SECTION 2 - GENERAL
‘Table 2-3. Inspection and Preventive Maintenance Schedule
a
reDevery’| Annual!
“ coos | oo | eel ee | me
Inspection | Inspection
Sy
‘Boom Weldments 124 1,2,4
ais ete
—= =e
mone ape
vs pe
=a tes
as
wi i ;
ere sta
= :
Swing Bearing o Worm Gear 1,2,14 1,2,3,13,14
Oi Coupking a
Swing Drive System
a ¥
Outrigger or Extendable Axe Systems: 5B 58
—
=
26 —JLG Litt (3121827,SECTION 2 - GENERAL
‘Table 2-3. Inspection and Preventive Maintenance Schedule
=
“ esac! | rte | ewer eregen| Son | SOR!
es |e ee oe,
Functions/Controls &
ae ss 5
eR [Le a3
i —|_ 5 ms
Se on
aaa :
om ;
costae :
See i
once ——3
Power System 9
pee co
aaa a
= : ;
aaa a 7
Hydraulic/Electrie System 9
oo - ee
ae Te
= ie 5
a ; as
aR ean ; oa
oa
aaa | aH
eae i
(3121827, —JLG Lift— 27SECTION 2 - GENERAL
‘Table 2-3. Inspection and Preventive Maintenance Schedule
INTERVAL
Capacty Decals netald Secure Lege 2
Prostar!
Inspection
Weody
Preventive
Maintenance
Monthly | Pre-Delivery?
Preventive | or Frequent”
Maintenance | inspection
2
Annualt
(early)
Inspection
a
‘AiDocale/Pacade Intled, Soeur, Logie 2
a
2
‘Wiall-Around lepacion Performed 2
‘Annual Maine inepocton Due
a
Ne Uneuthorzed Modications or Adiione
2
a
‘A Folevant Sally Publications nerporatod
a
a
Generel Structural Condon and Welds
2A
24
‘Al Fatonor, Pine, Side, ani Covers
42
12
(Grease ard Lubricate to Spectieatons
2
Funeon Teer Al Syatome 2
2
21,22
PaintandAppesrance
7
‘Stamp Inspecion Deteon Frame
2
Notify JLGot Machine Ownership
Footres
* pwoctouse each ay; or ategeh Opeaterenange
Prieto eachesle esse ordelvery
Sinseneo tor mont o 150 Hous; or Outotsenicofer9monthao:more;or Purchased used
4 Anaully nolaterthan 13 months om the date ofthe prornepecton
Performance Codes:
1 -Cheekfor proper and securenetlaton
| 2 Vieulinapecton for damage crake, Gatortoncr excessiveweer
9-Checktorproper adjustment
/4-Chocktorcrackador broken welds
|5-Operaies Propety|
-Roturatenoutlor ‘of postion whonteloasod
7-Ciean and eect deta
8-nteracke uncon property
|9-Checklorsigsofleskage
10-Deeasinalled sndlogile
11 -Checkfr proper uidleve
12-Checklor chafing and proper routing
19-Checklorproperoierercee
“4- Propel bicated
15-Torquedto proper epesteaton
18-No gouges, excssive wea, or corde showing
17-Propetinlatedandsectederourdrim
18-Proper andauthorzed components
19-Fullycharged
| 20-Noloose comecione,corecionorabrasone
24-Veriy
22-Perlorm
| 28-Sesled Properly
24-Drain, Clan, Refit
28
—JLG Lit
3121827