Rakitan 23 Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 762 882 882 762 882 762 882
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 762 882 882 762 882 762 882
Plan order receipts 762 882 882 762 882 762 882
Plan order release 882 762 882 762 882 762 882

Part Number : HT-2006 Level :2


Nama Komponen : Rakitan 24 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 762 882 882 762 882 762 882
Schdule receipt 55 75 95
Project on hand 4 2 1 0 0 0 0 0
Net requiment 703 805 786 762 882 762 882
Plan order receipts 705 806 786 762 882 762 882
Plan order release 806 786 762 882 762 882 762

Part Number : HT-2007 Level :2


Nama Komponen : Rakitan 25 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 508 588 588 508 588 508 588
Schdule receipt
Project on hand 2 0 0 0 0 0 0
Net requiment 508 586 588 508 588 508 588
Plan order receipts 510 586 588 508 588 508 588
Plan order release 586 588 508 588 508 588 508
Jumlah (Unit) :2 Current
:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016

0 0 0 0 0 0 0 0 0 0
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1024 1184 1024 1184 1176 1176 1016 1016 1176 1176
508 588 512 512 592 512 592 588 588 508

Jumlah (Unit) :2 Current


:4
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016

0 0 0 0 0 0 0 0 0 0
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176

Jumlah (Unit) :3 Current


:0
Lot Size :5 Inventory
8 9 10 11 12 13 14 15 16 17
1524 1764 1536 1536 1776 1536 1776 1764 1764 1524

3 4 3 2 1 0 4 0 1 2
1522 1761 1532 1533 1774 1535 1776 1760 1764 1523
1525 1765 1535 1535 1775 1535 1780 1760 1765 1525
1535 1535 1775 1535 1780 1760 1765 1525 1524 1764
254 294 256 256 296 256 296 294 294 254

Jumlah (Unit) :4 Current


:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016

0 0 0 0 0 0 0 0 0 0
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1016 1176 1024 1024 1184 1024 1184 1176 1176 1016
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176
Jumlah (Unit) :3 Current
:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
762 882 768 768 888 768 888 882 882 762

0 0 0 0 0 0 0 0 0 0
762 882 768 768 888 768 888 882 882 762
762 882 768 768 888 768 888 882 882 762
768 768 888 768 888 882 882 762 762 882

Jumlah (Unit) :3 Current


:4
Lot Size :3 Inventory
8 9 10 11 12 13 14 15 16 17
762 882 768 768 888 768 888 882 882 762

0 0 0 0 0 0 0 0 0 0
762 882 768 768 888 768 888 882 882 762
762 882 768 768 888 768 888 882 882 762
882 768 768 888 768 888 882 882 762 762

Jumlah (Unit) :2 Current


:0
Lot Size :3 Inventory
8 9 10 11 12 13 14 15 16 17
508 588 512 512 592 512 592 588 588 508

0 0 0 0 0 0 0 0 0 0
508 588 512 512 592 512 592 588 588 508
508 588 512 512 592 512 592 588 588 508
588 512 512 592 512 592 588 588 508 508
Rakitan 27

Rakitan 27

Rakitan 27

Rakitan 26
Rakitan 26

Rakitan 26

Rakitan 26
Part Number : HT-3001 Level :2
Nama Komponen : Rakitan 15 Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 2352 2032 2352 2032 2352 2032 2352
Schdule receipt
Project on hand 0 2 2 1 1 0 0
Net requiment 2352 2032 2350 2030 2351 2031 2352
Plan order receipts 2352 2034 2352 2031 2352 2031 2352
Plan order release 2352 2031 2352 2031 2352 2049 2049
1176 1016 1176 1016 1176 1016 1176

Part Number : HT-3002 Level :2


Nama Komponen : Rakitan 16 Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 1176 1016 1176 1016 1176 1016 1176
Schdule receipt
Project on hand 4 2 2 0 0 1 1
Net requiment 1176 1012 1174 1014 1176 1016 1175
Plan order receipts 1180 1014 1176 1014 1176 1017 1176
Plan order release 1176 1014 1176 1017 1176 1023 1026

Part Number : HT-3003 Level :2


Nama Komponen : Rakitan 17 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 1176 1016 1176 1016 1176 1016 1176
Schdule receipt
Project on hand 0 0 0 0 0 0 0
Net requiment 1176 1016 1176 1016 1176 1016 1176
Plan order receipts 1176 1016 1176 1016 1176 1016 1176
Plan order release 1016 1176 1016 1176 1016 1176 1024
882 762 882 762 882 762 882

Part Number : HT-3004 Level :2


Nama Komponen : Rakitan 18 Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 2646 2286 2646 2286 2646 2286 2646
Schdule receipt 50 80 110
Project on hand 5 4 3 2 1 0 4 3
Net requiment 2591 2202 2533 2284 2645 2286 2642
Plan order receipts 2595 2205 2535 2285 2645 2290 2645
Plan order release 2205 2535 2285 2645 2290 2645 2305
Part Number : HT-3005 Level :2
Nama Komponen : Rakitan 19 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 1764 1524 1764 1524 1764 1524 1764
Schdule receipt 45 70 95
Project on hand 4 0 1 2 3 4 0 1
Net requiment 1715 1454 1668 1522 1761 1520 1764
Plan order receipts 1715 1455 1670 1525 1765 1520 1765
Plan order release 1455 1670 1525 1765 1520 1765 1535
806 786 762 882 762 882 762

Part Number : HT-3006 Level :2


Nama Komponen : Rakitan 20 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 1612 1572 1524 1764 1524 1764 1524
Schdule receipt
Project on hand 2 2 2 2 2 2 2
Net requiment 1612 1570 1522 1762 1522 1762 1522
Plan order receipts 1614 1572 1524 1764 1524 1764 1524
Plan order release 1572 1524 1764 1524 1764 1524 1764
586 588 508 588 508 588 508

Part Number : HT-3007 Level :2


Nama Komponen : Rakitan 21 Lead Time :1
Periode PD 1 2 3 4 5 6 7
Gross requiment 2344 2352 2032 2352 2032 2352 2032
Schdule receipt
Project on hand 2 2 1 1 0 0 2
Net requiment 2344 2350 2030 2351 2031 2352 2032
Plan order receipts 2346 2352 2031 2352 2031 2352 2034
Plan order release 2352 2031 2352 2031 2352 2034 2352

Part Number : HT-3008 Level :2


Nama Komponen : As Roda Belakang Lead Time :2
Periode PD 1 2 3 4 5 6 7
Gross requiment 1172 1176 1016 1176 1016 1176 1016
Schdule receipt 55 75 95
Project on hand 8 1 0 4 3 2 1 0
Net requiment 1109 1100 921 1172 1013 1174 1015
Plan order receipts 1110 1100 925 1175 1015 1175 1015
Plan order release 925 1175 1015 1175 1015 1180 1020
Jumlah (Unit) :2 Current
:0
Lot Size :3 Inventory
8 9 10 11 12 13 14 15 16 17
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352

1 2 1 2 1 1 1 0 2 2
2048 2047 2366 2047 2366 2351 2351 2031 2032 2350
2049 2049 2367 2049 2367 2352 2352 2031 2034 2352
2367 2049 2367 2352 2352 2031 2034 2352 2352 2032
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176

Jumlah (Unit) :1 Current


:0
Lot Size :5 Inventory
8 9 10 11 12 13 14 15 16 17
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176

0 2 0 2 0 0 0 1 2 2
1023 1024 1182 1024 1182 1176 1176 1016 1015 1174
1023 1026 1182 1026 1182 1176 1176 1017 1017 1176
1182 1026 1182 1176 1176 1017 1017 1176 1176 1016

Jumlah (Unit) :1 Current


:0
Lot Size :2 Inventory
8 9 10 11 12 13 14 15 16 17
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176

