LEMBAR REVISI
TABLE OF CONTENT
1. GENERAL 4
1.1. Scope 4
1.2. Codes and Standards 4
2. CHECK OF LIFELINE STRUCTURE 5
2.1 Drawing of Portal Strusture 5
3 LOAD DATA ANALYSIS 6
3.1 Self Weight Load (SWL) 6
3.2 Dead Load (DL) 6
3.3 Live Load (LL) 6
3.4 Load Combination 6
4 CHECK CALCULATION OF LIFELINE STRUCTURE 7
5 SUMMARY REPORT 38
6 EHS STEEL 41
7 EHS CONCRETE 42
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document
` No. 21BARA-PRO-0XX-01-CA
4 of 42
Rev. B Date 29-Oct-21
1. GENERAL
1.1. Scope
1.2. Codes and Standards
REGULATIONS AND REFERENCES USED
SNI 2847:2013 Persyaratan beton struktural untuk bangunan gedung
UBC 97 Uniform Building Code
AISC-ASD 01 American Institute of Steel Construction
ACI- 318
RSNI - S1
-3 -1727- American Concrete Institute
1989/Mod SEI Tata Cara Perhitungan Pembebanan Untuk Bangunan
/ASCE7-02 Rumah dan Gedung
UBC 97 Uniform Building Code
AISC-LRFD American Institute of Steel Construction
ACI- 318 - S1 American Concrete Institute
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document
` No. 21BARA-PRO-0XX-01-CA
5 of 42
Rev. B Date 29-Oct-21
2. CHECK OF LIFELINE STRUCTURE
2.1 Drawing of Portal Strusture
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document No. 21BARA-PRO-0XX-01-CA
6 of 42
Rev. B Date 29-Oct-21
1 9 10 11 12 13 14 15
SectionName tfb Area TorsConst I33 I22 AS2 AS3
Text mm mm2 mm4 mm4 mm4 mm2 mm2
L-75.75.7 1001 15761.42 536633.22 536633.22 525 525
WF-150.150.7.10 10 3910 110159.1 16006583 5628715.8 1050 2500
WF-150.75.5.7 7 1730 21677 6420256.7 493604.17 750 875
1 16 17 18 19 20 21 22
SectionName S33 S22 Z33 Z22 R33 R22 TotalWt
Text mm3 mm3 mm3 mm3 mm mm Kgf
L-75.75.7 9999.16 9999.16 18013.5 18013.5 23.154 23.154 44
WF-150.150.7.10 213421.1 75049.54 239575 114092.5 63.982 37.942 1026.57
WF-150.75.5.7 85603.42 13162.78 98195 20537.5 60.919 16.891 157.51
Total Weight 1228.08
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document No. 21BARA-PRO-0XX-01-CA
21 of 42
Rev. B Date 29-Oct-21
5. ACI 318 – 02 : American Concrete Institute : Building Code Requiriments for Buildings
6. API650 : American Petroleum Institute : Welded Steel Tanks for Oil Storage
8. ASTM A615 : American Society for Testing Materials Specification for Deformed
and Plain Billet Steel Bars for Concrete Reinforcement
9. ASTM A36 : Standard Specification for Structure Steel. and Heat Treated Joints
11. Soil test report yang dilakukan oleh Laboratorium PT. TESTANA ENGINEERING . Inc Surabaya
4.7 Material
Material Specification
Steel Grade : ASTM A-36 fy = 2400 kg/cm2
Concrete Grade : K-300 f`c = 280 kg/cm2
Bending Reinforcement : BJTD40/ASTM 615 fy = 4000 kg/cm2
Stirrup : BJTD24/ASTM 615 fy = 2400 kg/cm2
Anchor Bolt :
Concrete Dencity : γbeton = 2400 kg/m3
` ` ` `
DATA :
Ø= 300 mm
L= 4,000 mm
The Bearing capacity of bore Pile
Qd = QA +Qf
Qad= QA/3 + Qf/5
QA= qp x Ap = (Np xK )x Ap x α
qp= (Np xK )xApx α
S (safety factor) 3
Skin pile bearing
Qf= qf x Af = ( Naverage/3 +1 ) Af x β
Skin pile bearing
S (safety factor) 5
A= B x H = Area of mini pile (m2)
QA = End Pile bearing capacity
Qf = Friction bearing along pile
qf = friction /cleef t/m2
Ns = Average value of SPT along pile (L) , for 3 ≤ N ≤ 50
As = Circumference x along pile (L)
K = Soil characteristic Coefficient
K= 12 ton/m2 Clay
K= 20 ton/m2 Silt clay
K= 25 ton/m2 Silt sand
K= 40 ton/m2 Sand
Nilai N diambil dari data N-SPT yang dilakukan pada kedalaman , 0.000 mm - 30000 mm
N1= nilai rata- rata N-SPTpada kedalaman 4D di atas tiang
N1 =( n1+n2+n3)/ nn ----
N2= nilai rata- rata N-SPTpada kedalaman 4D di bawah tiang
N2 =( n1+n2+n3)/ nn ----
-4.00 3.0
-5.20 5.0
n total = 8.0
N2=N2avr = 4.0
N' = ( N1+N2)/2 = 4.0
Soil Investigation Test Data
` ` ` `
1 2 3 4 5 6 7 8
9 10
β=
(βclay+βsan Qf(ton)
d)/2
0.65 5.71
Total 5.71
ΣH
Lateral =
n
