MNJPL Site Survey Report Spread-3 21082023
MNJPL Site Survey Report Spread-3 21082023
PIPELINE (Part-A)
A Approved - No Comments
Approved As Noted - Proceed with manufacture/ fabrication as per commented document. Revised document
B
required.
C Not Approved - Document does not conform to basic requirements as marked. Resubmit for Review.
V Void
SITE INFORMATION
SITE NAME: IPS-05, SV-20 & IPS
DATE: 05 – 01 - 2024
Site Address:
IPS-05 (POHAGAON)
SV-20 (BORI)
IPS-06(TALANI)
Name: Mr. Yusuf Khan & Bablu Kumar (Mecon India Limited)
bkumar@mecon.co.in
SITE LOCATION
DISTANCE FROM MAIN ROAD: All sites are Near Samruddhi express highway
ROUTE TO SITE:
ROAD CONDITIONS: Good
TEMPORARY ACCESS No
PROBLEM
FENCING: Fencing is not ready Yet (Site Under Construction)
GUARD AVAILABLE AT SITE: NO
PERMITS OBTAINABLE FROM:
Name: Mr. Yusuf Khan
Company: Mecon India Limited
Mob No.: 6351352250
Material Storage Details: Currently Site is under Construction for civil works. Space for Material
Storage is not available. Storage of material should be done after control
room and guard room is constructed with lock and key.
Door Ready
1 Visual Inspection of the site: Only SV-20 & IPS-06 Control Room
Building Ready
IPS-06 .
Space Availability for Telecom and Server Check Space for Installation of Telecom and
Cabinet: Server Panel:
4
Telecom Panel (800*800*2100) Control Room & Server Room ready
FOC cable entry status and required length Length of OFC cable required from Cabinet
from Cabinet to Termination in FTC to FTC
To be consider as per Control room Drawing
9
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)
Is Telecom Earthing and AC Power Earthing Telecom Vendor need to Prepare Telecom
being Available on Site: Earth Pit Separately.
Is Telecom Earth Bus bar provided in Telecom Existing Earth Pit Not Available
room:
10
Measure the Length of Earthing Cable
Required from Earth Bus Bar to Cabinet.
Telecom Cabinet:
Server Cabinet:
Earthing Pit
Availability of Space for Installation of
Indicate proposed location of the Earthing Earthing Bus Bar: Yes Available
Pit on sketch/Plant Layout.
Measure and indicate clearances on all sides Length of Earth cable required from earth
11 Pit to Earth Bus Bar: To be consider as Per
Cable trench Layout
No. of Ex-Proof Telephones- 1 nos. Location Not yet Finalized due to site is under
construction
Installation location of Acoustic Booth Ex-
Proof Telephone: - Required Cable Length considered as per
Cable trench Layout
Measure the Required Power Cable length
from Telephone to Telecom Panel
13
Measure the Required Ethernet Cable length
from Telephone to Telecom Panel
CCTV Cameras:
Check is the Pole required for installation of PTZ Camera is install on terrace & Fixed
Camera Record the length and Quantity of Camera is install near Section Valve to focus
14
poles Section Valve.
Measure the Required Power Cable length Required Cable Length considered as per
from CCTV Camera to Telecom Panel Cable trench Layout
GPS Clock:
No. of GPS Clock- nos.
Installation location of GPS Clock Antenna Not Required for SV’s and IPS’s Location
Display
Length for Required Power cable: Not Required for SV’s and IPS’s Location
19
Length for Required HDMI cable from SDH
Monitor to Client Work station
Console Table
Location for Installation of Console Table Not Required for SV’s and IPS’s Location
20
Length for Required Power cable:
Location of Tower (if on RF) Not Required for SV’s and IPS’s Location
Notes:
1. Photographs to be taken at site, scanned and inserted in the document showing proposed
Location of Telecom Rack, Server Rack, Client Workstation, Earth Pit Location, Earth Bus
bar, CCTV’s Location, Acoustic Booth Location, Telephone Location, Display Location,
Charger, Earthing bus bar, ACDB, OFC entry etc.
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)
Photographs:
IPS-05:
IPS-06:
SV-20: