Professional Documents
Culture Documents
Kodak Kingii Twin Manual 20220111
Kodak Kingii Twin Manual 20220111
Purpose ............................................................................................................................................................ 1
Scope ............................................................................................................................................................... 1
SAFETY INSTRUCTIONS................................................................................................................................... 1
INTRODUCTION ................................................................................................................................................. 2
Features ........................................................................................................................................................... 2
Basic System Architecture ............................................................................................................................... 2
Product Overview............................................................................................................................................. 3
Unpacking and Inspection ............................................................................................................................... 4
Preparation ...................................................................................................................................................... 4
Mounting the Unit ............................................................................................................................................. 4
Battery Connection .......................................................................................................................................... 5
AC Input/Output Connection ............................................................................................................................ 6
PV Connection ................................................................................................................................................. 8
Final Assembly ................................................................................................................................................. 9
Communication Connection ............................................................................................................................. 9
Dry Contact Signal ......................................................................................................................................... 10
OPERATION ...................................................................................................................................................... 11
SPECIFICATIONS ............................................................................................................................................. 46
Scope
This manual provides safety and installation guidelines as well as information on tools and wiring.
SAFETY INSTRUCTIONS
WARNING: This chapter contains important safety and operating instructions. Read and keep
this manual for future reference.
1. Before using the unit, read all instructions and cautionary markings on the unit, the batteries and all
appropriate sections of this manual.
2. CAUTION – To reduce risk of injury, charge only deep-cycle lead acid type rechargeable batteries.
Other types of batteries may burst, causing personal injury and damage.
3. Do not disassemble the unit. Take it to a qualified service center when service or repair is required.
Incorrect re-assembly may result in a risk of electric shock or fire.
4. To reduce risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning.
Turning off the unit will not reduce this risk.
5. CAUTION – Only qualified personnel can install this device with battery.
6. NEVER charge a frozen battery.
7. For optimum operation of this inverter/charger, please follow required spec to select appropriate cable
size. It’s very important to correctly operate this inverter/charger.
8. Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop
a tool to spark or short circuit batteries or other electrical parts and could cause an explosion.
9. Please strictly follow installation procedure when you want to disconnect AC or DC terminals. Please
refer to INSTALLATION section of this manual for the details.
10. Fuses are provided as over-current protection for the battery supply.
11. GROUNDING INSTRUCTIONS -This inverter/charger should be connected to a permanent grounded
wiring system. Be sure to comply with local requirements and regulation to install this inverter.
12. NEVER cause AC output and DC input short circuited. Do NOT connect to the mains when DC input
short circuits.
13. Warning!! Only qualified service persons are able to service this device. If errors still persist after
following troubleshooting table, please send this inverter/charger back to local dealer or service
center for maintenance.
14. WARNING: Because this inverter is non-isolated, only three types of PV modules are acceptable:
single crystalline, poly crystalline with class A-rated and CIGS modules. To avoid any malfunction, do
not connect any PV modules with possible current leakage to the inverter. For example, grounded PV
modules will cause current leakage to the inverter. When using CIGS modules, please be sure NO
grounding.
15. CAUTION: It’s required to use PV junction box with surge protection. Otherwise, it will cause
damage on inverter when lightning occurs on PV modules.
1
INTRODUCTION
This is a multi-function inverter, combining functions of inverter, solar charger and battery charger to offer
uninterruptible power support in a single package. The comprehensive LCD display offers user-configurable
and easy-accessible button operations such as battery charging current, AC or solar charging priority, and
acceptable input voltage based on different applications.
Features
Pure sine wave inverter
Customizable status LED ring with RGB lights
Touchable button with 4.3” colored LCD
Built-in Wi-Fi for mobile monitoring (APP is available)
Supports USB On-the-Go function
Data log events stored in the inverter
Built-in anti-dusk kit
Reserved communication port for BMS
Battery independent function
Parallel operation up to 9 units
This inverter can power various appliances in home or office environment, including motor-type appliances
such as tube light, fan, refrigerator and air conditioners.
2
Product Overview
Single model
Parallel model
NOTE: For parallel installation and operation, please check Appendix I.
