Professional Documents
Culture Documents
Technical Checklist
Sales: Order handling:
Filled in by: Project n°:
Date: Serial n°:
Customer name:
Line layout n°:
Layout position n°:
Quotation n°:
Standard
execution
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
1. Type CutMaster CutMaster V
(no vacuum) (vacuum)
325 liter
500 liter
750 liter
3. Cutting speed
High
Performance Plus
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
4. Discharge single into 200 l trolleys
(standard)
internal
(integrated, watering pump)
external
(external, oil pump)
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
8. TopCut VSH without
knife head (only possible without knives, powertool, nut and Quick lock nut)
(knives excluded)
6 knives, 1 track 6 knives, 2 tracks
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
9. TopCut knives without
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
10. Fastening tool without
(standard)
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
13. Options Specification UL/CSA
(with external electrical cabinet)
Cable numbering CE
Cleaning trolley
Cooking system
(CMV only)
Cooling LN2
Cooling CO2
GEA INTERNAL
GEA CutMaster Gen 3
Technical Checklist
Water dosing system
Hygienic package 1
(bowl support, gearbox lid and
cover made of stainless steel)
Hygienic package 2
(upper space evacuation via
vacuum lid and meat separator)
Hygienic package 3
(cleaningring, not available with cooking unit)
MDI
Online PDI
GEA INTERNAL