UNIVERSITI

TEKNOLOGI
MARA
DEPARTMENT OF QUANTITY SURVEYING
COLLEGE OF BUILT ENVIRONMENT
UNIVERSITITEKNOLOGI MARA SARAWAK
SEMESTER MARCH - AUGUST 2023

BQS551
MEASUREMENT OF CONSTRUCTION WORKS IV

ASSIGNMENT 5
ISOLATED INSITUCONCRETE PILE

PREPARED FOR: MDM SYAMIMI LIYANA BINTI AMAT RAIS

PREPARED BY : 1. MUHAMAD AKIF BIN JEMAN (2022602758)

2. ABANG HAZIQRUSHDY BIN ABG


HAMASAWI(2022602372)
GROUP AP224 4B

DATEOF SUBMISSION: 2nd JULY 2023

Cheted
No

Subect: Date.

TALLNK oFf LIST


Vesaipion

Boved
3. tal of No

NO

No.

boved
vutical
Total No
M
(2. tal onrtt

N
head

(B. Ttal

23tt

P
Subect Dale

Duiplir
00 yvlial
tS. Tolal
(0mele
i M
mie
24.
N,
pilu
3
No
32. Main bar rçnteemt
33.44 Helical ar rinforctment

33. Tlal
34. ExtA

paTmynent ca_iny
31

Head
4o.

(00 mom vutial

pl
34
in rock
31 Edya
r mannt
34. (

No
Main hor yintoreimeal
Subet
Dat

Qung Rmas

|00

1. Thik t stl
PROJECT
DRWG. BILLING
PAPER
NO: NO:KOLEJ
Etal
bore dDtacYet(oen Bluw A
a f
lBxtra 800mn |or Ste Aow BoredPite 3position\ns 2. below4roun Notes:ELEMENT
deep humber
lotal plino Ly(hs dowina PENGAJIAN
Estra 24-50 There Seveh
al
ths tor
(ves or Oriaina
Ouer dianeter tupe plont
Ste
is numbers Water NO.
maintaining brinaina
borina IPTIOU
DESCR
1: ALAM
placing ot is ho
pling reaAiVed hot
Servlcesr Showr around
PILING
deoth lenath Pileot to yelwas BINA,
throwah Concret 6
Site hear
pile Concrete on
bore
on 1eel
WORte UïTM
to ot t and any
aade site or the estebished
r?auirea rocK a th heles CAI SAMARAHAN
Maximu a remoV water on
byim'e 45 0 Site 0Ca
plant tupe ingg 23 PROUISja
cath tron were
Boved 4t
eel requitedl Trom June 4-00m
o+ anent Sund
Pipc Pilc NA

NO tex
DATE:PAGE:

44662 434 Qry


144
RATECe)
AMOUNT
EAllow D PROJECT
DRWG. BILLING
PAPER
NO: NO:KOLEJ
k|reparing Boredhl)e IELEMENT
eiofovcement torcappin
ToTming |Wont)
oreinghkCcont'
testihg b4r 20 PENGAJAN
oYHetabridaina
hh
numblrfor 2 r2
enlarac NO|
hum con(rete ALAM
ber
neter Caging PILING
aSing bases
Gnd nle BINA,
hiqh \WUpx
Preiminary
rstrna
Yuad baredplacing
toik
r with UiTM
l000
mm Ten he s(A,
testingon Subseancntad sik aas
mainun SAMARAHAN
bar Seel qhA PRovis1ONAL
Vbratun naie
rod entoV ne
bar 400nn
)

No
DATE:
25415 |44
PAGE: 2
BAR REINFORCEMENT SCHEDULE
Drawing No:

JOB: STEEL ROD REINFORCEMENT IN: PAGE NO:

JOB NO: SECTION/BILL NO: FLOOR LEVEL: SQUARED: TRANSF:


CHECKED: CHECKED:
Location/ Dia No. of Sizes of High Tensile / Mild Steel Rods Calculation/
Ref. (mm) Rods Length (m) 32 mm Remarks
6 mm 8 mm 10 mm 12 mm 16 mm 20 mm 22 mm 25 mm 28 mm

800 mDihmeter (0st inStu Bortd Rle


PL48-3
2pMB 20 74|3.26t 2S454.52
12 AI\92-23 |4545-02
| 4PMB 20 63|3|2346 |2\083.84
12 142491

12

20
|2 2045-8b

Total Length 26620-5 |50\44 32


Conversion factor (Mass per unit weight) 0.222 0.395 0.616|/O888 1.579 2466 2.984 3.854 4.834 6.313

|TOTAL WEIGHT IN KG CARRIED TO SUMMARY 5415.0Q


5 OT
w|-IA a/ \0
2 -YA wI ab
WI-YIA 44/
5
Sa/TYIA
2
w
w
yIA 24/S
la/S-IB
2
N/I-
13
2
li-15 L/
Ka515-l6
l5-\6 K/
4-l6 JJ
2
F2/9-\6
Fl/4-lb
2
5
El/4-16
3o 4% PL
PP 6P600 ret Pile
PGOO 2 1PA\O0O
DATE: NO:DRWG.
PAGE: PROJECT
NO:
UITM PENGAJIAN
BINA, ALAM KOLEJ
SAMARAHAN PAPERSCHEDULE
2
7a-4 PV
P300 LI|6a
6P6o0
SP300 45-5o pL
80 2 |PAlO00 1PI000
PDATE:AGE:
NO:DRWG.
PROJECT
NO:
SAMARAHAN UITM BINA, PENGAJIAN
ALAM
PAPERSCHEDULE KOLEJ
3
16.5 16S 16.50 Total
76.50 760
25-5o s/ 5025
25.50
25.50
(fiatple)
caM)
(M) (M) (nu) k
DATE:
PAGE: NO:DRWG.
ALAM SHAH PROJECT
NO:
UITM UKUR,PERANCANGAN
DAN
SENIBINA,P FAKULTI
PAPERSCHEDULE
I1s83 ||4.20,
I|.42 6 Total
-48 |6
(6-70 16-10 |PA
45.5O PL
47-50
(4.73
IRA
|145.30 000Mm
14s0
|1.80 Tolal
30241 30241
(4 I5.45 2445 4450 2
IS-50
(0
942.63 45.50
B42.63
(9-73
L8.13 3.s0 92
19.30 |8.30
4S 1P
49.40
(M) (usin M)
(M)
l E0erManent )
DATE:
PAGE:
ALAM SHAH PROJECT
NO: NODRI: WG.
UTM UKUR,ERANCANGAN
DAN A,
434.40 Totu
12/14-1 12/14-3
14-00 / 12 4 4P
-673.
26 3
20
G73-
4o/2-83 /1.20o
/21:?0 40 40/
Pop 20
ia24 9s-SO PL
24 e -
6 6E/21-4
4
-|3m-2 22.62 e18\800
14 74 /24:6 74 24-63 74/ 242450 To 74 34
2
Pye) worcna (ile Bores ter iame S0Ow
36 5-28 l0% L06-2 062-40 \otcl
6/l6 6
Is/35-38 5245 SO
524 =
15/353 /3S-30 to/1s
S 5
W
b./44 I90 /6/ To e/18:90
G
343.62 -
//38-10 -344O
1/38-\0
N
bases|lDNciered Eniarae PLAB:30L
(n)(asng
le)
(n0)
Piie pie<|Cut
ot Trimie |E0 Yerman
ntnt UE
DATE:
PAGE:
SAMARAHAN NO:DRWG.
NO:
PENGAJIAN PROJECT
UiTM BINA, ALAM
KOLEJ