1. RGB LED ring (refer to LCD Setting section for the details)
2. LCD display
3. Touchable Function keys
4. PV connectors
5. AC output connectors (Load connection)
6. AC input connectors
7. Battery connectors
8. Current sharing port
9. Parallel communication port
10. Circuit breaker
11. Power switch
12. Dry contact
13. USB port as USB communication port and USB function port
14. RS-232 communication port
15. BMS communication port: CAN, RS-485 or RS-232
3
INSTALLATION
Preparation
Before connecting all wirings, please take off bottom cover by removing two screws as shown below.
4
Install the unit by screwing three screws. It’s recommended to use M4 or M5 screws.
Battery Connection
CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current
protector or disconnect device between battery and inverter. It may not be required to have a disconnect device
in some applications, however, it’s still required to have over-current protection installed. Please refer to typical
amperage in below table as required fuse or breaker size.
Ring terminal:
5
WARNING: Shock Hazard
Installation must be performed with care due to high battery voltage in series.
CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring
terminal. Otherwise, overheating may occur.
CAUTION!! Do not apply anti-oxidant substance on the terminals before terminals are connected
tightly.
CAUTION!! Before making the final DC connection or closing DC breaker/disconnector, be sure
positive (+) must be connected to positive (+) and negative (-) must be connected to negative
(-).
AC Input/Output Connection
CAUTION!! Before connecting to AC input power source, please install a separate AC breaker between
inverter and AC input power source. This will ensure the inverter can be securely disconnected during
maintenance and fully protected from over current of AC input.
CAUTION!! There are two terminal blocks with “IN” and “OUT” markings. ENSURE that utility AC input is
connected to IN and load AC to OUT and not the wrong way round and also that Line and Neutrals are
connected correctly.
6
WARNING:
Be sure that AC power source is disconnected before attempting to hardwire it to the unit.
4. Then, insert AC output wires according to polarities indicated on terminal block and tighten terminal
screws. Be sure to connect PE protective conductor ( ) first.
→Ground (yellow-green)
L1→LINE (brown or black)
N1→Neutral (blue)
L2→LINE (brown or black)
N2→Neutral (blue)
CAUTION: Appliances such as air conditioner are required at least 2~3 minutes to restart because it’s required
to have enough time to balance refrigerant gas inside of circuits. If a power shortage occurs and recovers in a
short time, it will cause damage to your connected appliances. To prevent this kind of damage, please check
manufacturer of air conditioner if it’s equipped with time-delay function before installation. Otherwise, this
inverter/charger will trig overload fault and cut off output to protect your appliance but sometimes it still causes
internal damage to the air conditioner.
7
PV Connection
CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between
inverter and PV modules.
CAUTION: Please install a surge protection device between inverter and PV modules and the recommended
voltage is 500V.
WARNING! Do switch off the inverter before connecting to PV modules. Otherwise, it will cause inverter
damage.
WARNING! Do NOT connect negative and positive terminal of PV modules to the ground.
PV Module Selection:
When selecting proper PV modules, please be sure to consider below parameters:
1. Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of inverter.
2. Open circuit Voltage (Voc) of PV modules should be higher than min. battery voltage.
Final Assembly
After connecting all wirings, please put bottom cover back by screwing two screws as shown below.
Communication Connection
Serial Connection
Please use the supplied serial cable to connect between the inverter and your PC. Install the monitoring software
from the bundled CD and follow the on-screen instructions to complete your installation. For detailed software
operation, refer to the software user manual on the bundled CD.
Wi-Fi Connection
This unit is equipped with a Wi-Fi transmitter. Wi-Fi transmitter can enable wireless communication between
off-grid inverters and monitoring platform. Users can access and control the monitored inverter with
downloaded APP. You may find “WatchPower” app from the Apple® Store or “WatchPower Wi-Fi” in Google®
Play Store. All data loggers and parameters are saved in iCloud. For quick installation and operation, please
refer to Appendix III - The Wi-Fi Operation Guide for details.
9
BMS Communication
It is recommended to purchase a special communication cable if you are connecting to Lithium-Ion battery
banks. Please refer to Appendix II - BMS Communication Installation for details.