0 0 0 0 0 0 0 0 0 0
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176
1024 1184 1024 1184 1176 1176 1016 1016 1176 1176
768 768 888 768 888 882 882 762 762 882

Jumlah (Unit) :3 Current


:5
Lot Size :5 Inventory
8 9 10 11 12 13 14 15 16 17
2304 2304 2664 2304 2664 2646 2646 2286 2286 2646

4 0 1 2 3 2 1 0 4 3
2301 2300 2664 2303 2662 2643 2644 2285 2286 2642
2305 2300 2665 2305 2665 2645 2645 2285 2290 2645
2300 2665 2305 2665 2645 2645 2285 2290 2645 2646
Jumlah (Unit) :2 Current
:4
Lot Size :5 Inventory
8 9 10 11 12 13 14 15 16 17
1536 1536 1776 1536 1776 1764 1764 1524 1524 1764

0 4 3 2 1 2 3 4 0 1
1535 1536 1772 1533 1774 1763 1762 1521 1520 1764
1535 1540 1775 1535 1775 1765 1765 1525 1520 1765
1540 1775 1535 1775 1765 1765 1525 1520 1765 1715
882 768 768 888 768 888 882 882 762 762

Jumlah (Unit) :2 Current


:0
Lot Size :3 Inventory
8 9 10 11 12 13 14 15 16 17
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524

2 2 2 2 2 2 2 2 2 2
1762 1534 1534 1774 1534 1774 1762 1762 1522 1522
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524
1536 1536 1776 1536 1776 1764 1764 1524 1524 1614
588 512 512 592 512 592 588 588 508 508

Jumlah (Unit) :4 Current


:0
Lot Size :3 Inventory
8 9 10 11 12 13 14 15 16 17
2352 2048 2048 2368 2048 2368 2352 2352 2032 2032

2 0 1 0 1 0 0 0 2 1
2350 2046 2048 2367 2048 2367 2352 2352 2032 2030
2352 2046 2049 2367 2049 2367 2352 2352 2034 2031
2046 2049 2367 2049 2367 2352 2352 2034 2031 2346

Jumlah (Unit) :2 Current


:8
Lot Size :5 Inventory
8 9 10 11 12 13 14 15 16 17
1176 1024 1024 1184 1024 1184 1176 1176 1016 1016

4 0 1 2 3 4 3 2 1 0
1176 1020 1024 1183 1022 1181 1172 1173 1014 1015
1180 1020 1025 1185 1025 1185 1175 1175 1015 1015
1025 1185 1025 1185 1175 1175 1015 1015 1172 1176
Rakitan 22

Rakitan 22

Rakitan 22

Rakitan 23
Rakitan 23

Rakitan 24

Rakitan 25

Rakitan 25
Part Number Nama : HT-4008 Level :4
Komponen : Rakitan 1 Lead Time :2
Periode PD 1 2 3 4 5 6
Gross Requirement 2352 2031 2352 2031 2352 2049
Schedule Receipts
Project On Hand 3 2 0 4 2 3
Net Requirement 2352 2028 2350 2031 2348 2047
Plan Order Receipts 2355 2030 2350 2035 2350 2050
Plan Order Realese 2350 2035 2350 2050 2050 2365
2352 2031 2352 2031 2352 2049
Part Number Nama : HT-4009 Level :4
Komponen : Rakitan 2 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4704 4062 4704 4062 4704 4098
Schedule Receipts
Project On Hand 1 4 0 3 4 1
Net Requirement 4704 4061 4700 4062 4701 4094
Plan Order Receipts 4705 4065 4700 4065 4705 4095
Plan Order Realese 4065 4705 4095 4100 4735 4095

Part Number Nama : HT-4010 Level :4


Komponen : Rakitan 3 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4704 4062 4704 4062 4704 4098
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 4704 4062 4704 4062 4704 4098
Plan Order Receipts 4704 4062 4704 4062 4704 4098
Plan Order Realese 4062 4704 4098 4098 4734 4098

Part Number Nama : HT-4001 Level :4


Komponen : Plat Landasan Kopling Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 9408 8124 9408 8124 9408 8196
Schedule Receipts 50 80 110
Project On Hand 5 1 1 1 1 1 1
Net Requirement 9353 8043 9297 8123 9407 8195
Plan Order Receipts 9354 8044 9298 8124 9408 8196
Plan Order Realese 8124 9408 8196 8196 9468 8196

Part Number Nama : HT-4002 Level :4


Komponen : Plat Rangka Kopling Kanan Lead Time :2
Periode PD 1 2 3 4 5 6
Gross Requirement 9408 8124 9408 8124 9408 8196
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 9408 8124 9408 8124 9408 8196
Plan Order Receipts 9408 8124 9408 8124 9408 8196
Plan Order Realese 9408 8124 9408 8196 8196 9468

Part Number Nama : HT-4003 Level :4


Komponen : Plat Rangka Kopling Kiri Lead Time :2
Periode PD 1 2 3 4 5 6
Gross Requirement 4704 4062 4704 4062 4704 4098
Schedule Receipts
Project On Hand 1 4 0 3 4 1
Net Requirement 4704 4061 4700 4062 4701 4094
Plan Order Receipts 4705 4065 4700 4065 4705 4095
Plan Order Realese 4700 4065 4705 4095 4100 4735

Part Number Nama : HT-4011 Level :4


Komponen : Rakitan 4 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 1176 1014 1176 1017 1176 1023
Schedule Receipts 45 70 95
Project On Hand 2 2 0 2 2 2 2
Net Requirement 1129 942 1081 1015 1174 1021
Plan Order Receipts 1131 942 1083 1017 1176 1023
Plan Order Realese 1017 1176 1023 1026 1182 1026
1176 1014 1176 1017 1176 1023
Part Number Nama : HT-4012 Level :4
Komponen : Rakitan 5 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 3528 3042 3528 3051 3528 3069
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 3528 3042 3528 3051 3528 3069
Plan Order Receipts 3528 3042 3528 3051 3528 3069
Plan Order Realese 3051 3528 3069 3078 3546 3078

Part Number Nama : HT-4013 Level :4


Komponen : Rakitan 6 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 2352 2028 2352 2034 2352 2046
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 2352 2028 2352 2034 2352 2046
Plan Order Receipts 2352 2028 2352 2034 2352 2046
Plan Order Realese 2034 2352 2046 2052 2364 2052
1016 1176 1016 1176 1016 1176
Part Number Nama : HT-4014 Level :4
Komponen : Rakitan 7 Lead Time :1
Periode PD 1 2 3 4 5 6
Gross Requirement 3048 3528 3048 3528 3048 3528
Schedule Receipts
Project On Hand 2 4 1 3 0 2
Net Requirement 3048 3526 3044 3527 3045 3528
Plan Order Receipts 3050 3530 3045 3530 3045 3530
Plan Order Realese 3530 3045 3530 3045 3530 3070

Part Number Nama : HT-4015 Level :4


Komponen : Rakitan 8 Lead Time :1
Periode PD 1 2 3 4 5 6
Gross Requirement 2032 2352 2032 2352 2032 2352
Schedule Receipts 55 75 95
Project On Hand 3 0 1 0 0 0 0
Net Requirement 1974 2277 1936 2352 2032 2352
Plan Order Receipts 1974 2278 1936 2352 2032 2352
Plan Order Realese 2278 1936 2352 2032 2352 2048

