You are on page 1of 1

MUNJETI

Verified

18:00:05 IST
HARI KRISHNA

Date: 2023.11.16
Digitally signed by
Signature Not

Location: New Delhi


Reason: IREPS-CRIS
E
PRx. BR 11
99 O. N
00

RO
Ch TB BR o. 2

W
: 12 .00
0 - 1 No 34

R1
CH .23 AT
FL 0000. :

10
=1 000 119 4 T CH
m

RO
TO BIBINAGAR

37. 804 O B : 11

W
157 .22 E 9
m TP 0 m EXT826
120 -1 ,

RO
W
000 CH Cu ENDSPA
N

F1
.00 :1 rve

KILOMETRE
ALIGNMENT
0 19 No ED S 1x0
.
8

50

PRO.2nd LINE
20. 81 49 PA .9 M
51

REGRADE R.L.
TE .7 2 N1 P
6.3
8 -

RO
1C 0m x1 ipe

W
RO
H

W
,C .2 x

EXG. RAIL LEVELS


24.
u

TB
63 : 11

FORMATION LEVEL
FORMATION LEVEL
9 rv
1.8

DIFF. BET PRO. RAIL


120 959 eN RC

GROUND LEVELS (m)


. o

138M: R2
2

EX.TO REGRADE DIFF


100 20 .49 CB

.62 25

LVL. & EXIST. RAIL LVL.


.000 Ex.
B m

BANK(+) OR CUTTING(-)
R , OX

EXG. FORMATION LEVEL


PRO.2nd LINE GRADIENT

PROPOSED HORIZONTAL
PRO No
. Cu

PRO.2nd LINE RAIL LEVEL


r

D = 1.500
.

EXISTING LINE GRADIENT


2

ROW
ve

PROPOSED CHAINAGE (m)


Ca = 130 mm
SPA BR N 44A

S = 130 kmph
ROW
No

105
110
115
120
125
130
135
140
TL = 299.039 m
R = 1167.000 m

CL = 585.481 m
Ex. N1 o.24 AT C

TRL= 155.000 m
x 4 H .49

EXISTING LINE RE GRADIENT


BR 5

Δ = 28°44'42.611"
AT : 1

Curve No. = 49 (LH)


120000 134.757 136.590 137.300 137.157 137.919 + 2.400 0.619 136.590 137.157 PRO No. 2
38
x4R
C O B 2 0 00
. BR CB
1202 No.2 AT CH ox E EXT 9 SPA
3 :

ROW
E 8 1

KM: 120.0
00.00 END N 1
CH:120000.000 GRADIENT POST, FL :137.157m 0 x. B TO B 2006 ED x5 M C
120050 134.598 136.350 137.060 136.824 137.586 + 2.225 0.526 P
RN
o E E 0 SP Boxh: 1
RO. . 239 XTE AN 2
R1

Ch: 12

F 150
ROW
BR N NDE 1x0.
0260.0
00 m o . 2
AT C
H 9 M FL 0000.
0
19

FL = 1 39 T : 1202
D SP
AN 1 Pipe = 136 00 m
136.820 136.490

ROW
120100 134.440 136.110 137.252 + 2.050 0.433 Ex. BR No. 238 AT CH: 120060 SPAN 1x0.9 M Pipe 35.424
m
OB
E 17 S
P x 1 .2x1. .590
EXT m
PRO. BR No.238 TO BE EXTENDED END AN 1x0 8 RC
120300 E x . B R E D .4 M C B O
SPAN 1x1.2x1.8 RCC BOX .000 No. 240 S P P ip e X
F2