RS-232 communication to PC
BMS communication
USB communication
to PC
10
OPERATION
Power ON/OFF
Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch to
turn on the unit.
LCD Display
Touchable
Function keys
11
LCD Display Icons
12
Output Information
Indicate the output voltage, load in VA, load in Watt and output
frequency.
The ICON flashing indicates the unit with AC output and setting
programs 60, 61 or 62 different from default setting.
Battery Information
Indicates battery level in battery mode and charging status in line
mode by 0-24%, 25-49%, 50-74% and 75-100%.
When battery is charging, it will present battery charging status.
Status Battery voltage LCD Display
<2V/cell 4 bars will flash in turns.
Constant The right bar will be on and the other three bars
2 ~ 2.083V/cell
will flash in turns.
Current mode / The right two bars will be on and the other two
2.083 ~ 2.167V/cell
Constant bars will flash in turns.
Voltage mode The right three bars will be on and the left bar
> 2.167 V/cell
will flash.
Floating mode. Batteries are fully charged. 4 bars will be on.
In battery mode, it will present battery capacity.
Load Percentage Battery Voltage LCD Display
< 1.85V/cell
1.85V/cell ~ 1.933V/cell
Load >50%
1.933V/cell ~ 2.017V/cell
> 2.017V/cell
< 1.892V/cell
1.892V/cell ~ 1.975V/cell
Load < 50%
1.975V/cell ~ 2.058V/cell
> 2.058V/cell
Load Information
Indicates overload.
0%~24% 25%~49%
50%~74% 75%~100%
13
Indicates setting program 16 “Charger source priority” is selected as
“Solar and Utility”.
Indicates setting program 16 “Charger source priority” is selected as
“Solar only”.
Output source priority setting display
14
LCD Setting
General Setting
After pressing and holding “ ” button for 3 seconds, the unit will enter the setting mode. Press “ ” or “ ”
button to select setting programs. Press “ ” button to confirm you selection or “ ” button to exit.
Setting Programs:
Program Description Selectable option
Escape
Solar first
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient
to power all connected loads,
Output source priority: Utility energy will supply power
01 To configure load power to the loads at the same time.
source priority
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient
SBU priority
to power all connected loads,
battery energy will supply
power to the loads at the same
time.
Utility provides power to the
loads only when battery
voltage drops to either low-
level warning voltage or the
setting point in program 12.
Maximum charging current: 60A (default)
To configure total charging
current for solar and utility Setting range is from 10A to
02 chargers. 120A for 6.2KW model.
(Max. charging current = Increment of each click is 10A.
utility charging current +
solar charging current)
15
AGM (default) Flooded
05 Battery type
WECO battery If selected, programs of 02,
12, 26, 27 and 29 will be auto-
configured per battery supplier
recommended. No need for
further adjustment.
16
3rd party Lithium battery Select “LIC” if using lithium
batteries not listed above,
programs of 02, 26, 27 and 29
will be automatically set up.
05 Battery type
No need for further setting.
Please contact the battery
supplier for installation
procedure.
Restart disable (default) Restart enable
09 Output frequency
17
ECO Mode If selected and bypass is not
forbidden in program 23,
inverter will work in ECO mode
when utility is available.
Setting range is FUL and from 48V to 64V. Increment of each click
is 1V.
Battery fully charged 54V (default)
18
If this inverter/charger is working in Line, Standby or Fault mode,
charger source can be programmed as below:
SbL: Solar energy for battery Solar energy charges battery first
first and allow the utility to charge
UCB: Allow utility to charge battery.
battery (default)
SbL: Solar energy for battery Solar energy charge battery first
first and disallow the utility to charge
UdC: Disallow utility to charge battery.
battery
Charger source
priority:
16
To configure charger
source priority
SLb: Solar energy for load first Solar energy provides power to the
UCb: Allow utility to charge load first and also allow the utility
battery to charge battery.
SLb: Solar energy for load Solar energy will be the only
first charger source no matter utility is
UdC: Disallow utility to charge available or not.
battery
18 Alarm control
19
Return to default display screen If selected, no matter how users
(default) switch display screen, it will
automatically return to default
display screen (Input voltage
/output voltage) after no button is
pressed for 1 minute.