Part Number Nama : HT-4016 Level :4


Komponen : Rakitan 9 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4064 4704 4064 4704 4064 4704
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 4064 4704 4064 4704 4064 4704
Plan Order Receipts 4064 4704 4064 4704 4064 4704
Plan Order Realese 4704 4064 4704 4096 4096 4736
2205 2535 2285 2645 2290 2645
Part Number Nama : HT-4017 Level :4
Komponen : Rakitan 10 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4410 5070 4570 5290 4580 5290
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 4410 5070 4570 5290 4580 5290
Plan Order Receipts 4410 5070 4570 5290 4580 5290
Plan Order Realese 5290 4580 5290 4610 4600 5330
Part Number Nama : HT-4018 Level :4
Komponen : Rakitan 11 Lead Time :2
Periode PD 1 2 3 4 5 6
Gross Requirement 4410 5070 4570 5290 4580 5290
Schedule Receipts
Project On Hand 0 0 2 1 2 1
Net Requirement 4410 5070 4570 5288 4579 5288
Plan Order Receipts 4410 5070 4572 5289 4581 5289
Plan Order Realese 4572 5289 4581 5289 4611 4599

Part Number Nama : HT-4019 Level :4


Komponen : Rakitan 12 Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 8820 10140 9140 10580 9160 10580
Schedule Receipts
Project On Hand 0 0 1 2 1 2
Net Requirement 8820 10140 9140 10579 9158 10579
Plan Order Receipts 8820 10140 9141 10581 9159 10581
Plan Order Realese 10581 9159 10581 9219 9201 10659
1455 1670 1525 1765 1520 1765
Part Number Nama : HT-4020 Level :4
Komponen : Rakitan 13 Lead Time :1
Periode PD 1 2 3 4 5 6
Gross Requirement 2910 3340 3050 3530 3040 3530
Schedule Receipts
Project On Hand 0 2 0 1 0 1
Net Requirement 2910 3340 3048 3530 3039 3530
Plan Order Receipts 2910 3342 3048 3531 3039 3531
Plan Order Realese 3342 3048 3531 3039 3531 3069

Part Number Nama : HT-4021 Level :4


Komponen : Rakitan 14 Lead Time :1
Periode PD 1 2 3 4 5 6
Gross Requirement 2910 3340 3050 3530 3040 3530
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 2910 3340 3050 3530 3040 3530
Plan Order Receipts 2910 3340 3050 3530 3040 3530
Plan Order Realese 3340 3050 3530 3040 3530 3070
1572 1524 1764 1524 1764 1524
Part Number Nama : HT-4004 Level :4
Komponen : As Roda Depan Lead Time :1
Periode PD 1 2 3 4 5 6
Gross Requirement 1572 1524 1764 1524 1764 1524
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 1572 1524 1764 1524 1764 1524
Plan Order Receipts 1572 1524 1764 1524 1764 1524
Plan Order Realese 1524 1764 1524 1764 1524 1764

Part Number Nama : HT-4005 Level :4


Komponen : Pipa Ring As Roda Depan Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 6288 6096 7056 6096 7056 6096
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 6288 6096 7056 6096 7056 6096
Plan Order Receipts 6288 6096 7056 6096 7056 6096
Plan Order Realese 6096 7056 6096 7056 6144 6144
2352 2031 2352 2031 2352 2034
Part Number Nama : HT-4006 Level :4
Komponen : Besi U Pemegang Roda Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4704 4062 4704 4062 4704 4068
Schedule Receipts 50 80 110
Project On Hand 7 0 2 1 1 1 1
Net Requirement 4647 3982 4592 4061 4703 4067
Plan Order Receipts 4647 3984 4593 4062 4704 4068
Plan Order Realese 4062 4704 4068 4704 4092 4098

Part Number Nama : HT-4007 Level :4


Komponen : Besi Bulat Pemegang Roda Lead Time :3
Periode PD 1 2 3 4 5 6
Gross Requirement 4704 4062 4704 4062 4704 4068
Schedule Receipts
Project On Hand 0 0 0 0 0 0
Net Requirement 4704 4062 4704 4062 4704 4068
Plan Order Receipts 4704 4062 4704 4062 4704 4068
Plan Order Realese 4062 4704 4068 4704 4092 4098
Jumlah (Unit) :1 Current :0
Lot Size :5 Inventory
7 8 9 10 11 12 13 14 15 16
2049 2367 2049 2367 2352 2352 2031 2034 2352 2352

4 2 3 1 4 2 1 2 0 3
2046 2363 2047 2364 2351 2348 2029 2033 2350 2352
2050 2365 2050 2365 2355 2350 2030 2035 2350 2355
2050 2365 2355 2350 2030 2035 2350 2355 2030 2352
2049 2367 2049 2367 2352 2352 2031 2034 2352 2352
Jumlah (Unit) :2 Current :0
Lot Size :5 Inventory
7 8 9 10 11 12 13 14 15 16
4098 4734 4098 4734 4704 4704 4062 4068 4704 4704

3 4 1 2 3 4 2 4 0 1
4097 4731 4094 4733 4702 4701 4058 4066 4700 4704
4100 4735 4095 4735 4705 4705 4060 4070 4700 4705
4735 4705 4705 4060 4070 4700 4705 4065 4704 4062

Jumlah (Unit) :2 Current :0


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
4098 4734 4098 4734 4704 4704 4062 4068 4704 4704

0 0 0 0 0 0 0 0 0 0
4098 4734 4098 4734 4704 4704 4062 4068 4704 4704
4098 4734 4098 4734 4704 4704 4062 4068 4704 4704
4734 4704 4704 4062 4068 4704 4704 4064 4704 4062

Jumlah (Unit) :4 Current :5


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
8196 9468 8196 9468 9408 9408 8124 8136 9408 9408

1 1 1 1 1 1 1 1 1 1
8195 9467 8195 9467 9407 9407 8123 8135 9407 9407
8196 9468 8196 9468 9408 9408 8124 8136 9408 9408
9468 9408 9408 8124 8136 9408 9408 8128 9408 8124

Jumlah (Unit) :4 Current :0


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
8196 9468 8196 9468 9408 9408 8124 8136 9408 9408

0 0 0 0 0 0 0 0 0 0
8196 9468 8196 9468 9408 9408 8124 8136 9408 9408
8196 9468 8196 9468 9408 9408 8124 8136 9408 9408
8196 9468 9408 9408 8124 8136 9408 9408 8128 9408

Jumlah (Unit) :2 Current :0


Lot Size :5 Inventory
7 8 9 10 11 12 13 14 15 16
4098 4734 4098 4734 4704 4704 4062 4068 4704 4704

3 4 1 2 3 4 2 4 0 1
4097 4731 4094 4733 4702 4701 4058 4066 4700 4704
4100 4735 4095 4735 4705 4705 4060 4070 4700 4705
4095 4735 4705 4705 4060 4070 4700 4705 4065 4704

Jumlah (Unit) :1 Current :2


Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
1026 1182 1026 1182 1176 1176 1017 1017 1176 1176

2 2 2 2 2 2 2 2 2 2
1024 1180 1024 1180 1174 1174 1015 1015 1174 1174
1026 1182 1026 1182 1176 1176 1017 1017 1176 1176
1182 1176 1176 1017 1017 1176 1176 1014 1176 1014
1026 1182 1026 1182 1176 1176 1017 1017 1176 1176
Jumlah (Unit) :3 Current :0
Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
3078 3546 3078 3546 3528 3528 3051 3051 3528 3528

0 0 0 0 0 0 0 0 0 0
3078 3546 3078 3546 3528 3528 3051 3051 3528 3528
3078 3546 3078 3546 3528 3528 3051 3051 3528 3528
3546 3528 3528 3051 3051 3528 3528 3048 3528 3042

Jumlah (Unit) :2 Current :0


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
2052 2364 2052 2364 2352 2352 2034 2034 2352 2352

0 0 0 0 0 0 0 0 0 0
2052 2364 2052 2364 2352 2352 2034 2034 2352 2352
2052 2364 2052 2364 2352 2352 2034 2034 2352 2352
2364 2352 2352 2034 2034 2352 2352 2032 2352 2028
1024 1024 1184 1024 1184 1176 1176 1016 1016 1176
Jumlah (Unit) :3 Current :0
Lot Size :5 Inventory
7 8 9 10 11 12 13 14 15 16
3072 3072 3552 3072 3552 3528 3528 3048 3048 3528

0 3 1 4 2 4 1 3 0 2
3070 3072 3549 3071 3548 3526 3524 3047 3045 3528
3070 3075 3550 3075 3550 3530 3525 3050 3045 3530
3075 3550 3075 3550 3530 3525 3050 3045 3530 3530

Jumlah (Unit) :2 Current :3


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352

0 0 0 0 0 0 0 0 0 0
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352
2048 2368 2048 2368 2352 2352 2032 2032 2352 2352

Jumlah (Unit) :4 Current :0


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
4096 4096 4736 4096 4736 4704 4704 4064 4064 4704

0 0 0 0 0 0 0 0 0 0
4096 4096 4736 4096 4736 4704 4704 4064 4064 4704
4096 4096 4736 4096 4736 4704 4704 4064 4064 4704
4096 4736 4704 4704 4064 4064 4704 4704 4064 4704
2305 2300 2665 2305 2665 2645 2645 2285 2290 2645
Jumlah (Unit) :2 Current :0
Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
4610 4600 5330 4610 5330 5290 5290 4570 4580 5290

0 0 0 0 0 0 0 0 0 0
4610 4600 5330 4610 5330 5290 5290 4570 4580 5290
4610 4600 5330 4610 5330 5290 5290 4570 4580 5290
4610 5330 5290 5290 4570 4580 5290 5292 4410 5070
Jumlah (Unit) :2 Current :0
Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
4610 4600 5330 4610 5330 5290 5290 4570 4580 5290

2 1 2 0 1 0 2 1 2 1
4609 4598 5329 4608 5330 5289 5290 4568 4579 5288
4611 4599 5331 4608 5331 5289 5292 4569 4581 5289
5331 4608 5331 5289 5292 4569 4581 5289 5292 4410

Jumlah (Unit) :4 Current :0


Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
9220 9200 10660 9220 10660 10580 10580 9140 9160 10580

1 2 1 0 2 0 1 2 1 2
9218 9199 10658 9219 10660 10578 10580 9139 9158 10579
9219 9201 10659 9219 10662 10578 10581 9141 9159 10581
9219 10662 10578 10581 9141 9159 10581 10584 8820 10140
1535 1540 1775 1535 1775 1765 1765 1525 1520 1765
Jumlah (Unit) :2 Current :0
Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530

0 1 0 2 1 2 0 1 0 1
3069 3080 3549 3070 3548 3529 3528 3050 3039 3530
3069 3081 3549 3072 3549 3531 3528 3051 3039 3531
3081 3549 3072 3549 3531 3528 3051 3039 3531 3429

Jumlah (Unit) :2 Current :0


Lot Size :5 Inventory
7 8 9 10 11 12 13 14 15 16
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530

0 0 0 0 0 0 0 0 0 0
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530
3080 3550 3070 3550 3530 3530 3050 3040 3530 3430
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524
Jumlah (Unit) :1 Current :0
Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524

0 0 0 0 0 0 0 0 0 0
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524
1764 1536 1536 1776 1536 1776 1764 1764 1524 1524
1536 1536 1776 1536 1776 1764 1764 1524 1524 1614

Jumlah (Unit) :4 Current :0


Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
7056 6144 6144 7104 6144 7104 7056 7056 6096 6096

0 0 0 0 0 0 0 0 0 0
7056 6144 6144 7104 6144 7104 7056 7056 6096 6096
7056 6144 6144 7104 6144 7104 7056 7056 6096 6096
7104 6144 7104 7056 7056 6096 6096 6456 6288 6096
2352 2046 2049 2367 2049 2367 2352 2352 2034 2031
Jumlah (Unit) :2 Current :7
Lot Size :3 Inventory
7 8 9 10 11 12 13 14 15 16
4704 4092 4098 4734 4098 4734 4704 4704 4068 4062

1 1 1 1 1 1 1 1 1 1
4703 4091 4097 4733 4097 4733 4703 4703 4067 4061
4704 4092 4098 4734 4098 4734 4704 4704 4068 4062
4734 4098 4734 4704 4704 4068 4062 4692 4704 4062

Jumlah (Unit) :2 Current :7


Lot Size :2 Inventory
7 8 9 10 11 12 13 14 15 16
4704 4092 4098 4734 4098 4734 4704 4704 4068 4062

0 0 0 0 0 0 0 0 0 0
4704 4092 4098 4734 4098 4734 4704 4704 4068 4062
4704 4092 4098 4734 4098 4734 4704 4704 4068 4062
4734 4098 4734 4704 4704 4068 4062 4692 4704 4062
17
2032
Rakitan 15
1
2029
2030
2031
2032

17
4064
Rakitan 15
2
4063
4065
4704

17
4064
Rakitan 15
0
4064
4064
4704

17
8128
Rakitan 15
1
8127
8128
9408

17

Rakitan 15
8128
Rakitan 15
0
8128
8128
8124

17
4064
Rakitan 15
2
4063
4065
4062

17
1016
Rakitan 16
0
1014
1014
1176
1016

17
3048
Rakitan 16
0
3048
3048
3528

17
2032
Rakitan 16
0
Rakitan 16

2032
2032
2352
1176

17
3528
Rakitan 17
4
3526
3530
3048

17
2352
Rakitan 17
0
2352
2352
2032

17
4704
Rakitan 17
0
4704
4704
4064
2646

17
5292
Rakitan 18
0
5292
5292
4570
17
5292
Rakitan 18
1
5291
5292
5070

17
10584
Rakitan 18
2
10582
10584
9140
1715

17
3430
Rakitan 19
0
3429
3429
2910

17
3430
Rakitan 19
0
3430
3430
2910
1614

Rakitan 20
17
1614
Rakitan 20
0
1614
1614
1572

17
6456
Rakitan 20
0
6456
6456
7056
2346

17
4692
Rakitan 21
1
4691
4692
4704

17
4692
Rakitan 21
0
4692
4692
4704
Part Number Nama : HT-5001 Level
Komponen : Plat Segi Empat Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 2350 2035 2350 2050 2050
Schedule Receipts
Project On Hand 0 1 1 1 1
Net Requirement 2350 2035 2349 2049 2049
Plan Order Receipts 2350 2036 2350 2050 2050
Plan Order Realese 2364 2050 2366 2354 2350
2350 2035 2350 2050 2050
Part Number Nama : HT-5002 Level
Komponen : Pipa Dudukan Mesin Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 2034 2352 2046 2052 2364
Schedule Receipts 45 70 95
Project On Hand 4 0 3 2 0 1
Net Requirement 1985 2282 1948 2050 2364
Plan Order Receipts 1985 2285 1950 2050 2365
Plan Order Realese 2050 2365 2055 2360 2355
1017 1176 1023 1026 1182
Part Number Nama : HT-5003 Level
Komponen : Alas Dudukan Mesin Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 2034 2352 2046 2052 2364
Schedule Receipts 55 75 95
Project On Hand 3 4 2 1 4 0
Net Requirement 1976 2273 1949 2051 2360
Plan Order Receipts 1980 2275 1950 2055 2360
Plan Order Realese 1950 2055 2360 2055 2365

Part Number Nama : HT-5004 Level


Komponen : Penyangga Dudukan Mesin Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 3051 3528 3069 3078 3546
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 3051 3528 3069 3078 3546
Plan Order Receipts 3051 3528 3069 3078 3546
Plan Order Realese 3069 3078 3546 3078 3546

Part Number Nama : HT-5005 Level


Komponen : Plat Dudukan Mesin Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4068 4704 4092 4104 4728
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 4068 4704 4092 4104 4728
Plan Order Receipts 4068 4704 4092 4104 4728
Plan Order Realese 4092 4104 4728 4104 4728

