Professional Documents
Culture Documents
BUILDING 7
Oil Palm Plantation DCR PROJECT
Existing Toilet
12 Toilet
(M) Existing Toilet
12 Toilet
IMPROVEMENT
Corrugated zinc fence
6 Shower 6 Shower
Shower BUILDING 6 Security Desk, LOCATION
(F)
BUILDING 1 Shelter, Public MINA RAYA
Toilet (F) Toilet (M) Kitchen, Storage
s
ACEH PIDIE
rie
da
ou
Security Room, IOM
b
Car port
nd
BUILDING 2 Clinic, Classroom,
La
UNHCR
142,37 m
Shower (F)
ISSUE
New SP Toilet Basketball field
BUILDING 4
BUILDING 5
Toilet (F)
3 unit MM.DD.YY
DRAWN BY
Volley ball field
Yusfan Wahyudi
BUILDING 5 Shelter (male)
APPROVED BY
Flag Pole
BUILDING 6 Shelter (female) Project Manager
House 2
Villagers Houses
Well 3
Toilet (F)
New SP Toilet
BUILDING 7 Shelter (family)
3 unit
DESCRIPTION
ion
BUILDING 2
Well 2
e) ntat
House 1
SITE PLAN
wid la
Security
m oP
Desk
(4 ad t
Gate BUILDING 1
Ro
ss
ce
Ac
Car Park
Entrance Well 1
igli
Existing Fence
To S
To Banda Aceh
MAIN ROAD
a
73,21 m
01
84,60 m
IOM INDONESIA
BUILDING 7
DCR PROJECT
Working Area 2
Shower Male Working Area 1
Toilet Male PROJECT
Working Area 3 Toilet Family
Toilet Female Shower CAMP SITE
Shower Female
(M)
IMPROVEMENT
Shower BUILDING 6 Security Desk, LOCATION
(F)
BUILDING 1 Shelter, Public MINA RAYA
Toilet (F) Toilet (M) Kitchen, Storage
s
ACEH PIDIE
rie
da
ou
Security Room, IOM
b
Car port
nd
BUILDING 2 Clinic, Classroom,
La
UNHCR
142,37 m
Shower (F)
ISSUE
New SP Toilet Basketball field
BUILDING 4
BUILDING 5
Toilet (F)
3 unit MM.DD.YY
DRAWN BY
Volley ball field
Yusfan Wahyudi
BUILDING 5 Shelter (male)
Villagers Houses
APPROVED BY
n
BUILDING 6 Shelter (female)
io
Project Manager
e) ntat
Flag Pole
House 2
wid la
Well 3
m oP
New SP Toilet
BUILDING 7 Shelter (family)
(4 ad t
Toilet (F)
3 unit
DESCRIPTION
Ro
BUILDING 2
Well 2
ss
House 1
LAND CLEARING
ce
Security
Ac
Desk
WORKING AREA
Gate BUILDING 1
Access 2
Car Park
ss
igli
ce
Entrance Well 1
To S
Ac
Existing Fence
To Banda Aceh
MAIN ROAD
a
73,21 m
02
Corrugated zinc fence
IOM INDONESIA
BUILDING 7
DCR PROJECT
15,40 m
IMPROVEMENT
BUILDING 6 Security Desk, LOCATION
BUILDING 1 Shelter, Public
12,93 m
MINA RAYA
Kitchen, Storage
s
ACEH PIDIE
5,97 m
rie
31,00 m
da
ou
Security Room, IOM
b
nd
BUILDING 2 Clinic, Classroom,
La
UNHCR
19,00 m
ISSUE
9,30 m Basketball field
BUILDING 5
BUILDING 4
MM.DD.YY
23,00 m
14,00 m
Volley ball field
Yusfan Wahyudi
BUILDING 5 Shelter (male)
4,33 m 12,00 m
7,20 m
APPROVED BY
BUILDING 6 Shelter (female) Project Manager
12,90 m
House 2
Well 3
15,14 m BUILDING 7 Shelter (family)
19,46 m BUILDING 2
DESCRIPTION
Well 2
4,45 m
8,98 m
House 1
LAYOUT PLAN
4,00 m
Gate BUILDING 1
Entrance Well 1
igli
Existing Fence
To S
6,00 m
To Banda Aceh
MAIN ROAD
a
03
3,00 m 1,50 m
0,90 m
IOM INDONESIA
DCR PROJECT
2,50 m
0,60 m
0,60 m
0,60 m PROJECT
CAMP SITE
IMPROVEMENT
LOCATION
2,00 m
MINA RAYA
1,25 m 1,25 m ACEH PIDIE
ISSUE
1,50 m
1,50 m
MM.DD.YY
DRAWN BY
2,00 m
Yusfan Wahyudi
APPROVED BY
Project Manager
7,30 m
1,50 m
DESCRIPTION
LAYOUT
TOILET MALE/FEMALE
2,30 m
SEPTIC TANK
SOAK PIT
15,00 m
a
04
4,50 m
3,00 m 1,50 m
0,90 m
SEPTIC TANK
IOM INDONESIA
DCR PROJECT
0,60 m
2,50 m
0,60 m
SOAK PIT / RESAPAN
PROJECT
0,60 m CAMP SITE
IMPROVEMENT
LOCATION
MINA RAYA
ACEH PIDIE
Manhole 60x60 cm
DRAWN BY
PVC pipe 4 inch SOAK PIT / RESAPAN Yusfan Wahyudi
0,50 m
DESCRIPTION
2,00 m
Baffle pipe
PVC 4 inch
0,90 m DETAIL
SEPTIC TANK
SOAK PIT (RESAPAN)
1,00 m
Baffle pipe
PVC 4 inch Coconut fiber
Brick Masonry Reinforced concrete floor 7cm
Lime stone,
Rebar dia.8mm, 15x15 cm
Gravel,
Sand
Tie beam 20x20cm
rebar 4 x 10mm
Concrete foundation
3,00 m 1,50 m
a
4,50 m SECTION / POTONGAN 05
IOM INDONESIA
DCR PROJECT
50,00 m
3,00 m 2,00 m
2,00 m 3,00 m
PROJECT
CAMP SITE
IMPROVEMENT
0,50 m
LOCATION
MINA RAYA
3,00 m 3,00 m
ACEH PIDIE
TOILET TOILET TOILET
6,00 m
ISSUE
MM.DD.YY
2,30 m
SHELTER SHELTER SHELTER
DRAWN BY
Yusfan Wahyudi
APPROVED BY
Project Manager
DESCRIPTION
LAYOUT
BUILDING 7 (FAM)
SEPTIC TANK
SOAK PIT (RESAPAN)
a
06