You are on page 1of 1

SEAOIL PHILIPPINES INCORPORATED

PRODUCT TRANSFER FORM PTF CONTROL NUMBER

DATE ISSUED : PURPOSE :

PRODUCT : SOURCE :

VOLUME : DESTINATION :

SPECIAL INSTRUCTIONS :
ISSUED BY :

DISG. OFFICER / DEPOT HEAD

DATE & TIME STARTED : PUMP/S USED :

DATE & TIME FINISHED : HOSE/S USED :

SHORE TANK TO SHORE TANK TRANSFER

SOURCE DESTINATION

OPENING CLOSING OPENING CLOSING

TANK NO. INNAGE VOLUME INNAGE VOLUME Δ VOLUME TANK NO. INNAGE Δ VOLUME INNAGE VOLUME Δ VOLUME

VESSEL TO SHORE TANK / SHORE TANK TO VESSEL TRANSFER

TANK NO. INNAGE VOLUME INNAGE VOLUME Δ VOLUME TANK NO. INNAGE VOLUME INNAGE VOLUME Δ VOLUME

VARIANCE @ AIR

TEMPERATURE : OPENING CLOSING TEMPERATURE : OPENING CLOSING

PRODUCT SAMPLE

SOURCE (BEFORE TRANSFER) DESTINATION (AFTER TRANSFER)

SAMPLED BY : SAMPLED BY :

RECEIVED BY : RECEIVED BY :

REMARKS :

PREPARED BY : GAUGER : CHECKED BY :

_________________________________________________________ _________________________________________________________ _________________________________________________________

DISG FOREMAN OIL MOVEMENT PERSONNEL DISG. OFFICER / DEPOT HEAD

DISG_Terminal/Depot_F_005_071919_rev.05

You might also like