120150 134.307 135.869 136.579 136.157 136.919 + 1.850 0.340 AT CH: 1 AN 1

R 400
PRO. BR
Ex. BR No. 239 AT CH: 120217 SPAN 1x0.4 M Pipe 20323 S x1.2

0
08

No.240 T x

FALL 1 IN 150
O
ROW
S P B PAN 2x1
ROW

PRO. BR No.239 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX

FALL 1 IN 150
AN 2x1.5 E EXTEN .22 M Pip1.8 R
DED

FALL 1 IN 208
x1.8 RCC e CC B
120200 134.173 135.629 136.339 135.824 136.586 + 1.650 0.247 BOX OX
137.74
TBM: R226

Ex. BR N Ch: 12
F 208

120400.000
ROW

120250 133.553 135.389 136.099 135.491 136.253 + 1.937 0.154 PRO. BR o. 241 AT CH: 120 0260.0
120260 133.429 135.341 136.051 135.424 136.186 + 1.994 0.135 135.341 135.424 CH:120260.000 GRADIENT POST, FL :135.424m No.241 TO 427 SPAN FL
00 m
1x =
ROW

BE EXT E 0.4 M 13 5 .3

S = 130 kmph
TB-2 CH : 1203 41 m
89.701 m, Cur NDED SPAN 1 Pipe
Ex. BR No. 240 AT CH: 120323 SPAN 2x1.22 M Pipe

Δ = 28°44'42.611"
120300 132.933 135.347 136.057 135.434 136.196 + 2.500 0.139 ve No.49 x1.2x1.8 R

Curve No. = 49 (LH)


PRO. BR No.240 TO BE EXTENDED SPAN 2x1.5x1.8 RCC BOX TP-2 CH: 120466.975 m, Curve No.4 C C B OX
9

R = 1167.000 m D = 1.500
R 642

Ex. BR No. 242 AT CH: 120536 SPAN 1x0.9 M Pipe


9

TRL= 155.000 m Ca = 130 mm


ROW

120350 133.421 135.355 136.065 135.447 136.209 + 2.025 0.143 120500.000

TL = 299.039 m CL = 585.481 m
PRO. BR No.242 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
Ex. BR No. 241 AT CH: 120427 SPAN 1x0.4 M Pipe
ROW

PRO. BR No.241 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX


120400 133.908 135.363 136.073 135.459 136.221 + 1.550 0.148 TE-2 CH : 120544.701 m, Curve No.49
ROW
R 4000
R 6429

120450 133.821 135.371 136.081 135.472 136.234 + 1.650 0.153 120600.000 5.3
TP-2 CH: 120466.975 m, Curve No.49 Ch: 120620.000 m Ch: 120620.000 m
21.32
ROW

17.60
5.3 Ex. BR No. 242 AT CH: 120536 SPAN 1x0.9 M Pipe FL = 135.514 m FL = 135.397 m

RISE 1 IN 4000
ROW

RISE 1 IN 4000
120500 133.733 135.378 136.088 135.484 136.246 + 1.750 0.158 PRO. BR No.242 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX

RISE 1 IN 6429
R 124

R 120

120550 133.721 135.386 136.096 135.497 136.259 + 1.775 0.162 120700.000


D= 1.5°
R= 1167m

TRL= 299m
Δ= 28°44'0"

CCL= 585m

ROW
Curve No= 40

TL= 298.826m

TP-2= 120525m
TP-1= 119940m

120600 133.708 135.394 136.104 135.509 136.271 + 1.800 0.167


ROW

120620 133.883 135.397 136.107 135.514 136.276 + 1.631 0.169 135.397 135.514 CH:120620.000 GRADIENT POST, FL :135.514m Ex. BR No. 243 AT CH: 120894 SPAN 1x0.4 M Pipe
PRO. BR No.243 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
120650 134.144 135.639 136.349 135.764 136.526 + 1.619 0.177 120800.000
Ex. BR No. 244 AT CH: 120906 SPAN 1x5 M Slab
ROW
ROW

PRO. BR No.244 TO BE EXTENDED SPAN 1x5x4 RCC BOX


120700 134.580 136.043 136.753 136.181 136.943 + 1.600 0.190
R 124

R 120

120750 135.397 136.446 137.156 136.597 137.359 + 1.200 0.203


ROW

120900.000
Ch: 120920.000 m Ch: 120920.000 m
ROW
140.53

FL = 138.014 m FL = 137.818 m
TBM: R227

120800 136.213 136.850 137.560 137.014 137.776 + 0.800 0.216

RISE 1 IN 120

RISE 1 IN 124
Ex. BR No. 243 AT CH: 120894 SPAN 1x0.4 M Pipe

RISE 1 IN 120
F 257

F 300

120850 137.205 137.253 137.963 137.431 138.193 + 0.225 0.230 PRO. BR No.243 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX 121000.000
ROW

