You are on page 1of 1
Classified as MARAFIO Internal Use ‘Power & Water Utility Company for [pacaamim mre cem 5—SI,—> Jubail and Yanbu (MARAFIQ) Pssst att MARAFIQ REQUEST FOR INSPECTION peeeaere Inspection Request No. MaC.oeTooRFLcInas Date ofRequest: — 28-De0-23 ——_ “WARAFICT NEW PUMP STATON PSSERANT] ev. No. ° PropetNeme : FORCESMAINTO SiIPS [Equipment iSystom /Sub-System : ContattNo.: 720) 039700, Provious RFINo./Rev.No jitny) NA Contactor "AL UANAR ARABIAN GO (WACO) [Disctatine Coteticas J [osteo et 86) [eonminetion [=] trys) meena [Enorochrmant Parmit) L] Spoe-Ret:: MAC-TPC-029700-001 (Actvly 2.8) [Dwg. No 7200%99700.sNF.CE-06,CE-080 Pipe Zone Geotextils end Gravel Backill Inspection Above & around the DN'1200 Pipe at station 2875 to 2863 , as per hichlighied in the drewing, [PareaDuoTine ct enecion | SoDeoas 1p ea bvlTine mec a a ES PS SS enslaaare ie s-twmeowsn He CONTRACTOR REQUESTS INSPECTION OF THE FOLLOWING SITE WORKS AND CERPIES THAT ALL ITEMS OF WORK HAVE BEEW JPROPESLY EXECUTED If ACCURDANCE WITH THE CONTRACT [SPECIFICATIONS AND APPROVED DRAWINGS.ALL TEMS HAVE BEEN [COCRDMATED WITH FUTURE WORKS OF ALL OTHERDISCPLINE a Related deovinge — DE] 6. tonthg rocoto 1 thers Co 3 cheek uae apo! Documents Attached Varied By Ore. ‘DeenangATPICheck List (Speci) ‘Conacoraace | MARAFIO DIPS ‘ae a 2 [20039740 .wnwr-CE-064.cE-960 4 REMARKS: INSPECTION STATUS [ction cone FoRiTem CHECKED JA-AccePreD ACCEPTED vith Comments, See REMARKS c-revecten, seoremares — [__] Re a ec ‘CONTRACTOR WARAFIO PIDIPMG MCI NARAFIO GAG 730 = SHAH ZEB home Name: anata Es Rv L Siorare [soranwe loste za Die 28, ste bate cement Faecccal conarneaea issueu MARAFIQ PS 544

You might also like