TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR JHARSUGUDA

PIPELINE (Part-A)

DOCUMENT TITLE: SITE SURVEY REPORT FOR SPREAD-2 (SV-IPS-05 to I P S - 0 6 )

ERATRONICS DOCUMENT NO: ER-TRE065-SSR-037

ERATRONICS PROJECT NO: TRE065

CLIENT DOCUMENT NO: -

FOA/PO NO: GAIL/NOIDA/C&P/PROJ/MNJPLIV/TELECOM/22-04/128 dated 20.05.2022

CONTRACTOR ACCEPTANCE CODE

STATUS STATUS CODE CODE DESCRIPTION

A Approved - No Comments
Approved As Noted - Proceed with manufacture/ fabrication as per commented document. Revised document
B
required.

C Not Approved - Document does not conform to basic requirements as marked. Resubmit for Review.

R Retained for Reference

V Void

NAME RS NAME SK NAME PB


02 Issue for Approval
DATE 07-Jan-24 DATE 07-Jan-24 DATE 07-Jan-24

NAME RS NAME SK NAME PB


01 Issue for Approval
DATE 18-Nov-23 DATE 18-Nov-23 DATE 18-Nov-23

NAME PP NAME SK NAME PB


00 Issue for Approval
DATE 23-Apr-23 DATE 23-Apr-23 DATE 23-Apr-23

REV. DESCRIPTION PREPARED BY SIGN CHECKED BY SIGN APPROVED BY SIGN


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

SITE INFORMATION
SITE NAME: IPS-05, SV-20 & IPS

DATE: 05 – 01 - 2024

CONDUCTED BY: Rohit Sakpal, Geetesh Chohan & Aakash Ingole

Site specific information

Site Address:
IPS-05 (POHAGAON)

SV-20 (BORI)

IPS-06(TALANI)

Contact Person Details:

Name: Mr. Yusuf Khan & Bablu Kumar (Mecon India Limited)

Mobile No.: 6351352250

bkumar@mecon.co.in

Security Guard Details:

Security Not Available On-site, Site Under Construction.


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

SITE LOCATION

DISTANCE FROM NEAREST BUS-STOP/


CITY/TOWN/VILLAGE: RAILWAY
STATION

DISTANCE FROM MAIN ROAD: All sites are Near Samruddhi express highway
ROUTE TO SITE:
ROAD CONDITIONS: Good

SURROUNDING AREA Farmland and Near Road


INFORMATION:

ENVIRONMENTAL Temperature:35 - 40 Degree Celsius


CONDITIONS

SOIL CONDITION FOR Mix of Hard & Soft Soil


EARTHING:

TEMPORARY ACCESS No
PROBLEM
FENCING: Fencing is not ready Yet (Site Under Construction)
GUARD AVAILABLE AT SITE: NO
PERMITS OBTAINABLE FROM:
Name: Mr. Yusuf Khan
Company: Mecon India Limited
Mob No.: 6351352250

Keys of Equipment Rooms:

Material Storage Details: Currently Site is under Construction for civil works. Space for Material
Storage is not available. Storage of material should be done after control
room and guard room is constructed with lock and key.

Remarks: All Sites are Under Construction.


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

OTHER CHECK LIST


Check Points Remarks

a. Door aperture 900mm(w) x 2200mm (h):

Door Ready

b. Building -stage of completion:

1 Visual Inspection of the site: Only SV-20 & IPS-06 Control Room

Building Ready

c. Equipment room stage of completion:

Under Construction for IPS-05 &

IPS-06 .

