Owners Installation, Operation, & Service Manual

Catalog Number: UIHCT225-WNNN


For United Imaging uCT760

Specifications: Compliance &


Main Breaker: CB1
Certifications:
• 480V / 225A / 3 Phase

AIC Rating:
• 25KAIC

Enclosure Dimensions:
(H)x(W)x(D)
• 36.5’’ x 17’’x 8’’

Advantages and Features


This Bevco Engineering Main Disconnect Panel provides a single point power connection
that significantly reduces installation time and valuable mounting space. The panel implements
several safety features that offers protection to the operator, patient, and imaging equipment. The
UL/cUL design covers North America, National Electrical Code, and Canadian Electrical code.
Bevco Engineering main disconnect panels are manufactured with proven components and each
panel is individually tested prior to shipment. The true Automatic Restart feature reduces the
operational downtime following power loss/facility power testing and does not require facility or
electrical personnel intervention. Also included in this design are UPS EPO connections, remote
and local Emergency Power Off buttons, UL, cUL, OSHPD, RoHS labeled, and the panel can be
surfaced or semi-flush mounted.

Advancing the industry since 1985 - Over 45,000 worldwide installations - Strategically designed by industry
leaders - State of the art manufacturing Proven and trusted components - Custom panel applications - UL, cUL, CE,
RoHS, and Seismic compliance - Direct supply chain to replacement parts - OSHA Lock Out/Tag Out Features -
ISO9001 Compliant - Single-point connection allows for quick and seamless installation

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 1 of 12
Owners Installation, Operation, & Service Manual

TABLE OF CONTENTS

Panel Catalog Number and Specifications......................................................................................................................... 1


Confidential and Proprietary ............................................................................................................................................. 3
Description of Operation.................................................................................................................................................... 3
Component Supplied with Each Panel .............................................................................................................................. 4
Safety and Maintenance ..................................................................................................................................................... 4
Warning .............................................................................................................................................................................. 4
Schematic ............................................................................................................................................................................ 5
Panel Images ....................................................................................................................................................................... 6
Panel Dimensions and Layout............................................................................................................................................ 7
Installation Guidelines and Procedures ............................................................................................................................. 8
Remote EPOs ...................................................................................................................................................................... 9
Electrical Specifications...................................................................................................................................................... 9
Seismic and Environmental Specifications ..................................................................................................................... 10
Trouble Shooting and Technical Support ....................................................................................................................... 11
Replacement Parts and Fuses ........................................................................................................................................... 11
Revision History ............................................................................................................................................................... 12
Technical Support and Contact Information .................................................................................................................. 12

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 2 of 12
Owners Installation, Operation, & Service Manual

Bevco Engineering Company CONFIDENTIAL AND PROPRIETARY


This Bevco document contains the confidential and proprietary information of Bevco Engineering Company. The
intellectual property contained herein is copyrighted and may not be used or copied to the detriment of Bevco
Engineering Company. The information contained in this document may not be copied or utilized without the
express written approval of Bevco Engineering Company.

DESCRIPTION OF OPERATION
This Bevco Engineering Main Disconnect Panel serves as the main power between the
facility power source and the imaging system. The MDP saves time, installation labor, and
valuable mounting space by consolidating the main circuit breaker, control circuit, and indicator
lights into a compact factory manufactured and tested panel. The load side of the main circuit
breaker (CB1), the contactor (C) feeding the CT PDU, and the control circuit (PS), will be de-
energized when any of the following occurs: the panels main circuit breaker is de-energized, the
operator handle is switched to the off position, an EPO is pressed, or the panels ON/OFF selector
switch (SS1) is set to the off position. Power will be restored automatically once the main circuit
breaker is re-energized, provided the main circuit breaker operator handle and all EPOs are set
to the normal operating position, as well as the panels system ON/OFF switch is set to the ON
position. If an Emergency Power Off button has been pressed at any time it must be reset by
rotating the dial clockwise. Once the EPO is reset the contacts will open and automatically re-
energizing the control circuit restoring power to the imaging equipment. The control circuit is
factory configured to automatically re-energize the imaging equipment upon restoration of
facility power following outages created by planned testing, surges, storms, and other similar
interruptions without the need for facility or electrical staff intervention. The output power of
the main disconnect panel is enabled through a low voltage 24VDC control circuit wired in
series. The control circuit consists of normally closed contacts and are located on the panel
covers ON/OFF selector switch, EPO, and the remote EPO pushbutton(s). The panel is equipped
with one EPO built into the enclosure door and 2 optional remote EPOs are provided with each
panel. The UIHCT225-WNNN provides the means to lock-out/tag-out the power circuit per
OSHA standards and safeguards the technician in the event service is required for the imaging
equipment. In-Use room warning light connections for 24VDC and 120VAC are included in the
design. 24VDC applications are powered from within the panel while 120VAC requires external
power to be supplied.