where: ΣV = Total Vertical load
ΣHx , ∑Hy = Total Horizontal load
ΣMx , ∑My = Total Moment load
n = Number of pile
x, y = Distance between pile to COG of piles group direction : x & y
xmax , ymax = Max distance between pile to COG of piles group direction : x & y
Design Pie Cup Foundation
Data :
L= 1,500.00 mm
B= 900.00 mm
H= 450.00 mm
Specific gravity 2400 kg/m3
Strouspile
Data :
Ø= 300 mm
L= 4,000 mm
Number = 2 ea
Specific gravity 2400 kg/m3
Paxial tot :
Qfound= 2,814.48 Kgf
F3left = 1237.46 Kgf
F3right = -380.61 Kgf
Paxial tot : 3,671.33 Kgf
M1 = (4.36) Kgf-m
M2= 20.44 Kgf-m
9 10 11 12 13
Pv Px max Py max P
Pile no My (ton.m)
ton ton ton ton
max 1.84
min 1.84
P allw = 2.415 ton
Pmax = 1.8 ton
Capacity I pile ok ( safe )
` ` ` `
= /∅/( ∗ )
=∅ ( ) = 0.7
As = 0.04 cm2 = 4 mm2
Bending Bar
Minimum flexural reinforcement is installed
D= 13 mm
A tul , As1 = 133 mm2
Mounted Bar :
Amount = 4 ea
Area = 531 mm2
531 > 74.0 mm2 (ok)
Shear Reinforcement
Used Bar :
ø= 10.00 mm
A tul , As1 = 157.08 mm2
= 1.57 cm2
ɸ( shear factor) = 0.75
Vu = 17.96 kg
Vn = Vu/Φ = Vc+Vs = 23.94 kg
Dictance of Stirrup c to c :
S = Av . Fy .d /Vs = - mm
Use stirrup Φ = 8.00 mm
Dictance of Stirrup c to c : 150 mm
Summary
Reinforcement Bar for 3 Strouspiles
Use Longbar 5 D13 - Spiral Stirrup Ø 8 -150
` ` ` `
Datas :
Concrete Section
W= 35 cm
D = 35 cm
Factored load moment
Pud = 1237.46 kg
Mud = 2044 kg-cm
Reinforcement Bar
φ = 13 mm
nst = 8 buah
φs = 8 mm
Wall thickness 5 cm
fc' = 280 kg/cm2
fy = 4000 kg/cm2
Reduction Factor
0.75
Calculation :
The nominal forces that the cross section :
Pnd = 1650 kg
Mnd = 2725 kg-cm
Total of Bar Area
2
Ast = 10.62 cm = 0.87% Ab
The condition of the section under pure compression:
Po = C +T = 331,497.11 kg
Po = C +T =
C= 0.85 x fc ( bxh-Ast) = 0.85 280 35 35 10.62
0.85 280 1214.38142
C= 0.85 x fc ( bxh-Ast) = 289,022.78 kg
` ` `
The maximum axial force that can be carried by a rectangular column section is:
Pmax = 0.8* Po = 265198 kg
Pmax > Pnd= 265198 < 1650 Ok
(The Coloumn Section is oke )
Effective cross-sectional height:
H= 35 cm
d'= 5 cm
φs = 0.8 cm
φ= 1.3 cm
d= 28.55 cm
d= 28.55 cm
s= 6.45 cm
Area of compressive and tensile reinforcement:
2
As (compressive) = 5.31 cm
2
As'(tencsile) = 5.31 cm
-
` `
`
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document No. 21BARA-PRO-0XX-01-CA
38 of 42
Rev. B Date 29-Oct-21
5 Summary Report
Pu = (0.043) kg
Pr 25,100 kg
MuMajDsgn = 501,889 kgmm = 502 kgm
PhiMnMaj = 5,336,402.28 kgmm = 5,336 kgm
MuMinDsgn (21) kgmm = (0) kgm
PhiMnMin 2,564,382 kgmm = 2,564 kgm
D/C ratio = 0.5*(Pr/Pc) + Mr33/Mc33 + Mr22/Mc33
0.5*(Pr/Pc) = 0.00000
Mr33/Mc33 = 0.09405
Mr22/Mc33 = 0.00001
D/C ratio = 0.09406
` `
`
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document No. 21BARA-PRO-0XX-01-CA
39 of 42
Rev. B Date 29-Oct-21
2 Control kl/r
k = 1.00
L = 580.00 cm
rx = 63.98 cm
ry = 37.94 cm
kL/rx = 15.29
15 < 200
OK !
3 Control of deflection
Allowable deflection ---- d = L/240
L= 5800 mm
` ` dallowable= 24.17 mm
` Max deflection = 4.626 mm
4.63 mm < 24.17 mm
O.K!
` `
`
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
Document No. 21BARA-PRO-0XX-01-CA
40 of 40
Rev. B Date 29-Oct-21
Note :
Conclusion :
Column WF .150.150.7.10 is safe
Beam WF.150.150.7.10 is safe
Bracing L.75.75.7 is safe
CALCULATION FOR LIFELINE STRUCTURE (MODIFICATION)
4.9.5 Beban hidup pada balok tepi atau gording . Pada balok atau gording tepi dari atap yang tidak ditunjang oleh dinding
atau penunjang lainnya dan pada kantilever harus ditinjau kemungkinan adanya beban hidup terpusat sebesar minimum 1,96
KN ~ 200kg
SUMMARY
EHS SAFETY
` - FOUNDATION
Grade Load Control
Diameter length Number PROPOSED ACTION
NO DECRIPTION REFERENCE SUMMARY
Ø (mm) (mm) Bar Pmax Ton) Plimit(ton) OK/NO PLAN
2 FOUNDATION
2.1 STROUSPILE FOUNDATION