Summary of inspection sheet record

N° Date of request Inspection sheet N°

1 4 to 9/12/23 BN-9-0253

2 5 to 9/12/23 BN-9-0257

3 8 to 15/12/23 BN-9-0259

4 11 to 16/12/23 BN-9-0261

5 12/12/2023 BN-9-0264

6 12 to 16/12/23 BN-9-0265

7 13 to 16/12/23 BN-9-0266

10

11

12

13

14

15

16

17

18

19
20

21

22

23

24

25

26
Site: Groin A Month: December

Description Section Date of inspection

8t tetrapod installation +150 to +300m

2-3t stone placing +60 to +100m SS

100-500kg Slope trimming +300m RH

8t tetrapod installation +150 to +300m

1-2t Stone placing +300m RH

100-500kg Slope trimming +250 to +280m SS

1-70kg Stone placing +250 to +280m SS