Ex. BR No. 244 AT CH: 120906 SPAN 1x5 M Slab


ROW

PRO. BR No.244 TO BE EXTENDED SPAN 1x5x4 RCC BOX


120900 138.197 137.657 138.367 137.847 138.609 - 0.350 0.243
120920 137.807 137.818 138.528 138.014 138.776 + 0.207 0.248 137.818 138.014 CH:120920.000 GRADIENT POST, FL :138.014m
F 300
F 257

ROW

Ch: 121060.000 m Ch: 121060.000 m


120950 137.222 137.701 138.411 137.914 138.676 + 0.692 0.265 121100.000
FL = 137.547 m FL = 137.273 m
ROW

121000 136.247 137.507 138.217 137.747 138.509 + 1.500 0.293


F 100

ROW
F 101

KM: 121.0
FALL 1 IN 300

FALL 1 IN 257
FALL 1 IN 300

121050 135.397 137.312 138.022 137.580 138.342 + 2.183 0.320 121200.000


121060 135.227 137.273 137.983 137.547 138.309 + 2.320 0.326 137.273 137.547 CH:121060.000 GRADIENT POST, FL :137.547m
ROW
ROW

137.147
Ex. BR No. 246 AT CH: 121290 SPAN 1x0.4 M Pipe
121100 134.547 136.877 137.587 137.909 + 2.600 0.322
PRO. BR No.246 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX

121150 134.297 136.381 137.091 136.647 137.409 + 2.350 0.318 121300.000


ROW

ROW

121200 134.047 135.886 136.596 136.147 136.909 + 2.100 0.313

Ex. BR No. 246 AT CH: 121290 SPAN 1x0.4 M Pipe


121250 133.172 135.390 136.100 135.647 136.409 + 2.475 0.309 PRO. BR No.246 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX 121400.000
ROW

ROW

Ex. BR No. 247 AT CH: 121477 SPAN 1x1.22 M Pipe


135.51

121300 132.297 134.895 135.605 135.147 135.909 + 2.850 0.304 PRO. BR No.247 TO BE EXTENDED SPAN 1x1.5x1.8 RCC BOX
TBM: R228

ROW

121350 131.647 134.400 135.110 134.647 135.409 + 3.000 0.299 121500.000


ROW

121400 130.997 133.904 134.614 134.147 134.909 + 3.150 0.295


ROW

Ex. BR No. 247 AT CH: 121477 SPAN 1x1.22 M Pipe


121450 130.522 133.409 134.119 133.647 134.409 + 3.125 0.290 PRO. BR No.247 TO BE EXTENDED SPAN 1x1.5x1.8 RCC BOX 121600.000
ROW
ROW

121500 130.047 132.914 133.624 133.147 133.909 + 3.100 0.285

121550 129.397 132.418 133.128 132.647 133.409 + 3.250 0.281 121700.000


ROW

ROW

121600 128.747 131.923 132.633 132.147 132.909 + 3.400 0.276


ROW

121650 128.022 131.427 132.137 131.647 132.409 + 3.625 0.272 121800.000


ROW

121700 127.297 130.932 131.642 131.147 131.909 + 3.850 0.267


ROW

121750 126.922 130.437 131.147 130.647 131.409 + 3.725 0.262 121900.000


ROW
ROW

121800 126.547 129.941 130.651 130.147 130.909 + 3.600 0.258 Ex. BR No. 248A AT CH: 121998 SPAN 1x3
M Box
130.80

PRO. BR No.248A TO BE EXTENDED SPAN


1x3x4RCC Box
TBM: R229

121850 126.747 129.446 130.156 129.647 130.409 + 2.900 0.253 122000.000


ROW
ROW

121900 126.947 128.950 129.660 129.147 129.909 + 2.200 0.249


FALL 1 IN 1

FALL 1 IN 100
00

Ex. BR No. 248A AT CH: 121998 SPAN 1x3 M Box


FALL 1 IN 101
ROW

121950 126.522 128.455 129.165 128.647 129.409 + 2.125 0.244 PRO. BR No.248A TO BE EXTENDED SPAN 1x3x4RCC Box 122100.000
ROW

