Hitec Power Protection bv

Training department

Rotary Ride Through system (Level 2)

General

RT 400 kVA
RT 750 kVA
RT 1250 kVA

50 Years of Continuous Operation


Functions of the Ride Through

Hitec
spikes Ride Through
sags RFI System

Mains Customer
short
interruptions Quality
Power
frequency transients
variation

1. Quality frequency: 50/60 Hz +/- 1,5% Static & Dynamic


2. Quality voltage:400/480 V (Un) +/- 1% Static & +/- 10% Dynamic
3. Clean sine-wave

50 Years of Continuous Operation

Why Ride Through Systems?

Percentage
of Events
25,0%

20,0% Residual
grid voltage

15,0% 90% .. 85%


85% .. 70%
10,0% 70% .. 40%
40% .. 1%
5,0% 1% .. 0%

0,0%
s

s
0m

0m

1s

3s

s
10

s
50

20

0s
1-

60
0,5
-

0-

3-
20

18
-
10

20

-
60

50 Years of Continuous Operation Fault Duration


The principle

50 Years of Continuous Operation

System design

Choke
coil
Load

15 sec ride through time Rotating


filter

Flywheel Electro Magnetic Coupling Alternator

50 Years of Continuous Operation


System design

Electro
Magnetic
g Alternator
coupling
Pony motor
Flywheel Base frame
(bearing less)
flex coupling
Flywheel bearings
flex coupling
(double row
spherical roller bearings)
50 Years of Continuous Operation

Mechanical build-up

Ventilator The transfer of energy from the flywheel


to the alternator is done with the EMC

50 Years of Continuous Operation


The flywheel

Weights : RT 400 1900 kg


: RT 750 3700 kg
: RT 1250 5000 kg
Flywheel speed all types : 2900 rpm

50 Years of Continuous Operation

The bearings

The high performance roller bearings

RT 400 and RT 750 : Oil bath lubrication


RT 1250 : Oil circulation lubrication

50 Years of Continuous Operation


The pony motor

Accelerating the flywheel up to 2900 rpm

50 Years of Continuous Operation

Cooling pony motor and EMC

Ventilator underneath the pony motor

50 Years of Continuous Operation


Key specifications

 The same specifications and features as the other Hitec UPS systems :
– Output frequency, output voltage, filter working, short circuit
behaviour power factor improvement.
behaviour, improvement

 Ride Through time >15 sec full load.

 High efficiency: >96%.

 1 min speed up time needed for 1 sec mains failure at full load

 Speed up time is 15 min when the flywheel is completely drained after


a mains failure in full load.

 Flywheel speed 2900 rpm.

 Maintenance similar to diesel UPS but without diesel maintenance.

50 Years of Continuous Operation

Mains Failure’s: Transfer to RT operation


2 sec mains failure (Full Load)
15 sec mains failure (Full Load)

Flywheel 2 min. speed-up time


2900
Rpm

15 min. speed-up time

Alternator
1500
Rpm
(50 Hz)

0 Normal Operation Normal Operation


RT Operation
Mains Failure Q1 Close
50 Years of Continuous Operation
Normal Operation

Q3

mains Q1 Q2 load

1 Main power flow

AC AC
DC AC

2
AVR 3 4

1 Mains provides active power


2 Alternator controls load voltage
3 DC to EMC is off
4 Pony motor keeps kinetic energy storage charged

50 Years of Continuous Operation

Emergency Operation

Q3

mains Q1 Q2 load

Main power flow

1
AC AC
DC AC

2
AVR 3 4

1 RT power module provides active power


2 Alternator controls load voltage
3 DC to EMC is on
4 Pony motor is switched off

50 Years of Continuous Operation


Back to normal Operation

Q3

mains Q1 Q2 load

Main power flow


synchronization

1
AC AC
DC AC

2
AVR 3 4

1 RT power module provides active power


2 Alternator controls load voltage
3 DC to EMC is on (RT system is synchronized to mains frequency)
4 Pony motor is switched off

50 Years of Continuous Operation

Normal Operation

Q3

mains Q1 Q2 load

1 Main power flow

AC AC
DC AC

2
AVR 3

4
recharge

1 active power provided by mains


2 Alternator controls the load voltage
3 DC to EMC is off
4 Recharge of the kinetic energy storage

50 Years of Continuous Operation


Single and parallel RT

< 4 second interruption


p

ƒ Why paralleling :
- Higher power ratings
- Redundancy
- Additional RT time
- Increased reliability

50 Years of Continuous Operation

Combination Ride Through & Genset

Can be used on all configurations and is easily integrated

ƒ Single or parallel system configurations


ƒ Interfacing (simple I/O interface)
ƒ Genset control (AMF or control by RT)
ƒ Genset startup time
ƒ Genset specifications
ƒ Redundant genset start option
ƒ Containerized versions
l d
load

50 Years of Continuous Operation


Hitec Power Protection bv
Training department

Rotary Ride Through system (Level 2)