You are on page 1of 1

REFERENCE DOCUMENTS

PLANT TRUE COMPANY DWG NO. CONTRACTOR DWG NO. DESCRIPTION


NORTH NORTH
FOUNDATION CONCRETE QUANTITY 2050-CVSTD-00101 4355-AA-DX-00000001 STANDARD DRAWING FOR CONCRETE STRUCTURES GENERAL NOTES
3.19°
MATERIAL TOTAL QUANTITY [Cu. M] 2050-CVSTD-00103 4355-AA-DX-00000003 STANDARD DRAWING FOR ANCHOR BOLTS
3500
3200 FOUNDATION CONCRETE 120.44
== EQUIPMENT LAYOUT PELLET HANDLING AND FINISHING AREA
== 22-PIDAL-E1001 4355-XX-DE-22600001
PLAN FROM EL.100.000 TO EL.113.000

PR IN
22I10-PR009I 22I10-PR009I
700 700

EV D D
W
1 2 3000 22-CVCS-I1009 4355-AA-CS-22I10PR09001 CALCULATION REPORT FOR AREA PIPERACK 22I10-PR009I
==

A I IR
==

LI .
==
LEAN CONCRETE QUANTITY
NG
PIPERACK 22I10-PR009I PLAN AT EL.100.300 (BOB), BASE PLATE DETAILS
7000 700 22-STDTE-I1052 4355-AI-DU-22I10PR09001
& SECTIONS, PLAN AT EL.106.000 (TOS) & PLAN AT EL.108.000 (TOS)

OF FDN. & PED.


OF FDN. & PED.
== CONCRETE DRAWING UNIT 22 PIPE RACK 22I10-PR009I

E = 2672.800
MATERIAL TOTAL QUANTITY [Cu. M] 22-CVDFN-I1054 4355-AA-DC-22I10PR09002
R/F DETAILS OF FOUNDATIONS & BBS
LEAN CONCRETE 9.29

1500
3 3

1250
1 1

2500

600
2500

==

==
OF PED.
600
==

==
- - - - GROUTING QUANTITY - FOUNDATIONS
2 2 NOTES

600
==
22I10-PR009I

N = 747.950 - - MATERIAL TOTAL QUANTITY [Cu. M]


A

NON-SHRINK CEMENTITIOUS GROUT 0.25 1. ALL DIMENSIONS ARE IN MILLIMETERS (UNLESS INDICATED OTHERWISE).

2. ALL ELEVATIONS AND COORDINATES ARE IN METERS (UNLESS INDICATED OTHERWISE).

FN-015A FN-016A OF FDN. & PED. FOUNDATIONS F/W-R/F TYPES 3. PLANT DATUM ELEVATION : H.P.P EL.+100.000 = +3.0 QNHD.

FNJ003 FNJ003 OF FDN. & PED.


4. ALL CONCRETE BELOW GROUND AND ABOVE UPTO MIN. 150mm SHALL BE COATED WITH BITUMINOUS, AS PER
F/W TYPE R/F TYPE QUANTITY
6000

RFJ003 RFJ003 PROJECT SPECIFICATION .


ABJ003 ABJ003 FNJ001 RFJ001 10
F/W DETAIL OF FNJ001 F/W DETAIL OF FNJ003 FNJ002 RFJ002 2 5. DISCREPANCY IN DRAWING OR DOCUMENT, IF ANY, SHALL BE BROUGHT TO THE NOTICE OF THE SITE ENGINEER
(SCALE: 1 : 50) (SCALE: 1 : 50) FNJ003 RFJ003 2 PRIOR TO CONSTRUCTION.
FNJ004 RFJ004 2
6. ANY ELEMENTS IN THE ANY DRAWINGS SHOULD NOT BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.

8500

6000
9000
22I10-PR009I

7. SUB GRADE BELOW FOUNDATION SHALL BE TREATED AND COMPACTED AS INDICATED IN PAR.10.6.3 OF 2050-CVES-00012/
B

4355-AG-SG-00000002 - GENERAL SPECIFICATION FOR EARTH WORKS (95% OF THE MAXIMUM DRY DENSITY AS PER
ABJ002 ABJ002
ISOLATION JOINT (TYP.) FOUNDATIONS TYPE SCHEDULE MODIFIED PROCTOR TEST - ASTM D1557).