122000 126.097 127.960 128.670 128.147 128.909 + 2.050 0.239


ROW

KM: 122.0
122050 125.622 127.464 128.174 127.647 128.409 + 2.025 0.235 122200.000
ROW

Ex. BR No. 250 AT CH: 122200 SPAN 1x0.9 M Pipe


122100 125.147 126.969 127.679 127.147 127.909 + 2.000 0.230
PRO. BR No.250 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
ROW

122150 124.697 126.473 127.183 126.647 127.409 + 1.950 0.226 122300.000


ROW
ROW

122200 124.247 125.978 126.688 126.147 126.909 + 1.900 0.221


Ex. BR No. 250 AT CH: 122200 SPAN 1x0.9 M Pipe
122250 123.497 125.483 126.193 125.647 126.409 + 2.150 0.216 PRO. BR No.250 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX 122400.000
ROW
ROW

L =3507.98m

122300 122.747 124.987 125.697 125.147 125.909 + 2.400 0.212


ROW

122350 122.747 124.492 125.202 124.647 125.409 + 1.900 0.207 122500.000


ROW
124.60
TBM: R230

122400 122.747 123.996 124.706 124.147 124.909 + 1.400 0.203

122450 122.697 123.501 124.211 123.647 124.409 + 0.950 0.198 122600.00025.48 14.36
ROW

ROW

5.3
122500 122.647 123.006 123.716 123.147 123.909 + 0.500 0.193
F 100
F 101

ROW

122550 122.547 122.510 123.220 122.647 123.409 + 0.100 0.189 122700.000 Ch: 122700.000 m Ch: 122700.000 m
FL = 121.147 m
ROW

FL = 121.024 m
122600 122.447 122.015 122.725 122.147 122.909 - 0.300 0.184
ROW
F 759

F 2500

122650 121.872 121.519 122.229 121.647 122.409 - 0.225 0.180 122800.000


ROW

122700 121.297 121.024 121.734 121.147 121.909 - 0.150 0.175 121.024 121.147 CH:122700.000 GRADIENT POST, FL :121.147m
ROW

122750 120.527 120.958 121.668 121.127 121.889 + 0.600 0.221 122900.000


ROW
ROW

122800 119.757 120.892 121.602 121.107 121.869 + 1.350 0.267


F 2500
F 759

Ch: 122920.000 m Ch: 122920.000 m


122850 119.212 120.826 121.536 121.087 121.849 + 1.875 0.313 123000.000 FL = 121.059 m FL = 120.734 m
FALL 1 IN 2500

FALL 1 IN 2500

FALL 1 IN 759
ROW
ROW
F 400
F 487

122900 118.667 120.760 121.470 121.067 121.829 + 2.400 0.359


122920 118.565 120.734 121.444 121.059 121.821 + 2.494 0.377 120.734 121.059 CH:122920.000 GRADIENT POST, FL :121.059m Ex. BR No. 253 AT CH: 123000 SPAN 1x0.6 M Pipe
PRO. BR No.253 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
ROW

122950 118.413 120.672 121.382 120.984 121.746 + 2.571 0.364 123100.000 Ex. BR No. 254 AT CH: 123100 SPAN 1x0.91 M Pipe
ROW

PRO. BR No.254 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX


123000 118.159 120.570 121.280 120.859 121.621 + 2.700 0.341
KM: 123.0

123050 117.484 120.467 121.177 120.734 121.496 + 3.250 0.319 123200.000


ROW

Ex. BR No. 253 AT CH: 123000 SPAN 1x0.6 M Pipe


ROW

PRO. BR No.253 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX


123100 116.809 120.364 121.074 120.609 121.371 + 3.800 0.297 Ex. BR No. 254 AT CH: 123100 SPAN 1x0.91 M Pipe
PRO. BR No.254 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
ROW
122.62

123150 117.134 120.261 120.971 120.484 121.246 + 3.350 0.275 123300.000 Ex. BR No. 255 AT CH: 123300 SPAN 1x0.6 M Pipe
TBM: R231

ROW

PRO. BR No.255 TO BE EXTENDED SPAN 1x1.2x1.8


RCC BOX
123200 117.459 120.159 120.869 120.359 121.121 + 2.900 0.252
ROW

Ex. BR No. 257 AT CH: 123500 SPAN 1x4 M Box


123250 117.709 120.056 120.766 120.234 120.996 + 2.525 0.230 123400.000 PRO. BR No.257 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
FALL 1 IN 400
FALL 1 IN 400
ROW

FALL 1 IN 487
ROW

123300 117.959 119.953 120.663 120.109 120.871 + 2.150 0.208 Ex. BR No. 255 AT CH: 123300 SPAN 1x0.6 M Pipe
PRO. BR No.255 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX
F 400
F 487

123350 117.634 119.850 120.560 119.984 120.746 + 2.350 0.186 123500.000


ROW

Ch: 123520.000 m Ch: 123520.000 m


ROW

Ex. BR No. 257 AT CH: 123500 SPAN 1x4 M Box


PRO. BR No.257 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX FL = 119.559 m FL = 119.501 m
123400 117.309 119.748 120.458 119.859 120.621 + 2.550 0.163
ROW
R 2500
F 2778

123450 117.209 119.645 120.355 119.734 120.496 + 2.525 0.141 123600.000


ROW

123500 117.109 119.542 120.252 119.609 120.371 + 2.500 0.119


ROW

123520 117.175 119.501 120.211 119.559 120.321 + 2.384 0.110 119.501 119.559 CH:123520.000 GRADIENT POST, FL :119.559m
123550 117.275 119.490 120.200 119.571 120.333 + 2.296 0.133 123700.000 Ex. BR No. 258 AT CH: 123700 SPAN 1x1.22 M Pipe
ROW

PRO. BR No.258 TO BE EXTENDED SPAN 1x1.5x1.8 RCC BOX


123600 117.441 119.472 120.182 119.591 120.353 + 2.150 0.171
ROW
R 2500
F 2778

123650 117.261 119.454 120.164 119.611 120.373 + 2.350 0.209 123800.000


Ch: 123820.000 m Ch: 123820.000 m
ROW

Ex. BR No. 258 AT CH: 123700 SPAN 1x1.22 M Pipe


ROW

PRO. BR No.258 TO BE EXTENDED SPAN 1x1.5x1.8 RCC BOX FL = 119.679 m FL = 119.393 m


123700 117.081 119.436 120.146 119.631 120.393 + 2.550 0.247
RISE 1 IN 2500

RISE 1 IN 2500

Ex. BR No. 259 AT CH: 123900


F 130

SPAN 1x0.6 M Pipe


FALL 1 IN 2778
F 133

123750 116.926 119.418 120.128 119.651 120.413 + 2.725 0.285 123900.000 PRO. BR No.259 TO BE EXTEND
ED SPAN 1x1.2x1.8 RCC BOX
ROW

ROW

TB-1 CH : 123924.952 m, Curve No.50


123800 116.771 119.400 120.110 119.671 120.433 + 2.900 0.323
123820 116.389 119.393 120.103 119.679 120.441 + 3.289 0.338 119.393 119.679 CH:123820.000 GRADIENT POST, FL :119.679m
TP-1 CH: 123974.952 m, Curve No.50
123850 115.817 119.168 119.878 119.448 120.210 + 3.631 0.333 124000.000
ROW

Ex. BR No. 259 AT CH: 123900 SPAN 1x0.6 M Pipe


ROW

PRO. BR No.259 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX TE-1 CH : 124024.952 m, Cur
ve No.50
119.75

123900 114.863 118.792 119.502 119.064 119.826 + 4.200 0.324 TP-1 CH: 123974.952 m, Curve No.50
TBM: R232

Ex. BR No. 260 AT CH: 124100 SPAN 1x0.6


Ex. BR No. 260 AT CH: 124100 SPAN 1x0.6 M Pipe M Pipe
ROW

124100.000
123950 114.429 118.416 119.126 118.679 119.441 + 4.250 0.315 PRO. BR No.260 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX PRO. BR No.260 TO BE EXTENDED SPAN
1x1.2x1.8 RCC BOX
ROW

124000 113.994 118.041 118.751 118.294 119.056 + 4.300 0.306


ROW

Ex. BR No
KM: 124.0

124200.0 . 25
00
124050 113.834 117.665 118.375 117.910 118.672 + 4.075 0.297 PRO. BR N 9A AT CH: 124200
TB-2 CH o.259A TO BE EXT SPAN 1x4.5 M Box
ROW

: 12419 ENDED S
7.117 m PAN 1x4.5
, Curve x4RCC Bo
x
124100 113.675 117.289 117.999 117.525 118.287 + 3.850 0.288 No.50
ROW

TP-2 CH:
124247.1
124300 16 m, Cu
.000 rve No.50
124150 113.240 116.913 117.623 117.140 117.902 + 3.900 0.279
S = 130 kmph
Δ = 7°47'48.976"

TE-2 CH
ROW

: 12429
Curve No. = 50 (RH)
ROW

7.117 m
, Curve
124200 112.805 116.538 117.248 116.756 117.518 + 3.950 0.270 No.50
R = 2000.000 m D = 0.880°
D= 1°

TRL= 100.000 m Ca = 75 mm
TL = 136.293 m CL = 272.165 m
R= 1750m

D = 0.880°

124400
TRL= 120m
Δ= 7°51'20"

CCL= 240m

Ca = 75 mm

.000
Curve No= 41

TL= 120.155m

S = 130 kmph

116.371
TP-2= 124288m
TP-1= 124048m

124250 112.796 116.162 116.872 117.133 + 3.575 0.261


TL = 136.293 m
R = 2000.000 m

CL = 272.165 m
TRL= 100.000 m
Δ = 7°47'48.976"

ROW

ROW

Ex. BR No. 259A AT CH: 124200 SPAN 1x4.5 M Box


Curve No. = 50 (RH)

PRO. BR No.259A TO BE EXTENDED SPAN 1x4.5x4RCC Box


124300 112.786 115.786 116.496 115.987 116.749 + 3.200 0.252 Ex. BR
TP-2 CH: 124247.116 m, Curve No.50 No. 261
116.27

PRO. B AT CH
FALL 1 IN 130

124500.0 R No.2 : 12440


00
TBM: R233

61 TO 0 SPAN
FALL 1 IN 133

124350 112.602 115.411 116.121 115.602 116.364 + 3.000 0.243 BE EXT 1x0.4 M
ROW

ENDED Pipe
ROW

SPAN
FALL 1 IN 130

Ex. B 1 x1 .2x1.8
RCC B
124400 112.417 115.035 115.745 115.217 115.979 + 2.800 0.234 PRO R No. 26 OX
. BR 2 AT
No.2 CH:
124600 1
ROW

Ex. BR No. 261 AT CH: 124400 SPAN 1x0.4 M Pipe .000 62 T


O BE 24500 S
124450 112.057 114.659 115.369 114.833 115.595 + 2.775 0.225 PRO. BR No.261 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX EXT P
ROW

END AN 1x0.
ED S 4
PAN M Pipe
1x1.2
124500 111.698 114.284 114.994 114.448 115.210 + 2.750 0.216
ROW

x1.8
Ex. BR No. 262 AT CH: 124500 SPAN 1x0.4 M Pipe 124700
RCC
BO X
PRO. BR No.262 TO BE EXTENDED SPAN 1x1.2x1.8 RCC BOX .00022.57
124550 111.713 113.908 114.618 114.063 114.825 + 2.350 0.208 12.72
ROW

5.3
ROW

124600 111.729 113.532 114.242 113.679 114.441 + 1.950 0.199


124800.0
00
124650 111.519 113.157 113.867 113.294 114.056 + 1.775 0.190
ROW

ROW
F 130

Ch: 124
760.000
m
L =2571.67m

124700 111.309 112.781 113.491 112.910 113.672 + 1.600 0.181 FL = 11 C h: 1 24


TBM: R
F 133

760.000
2.448 m m
114.89 234

124900 FL = 11
.000 2.330 m
124750 110.800 112.405 113.115 112.525 113.287 + 1.725 0.172 Ex. BR
ROW

124760 110.698 112.330 112.448 113.210 + 1.750 0.170 112.330 112.448 CH:124760.000 GRADIENT POST, FL :112.448m No. 26
ROW
R 950

