100% found this document useful (3 votes)
6K views7 pages

Questions Based On X Bar and R Chart

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (3 votes)
6K views7 pages

Questions Based On X Bar and R Chart

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
vue 2. The following table gives the sample means and ranges for 1:Q. samples \ of size 6, in the production of certain component. Construct me control cst for mean and range and comment on the nature of control. Sample.No.| 1 2 3 4 5 6 7 8 | 9 Mean X | 37.5 | 49.8| 515| 59.2] 547 | 347] sia] o14| 707 RangeR | 95 | 128] 100| 91| 78 | 58| 145| 28 | 37 = 5 xt Solution. Mean of means ¥ == ES mh . = 375+4984515459.2454.7434.7 451.44 61.4470.7+753 3-27.54 498451.54592454743474 5144 61447074953 10 546.2 j ATH 5402. Central line) From the table of control chart, for sample size of 6 1 \“ = 0483, D, = 0, D, = 2.004 } given : D a0) quality Contro! Methods (Contro} Charts) ical rol limits of % — Chart 2 UCL. = X+A,R = 54.62 + (0.483) (8,4) = X-A,R 447 58.677 LCL. = 54.62 — (0.483) (8,4) = 50.563 CHART RaZR _95+12.8410049.147.8+5.8414.542.843.748,0 =840i- 9g Ucentrod. i 10 10, lina) From table dD, = 2.004, D, $ Control limits of R Chart uct 1, = 2.004-x 8.4 = 16.834” LCL=D,R ated tion to. i 50 Introduc Engineering Mathomates_ Solution. _ Here, we have Bo 6 | 7 es Sample No. | 1 [| 2.| 3 | 4 oy 3 130 | 50 | 48 | 47 | 52 | 49 [55 Observed . | 55 1, 3] 53. 1.53, fe 49. S5a) 49). | 1 58 demauemeltsl Se SB KAS. [ook de eo Me Alen sf 3° 4 | 46 | 52 | 50 | 44] 56°] 53 | 53 s3_|so | a7 | 53 | 45 | 50 | 45 | 57 EX 260 | 250 | 250 | 255 | 235 | 260 | 245 | 270 52 50 50 SI 47 52 49 ‘54 R |s5-49] 53-46] 53-47 [53-48] 50-44] 56-47] 53-45] 57-50 2e|27| =6.| =5,1-26 |. =9-]_= 27 Ex 7” 52450+50451447 +524 49454451454 « 10 Mean of the means X = Control Limits for X - chart: UCL -=.X4A, R= 51.0 + (0.577) 6.5 = 54.7505 LCL = X-A,R = 51.0 - (0.577) 6.5 = 47,2495 Construction of control chart for Mean Step 1. Sample numbers are taken along x- axis and mean, values along y-axis. Step 2. Draw the lines for control limits y'= 54.75 upper control limit Step 3. Plot the points to represent the means and join them by straight lines. x, 55| 54 53 52| 51 ‘Sample Mean X 50} 49) Since X5 = 47 < LCL and this value lies outside the control limits ‘and hence the process is out of control. Metta S cal Quality Control Methods (Control Charts) ini statis chart . From the table D, = 0, D, = 2.115 ER _O+74+6+54+04948474744 _ se Se From the table, for sample size of 5, A, = 0.577, 65 UCL =D, R = 2115 x 6.5'= 13.7475 R =0 Lak =65 Construction of control chart for R sep 1. Sample Nos, are taken along x-axis and mean values of R on axis, Step 2. Draw the lines of control limits y"= 6.5, upper control limit y = 13.7475 and lower limit y = 0, Step 3. Plot the points to represent the R and join them by st. lines, r UCL = 13.75 8 Sample Range R 2 © 1203 4 5 6 7.8 9 10 ‘Sample Number All values of R lie between the control limits 13.7475 and 0, Hence, the variability is under control, Still the process is out of control due to X chart, bape Fie table given below gives the measurements obtained in 10 samples. Construct control charts for mee “an and the range, Discuss the nature of control. Sample No,| 1 2 3 4 5 6 7] 8 | 9 | 10 62 | 50 | 67 | 64 [49 | 63 | 6 | 03 | 48] 70 Measurements) 68 | 58 | 70 | 62 | 9g 75.| 71 | 72] 79 | $2 x 66 | 52 | 68 | 57 | os | 62 | 66} or | 53] 62 % | 58 | 56 | 62 | 64 | sa | 69] 53] or | 50 73 | 65 | 61 | 63 | 66 | 68 | 77| 55] 49} 6 58 | 66 |.66 | 74 | 64 | 55 | sz | 57 | 56 | 2 452 Introduction to Engineering Mathematigg fy Solution. Here, we have BompleWo| 12 1 aS ee ee 62 | so | 67 | 64 | 49 | 63 [or [5 Measurements) 68 | 58 | 70 |. 62 | 98 | 75 | 1 | 79 x 66 | 52 | 68 | 57 | 65 | 62 | 66 | 6; 68 | 58 | 56 | 62 | 64 | se | 69 | 53 73 | 65 | 61 | 63: | 66 | 68 | 77 | 55 68 | 66 | 66 | 74 | 64 | 55 | 53 | 57 EX | 405 | 349 | 388 | 382 | 406 | 381 | 397 | 361 58.2 | 64.7 | 63.7 | 67.7] 63.5°'| 66.2 | 60.2 For sample size of 6, A, = 0.483, A, = 0.483 Control limits for ¥- chart: ‘Sample Mean X UCL LCL ¢ CLy 75 73 nm 69 67 65 63 61 59 57 55 53. ay ol 10 = FAR = 63.19 + (0.483) «29.6 = 74.1058 4 5 6 Sample Number Quality Control Methods (Control Charts) 453 auithe means of the samples lie between UCL and LCL 52.59 UCL¥ =2.8. Also X,

You might also like