20 Backlight control
Overload bypass:
When enabled, the
unit will transfer to line
23
mode if overload Bypass disable If selected and power ON button is
occurs in battery
pressed on, inverter can work in
mode.
bypass/ECO mode only if utility is
available.
20
Bypass enable (default) If selected and no matter power ON
button is pressed on or not,
inverter can work in bypass mode if
utility is available.
AC output mode
*This setting is only
28 available when the
inverter is in standby L1 phase: L2 phase:
mode (Switch off).
21
L3 phase:
900 min
22
If “Flooded” or “User-Defined” is selected in program 05, this program
can be set up.
Battery equalization Battery equalization disable
(Default)
33 Battery equalization
Battery equalization
34
voltage
30days (Default)
Equalization activated
39
immediately
23
If equalization function is enabled in program 33, this program can be
set up. If “Enable” is selected in this program, it’s to activate battery
equalization immediately and LCD main page will shows “ ”. If
“Disable” is selected, it will cancel equalization function until next
activated equalization time arrives based on program 37setting. At this
time, “ ” will not be shown in LCD main page.
Not reset (Default) Reset
24
Not reset (Default) Reset
3 minutes 5 minutes
30 minutes 60 minutes
25
For month setting, the range is
from 1 to 12.
26
Power cycling Power wheel
27
Energy source (Grid-PV-Battery)
If selected, the LED color will be
background color setting in #40 in
AC mode. If PV power is active, the
Data presentation for
LED color will be data color setting
data color
in #41. If the remaining status, the
*Energy source (Grid-
LED color will be set in #42.
PV-Battery) and battery
95
charge/discharge status Battery charge/discharge status
only available when RGB If selected, the LED color will be
LED effects is set to background color setting in #40 in
Solid on. battery charging status. The LED
color will be data color setting in
#41 in battery discharging status.
Pink Orange
Yellow Green
Background color of
96 Blue Sky blue (Default)
RGB LED
28
Pink Orange
Pink Orange
Background color of
RGB LED
*Only available when
98
program 95 is set as Yellow Green
“EGS” Energy source
(Grid-PV-Battery).
29
Blue Sky blue (Default)
Background color of
RGB LED
*Only available when
98 Other: If selected, the background
program 95 is set as Purple
color is set by RGB via software.
“EGS” Energy source
(Grid-PV-Battery).
Once access this program, it will show “OPP” in LCD. Press “ ” button
to select timer setting for output source priority. There are three timers
to set up. Press “ ” or “ ” button to select specific timer option.
Then, press “ ” to confirm timer option. Press “ ” or “ ” button
to adjust starting time first and the setting range is from 00 to 23.
Increment of each click is one hour. Press “ ” to confirm starting time
setting.Next, the cursor will jump to right column to set up end time.
Timer Setting for Output Once end time is set completely, press “ ” to confirmall setting.
Source Priority Utility first timer Solar first timer
99
Timer Setting for Once access this program, it will show “CGP” in LCD. Press “ ” button
Charger Source Priority to select timer setting for charger source priority. There are three timers
to set up. Press “ ” or “ ” button to select specific timer option.
Then, press “ ” to confirm timer option. Press “ ” or “ ” button
100
to adjust starting time first and the setting range is from 00 to 23.
Increment of each click is one hour. Press “ ” to confirm starting time
setting.Next, the cursor will jump to right column to set up end time.
Once end time is set completely, press “ ” to confirmall setting.
30
Solar first Sloar and utility
Only solar
31
USB Function Setting
There are three USB function setting such as firmware upgrade, data log export and internal parameter re-
write from the USB disk. Please follow below procedure to execute selected USB function setting.
Procedure LCD Screen
Step 1: Insert an OTG USB disk into the USB port (L).
Export data If the selected function is ready, LCD will display “ ”. Press
log
“ ” button to confirm the selection again.
Error message:
Error Code Messages
No USB disk is detected.
If any error occurs, error code will only show 3 seconds. After 3 seconds, it will automatically return to
display screen.
32
LCD Display
The LCD display information will be switched in turn by pressing the “ ” or “ ” button. The selectable
information is switched as the following table in order.