113.040 PRO. 3
R 762

BR No A AT CH: 1
.263A 2
124800 110.290 112.382 113.092 112.490 113.252 + 2.200 0.160 TO BE 4800 SPAN
EXTEN 1x
50
49
No.

125000 DED S 4 M Box


Curve

.000 P AN 1
ROW

x4x3R
124850 109.943 112.448 113.158 112.543 113.305 + 2.600 0.147 CC
ROW

Box

124900 109.595 112.514 113.224 112.595 113.357 + 3.000 0.134 Ex. BR No. 263A AT CH: 124800 SPAN 1x4 M Box
PRO. BR No.263A TO BE EXTENDED SPAN 1x4x3RCC Box
TB-1
TO GUNTUR

125100.0
00
RISE 1 IN 950

RISE 1 IN 762

5.3
RISE 1 IN 950
123924.952
119804.220

124950 109.648 112.579 113.289 112.648 113.410 + 3.000 0.121

125000 109.700 112.645 113.355 112.701 113.463 + 3.000 0.108


KM: 125.0
TE-1

124024.952
119959.220
TP-1

123974.952
119881.720
TB-2
Chainage in metres

120389.475
124197.116
TE-2

124297.116
120544.475
TP-2

124247.116
120466.975
List of Curves

262
261
260
259
258
257
255
254
253
250
247
246
244
243
242
241
240
239
238
No.

263A
259A
254A
248A
Bridge
1167
2000
1.50
0.88

124800
124500
124400
124200
124100
123900
123700
123500
123500
123300
123100
123000
122200
121998
121477
121290
120906
120894
120536
120427
120323
120217
120060
Radius (R) Degree (D)

R-234
R-230
R-229
R-228
R-227
R-226

R-233
R-232
R-231
R-225
Name
Angle (?)
Deflection

7°47'48.976"
28°44'42.611"

1x4 Box
1x4 Box
1x4 Box
1x3 Box
1x5 Slab

1x4.5 Box

1x0.4 Pipe
1x0.4 Pipe
1x0.6 Pipe
1x0.6 Pipe
1x0.6 Pipe
1x0.6 Pipe
1x0.9 Pipe
1x0.4 Pipe
1x0.4 Pipe
1x0.9 Pipe
1x0.4 Pipe
1x0.4 Pipe
1x0.9 Pipe

1x1.22 Pipe
1x0.91 Pipe
1x1.22 Pipe
2x1.22 Pipe
Chainage Existing Span
(CL)

Easting
272.164
585.481

346901.340

350404.208
350135.399
349833.749
349250.117
348150.048
347739.099
347324.097
346666.938

348604.113
Span

1x4x3
1x4x3
1x3x4
1x5x4
LIST OF BRIDGES

1x4.5x4
Curve Length Tangent

136.293
299.039
Length (TL)

TBM DETAILS
Northing
Type
Proposed Opening

1858266.164
1858919.910
1859233.304

1857050.068
1857335.048
1858610.568
1859561.301

1856772.513
1857770.173
1859864.523
100
155

RCC Box
RCC Box
RCC Box
RCC Box

1x1.2x1.8 RCC BOX


1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.5x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.5x1.8 RCC BOX
1x1.2x1.8 RCC BOX
RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
2x1.5x1.8 RCC BOX
1x1.2x1.8 RCC BOX
1x1.2x1.8 RCC BOX
(TRL)

75
130
(Ca)

RUB
RUB
RUB
RUB

Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Minor
Bridge

130.798
140.526
138.624

119.755
122.615
124.601
135.505

114.893
116.273
137.743
Type of

Elevation
(S)

130
130
Transition Super Speed
Length elevation in kmph

1.

9.
7.
5.
3.