A copy of the layout drawing of the


2 Equipment room and building obtained from yes
Customer.

a. Ventilation available - To be Checked


after Site Readiness

Visual Survey for general conditions in the b. Air-conditioning available – To be


3
Equipment room: Checked after Site Readiness

c. Dust-proofing available – To be Checked


after Site Readiness

Space Availability for Telecom and Server Check Space for Installation of Telecom and
Cabinet: Server Panel:
4
Telecom Panel (800*800*2100) Control Room & Server Room ready

Server Panel (1000*800*2100)


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Availability of Spare Feeder in DCDB for


Power on the DC Cabinet: DCDB is not yet
ready
Check if Redundant Power Supply is
Available: DCDB is not yet ready
DC Power Supply for DC (Telecom) Cabinet
Mention the feeder number and Ampere
Rating of Available feeder: DCDB is not yet
Indicate proposed location of the Telecom ready
5 rack and DC supply charger on sketch/Room Length of DC Power cable required from
Layout. Charger to Rack
- To be consider as per room layout &
Measure and indicate clearances on all sides cable route layout
Length of Earthing cable from Earth busbar
to Rack
- To be consider as per room layout &
cable route layout

Availability of Spare Feeder in DCDB for


Power on the AC Cabinet: Not Required for
SV’s & IPS station
AC Power Supply for AC (Server) Cabinet
Check if Redundant Power Supply is
Available: Not Required for SV’s & IPS station
Indicate proposed location of the Telecom
6 rack and DC supply charger on sketch/Room Mention the feeder number and Ampere
Layout. Rating of Available feeder: Not Required for
SV’s & IPS station
Measure and indicate clearances on all sides
Length of AC Power cable required from
Charger to Rack: Not Required for SV’s & IPS
station

Flooring Type: Concrete Flooring


Type of Flooring. Status of false flooring at
7 proposed location. Is base frame or a stand Base frame – 2 legged (width :1200 MM)
required?
Adjacent welding Required

FOC cable entry status and required length Length of OFC cable required from Cabinet
from Cabinet to Termination in FTC to FTC
To be consider as per Control room Drawing

Length of Flexible Pipe for OFC cable


required from Cabinet to FTC-
8 To be consider as per Control room drawing

Type of Connector Required for termination in FC type connector available.


FTC -

9
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Are Cable trays required from rack to DCDB


and other terminations? Measure length of To be consider as per Control room and
trays required and record the length Electrical room Layout Drawing

Is Telecom Earthing and AC Power Earthing Telecom Vendor need to Prepare Telecom
being Available on Site: Earth Pit Separately.

Is Telecom Earth Bus bar provided in Telecom Existing Earth Pit Not Available
room:
10
Measure the Length of Earthing Cable
Required from Earth Bus Bar to Cabinet.
Telecom Cabinet:
Server Cabinet:

Availability of Space for preparation of


Earthing Pit: To be Decided at Site

Earthing Pit
Availability of Space for Installation of
Indicate proposed location of the Earthing Earthing Bus Bar: Yes Available
Pit on sketch/Plant Layout.

Measure and indicate clearances on all sides Length of Earth cable required from earth
11 Pit to Earth Bus Bar: To be consider as Per
Cable trench Layout

Length of Earthing cable from Earth bus bar


to Rack: To be consider as Per Cable trench
Layout

IP Telephone: 1 IP Phone in Security Room & 1 IP Phone in


Control Room.
No. of Telephone - 2 nos.
For Security Room Cable Length required
Installation location of each type of Phone: - consider as per Cable trench Layout and For
Control Room Location consider as per
Distance of Phone from EPABX Switch: - control room layout

Measure the Required Ethernet Cable length


12
from Each Telephone from Telecom Panel

Measure the Required Fiber Cable length


from Telephone to Telecom Panel
(If Required)
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Ex-Proof Telephone: Ex-Proof Telephone is only for IPS Site.

No. of Ex-Proof Telephones- 1 nos. Location Not yet Finalized due to site is under
construction
Installation location of Acoustic Booth Ex-
Proof Telephone: - Required Cable Length considered as per
Cable trench Layout
Measure the Required Power Cable length
from Telephone to Telecom Panel
13
Measure the Required Ethernet Cable length
from Telephone to Telecom Panel

Measure the Required Fiber Cable length


from Telephone to Telecom Panel
(If Required)

CCTV Cameras:

No. of Ex-Proof CCTV CAMERAS- nos. For SV’s:


Fixed Camera:1 No’s
PTZ Camera:1 No’s
Installation location of CCTV Cameras
For IPS’s:
Check is Foundation Required for camera Fixed Camera:2 No’s
pole installation PTZ Camera:2 No’s

Check is the Pole required for installation of PTZ Camera is install on terrace & Fixed
Camera Record the length and Quantity of Camera is install near Section Valve to focus
14
poles Section Valve.