Part Number Nama : HT-5006 Level


Komponen : Plat Panahan Depan Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 1017 1176 1023 1026 1182
Schedule Receipts
Project On Hand 1 1 0 0 0
Net Requirement 1017 1175 1022 1026 1182
Plan Order Receipts 1018 1176 1022 1026 1182
Plan Order Realese 1022 1026 1182 1026 1182
3051 3528 3069 3078 3546
Part Number Nama : HT-5007 Level
Komponen : Pipa Dudukan Tengah 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 6102 7056 6138 6156 7092
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 6102 7056 6138 6156 7092
Plan Order Receipts 6102 7056 6138 6156 7092
Plan Order Realese 7056 6138 6156 7092 6156

Part Number Nama : HT-5008 Level


Komponen : Besi Strip Jari-Jari Lengkung 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9153 10584 9207 9234 10638
Schedule Receipts 50 80 110
Project On Hand 7 0 2 1 1 1
Net Requirement 9096 10504 9095 9233 10637
Plan Order Receipts 9096 10506 9096 9234 10638
Plan Order Realese 10506 9096 9234 10638 9234

Part Number Nama : HT-5009 Level


Komponen : Besi Lingkaran Roda 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 6102 7056 6138 6156 7092
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 6102 7056 6138 6156 7092
Plan Order Receipts 6102 7056 6138 6156 7092
Plan Order Realese 6156 7092 6156 7092 7056

Part Number Nama : HT-5010 Level


Komponen : Besi Lingkaran Roda 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 12204 14112 12276 12312 14184
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 12204 14112 12276 12312 14184
Plan Order Receipts 12204 14112 12276 12312 14184
Plan Order Realese 12312 14184 12312 14184 14112
2034 2352 2046 2052 2364
Part Number Nama : HT-5011 Level
Komponen : Plat Roda Pembajak 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4068 4704 4092 4104 4728
Schedule Receipts
Project On Hand 2 3 1 2 4
Net Requirement 4068 4702 4089 4103 4726
Plan Order Receipts 4070 4705 4090 4105 4730
Plan Order Realese 4705 4090 4105 4730 4100

Part Number Nama : HT-5012 Level


Komponen : Besi Lingkaran Roda 3 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 8136 9408 8184 8208 9456
Schedule Receipts 45 70 95
Project On Hand 6 1 1 0 0 0
Net Requirement 8085 9337 8088 8208 9456
Plan Order Receipts 8086 9338 8088 8208 9456
Plan Order Realese 8208 9456 8208 9456 9408

Part Number Nama : HT-5013 Level


Komponen : Pipa Dudukan Ujung 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4068 4704 4092 4104 4728
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 4068 4704 4092 4104 4728
Plan Order Receipts 4068 4704 4092 4104 4728
Plan Order Realese 4104 4728 4104 4728 4704
2278 1936 2352 2032 2352
Part Number Nama : HT-5014 Level
Komponen : Plat Alas Rangka Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 6834 5808 7056 6096 7056
Schedule Receipts 55 75 95
Project On Hand 8 0 0 2 2 2
Net Requirement 6771 5733 6961 6094 7054
Plan Order Receipts 6771 5733 6963 6096 7056
Plan Order Realese 6963 6096 7056 6144 6144

Part Number Nama : HT-5015 Level


Komponen : Rangka Utama Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9112 7744 9408 8128 9408
Schedule Receipts 50 80 110
Project On Hand 2 0 1 0 2 2
Net Requirement 9060 7664 9297 8128 9406
Plan Order Receipts 9060 7665 9297 8130 9408
Plan Order Realese 9297 8130 9408 8190 8193

Part Number Nama : HT-5016 Level


Komponen : Rangka Bawah Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9112 7744 9408 8128 9408
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 9112 7744 9408 8128 9408
Plan Order Receipts 9112 7744 9408 8128 9408
Plan Order Realese 9408 8128 9408 8192 8192

Part Number Nama : HT-5017 Level


Komponen : Rangka Penguat Bawah Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 2278 1936 2352 2032 2352
Schedule Receipts
Project On Hand 2 1 4 2 0
Net Requirement 2278 1934 2351 2028 2350
Plan Order Receipts 2280 1935 2355 2030 2350
Plan Order Realese 2355 2030 2350 2050 2050

Part Number Nama : HT-5018 Level


Komponen : Cincin Penguat Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9112 7744 9408 8128 9408
Schedule Receipts 45 70 95
Project On Hand 3 0 0 1 1 1
Net Requirement 9064 7674 9313 8127 9407
Plan Order Receipts 9064 7674 9314 8128 9408
Plan Order Realese 7674 9314 8128 9408 8192
4704 4064 4704 4096 4096
Part Number Nama : HT-5019 Level
Komponen : Besi Strip Jari-Jari Roda Pembajak 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4704 4064 4704 4096 4096
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 4704 4064 4704 4096 4096
Plan Order Receipts 4704 4064 4704 4096 4096
Plan Order Realese 4064 4704 4096 4096 4736

Part Number Nama : HT-5020 Level


Komponen : Mata Pembajak 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4704 4064 4704 4096 4096
Schedule Receipts
Project On Hand 1 2 3 2 1
Net Requirement 4704 4063 4702 4093 4094
Plan Order Receipts 4705 4065 4705 4095 4095
Plan Order Realese 4705 4095 4095 4735 4100

Part Number Nama : HT-5021 Level


Komponen : Mata Pembajak 3 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 14112 12192 14112 12288 12288
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 14112 12192 14112 12288 12288
Plan Order Receipts 14112 12192 14112 12288 12288
Plan Order Realese 14112 12288 12288 14208 12288
5290 4580 5290 4610 4600
Part Number Nama : HT-5022 Level
Komponen : Mata Pembajak 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 21160 18320 21160 18440 18400
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 21160 18320 21160 18440 18400
Plan Order Receipts 21160 18320 21160 18440 18400
Plan Order Realese 21160 18440 18400 21320 18440

Part Number Nama : HT-5023 Level


Komponen : Plat Roda Pembajak 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10580 9160 10580 9220 9200
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 10580 9160 10580 9220 9200
Plan Order Receipts 10580 9160 10580 9220 9200
Plan Order Realese 9220 9200 10660 9220 10660

Part Number Nama : HT-5024 Level


Komponen : Besi Lingkaran Roda 4 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10580 9160 10580 9220 9200
Schedule Receipts 55 75 95
Project On Hand 5 0 0 0 0 0
Net Requirement 10520 9085 10485 9220 9200
Plan Order Receipts 10520 9085 10485 9220 9200
Plan Order Realese 9085 10485 9220 9200 10660

Part Number Nama : HT-5025 Level


Komponen : Pipa Dudukan Ujung 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 15870 13740 15870 13830 13800
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 15870 13740 15870 13830 13800
Plan Order Receipts 15870 13740 15870 13830 13800
Plan Order Realese 13830 13800 15990 13830 15990

Part Number Nama : HT-5026 Level


Komponen : Mata Pembajak 4 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10580 9160 10580 9220 9200
Schedule Receipts 50 80 110
Project On Hand 4 1 2 2 1 2
Net Requirement 10526 9079 10468 9218 9199
Plan Order Receipts 10527 9081 10470 9219 9201
Plan Order Realese 9081 10470 9219 9201 10659

Part Number Nama : HT-5027 Level


Komponen : Besi Strip Jari-Jari Roda Pembajak 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 5290 4580 5290 4610 4600
Schedule Receipts
Project On Hand 2 0 2 0 2
Net Requirement 5290 4578 5290 4608 4600
Plan Order Receipts 5292 4578 5292 4608 4602
Plan Order Realese 4608 4602 5328 4611 5331
4572 5289 4581 5289 4611
Part Number Nama : HT-5028 Level
Komponen : Penyangga Mata Pembajak 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 4572 5289 4581 5289 4611
Schedule Receipts 45 70 95
Project On Hand 4 1 2 1 1 1
Net Requirement 4523 5218 4484 5288 4610
Plan Order Receipts 4524 5220 4485 5289 4611
Plan Order Realese 5220 4485 5289 4611 4599