Selectable information LCD display
Input Voltage=230V, Input frequency=50Hz
Default
PV voltage/ PV current/ PV power
Display
Screen
33
Battery voltage=53.9V, Floating charging voltage=54.0V,
Charging current=2A
Default
Display
Screen Output voltage=230V, Output frequency=50Hz
34
Load in Watt=2.4kW, Output frequency=50Hz
Default
Display 2nd output is off.
Screen L2 output voltage=0, L2 output frequency=0 Hz
Real date.
35
Real time 11:31.
Real time.
36
Total PV energy generation = 0.5kWh.
37
Load Output Total energy = 0.4kWh.
38
Operating Mode Description
Operation mode Description LCD display
Charging by utility and PV energy.
Charging by utility.
Standby mode
Note:
*Standby mode: The No output is supplied
inverter is not turned on by the unit but it still
yet but at this time, the can charge batteries.
inverter can charge battery Charging by PV energy.
without AC output.
No charging.
39
Operation mode Description LCD display
No charging.
Fault mode
Note:
*Fault mode: Errors are
caused by inside circuit No output is supplied
error or external reasons by the unit.
such as over temperature,
output short circuited and
so on.
Charging by utility.
Charging by PV energy.
40
No charging
Charging by utility.
41
Operation mode Description LCD display
If either “SUB” (solar first) or “SBU” is selected as
output source priority and battery is not connected,
solar energy and the utility will provide the loads.
42
Operation mode Description LCD display
Power from battery only.
02 Over temperature
10 PV over current
51 OP over current
43
53 Inverter soft start failed
Warning Indicator
Warning
Warning Event Audible Alarm Icon flashing
Code
Beep three times every
01 Fan is locked when inverter is on.
second
44
BATTERY EQUALIZATION
Equalization function is added into charge controller. It reverses the buildup of negative chemical effects like
stratification, a condition where acid concentration is greater at the bottom of the battery than at the top.
Equalization also helps to remove sulfate crystals that might have built up on the plates. If left unchecked, this
condition, called sulfation, will reduce the overall capacity of the battery. Therefore, it’s recommended to
equalize battery periodically.
When to Equalize
In float stage, when the setting equalization interval (battery equalization cycle) is arrived, or equalization is
active immediately, the controller will start to enter Equalize stage.
However, in Equalize stage, when battery equalized time is expired and battery voltage doesn’t rise to battery
equalization voltage point, the charge controller will extend the battery equalized time until battery voltage
achieves battery equalization voltage. If battery voltage is still lower than battery equalization voltage when
battery equalized timeout setting is over, the charge controller will stop equalization and return to float stage.
45
SPECIFICATIONS
Table 1 Line Mode Specifications
INVERTER MODEL 6.2KW
Input Voltage Waveform Sinusoidal
Nominal Input Voltage 230Vac
Input Voltage range 110Vac-280Vac
Low Loss Voltage 110Vac ± 7V
Low Loss Return Voltage 120Vac± 7V
High Loss Voltage 280Vac± 7V
High Loss Return Voltage 270Vac± 7V
Max AC Input Voltage 300Vac
Nominal Input Frequency 50Hz / 60Hz (Auto detection)
Low Loss Frequency 46± 1Hz @50Hz; 56± 1Hz @60Hz
Low Loss Return Frequency 46.5± 1Hz @50Hz; 57± 1Hz @60Hz
High Loss Frequency 54± 1Hz @50Hz; 64± 1Hz @60Hz
High Loss Return Frequency 53± 1Hz @50Hz; 63± 1Hz @60Hz
Power Factor >0.98
Output Short Circuit Protection Line mode: Circuit Breaker
Battery mode: Electronic Circuits
Efficiency (Line Mode) 93% (Peak Efficiency)
Transfer Time Line mode←→Battery mode 0ms
Inverter←→Bypass 4ms
46
High DC Cut-off Voltage 66Vdc
No Load Power Consumption <75W
2.43Vdc (2.35Vdc)
Voltage
2.25Vdc
100%
Charging Curve
50%
T0 T1
T1 = 10* T0, minimum 10mins, maximum 8hrs
Current
Time
Bulk Absorption Maintenance
(Constant Current) (Constant Voltage) (Floating)
47
Table 4 ECO/Bypass Mode Specifications
INVERTER MODEL 6.2KW
Input Voltage Waveform Sinusoidal
Low Loss Voltage 176Vac± 7V
Low Loss Return Voltage 186Vac± 7V
High Loss Voltage 280Vac± 7V
High Loss Return Voltage 270Vac± 7V
Nominal Input Frequency 50Hz / 60Hz (Auto detection, 55Hz as boundary)
Low Loss Frequency 46± 1Hz @50Hz; 56± 1Hz @60Hz
Low Loss Return Frequency 46.5± 1Hz @50Hz; 57± 1Hz @60Hz
High Loss Frequency 54± 1Hz @50Hz; 64± 1Hz @60Hz
High Loss Return Frequency 53± 1Hz @50Hz; 63± 1Hz @60Hz
48
TROUBLE SHOOTING
Problem LCD/LED/Buzzer Explanation / Possible cause What to do
Unit shuts down LCD/LEDs and buzzer
automatically will be active for 3 The battery voltage is too low 1. Re-charge battery.