Measure the Required Power Cable length Required Cable Length considered as per
from CCTV Camera to Telecom Panel Cable trench Layout

Measure the Required Ethernet Cable length


from CCTV Camera to Telecom Panel

Measure the Required Fiber Cable length


from CCTV Camera to Telecom Panel
(If Required)

GPS Clock:
No. of GPS Clock- nos.

Installation location of GPS Clock Antenna Not Required for SV’s and IPS’s Location

Check is the Pole required for installation of


15
Antenna Record the length and Quantity of
poles

Measure the Required GPS Cable length from


GPS Clock to GPS Antenna
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

CCTV Client Workstation, Monitor and display


installation details (Manned location)

Location of Client Workstation installation:

Location of Monitor Installation:


Not Required for SV’s and IPS’s Location
16
Length for Required Power cable:

Length for Required HDMI cable from CCTV


Monitor to Client Work station

Length for Required Ethernet cable from


CCTV Switch to Client Work station:

MPLS Client Workstation, Monitor and display


installation details (Manned location)

Location of Client Workstation installation:

Location of Monitor Installation:


17 Not Required for SV’s and IPS’s Location
Length for Required Power cable:

Length for Required HDMI cable from SDH


Monitor to Client Work station

Length for Required Ethernet cable from SDH


Switch to Client Work station:

EPABX Client Workstation, Monitor and


display installation details (Manned location)

Location of Client Workstation installation:

Location of Monitor Installation:


Not Required for SV’s and IPS’s Location
18
Length for Required Power cable:

Length for Required HDMI cable from EPABX


Monitor to Client Work station

Length for Required Ethernet cable from SDH


Switch to Client Work station:
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Display

Location of Display installation:

Length for Required Power cable: Not Required for SV’s and IPS’s Location
19
Length for Required HDMI cable from SDH
Monitor to Client Work station

Length for Required Ethernet cable from SDH


Switch to Client Work station:

Console Table

Location for Installation of Console Table Not Required for SV’s and IPS’s Location
20
Length for Required Power cable:

Lease Line installation detail (Manned


location)

Location of equipment installation:

Location of Tower (if on RF) Not Required for SV’s and IPS’s Location

Route for OFC cable laying:


21
Distance of OFC cable and type of trench:

Ethernet cable required from Lease Line


Equipment to Router

Ethernet cable required from Router to


Application

Notes:

1. Photographs to be taken at site, scanned and inserted in the document showing proposed
Location of Telecom Rack, Server Rack, Client Workstation, Earth Pit Location, Earth Bus
bar, CCTV’s Location, Acoustic Booth Location, Telephone Location, Display Location,
Charger, Earthing bus bar, ACDB, OFC entry etc.
TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Photographs:
IPS-05:

Guard Room is Under Construction

Gate & Boundary Wall is under construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Control Room for Telecom Panel is under construction

Store Room For Installation Material is Under Construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Process Area is Under Construction

Ground Leveling for Earth-Pit is pending


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

IPS-06:

Guard Room is under construction

Control Room for Telecom Panel is under construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Store Room For Installation Material is Under Construction

Gate & Boundary Wall is under construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Ground Leveling for Earth-Pit is pending

Process Area is Under Construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

SV-20:

Control Room for Telecom Panel is under construction

Guard Room is under construction


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03

Process Area is Under Construction

Ground Leveling for Earth-Pit is pending


TELECOMMUNICATION SYSTEM FOR MUMBAI NAGPUR -
JHARSUGUDA PIPELINE (PART A)

Doc. Title: SITE SURVEY REPORT FOR SPREAD-2 (SV-20 to RT)

Doc. No.: ERA-TRE065-SSR-037 Rev. No.: 03