MEMORIA DE CALCULO DISEÑO DE LOSA MACIZA

PROYECTO MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE SALUD ESPECIALIZADOS DEL HOSPITAL REGIONAL DE LORETO "FELIPE ARRIOLA IGLESIAS"EN EL DISTRITO DE PUNCHANA - PROVINCNA DE MAYNAS - DEPARTAMENTO DE LORETO
ENTIDAD GOBIERNO REGIONAL
UBICACIÓN DISTRITO DE PUNCHANA - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
MODULO MODULO B1 - 2do NIVEL

A. DATOS GEOMETRICOS DE LA LOSA MACIZA E=0.20M

DIRECCION X-X DATOS: f'c= 280 fy= 4200

TRAMO B1-1/B1-2 B1-2 B1-1/B1-2


F. CENTRAL F. COLUMNA F. CENTRAL
h= 20 20 20
b= 375 370 365
d= 18 18 18
Asmín= 13.500 13.320 13.140

B. DISEÑO POR FLEXIONY CORTANTE

TRAMO TRAMO 1 TRAMO 2 TRAMO 3 TRAMO 4 TRAMO 5 TRAMO 6 TRAMO 7 TRAMO 8


LONGITUD DEL TRAMO 7.200 6.850 6.850 7.630 7.050 6.900 6.900 7.050
EJE (-) -8.170 8.940 -8.940 10.260 -10.260 9.330 -9.330 10.870 -10.870 10.370 -10.370 9.830 -9.830 10.900 -10.900 0.000
MOMENTOS (Tn-m)
F.C. (+) 6.650 6.130 6.390 5.370 7.350 5.490 7.620 6.210
CORTANTES (Tn) EJE V act. -9.530 7.580 -7.580 8.640 -8.640 8.580 -8.580 8.150 -8.150 8.950 -8.950 7.730 -7.730 8.920 -8.920 4.510
φ=0.85 F.C. V conc. 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88
Verificacion V conc > V act OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
(-) 11.82 13.37 12.92 15.39 14.79 13.97 13.47 16.33 15.66 15.56 14.95 14.73 14.18 16.37 15.70 0.00
As calculado (cm2)
(+) 9.90 9.12 9.51 7.98 10.96 8.16 11.37 9.24
(-) 13.50 13.50 13.50 15.39 14.79 13.97 13.50 16.33 15.66 15.56 14.95 14.73 14.18 16.37 15.70 13.50
As requerido (cm2)
(+) 13.50 13.50 13.50 13.50 13.50 13.50 13.50 13.50
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
f varilla elegida
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
(-) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
As provisto (cm2)
(+) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
Cantidad de varillas ( - )und 20.00 20.00 20.00 22.00 21.00 20.00 20.00 23.00 23.00 22.00 22.00 21.00 20.00 24.00 23.00 20.00
( + )und 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Espaciamiento ( - )cm 20.00 20.00 20.00 15.00 20.00 20.00 20.00 15.00 15.00 15.00 15.00 20.00 20.00 15.00 15.00 20.00
( + )cm 20.00 20.00 10.00 20.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 20.00 20.00 20.00 20.00
EJE (-) -5.960 13.340 -11.640 10.700 -10.870 11.650 -12.380 12.970 -12.780 11.670 -10.940 10.460 -10.250 12.110 -13.360 6.460
MOMENTOS (Tn-m)
F.C1. (+) 6.820 4.370 4.580 5.700 4.640 4.880 4.890 6.130
CORTANTES (Tn) EJE V act. -9.530 7.580 -7.580 8.640 -8.640 8.580 -8.580 8.150 -8.150 8.950 -8.950 7.730 -7.730 8.920 -8.920 4.510
φ=0.85 F.C1. V conc. 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21
Verificacion V conc > V act OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
(-) 8.66 20.15 16.74 16.07 15.65 17.53 17.78 19.57 18.34 17.56 15.75 15.70 14.78 18.24 19.15 9.62
As calculado (cm2)
(+) 10.16 6.48 6.79 8.47 6.88 7.24 7.26 9.12
(-) 13.32 20.15 16.74 16.07 15.65 17.53 17.78 19.57 18.34 17.56 15.75 15.70 14.78 18.24 19.15 13.32
As requerido (cm2)
(+) 13.32 13.32 13.32 13.32 13.32 13.32 13.32 13.32
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
f varilla elegida
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
(-) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
As provisto (cm2)
(+) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
Cantidad de varillas ( - )und 19.00 29.00 24.00 23.00 23.00 25.00 26.00 28.00 26.00 25.00 23.00 23.00 21.00 26.00 27.00 19.00
( + )und 19.00 19.00 19.00 19.00 19.00 19.00 19.00 19.00
Espaciamiento ( - )cm 20.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 20.00 15.00 15.00 20.00
( + )cm 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 20.00 10.00 10.00 20.00
EJE (-) -5.600 13.590 -10.820 9.330 -10.280 10.900 -11.640 12.530 -11.650 11.120 -10.590 10.130 -9.880 11.920 -12.860 6.080
MOMENTOS (Tn-m)
F.C. (+) 6.820 4.290 4.570 5.700 4.600 4.830 4.840 6.140
CORTANTES (Tn) EJE V act. -1.370 13.300 -10.030 10.400 -11.800 10.600 -11.600 12.350 -12.950 12.600 -10.560 9.860 -9.760 10.980 -13.500 10.020
φ=0.85 F.C. V conc. 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21 50.21
Verificacion V conc > V act OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
(-) 8.14 20.54 15.58 13.98 14.81 16.38 16.73 18.90 16.75 16.72 15.25 15.20 14.25 17.95 18.44 9.05
As calculado (cm2)
(+) 10.16 6.36 6.78 8.47 6.82 7.17 7.18 9.14
(-) 13.14 20.54 15.58 13.98 14.81 16.38 16.73 18.90 16.75 16.72 15.25 15.20 14.25 17.95 18.44 13.14
As requerido (cm2)
(+) 13.14 13.14 13.14 13.14 13.14 13.14 13.14 13.14
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
f varilla elegida
φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8" φ 3/8"
(-) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
As provisto (cm2)
(+) 0.71 0.71 0.71 0.71 0.71 0.71 0.71 0.71
Cantidad de varillas ( - )und 18.51 28.93 21.94 19.68 20.86 23.07 23.56 26.62 23.58 23.55 21.48 21.41 20.07 25.29 25.97 18.51
( + )und 18.51 18.51 18.51 18.51 18.51 18.51 18.51 18.51
Espaciamiento ( - )cm 20.00 15.00 15.00 20.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 20.00 15.00 15.00 20.00
( + )cm 20.00 10.00 10.00 20.00 10.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 10.00 20.00 10.00 20.00 10.00 10.00 20.00

Página 1