You are on page 1of 5

1/ 5

Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents
Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, L-2985 Luxembourg Fax (352) 29 29-42670 E-mail: ojs@publications.europa.eu On-line notification: http://simap.europa.eu

ENOTICES_romanla 15/12/2010- ID:2010-167424

Standard form 14 - EN

NOTICE FOR ADDITIONAL INFORMATION, INFORMATION ON INCOMPLETE PROCEDURE OR CORRIGENDUM


Reminder: Should any corrected or added information lead to a substantial change of the conditions provided for in the original contract notice with a bearing on the principle of equal treatment and on the objective of competitive procurement, it would be necessary to extend the originally foreseen deadlines. SECTION I: CONTRACTING AUTHORITY I.1) NAME, ADDRESSES AND CONTACT POINT(S) Official name: Postal address: Town: Country: Contact point(s): For the attention of: Email: laura.romano@f4e.europa.eu Fax: +34 933201804 European Joint Undertaking for ITER and the Development of Fusion Energy (Fusion for Energy) Josep Pla, 2 Torres Diagonal Litoral B3 Barcelona Spain Laura Romano Telephone: Postal code: 08019

Internet address(es) (if applicable) General address of the contracting authority (URL): http://fusionforenergy.europa.eu/index_en.htm Address of the buyer profile (URL): https://industryportal.f4e.europa.eu

I.2) TYPE OF PURCHASING BODY Contracting authority (in the case of a contract covered by Directive 2004/18/EC) Contracting entity (in the case of a contract covered by Directive 2004/17/EC Utilities)

2/ 5

Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents
SECTION II: OBJECT OF THE CONTRACT II.1) DESCRIPTION

ENOTICES_romanla 15/12/2010- ID:2010-167424

Standard form 14 - EN

II.1.1) Title attributed to the contract by the contracting authority (as stated in the original notice) Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents II.1.2) Short description (as stated in the original notice) The services cover the fabrication of four TBM plate subcomponents and specifically: - the development of fabrication processes and procedure specifications for TBM subcomponents according to available professional guides & standards; - the design, fabrication and characterization of subcomponents feasibility mock-ups. II.1.3) Common procurement vocabulary (CPV) (as stated in the original notice) Main vocabulary Main object 73100000 Supplementary vocabulary (if applicable)

3/ 5

Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents
SECTION IV: PROCEDURE IV.1) TYPE OF PROCEDURE IV.1.1) Type of procedure (as stated in the original notice) Open Restricted Accelerated restricted Negotiated Accelerated negotiated Competitive dialogue

ENOTICES_romanla 15/12/2010- ID:2010-167424

Standard form 14 - EN

IV.2) ADMINISTRATIVE INFORMATION IV.2.1) File reference number attributed by the contracting authority/entity (as stated in the original notice, if applicable) F4E-2009-OPE-044 (PNS-TBM) IV.2.2) Notice reference for electronically submitted notices (if known) Original notice sent via SIMAP OJS eSender Login : Notice reference : ENOTICES_romanla 2010-055484 (year and document number)

IV.2.3) Notice to which this publication refers (if applicable) Notice number in OJ: 2010/S 87-130542 of 05/05/2010 (dd/mm/yyyy)

IV.2.4) Date of dispatch of the original notice 03/05/2010 (dd/mm/yyyy)

4/ 5

Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents
SECTION VI: COMPLEMENTARY INFORMATION VI.1) THIS NOTICE INVOLVES (if applicable; tick as many boxes as needed) Incomplete procedure Correction Additional information VI.2) INFORMATION ON INCOMPLETE AWARDING PROCEDURE (if applicable; tick as many boxes as needed) The awarding procedure has been discontinued. The awarding procedure has been declared unsuccessful. The contract has not been awarded. The contract may be the object of a re-publication.

ENOTICES_romanla 15/12/2010- ID:2010-167424

Standard form 14 - EN

VI.3) INFORMATION TO BE CORRECTED OR ADDED (if applicable; to specify the place of the text or of the dates to be corrected or added, please always provide the related section & the paragraph number of the original notice) VI.3.1) Modification of original information or publication on TED not compliant. Modification of original information submitted by the contracting authority Publication on TED not compliant with original information provided by the contracting authority In both VI.3.2) Notice or corresponding tender documents In the original notice In the corresponding tender documents (for further information please refer to the relevant corresponding tender documents) In both (for further information please refer to the relevant corresponding tender documents) VI.3.3) Text to be corrected in the original notice (if applicable) Place of text to be modified: _____ Instead of: _____ Read: _____

VI.3.4) Dates to be corrected in the original notice (if applicable) Place of dates to be modified: _____ Instead of: (dd/mm/yyyy) _____ (hh:mm) _____ Read: (dd/mm/yyyy) _____ (hh:mm) _____

5/ 5

Supply of preliminary fabrication & welding procedure specifications for TBMs EUROFER subcomponents
VI.3.5) Addresses and contact points to be corrected (if applicable) Place of text to be modified: Official name: Postal address: Town: Country: Contact point(s): For the attention of: Email: Internet address(es) (if applicable) General address of the contracting authority (URL): Address of the buyer profile (URL): VI.3.6) Text to be added in the original notice (if applicable) Place of text to be added _____ Text to be added _____ Fax: Telephone: Postal code:

ENOTICES_romanla 15/12/2010- ID:2010-167424

Standard form 14 - EN

VI.4) OTHER ADDITIONAL INFORMATION (if applicable) VI.5) DATE OF DISPATCH OF THIS NOTICE 15/12/2010 (dd/mm/yyyy)

You might also like