Part Number Nama : HT-5029 Level


Komponen : Penyangga Mata Pembajak 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9144 10578 9162 10578 9222
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 9144 10578 9162 10578 9222
Plan Order Receipts 9144 10578 9162 10578 9222
Plan Order Realese 10578 9162 10578 9222 9198

Part Number Nama : HT-5030 Level


Komponen : Plat Pintu Dudukan 1 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 9144 10578 9162 10578 9222
Schedule Receipts
Project On Hand 1 3 1 3 1
Net Requirement 9144 10577 9159 10577 9219
Plan Order Receipts 9145 10580 9160 10580 9220
Plan Order Realese 10580 9160 10580 9220 9200

Part Number Nama : HT-5031 Level


Komponen
Part Number Nama
Komponen : Sarang As A Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 13716 15867 13743 15867 13833
Schedule Receipts 55 75 95
Project On Hand 3 1 1 0 0 0
Net Requirement 13658 15791 13647 15867 13833
Plan Order Receipts 13659 15792 13647 15867 13833
Plan Order Realese 13647 15867 13833 13797 15993
10581 9159 10581 9219 9201
Part Number Nama : HT-5032 Level
Komponen : Besi Pemutar As Pembajak A Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10581 9159 10581 9219 9201
Schedule Receipts
Project On Hand 1 0 1 0 1
Net Requirement 10581 9158 10581 9218 9201
Plan Order Receipts 10582 9158 10582 9218 9202
Plan Order Realese 10582 9218 9202 10658 9220
3342 3048 3531 3039 3531
Part Number Nama : HT-5033 Level
Komponen : Penyangga Mata Pembajak 3 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 6684 6096 7062 6078 7062
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 6684 6096 7062 6078 7062
Plan Order Receipts 6684 6096 7062 6078 7062
Plan Order Realese 7062 6078 7062 6138 6162

Part Number Nama : HT-5034 Level


Komponen : Penyangga Mata Pembajak 4 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10026 9144 10593 9117 10593
Schedule Receipts 50 80 110
Project On Hand 6 0 1 3 1 3
Net Requirement 9970 9064 10482 9114 10592
Plan Order Receipts 9970 9065 10485 9115 10595
Plan Order Realese 10485 9115 10595 9205 9245

Part Number Nama : HT-5035 Level


Komponen : Strip Mata Pembajak 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10026 9144 10593 9117 10593
Schedule Receipts 45 70 95
Project On Hand 5 2 0 2 2 2
Net Requirement 9976 9072 10498 9115 10591
Plan Order Receipts 9978 9072 10500 9117 10593
Plan Order Realese 10500 9117 10593 9207 9243

Part Number Nama : HT-5036 Level


Komponen : Plat Penutup Pipa Dudukan 2 Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 10026 9144 10593 9117 10593
Schedule Receipts
Project On Hand 0 0 0 0 0
Net Requirement 10026 9144 10593 9117 10593
Plan Order Receipts 10026 9144 10593 9117 10593
Plan Order Realese 10593 9117 10593 9207 9243

Part Number Nama : HT-5037 Level


Komponen : Sarang As B Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 6684 6096 7062 6078 7062
Schedule Receipts 55 75 95
Project On Hand 4 2 2 1 1 1
Net Requirement 6625 6019 6965 6077 7061
Plan Order Receipts 6627 6021 6966 6078 7062
Plan Order Realese 6078 7062 6138 6162 7098
3340 3050 3530 3040 3530
Part Number Nama : HT-5038 Level
Komponen : Besi Pemutar AS Pembajak B Lead Time
Periode PD 1 2 3 4 5
Gross Requirement 3340 3050 3530 3040 3530
Schedule Receipts 50 80 110
Project On Hand 5 1 1 1 1 1
Net Requirement 3285 2969 3419 3039 3529
Plan Order Receipts 3286 2970 3420 3040 3530
Plan Order Realese 2970 3420 3040 3530 3070
:5 Jumlah (Unit) :1 Current :0
:5 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
2365 2050 2365 2355 2350 2030 2035 2350 2355 2030

0 0 1 0 0 0 1 1 0 0
2364 2050 2365 2354 2350 2030 2035 2349 2354 2030
2364 2050 2366 2354 2350 2030 2036 2350 2354 2030
2030 2036 2350 2354 2030 2352 2032 2350 2035 2350
2365 2050 2365 2355 2350 2030 2035 2350 2355 2030
:5 Jumlah (Unit) :2 Current :4
:3 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
2052 2364 2352 2352 2034 2034 2352 2352 2028 2352

4 0 3 1 2 3 1 4 1 4
2051 2360 2352 2349 2033 2032 2349 2351 2024 2351
2055 2360 2355 2350 2035 2035 2350 2355 2025 2355
2350 2035 2035 2350 2355 2025 2355 2025 2355 2034
1026 1182 1176 1176 1017 1017 1176 1176 1014 1176
:5 Jumlah (Unit) :2 Current :3
:2 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
2052 2364 2352 2352 2034 2034 2352 2352 2028 2352

3 4 2 0 1 2 0 3 0 3
2052 2361 2348 2350 2034 2033 2350 2352 2025 2352
2055 2365 2350 2350 2035 2035 2350 2355 2025 2355
2350 2350 2035 2035 2350 2355 2025 2355 2025 2355

:5 Jumlah (Unit) :3 Current :0


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
3078 3546 3528 3528 3051 3051 3528 3528 3042 3528

0 0 0 0 0 0 0 0 0 0
3078 3546 3528 3528 3051 3051 3528 3528 3042 3528
3078 3546 3528 3528 3051 3051 3528 3528 3042 3528
3528 3528 3051 3051 3528 3528 3042 3528 3042 3528

:5 Jumlah (Unit) :4 Current :0


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
4104 4728 4704 4704 4068 4068 4704 4704 4056 4704

0 0 0 0 0 0 0 0 0 0
4104 4728 4704 4704 4068 4068 4704 4704 4056 4704
4104 4728 4704 4704 4068 4068 4704 4704 4056 4704
4704 4704 4068 4068 4704 4704 4056 4704 4056 4704

:5 Jumlah (Unit) :1 Current :0


:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
1026 1182 1176 1176 1017 1017 1176 1176 1014 1176

0 0 0 0 1 0 0 0 0 0
1026 1182 1176 1176 1017 1016 1176 1176 1014 1176
1026 1182 1176 1176 1018 1016 1176 1176 1014 1176
1176 1176 1018 1016 1176 1176 1014 1176 1014 1176
3078 3546 3528 3528 3051 3051 3528 3528 3048 3528
:5 Jumlah (Unit) :2 Current :0
:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056

0 0 0 0 0 0 0 0 0 0
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056
7092 7056 7056 6102 6102 7056 7056 6096 7056 6084

:5 Jumlah (Unit) :3 Current :7


:1 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
9234 10638 10584 10584 9153 9153 10584 10584 9144 10584

1 1 1 1 1 1 1 1 1 1
9233 10637 10583 10583 9152 9152 10583 10583 9143 10583
9234 10638 10584 10584 9153 9153 10584 10584 9144 10584
10638 10584 10584 9153 9153 10584 10584 9144 10584 9126

:5 Jumlah (Unit) :2 Current :0


:3 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056

0 0 0 0 0 0 0 0 0 0
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056
6156 7092 7056 7056 6102 6102 7056 7056 6096 7056
7056 6102 6102 7056 7056 6096 7056 6084 7056 6102

:5 Jumlah (Unit) :4 Current :0


:3 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
12312 14184 14112 14112 12204 12204 14112 14112 12192 14112

