Slab Culvert Design and Details

The document contains drawings and details of a 1.5m x 1m span slab drain at chainage 0/070. It includes a sectional elevation, plan, and details of the return, dirt wall abutment cap, and deck slab. Dimensions and reinforcement details are provided. It was prepared by the Executive Engineer of the Zilla Parishad Works Sub-Division in Jalgaon for the Tondapur to Hadola Road from km 0/000 to 1/110.

Uploaded by

cpachore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (6 votes)
10K views3 pages

Slab Culvert Design and Details

The document contains drawings and details of a 1.5m x 1m span slab drain at chainage 0/070. It includes a sectional elevation, plan, and details of the return, dirt wall abutment cap, and deck slab. Dimensions and reinforcement details are provided. It was prepared by the Executive Engineer of the Zilla Parishad Works Sub-Division in Jalgaon for the Tondapur to Hadola Road from km 0/000 to 1/110.

Uploaded by

cpachore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Technical Drawing and Specifications Page 1
  • Technical Drawing and Specifications Page 2
  • Technical Drawing and Specifications Page 3

0.

40
7.22
PREMOULDED JOINT
FILLER IN EXPANSION JT. 0.40 Span=1.50m
1.50 0.66
0.30 RTL - 500.077
Slab Depth - 0.210
WEEP HOLE 0.20
100MM DIA.
1
0.70
2.86 1
4
2.65 NBL-498.035
4
2.86
0.66
1.30
0.20 0.10
FNRL-496.740
1.36
1.60 1.56
7.42
0.10 0.10
SECTIONAL ELEVATION 0.72
0.10
0.20
0.40
1.12
0.72
1.32
1.60 1.56
DETAILS OF RETURN
1.36
5.06 0.66 0.70 7.50 7.70
0.10

0.10

0.21

0.10 

0.20 

0.40 0.30
PLAN 0.70
0.15 1.20 0.15
  DETAILS OF DIRT WALL
ABUTMENT CAP
 
0.21
0.20

0.30 1.50 0.30
2.10
DETAILS OF DECK SLAB
SOIL 0.60
 OR 0.40
  Dist :- Jalgaon 0.30
HR

TRIAL PIT
 
 
 
7.18
PREMOULDED JOINT
0.40
FILLER IN EXPANSION JT. 0.40 Span=1.50m
1.50 0.64
0.30 RTL - 510.077
Slab Depth - 0.21
WEEP HOLE 0.20
100MM DIA.
1
0.70
2.78 4
2.57 NBL-508.115
0.64 1
1.30 4 2.78
0.20 0.10
FNRL-506.820
1.34
1.60 1.54
7.38
SECTIONAL ELEVATION
0.10 0.10
0.10 0.70
0.40 0.20
0.70
1.10
1.30
1.60 1.54
1.34 DETAILS OF RETURN
3.60 0.64 0.70 6.00 6.20
0.10

0.10

0.21

0.10


0.20 

0.40 0.30
PLAN 0.70
DETAILS OF DIRT WALL
0.15 1.20 0.15 ABUTMENT CAP
 
 
0.21
0.20

0.30 1.50 0.30
2.10
DETAILS OF DECK SLAB
SOIL 0.60
 OR 0.40
  Dist :- Jalgaon 0.30
HR

TRIAL PIT
 
 
 
7.18
PREMOULDED JOINT
0.40
FILLER IN EXPANSION JT. 0.40 Span=1.50m
1.50 0.64
0.30 RTL - 511.410
Slab Depth - 0.210
WEEP HOLE 0.20
100MM DIA.
1
0.70
2.77 4
2.56 NBL-509.355
0.64 1
1.20 4 2.77
0.20 0.10
FNRL-508.160
1.34
1.60 1.54
7.38
SECTIONAL ELEVATION
0.10 0.10
0.10 0.69
0.40 0.20
0.69
1.09
1.29
1.60 1.54
1.34 DETAILS OF RETURN
3.62 0.64 0.70 6.00 6.20
0.10

0.10

0.21

0.10


0.20 

0.40 0.30
PLAN 0.70
DETAILS OF DIRT WALL
0.15 1.20 0.15 ABUTMENT CAP
 
 
0.21
0.20

0.30 1.50 0.30
2.10
DETAILS OF DECK SLAB
SOIL 0.40
 OR 0.40
  Dist :- Jalgaon 0.40
HR

TRIAL PIT
 
 
 