100.275 TOC 100.275 TOC ITEM TAG F/W TYPE R/F TYPE
22I10-PR009I-FN001A FNJ001 RFJ001
100.000 HPP 100.000 HPP
22I10-PR009I-FN002A FNJ001 RFJ001
22I10-PR009I-FN003A FNJ004 RFJ004
6000

22I10-PR009I-FN004A FNJ001 RFJ001


22I10-PR009I-FN005A FNJ001 RFJ001
99.000 PTS 99.000 PTS

OF PED.
22I10-PR009I-FN006A FNJ004 RFJ004

2875

2875
22I10-PR009I-FN007A FNJ001 RFJ001
2 2 22I10-PR009I-FN008A FNJ001 RFJ001

600
==
22I10-PR009I

- - 22I10-PR009I-FN009A FNJ001 RFJ001


TECNIMONT ("CONTRACTOR") HEREBY TRANSFERS TITLE TO THIS DRAWING TO RAS LAFFAN PETROCHEMICALS ("COMPANY"), IN ACCORDANCE WITH THE POLYETHYLENE EPC CONTRACT BETWEEN CONTRACTOR AND COMPANY. COMPANY HAS THE FREE AND UNRESTRICTED RIGHT TO USE THIS DRAWING WITHOUT REGARD TO ANY PATENTS OR COPYRIGHTS OWNED OR CONTROLLED BY CONTRACTOR.

CONSTRUCTION JOINT (TYP.) 22I10-PR009I-FN010A FNJ001 RFJ001

1250
1500 22I10-PR009I-FN011A FNJ001 RFJ001
THIS DOCUMENT IS NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR ANY PURPOSE OTHER THAN AS SET FORTH IN THE POLYETHYLENE EPC CONTRACT. CONTRACTOR SHALL NOT DISCLOSE THIS DOCUMENT TO OTHERS NOR USE THIS DOCUMENT FOR ANY PURPOSE OTHER THAN AS PROVIDED IN THE POLYETHYLENE EPC CONTRACT WITHOUT COMPANY'S PRIOR WRITTEN PERMISSION.

22I10-PR009I-FN012A FNJ001 RFJ001


22I10-PR009I-FN013A FNJ002 RFJ002

600

600
FN-013A FN-014A 22I10-PR009I-FN014A FNJ002 RFJ002
FNJ002 FNJ002 96.800 BOF 96.800 BOF 22I10-PR009I-FN015A FNJ003 RFJ003
6000

RFJ002 RFJ002 100 22I10-PR009I-FN016A FNJ003 RFJ003


ABJ002 ABJ002 (TYP.) OF FDN. & PED.
50 THK. LEAN CONCRETE
22I10-PR009I

SECTION F/W DETAIL OF FNJ002 SECTION ANCHOR BOLTS LAYOUT SCHEDULE - FOUNDATIONS
D

1 3
(SCALE: 1 : 50) - (SCALE: 1 : 50) (SCALE: 1 : 50) - ANCHOR BOLTS LAYOUT
QUANTITY NO. OF BOLTS BOLTS DIA. [mm]
TYPE
ABJ001 10 40 20
FN-011A FN-012A ABJ002 4 16 20
FNJ001 FNJ001 ABJ003 2 8 20
6000

RFJ001 RFJ001 ABJ004 2 8 20


ABJ001 ABJ001
43750

2500
==
600
100.275 TOC ANCHOR BOLTS QUANTITY - FOUNDATIONS
22I10-PR009I

== 600
100.000 HPP DIA. OF ANCHOR BOLTS NO. OF ANCHOR BOLTS BOLT LENGTH [mm]
==
E

AB-GR 36-1-M20-120-400
200 M20 72 520
==

OF FDN. & PED.