0 0 0 0 0 0 0 0 0 0
12312 14184 14112 14112 12204 12204 14112 14112 12192 14112
12312 14184 14112 14112 12204 12204 14112 14112 12192 14112
14112 12204 12204 14112 14112 12192 14112 12168 14112 12204
2052 2364 2352 2352 2034 2034 2352 2352 2032 2352
:5 Jumlah (Unit) :2 Current :0
:1 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
4104 4728 4704 4704 4068 4068 4704 4704 4064 4704

0 2 3 4 1 3 4 0 1 2
4100 4728 4702 4701 4064 4067 4701 4700 4064 4703
4100 4730 4705 4705 4065 4070 4705 4700 4065 4705
4730 4705 4705 4065 4070 4705 4700 4065 4705 4055

:5 Jumlah (Unit) :4 Current :6


:3 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
8208 9456 9408 9408 8136 8136 9408 9408 8128 9408

0 0 0 0 0 0 0 0 0 0
8208 9456 9408 9408 8136 8136 9408 9408 8128 9408
8208 9456 9408 9408 8136 8136 9408 9408 8128 9408
9408 8136 8136 9408 9408 8128 9408 8112 9408 8136

:5 Jumlah (Unit) :2 Current :0


:3 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
4104 4728 4704 4704 4068 4068 4704 4704 4064 4704

0 0 0 0 0 0 0 0 0 0
4104 4728 4704 4704 4068 4068 4704 4704 4064 4704
4104 4728 4704 4704 4068 4068 4704 4704 4064 4704
4704 4068 4068 4704 4704 4064 4704 4056 4704 4068
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352
:5 Jumlah (Unit) :3 Current :8
:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
6144 6144 7104 6144 7104 7056 7056 6096 6096 7056

2 2 2 2 2 2 2 2 2 2
6142 6142 7102 6142 7102 7054 7054 6094 6094 7054
6144 6144 7104 6144 7104 7056 7056 6096 6096 7056
7104 6144 7104 7056 7056 6096 6096 7056 7056 6096

:5 Jumlah (Unit) :4 Current :2


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408

0 1 0 1 0 0 0 2 1 1
8190 8192 9471 8192 9471 9408 9408 8128 8126 9407
8190 8193 9471 8193 9471 9408 9408 8130 8127 9408
9471 8193 9471 9408 9408 8130 8127 9408 9408 8127

:5 Jumlah (Unit) :4 Current :2


:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408

0 0 0 0 0 0 0 0 0 0
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408
9472 8192 9472 9408 9408 8128 8128 9408 9408 8128

:5 Jumlah (Unit) :1 Current :0


:2 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
2048 2048 2368 2048 2368 2352 2352 2032 2032 2352

2 4 1 3 0 3 1 4 2 0
2048 2046 2364 2047 2365 2352 2349 2031 2028 2350
2050 2050 2365 2050 2365 2355 2350 2035 2030 2350
2365 2050 2365 2355 2350 2035 2030 2350 2355 2030

:5 Jumlah (Unit) :4 Current :3


:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408

1 1 1 1 1 1 1 1 1 1
8191 8191 9471 8191 9471 9407 9407 8127 8127 9407
8192 8192 9472 8192 9472 9408 9408 8128 8128 9408
8192 9472 8192 9472 9408 9408 8128 8128 9408 9408
4736 4096 4736 4704 4704 4064 4064 4704 4704 4064
:5 Jumlah (Unit) :1 Current :0
:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
4736 4096 4736 4704 4704 4064 4064 4704 4704 4064

0 0 0 0 0 0 0 0 0 0
4736 4096 4736 4704 4704 4064 4064 4704 4704 4064
4736 4096 4736 4704 4704 4064 4064 4704 4704 4064
4096 4736 4704 4704 4064 4064 4704 4704 4064 4704

:5 Jumlah (Unit) :1 Current :0


:2 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
4736 4096 4736 4704 4704 4064 4064 4704 4704 4064

0 4 3 4 0 1 2 3 4 0
4735 4096 4732 4701 4700 4064 4063 4702 4701 4060
4735 4100 4735 4705 4700 4065 4065 4705 4705 4060
4735 4705 4700 4065 4065 4705 4705 4060 4705 4065

:5 Jumlah (Unit) :3 Current :0


:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
14208 12288 14208 14112 14112 12192 12192 14112 14112 12192

0 0 0 0 0 0 0 0 0 0
14208 12288 14208 14112 14112 12192 12192 14112 14112 12192
14208 12288 14208 14112 14112 12192 12192 14112 14112 12192
14208 14112 14112 12192 12192 14112 14112 12192 14112 12192
5330 4610 5330 5290 5290 4570 4580 5290 5292 4410
:5 Jumlah (Unit) :4 Current :0
:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
21320 18440 21320 21160 21160 18280 18320 21160 21168 17640
0 0 0 0 0 0 0 0 0 0
21320 18440 21320 21160 21160 18280 18320 21160 21168 17640
21320 18440 21320 21160 21160 18280 18320 21160 21168 17640
21320 21160 21160 18280 18320 21160 21168 17640 20280 18280

:5 Jumlah (Unit) :2 Current :0


:3 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
10660 9220 10660 10580 10580 9140 9160 10580 10584 8820

0 0 0 0 0 0 0 0 1 1
10660 9220 10660 10580 10580 9140 9160 10580 10584 8819
10660 9220 10660 10580 10580 9140 9160 10580 10585 8820
10580 10580 9140 9160 10580 10585 8820 10140 9140 10580

:5 Jumlah (Unit) :2 Current :5


:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
10660 9220 10660 10580 10580 9140 9160 10580 10584 8820

0 0 0 0 0 0 0 0 1 1
10660 9220 10660 10580 10580 9140 9160 10580 10584 8819
10660 9220 10660 10580 10580 9140 9160 10580 10585 8820
9220 10660 10580 10580 9140 9160 10580 10585 8820 10140

:5 Jumlah (Unit) :3 Current :0


:3 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
15990 13830 15990 15870 15870 13710 13740 15870 15876 13230

0 0 0 0 0 0 0 0 4 4
15990 13830 15990 15870 15870 13710 13740 15870 15876 13226
15990 13830 15990 15870 15870 13710 13740 15870 15880 13230
15870 15870 13710 13740 15870 15880 13230 15210 13710 15870

:5 Jumlah (Unit) :2 Current :4


:1 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
10660 9220 10660 10580 10580 9140 9160 10580 10584 8820

1 0 2 0 1 2 1 2 2 2
10658 9219 10660 10578 10580 9139 9158 10579 10582 8818
10659 9219 10662 10578 10581 9141 9159 10581 10584 8820
9219 10662 10578 10581 9141 9159 10581 10584 8820 10140

:5 Jumlah (Unit) :1 Current :0


:3 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
5330 4610 5330 5290 5290 4570 4580 5290 5292 4410

0 1 2 1 0 2 0 2 2 2
5328 4610 5329 5288 5289 4570 4578 5290 5290 4408
5328 4611 5331 5289 5289 4572 4578 5292 5292 4410
5289 5289 4572 4578 5292 5292 4410 5070 4569 5290
4599 5331 4608 5331 5289 5292 4569 4581 5289 5292
:5 Jumlah (Unit) :1 Current :4
:1 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
4599 5331 4608 5331 5289 5292 4569 4581 5289 5292

1 1 1 1 1 1 1 1 1 1
4598 5330 4607 5330 5288 5291 4568 4580 5288 5291
4599 5331 4608 5331 5289 5292 4569 4581 5289 5292
5331 4608 5331 5289 5292 4569 4581 5289 5292 4410

:5 Jumlah (Unit) :2 Current :0


:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
9198 10662 9216 10662 10578 10584 9138 9162 10578 10584

0 0 0 0 0 0 0 0 0 0
9198 10662 9216 10662 10578 10584 9138 9162 10578 10584
9198 10662 9216 10662 10578 10584 9138 9162 10578 10584
10662 9216 10662 10578 10584 9138 9162 10578 10584 8820