WARNING: If building power is removed from the panel while the system is in normal operation, the CT Main
Disconnect Panel will automatically re-energize when building power is restored

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 3 of 12
Owners Installation, Operation, & Service Manual

COMPONENTS SUPPLIED WITH EACH PANEL


1. The UIHCT225-WNNN Main Disconnect Panel
2. This installation Operations & Service Manual (English Only)
3. (2) Sets of Emergency Power Off push buttons with 2 NC contacts on each EPO
4. Drawings and Electrical Schematics

SAFETY AND MAINTENANCE


• Troubleshooting and servicing should be performed by a qualified electrician
• Always wear proper personal arc flash protection and observe the lock out/tag out
requirements of your employer and the facility you are working at
• De-energize and lockout the main disconnect before servicing this panel
• A Structural engineer shall define the proper fixing and anchoring hardware for the
installation to the wall of the MDP. Type and model of anchoring and the necessary
tightening torque shall be recorded in a document left in the MDP log book. A paint or lack
mark shall be applied on screw head, to facilitate further visual inspection.
• Prior to service or testing ensure that the Main Circuit Breaker (CB1) settings are properly set
according to the Instantaneous Trip Setting called out on the schematic. These settings come
factory set and are tested prior to shipping.
• Prior to service or testing ensure that no one is working on or near the equipment this panel
energizes

WARNING
• Always wear proper personal arc flash
protection and observe the lock out and
tag out requirements of your employer
and the facility you are working at
• Verify all factory and field electrical
connections are properly tightened
• Verify all voltages are as stated on the panel drawing
• If building power is removed from the panel while the system is in normal operation, the
CT Main Disconnect Panel will automatically re-energize when building power is restored

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 4 of 12
Owners Installation, Operation, & Service Manual

SCHEMATIC

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 5 of 12
Owners Installation, Operation, & Service Manual

PANEL IMAGES

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 6 of 12
Owners Installation, Operation, & Service Manual

PANEL AND DIMENSIONS AND LAYOUT

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 7 of 12
Owners Installation, Operation, & Service Manual

INSTALLATION
Guidelines
• Installation and servicing must only be performed by persons qualified and familiar with 480V power
distribution systems and must observe proper safety and arc flash requirements
• The enclosure must be mounted at a height that does not allow the top of the main circuit breaker
handle to exceed 6 feet, 7 inches when in the ON position. (Per National Electric Code (NEC # 404.8)
• Incoming power is connected to the main circuit breaker located at the upper right of the Main
Disconnect Panel. Refer to the schematic drawing for the incoming conductor size range and
tightening torques
• There are no conduit knockouts provided in the panel. The installer must punch the conduit holes in
the enclosure walls in the desired locations. The conduits may enter on the top of the enclosure.
• When drilling or punching the conduit entry holes, protect the internal components from falling
metal chips and remove all debris following installation
• All conductors must be sized per the wiring shown on the electrical schematic located inside of the
enclosure
• Please verify that all electrical connection are torqued correctly and that they have not loosened
during shipping.
Procedures
1. Connect the incoming power to the Line side of the main circuit breaker (CB1), conductor range #8 -
#1AWG
2. Connect the CT PDU to the load side of the contactor (C), conductor range #6AWG - 250MCM
3. Room Warning Light Connections as follows:
• 24VDC, internal power is supplied at TB1-5 and TB1-2
• 120VAC, requires an external power source to be terminated at TB1-17 and TB1-20 and Room
Warning Light terminations to be landed on TB1-19 and TB1-20, Conductor range #22 - #8AWG
4. Remote Emergency Power Off conductor range and connections are as follows:
• If only one EPO is installed ONLY the violet bypass jumper wire with yellow tag should be
removed from the TB1-7 and TB1-8 terminals and replaced with the normally closed EPO
pushbutton provided. Conductor range, #22 - #8AWG.
• If a second Remote EPO is installed the violet bypass jumper wire with yellow tag should be
removed from the TB1-8 and TB1-9 terminals and replaced with the second EPO provided.
Conductor range, #22 - #8AWG.
• The optional UPS EPO terminals are located at TB1-15 and TB1-16. Conductor range, #22 -
#8AWG.

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 8 of 12
Owners Installation, Operation, & Service Manual

REMOTE EPO
EPO-NCNC-F: This part number comes with two normally closed contact blocks attached
to the back of the emergency off push button. Two are included with each System Main
Disconnect Panel (NOTE: This emergency off push button must be mounted in an extra deep
switch box with mud ring. The contact block on the back of the EPO extends 1.38” into the
switch box and terminates from the side.)