8.
6.
2.

4.

16.
15.
14.
13.
12.
11.
10.
1.

6.
5.
3.
2.

4.

S.NO.

DATE

TITLE:
SCALE
site.

CTE-SC
LEGEND
R
NOTE:

Δ
D
TL

TBM
TRL

CE-C-III-SC
CCL
54
50

55
53
52
51
48
49

DRAWN BY.
DYCE/C/GNT
S.NO. ITEM

XEN/C/PLG/SC
DYCE-TRACK-II

AUTHORITY
DYCE/C/PLG/SC

CHECKED BY.
SSE-DRG-C-GNT
SSE-TRACK-LS-1

DEN-NORTH-GNT
SSE-DRG-C-III-HQ
BRIDGES

SRDEN-CORD-GNT

APPROVED BY.
TOE LINE

CAO/C/O/SC
BUILDINGS

CONSULTANTS :
ABBREVIATION:-

NAME OF WORK
DISMANTLED
NALA/CANALS
RADIUS

DEGREE
building as 0.00m.

ITEM

LAND REQUIRED
LEVEL CROSSING

ELECTRIC / HT LINE
KM POST / SIGNALS
SYMBOL

ROADS/CART-TRACK
124760
123820
122700
121060
120920
120620
120260
120000

NAME

H : 1:5000
and Yard plans approval.

19-05-2023
JITENDRA
NEHA PAL
EXISTING RAILWAY LINE

PROPOSED / DIVERSION
construction organization.

TANGENT LENGTH

PROPOSED RAILWAY LINE


DEFLECTION ANGLE

EXISTING LAND BOUNDARY


TRANSITION LENGTH
bounadry shown in Red chain .

PROPOSED LAND BOUNDARY


1. Proposed works shown in RED

incorporated in final P.T drawings

CIRCULAR CURVE LENGTH

PLAN AND PROFILE


9.
8.
7.

12.
11.
10.

TRANSIT SYSTEM LIMITED


5. Dismantling works shown in yellow dotted.

V : 1 : 500
Park, Shastri Park, Delhi 110053
120/-300
110/-150

-130/950
4000/120

-300/-100

2500/-130
-150/4000

8st Floor, Block-1,Delhi Technology


-100/-2500

SIGNATURE
Signature block

DELHI INTEGRATED MULTI-MODAL


L
S

FL
CH
SE
SL NO CHAINAGE GRADE/GRADE

TP
S.NO. ITEM
Draft L- Section are approved subject to the following:

DRG. NO. CAO/C/TR/LS/243-2023


GUNTUR DIVISION

FROM CH: 120+000 TO CH: 125+000 REV. NO.


SPEED
4. The difference between Pro. R.L and Pro. F.L is 762mm.

ensured Wherever formation slopes are overlaping at toe.

SOUTH CENTRAL RAILWAY


Date:2023.07.14 19:35:34 +05'30'
Date:2023.07.17 18:29:48 +05'30'

SHEET NO.
LENGTH

SYMBOL

ITEM No. - PB No.43 OF 2020-21


CHAINAGE
6. The existing gradient shown are as per site, physical survey.

6.667

8.092
-9.600

-8.745
-6.917
-8.083
11.667
15.758
GRADE

SYMBOL

GUNTUR - BIBINAGAR SECTION

GUNTUR AND BIBINAGAR STATIONS


DIFFERENCE

25
R0
TANGENT POINT
2. As per engineering code vertical curves if any will be provided at

7. The FL's and RL's furnished as jointly checked by division and

8. Exg. land boundary shown in black chain dotted and pro.land


3. The kilometer are reckoned from CL of Bibinagar junction station

KUNDU RAMARAO Digitally signed by KUNDU RAMARAO


SUPER ELEVATION

FORMATION LEVEL

CONSTRUCTION OF DOUBLE LINE BETWEEN


TENDU GOVINDA RAO Digitally signed by TENDU GOVINDA RAO
3. Vertical curves are to be provided at following Gradient post chainage
between two grades during execution of track and same may be
1. The final L section may be submitted after approval of bridge GADs

2. Provision of drain and retaining wall between c/c of track shall be