This document outlines the key post-installation steps for SAP S/4 HANA 1809 including performing a full database backup, running the initial automated setup using transaction STC01, installing the SAP license, configuring remote support connection and transport management system, uploading system profiles using RZ10, creating logon and RFC server groups, and performing a load configuration using SGEN.
This document outlines the key post-installation steps for SAP S/4 HANA 1809 including performing a full database backup, running the initial automated setup using transaction STC01, installing the SAP license, configuring remote support connection and transport management system, uploading system profiles using RZ10, creating logon and RFC server groups, and performing a load configuration using SGEN.
This document outlines the key post-installation steps for SAP S/4 HANA 1809 including performing a full database backup, running the initial automated setup using transaction STC01, installing the SAP license, configuring remote support connection and transport management system, uploading system profiles using RZ10, creating logon and RFC server groups, and performing a load configuration using SGEN.
Perform the automated initial setup Call Transaction STC01\ Choose the task list SAP_BASIS_SETUP_INITIAL_CONFIG Choose Execute Install the SAPLICENSE for Application and HANA Database Configure the remote connection to SAP Support Perform a consistency check – Run transaction SICK Configure Transport Management System (TMS) Upload and set system profiles using transaction RZ10 Create logon and RFC server groups Perform load configuration using SGEN – Generate all objects