TELOM~So & =
Pasa gaes [elem |e [8
ety Sota Teclgr ard ean trerZaoeavbenty | Oat | comma | Page: | tat
th mame :
‘ALL CLIENTS.
‘You ane nequesten —
1SSUE THE “No Or «TE FOR THE ABOVE MENTIONED PROJECT ACCORDING TO ZONING
SIGNATURE:..
.» Dave: 23 705 #2005
30 may 2005
TESOm
Een| The locations of DIC services as given on the NOC are approximate and the
Contractor is obliged to determine the exact location by cautious manual
‘excavation prior to commencing work activites,
. | The highest safety precautions are to be adopted while working in the vicinity of
DIC services to ensure safety of DIC services to avoid any consequential action,
2. Strcty only manual excavation should be done in vicinity of DIC serves and no 10| F any dificuly 1s experienced in locating the DIC services at site, then (DIC 7
machine excavation is allowed, TELECOM) should be contacted for assistance.
3.] The service corridor is allocated for DIC services and only DIC reserve the right 11] Any damages caused to DIC services shall be treated in accordance with ACT
to open manholes and excavate for any maintenance work and to lay new cables No, 6/2002 of the Government of Dubai concerning “Construction and Protection
to grant pernission for such acts within DIC corridor. Of Cable Networks for Dubai Intemet City’, and any fines end repair costs (i
any) shall be debited to the concerned Contractor.
| 4. | DIC services should be adequately protected and supported during excavation 12{ In case DIC manholes 7 manhole covers need to be raised / lowered due to
to ensure that no damage shall occur to those services. proposed works, then DIC / TELECOM should be notified of details for epproval.
5. | Surfaces to be reinstated to thelr original conditions ( asphalt / interlock J soft 13] After exposing DIC services in accordance with this NOG, the Contractor should
landscape ) upon completion of works. Contact DIC / TELECOM & SAMACOM for their inspection and further action.
8. | Any existing DIC services that ae ikely to lie under new vehide roads should be For new developments including buildings, cluster of buildings or master plan
encased by concrete with a minimum 150mm cover all around existing ducts developments requiring DIC Telecommunications services, please contact DIC
and cables, Telecom Department / PMO Unit for their approval ater obtaining this NOC from
the Zoning Authority. The contact details are provided below",
7. | No equipment 7 foundations should be placed over the existing DIC services 15) The: Contractor is obliged to contact DIC T TELECOM and SAMACOM prior to
(cables / ducts manholes). ‘commencing work at site, or immediately upon damaging any services on the
contacts below’,
8.| DIC existing underground cebles 7 ducts are laid at dey
120mm from the existing ground level._If for ar
be raised / lowered
*SAMACOM Saeed Baswaidan
*DIC | TELECOM ~~» Malek Hunnon
“DIC! TELECOM! PMO - Noora Al-Felasi
Marwa E-Daawi
(04-391 3810)
(04-391 4022)
(04 391 4080 )
(04- 391 3555)
2 MAY 2005