SPECIFICATIONS
Electrical Specifications
UL design and ratings of this panel require the application of wire at the 75°C ampacity ratings of NEC table
310.16. Wire rated at higher temperature ratings, such as 90°C, may be used but ONLY applied at the 75°C
ampacity ratings of NEC Table 310.16.
Incoming
Incoming Power *Main Circuit Regulatory
Catalog Number Voltage
Configuration Breaker Rating Markings
& Frequency
UIHCT225-WNNN 480VAC, 60Hz 3Ø + Ground 225 Amps OSHPD, UL, cUL

Short Circuit Current Rating is 25,000 Amperes RMS Symmetrical @ 480V

*To be installed with appropriate rating plug

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 9 of 12
Owners Installation, Operation, & Service Manual

SPECIFICATIONS (Continued)

• Seismic Specifications:
This Main Disconnect Panel has been
certified by an independent California structural
engineer in conformance with the shake testing
requirements of ICC-AC 156. The California
OSHPD number is OSP-0457-10.

The seismic performance characteristics are as follows: SDS(g) ≤ 2.56; z/h ≤ 1.0 ; Ip ≤ 1.5

• Environmental Specifications:
FOR INDOOR USE ONLY
Temperature 59-90°F (15-32°C)
Humidity 30-75%, NON-CONDENSING

• Electrical Wiring Diagram


The Electrical Wiring Diagram is adhered to the inside of the enclosure door for
convenient reference to the circuitry. A complete set of the panel drawings are also
attached to the back of this manual when shipped with the disconnect panel.

TROUBLE SHOOTING
Symptom Possible Solutions
• Verify that all EPOs are in the normal operating position by rotating the dial
No Power to the CT clockwise
• Verify that incoming, 480VAC is present on all 3 phases at CB1
FOR INQUIRIES DURING • Verify that 480V is present on the load side of CB1
INSTALLATION, FIRST • Verify that 480V is present on the output side of the contactor feeding the PDU
IDENTIFY THE SERIAL • Verify the DC power supply Fuses (FU1) are installed according to the fuse
NUMBER AND THE replacement chart located on the schematic
MANUFACTURING • Verify that 277V is present at the incoming terminal of the power supply and
DATE LOCATED ON THE that 24VDC is present on the outgoing terminals of the power supply to the
LABEL INSIDE OF THE control circuit components
ENCLOSURE, THEN • Verify that 24VDC is present throughout the control circuit and control relay for
CONTACT BEVCO the auxiliary contacts (K)
ENGINEERING AT: • If remote EPOs have been installed verify that the violet bypass jumper has
(262) 820-2400 been removed and that the EPO connection are terminated correctly

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 10 of 12
Owners Installation, Operation, & Service Manual

REPLACEMENT PARTS
Device Tag Part Number DESCRIPTION
C CK08CE311W250-500 3 Pole Contactor, 250-500V
C CKX03 Contactor Lugs
CB1 SFHA36AT0250 3 Pole circuit breaker, 250A Frame
CB1 SRPF250A225 225A Rating Plug
CB1 SEFHM2 Operating Handle
CB1 TCAL29 Main Circuit Breaker Lugs
K1 MCRC022ATD 24VDC control relay
K2 PRC1T20CDL 24VDC control interface
E01 P9B01VN NC/NC Contact Block
E02 P9B01VN NC/NC Contact Block
PS 1469530000 24VDC Power Supply

PARTS, TECHNICAL SUPPORT, & SERVICE


FOR INQUIRIES DURING INSTALLATION, FIRST IDENTIFY THE SERIAL NUMBER AND THE
MANUFACTURING DATE LOCATED ON THE LABEL INSIDE OF THE ENCLOSURE, THEN
CONTACT BEVCO ENGINEERING AT:
(262) 820-2400

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 11 of 12
Owners Installation, Operation, & Service Manual

Revision History
REV DATE AUTHOR PRIMARY REASONS FOR CHANGE
1 01/18/2019 James Taylor Initial Release

PARTS, TECHNICAL SUPPORT, & SERVICE


FOR INQUIRIES DURING INSTALLATION, FIRST IDENTIFY THE SERIAL NUMBER AND THE
MANUFACTURING DATE LOCATED ON THE LABEL INSIDE OF THE ENCLOSURE, THEN
CONTACT BEVCO ENGINEERING AT:
(262) 820-2400

UIHCT225-WNNN Owners Installation Operation Service Manual Rev 1.0 January 18, 2019 Page 12 of 12