OF PED.
3500 99.000 PTS
FN-009A FN-010A PRICE CODE

2875
FNJ001 FNJ001 5 5

550

280

205
==

==

==
6000

RFJ001 RFJ001 4 4 - - LIMITED SECTION EXCAVATION ABA02AC01/02/03


3200

700
==

==

ABJ001 ABJ001
22I10-PR009I - - BACKFILLING OF LIMITED SECTION EXCATION ACA05AM01
MICROSILICA ADDITIVE ADA08OA03
3
205 LEAN CONCRETE ADA08AA01
POCKET FOR SHEAR KEY
22I10-PR009I

== (205x205x150 DEEP) BITUMINOUS PAINT ADA16AA01

600
F

96.800 BOF OF PED.


FORMWORK FOR FOUNDATION ADA09AA01
FN-007A FN-008A FOUNDATION CONCRETE ADA08AB04
FNJ001 FNJ001
RFJ001 RFJ001 SUPPLY AND INSTALLATION OF STEEL REBARS ADA10AA02
ABJ001 ABJ001 OF FDN. & PED.
4500

NON-SHRINK CEMENTITOUS GROUT ADA12AB01


4000
SUPPLY AND INSTALLATION OF ANCHOR BOLTS ADA11AA01/ADA11EA01

F/W DETAIL OF FNJ004 SECTION 2 F/W DETAIL OF ABJ001


22I10-PR009I

(SCALE: 1 : 50) (SCALE: 1 : 50) - (SCALE: 1 : 25)


G

FN-004A FN-005A FN-006A

CEMENTITIOUS GROUT
100.275 TOC

25 THK. NON SHRINK


FNJ001 FNJ001 FNJ004
RFJ001 RFJ001 RFJ004 100.000 HPP
ABJ001 ABJ001 ABJ004

P= 120
9250

99.000 PTS
2875

100.275 TOC

150
KEYPLAN

PLANT TRUE
NORTH NORTH

3.19°
22I10-PR009I

PR WIN
EV D
600

AI DIR
LI .
NG
H

96.800 BOF

CRANE ACCESS
FN-001A FN-002A
SECTION 4 SECTION 5
FN-003A
FNJ001
RFJ001
FNJ001 FNJ004
(SCALE: 1 : 50) - (SCALE: 1 : 25) -
RFJ001 RFJ004 21-G-8069

ABJ001 ABJ001 ABJ004


200

DN65
A

O
C
Z
22I10-PR009I

FOUNDATION PLAN
(SCALE: 1 : 100)

CHECKPRINT FOR SQUAD


500
550
==
UP

650 ==
200 == 280 AB-GR 36-1-M20-120-400
AB-GR 36-1-M20-120-400
== 200 AB-GR 36-1-M20-120-400 ==
==
OF PED.
OF PED.

OF PED.

6 6 8 8
200

205
600
==

==

==
280

205
500
==

==

==

7 7 - -
- -
280

205
550
==

==

==

- -
0 08.Aug.2023 IFC-Issued for Construction D.Patil A.Bagchi/D.Masekar M.Lazzaro
205 205 POCKET FOR SHEAR KEY Rev. Date Reason for Issue - Revision Description Prepared Checked Approved
205
== == (205x205x150 DEEP)
POCKET FOR SHEAR KEY == POCKET FOR SHEAR KEY
(205x205x125 DEEP)
(205x205x150 DEEP) OF PED.
OF PED. OF PED.

T
F/W DETAIL OF ABJ002 F/W DETAIL OF ABJ003 CONTRACTOR JOB CODE
(SCALE: 1 : 25)
(SCALE: 1 : 25)
4355
F/W DETAIL OF ABJ004
Ras Laffan Petrochemicals
CEMENTITIOUS GROUT

(SCALE: 1 : 25)
25 THK. NON SHRINK

Ras Laffan Industrial City, Qatar


CEMENTITIOUS GROUT
25 THK. NON-SHRINK

CEMENTITIOUS GROUT
25 THK. NON-SHRINK

MODEL NAME:4355-AA3D-22I10-PR009I
Polyethylene Plant
P= 120

Unit 22
P= 120

P= 120

100.275 TOC
150

100.275 TOC DOCUMENT TITLE


100.275 TOC
150

CONCRETE DRAWING
150

UNIT 22 PIPE RACK 22I10-PR009I


FOUNDATION PLAN & F/W DETAILS
CONTRACTOR DWG NO. SCALE

Isometric View
SECTION SECTION SECTION 4355-AA-DC-22I10PR09001 1:100
MOD - CADA0 E rev.1

6 7 8

A0 SHEET
(SCALE: 1 : 25) - (SCALE: 1 : 25) - (SCALE: 1 : 25) - DWG NO. Sht. No REV

22-CVDFN-I1053 - 0