:5 Jumlah (Unit) :2 Current :0


:1 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
9198 10662 9216 10662 10578 10584 9138 9162 10578 10584

3 1 0 3 0 1 3 1 3 4
9197 10659 9215 10662 10575 10584 9137 9159 10577 10581
9200 10660 9215 10665 10575 10585 9140 9160 10580 10585
10660 9215 10665 10575 10585 9140 9160 10580 10585 8820

:5 Jumlah (Unit) :3 Current :3


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
13797 15993 13824 15993 15867 15876 13707 13743 15867 15876

0 0 0 0 0 0 0 0 0 0
13797 15993 13824 15993 15867 15876 13707 13743 15867 15876
13797 15993 13824 15993 15867 15876 13707 13743 15867 15876
13824 15993 15867 15876 13707 13743 15867 15876 13230 15210
10659 9219 10662 10578 10581 9141 9159 10581 10584 8820
:5 Jumlah (Unit) :1 Current :0
:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
10659 9219 10662 10578 10581 9141 9159 10581 10584 8820

0 1 1 1 0 1 0 1 1 1
10658 9219 10661 10577 10580 9141 9158 10581 10583 8819
10658 9220 10662 10578 10580 9142 9158 10582 10584 8820
10662 10578 10580 9142 9158 10582 10584 8820 10140 9140
3069 3081 3549 3072 3549 3531 3528 3051 3039 3531
:5 Jumlah (Unit) :2 Current :0
:2 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
6138 6162 7098 6144 7098 7062 7056 6102 6078 7062

0 0 0 0 0 0 0 0 0 0
6138 6162 7098 6144 7098 7062 7056 6102 6078 7062
6138 6162 7098 6144 7098 7062 7056 6102 6078 7062
7098 6144 7098 7062 7056 6102 6078 7062 6858 5820

:5 Jumlah (Unit) :3 Current :6


:2 Lot Size :5 Inventory
6 7 8 9 10 11 12 13 14 15
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593

1 3 1 0 3 0 1 3 1 3
9204 9242 10644 9215 10647 10590 10584 9152 9114 10592
9205 9245 10645 9215 10650 10590 10585 9155 9115 10595
10645 9215 10650 10590 10585 9155 9115 10595 10285 8730

:5 Jumlah (Unit) :3 Current :0


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593
2 2 2 2 2 2 2 2 2 2
9205 9241 10645 9214 10645 10591 10582 9151 9115 10591
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593
10647 9216 10647 10593 10584 9153 9117 10593 10287 8730

:5 Jumlah (Unit) :3 Current :0


:2 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593

0 0 0 0 0 0 0 0 0 0
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593
9207 9243 10647 9216 10647 10593 10584 9153 9117 10593
10647 9216 10647 10593 10584 9153 9117 10593 10287 8730

:5 Jumlah (Unit) :2 Current :4


:3 Lot Size :3 Inventory
6 7 8 9 10 11 12 13 14 15
6138 6162 7098 6144 7098 7062 7056 6102 6078 7062

1 1 1 1 1 1 1 1 1 1
6137 6161 7097 6143 7097 7061 7055 6101 6077 7061
6138 6162 7098 6144 7098 7062 7056 6102 6078 7062
6144 7098 7062 7056 6102 6078 7062 6858 5820 6684
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530
:5 Jumlah (Unit) :1 Current :5
:1 Lot Size :2 Inventory
6 7 8 9 10 11 12 13 14 15
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530

1 1 1 1 1 1 1 1 1 1
3069 3079 3549 3069 3549 3529 3529 3049 3039 3529
3070 3080 3550 3070 3550 3530 3530 3050 3040 3530
3080 3550 3070 3550 3530 3530 3050 3040 3530 3430
16 17
2352 2031
Rakitan 1
0 1
2352 2031
2352 2032
2050 2050
2352 2031

16 17
2028 2352
Rakitan 4
1 4
2024 2351
2025 2355
2352 2046
1014 1176

16 17
2028 2352
Rakitan 4
0 3
2025 2352
2025 2355
2034 2352

16 17
3042 3528
Rakitan 4
0 0
3042 3528
3042 3528
3051 3528

16 17

Rakitan 4
4056 4704
Rakitan 4
0 0
4056 4704
4056 4704
4068 4704

16 17
1014 1176
Rakitan 4
0 0
1014 1176
1014 1176
1017 1176
3042 3528

16 17
6084 7056
Rakitan 5
0 0
6084 7056
6084 7056
7056 6102

16 17
9126 10584
Rakitan 5
1 1
9125 10583
9126 10584
10584 9153

16 17
6084 7056
Rakitan 5
0 0
Rakitan 5

6084 7056
6084 7056
7056 6138

16 17
12168 14112
Rakitan 5
0 0
12168 14112
12168 14112
14112 12276
2028 2352

16 17
4056 4704
Rakitan 6
1 2
4054 4703
4055 4705
4705 4068

16 17
8112 9408
Rakitan 6
0 0
8112 9408
8112 9408
9408 8184

16 17
4056 4704
Rakitan 6
0 0
4056 4704
4056 4704
4704 4092
2352 2032

16 17
7056 6096
Rakitan 8
2 2
7054 6094
7056 6096
6834 5808

16 17
9408 8128
Rakitan 8
1 0
9407 8127
9408 8127
9112 7744

16 17
9408 8128
Rakitan 8
0 0
9408 8128
9408 8128
9112 7744

16 17
2352 2032
Rakitan 8
3 1
2352 2029
2355 2030
2278 1936

Rakitan 8
16 17
9408 8128
Rakitan 8
1 1
9407 8127
9408 8128
8128 9112
4704 4064

16 17
4704 4064
Rakitan 9
0 0
4704 4064
4704 4064
4064 4704

16 17
4704 4064
Rakitan 9
1 2
4704 4063
4705 4065
4704 4064

16 17
14112 12192
Rakitan 9
0 0
14112 12192
14112 12192
14112 12192
5070 4570

16 17
20280 18280
Rakitan 10
Rakitan 10
0 0
20280 18280
20280 18280
21160 18320

16 17
10140 9140
Rakitan 10
1 1
10139 9139
10140 9140
9160 10580

16 17
10140 9140
Rakitan 10
1 1
10139 9139
10140 9140
9140 10580

16 17
15210 13710
Rakitan 10
4 4
15206 13706
15210 13710
13740 15870

16 17
10140 9140
Rakitan 10
2 0
10138 9138
10140 9138
Rakitan 10

9138 10580

16 17
5070 4570
Rakitan 10
2 1
5068 4568
5070 4569
4580 5290
4410 5070

16 17
4410 5070
Rakitan 11
1 1
4409 5069
4410 5070
5070 4572

16 17
8820 10140
Rakitan 11
0 0
8820 10140
8820 10140
10140 9144

16 17
8820 10140
Rakitan 11
4 4
8816 10136
8820 10140
10140 9144

Rakitan 11
16 17
13230 15210
Rakitan 11
0 0
13230 15210
13230 15210
13716 15867
10140 9140

16 17
10140 9140
Rakitan 12
1 1
10139 9139
10140 9140
10581 9159
3429 2910

16 17
6858 5820
Rakitan 13
0 0
6858 5820
6858 5820
6684 6096

16 17
10287 8730
Rakitan 13
1 1
10284 8729
10285 8730
10026 9144

16 17
10287 8730
Rakitan 13
Rakitan 13
2 2
10285 8728
10287 8730
10026 9144

16 17
10287 8730
Rakitan 13
0 0
10287 8730
10287 8730
10026 9144

16 17
6858 5820
Rakitan 13
1 1
6857 5819
6858 5820
6096 7062
3430 2910

16 17
3430 2910
Rakitan 14
1 1
3429 2909
3430 2910
2910 3340

You might also like