04 Ride Through System (Level 2)
04 Ride Through System (Level 2)
Training department
General
RT 400 kVA
RT 750 kVA
RT 1250 kVA
Hitec
spikes Ride Through
sags RFI System
Mains Customer
short
interruptions Quality
Power
frequency transients
variation
Percentage
of Events
25,0%
20,0% Residual
grid voltage
0,0%
s
s
0m
0m
1s
3s
s
10
s
50
20
0s
1-
60
0,5
-
0-
3-
20
18
-
10
20
-
60
System design
Choke
coil
Load
Electro
Magnetic
g Alternator
coupling
Pony motor
Flywheel Base frame
(bearing less)
flex coupling
Flywheel bearings
flex coupling
(double row
spherical roller bearings)
50 Years of Continuous Operation
Mechanical build-up
The bearings
The same specifications and features as the other Hitec UPS systems :
– Output frequency, output voltage, filter working, short circuit
behaviour power factor improvement.
behaviour, improvement
1 min speed up time needed for 1 sec mains failure at full load
Alternator
1500
Rpm
(50 Hz)
Q3
mains Q1 Q2 load
AC AC
DC AC
2
AVR 3 4
Emergency Operation
Q3
mains Q1 Q2 load
1
AC AC
DC AC
2
AVR 3 4
Q3
mains Q1 Q2 load
1
AC AC
DC AC
2
AVR 3 4
Normal Operation
Q3
mains Q1 Q2 load
AC AC
DC AC
2
AVR 3
4
recharge
Why paralleling :
- Higher power ratings
- Redundancy
- Additional RT time
- Increased reliability