You are on page 1of 1

UTHM / /

No. Rujukan : TK

AR/CS/MEC/ELE
PROSEDUR PEMBINAAN DAN PENYELIAAN Bidang :

TAPAK BINA No. Keluaran :

Tarikh :

BORANG TATACARA KERJA (TK) – METHOD STATEMENTS

PROJECT : KERJA-KERJA PENGGANTIAN KEMASAN LANTAI KARPET DI ARAS 2 DAN MEZZANINE MASJID SULTAN IBRAHIM
ATTENTION
Architectural Inspector of Work M&E Engineer

Civil & Structural Engineer Quantity Surveyor

UTHM’s Site Office Main Contractor

TATACARA KERJA :

KERJA-KERJA ELEKTRIKAL
1. PENGUKURAN DAN PENGENALPASTIAN JARAK DI ANTARA DB DAN KAWASAN KERJA
2. MEMECAH DINDING DAN MENEBUK
3. PEMASANGAN TRUNKING
4. PEMASANGAN SHOWER
5. PENGUJIAN DAN PENDAWAIAN
6. PEMBERSIHAN KAWASAN TAPAK

Checked By (Site Manager) Verified By (UTHM) Endorsed By (UTHM)


Signature : Signature : Signature :
Name : Name : Name :
Date : Date : Date :