during startup seconds and then (<1.91V/Cell) 2. Replace battery.
process. complete off.
1. The battery voltage is far too 1. Check if batteries and the
No response after low. (<1.4V/Cell) wiring are connected well.
No indication.
power on. 2. Battery polarity is connected 2. Re-charge battery.
reversed. 3. Replace battery.
Input voltage is
Check if AC breaker is tripped
displayed as 0 on the
Input protector is tripped and AC wiring is connected
LCD and green LED
well.
is flashing.
1. Check if AC wires are too
Mains exist but the
thin and/or too long.
unit works in
Green LED is Insufficient quality of AC power. 2. Check if generator (if
battery mode.
flashing. (Shore or Generator) applied) is working well or if
input voltage range setting is
correct. (UPSAppliance)
Green LED is Set “Solar First” as the priority of Change output source
flashing. output source. priority to Utility first.
When the unit is
turned on, internal LCD display and Check if battery wires are
Battery is disconnected.
relay is switched on LEDs are flashing connected well.
and off repeatedly.
Reduce the connected load
Overload error. The inverter is
Fault code 07 by switching off some
overload 110% and time is up.
equipment.
Check if wiring is connected
Fault code 05 Output short circuited. well and remove abnormal
load.
Check whether the air flow of
Internal temperature of inverter the unit is blocked or
Fault code 02
component is over 100°C. whether the ambient
temperature is too high.
Battery is over-charged. Return to repair center.
Fault code 03 Check if spec and quantity of
Buzzer beeps The battery voltage is too high. batteries are meet
continuously and requirements.
red LED is on. Fault code 01 Fan fault Replace the fan.
Output abnormal (Inverter 1. Reduce the connected
Fault code 06/58 voltage below than 190Vac or is load.
higher than 260Vac) 2. Return to repair center
Fault code
Internal components failed. Return to repair center.
08/09/53/57
Fault code 51 Over current or surge.
Restart the unit, if the error
Fault code 52 Bus voltage is too low. happens again, please return
to repair center.
Fault code 55 Output voltage is unbalanced.
If the battery is connected
Battery is not connected well or
Fault code 56 well, please return to repair
fuse is burnt.
center.
49
Appendix I: Parallel function
1. Introduction
This inverter can be used in parallel with two different operation modes.
1. Parallel operation in single phase is with up to 9 units. The supported maximum output power
55.8KW/55.8KVA.
2. Maximum 9 units work together to support three-phase equipment. Maximum seven units support one
phase.
WARNING: Please make sure all output N wires of each inverter should be connected always. Otherwise, it
will cause fault in error #72.
2. Package Contents
If the inverter is single model, please purchase parallel kit separately. In parallel kit, you will find the following
items in the package:
Step 2: Remove two screws as below chart and remove 2-pin and 14-pin cables. Take out the board under the
communication board.
50
Step 3: Remove two screws as below chart to take out cover of parallel communication.
Step 8: Put wire cover back to the unit. Now the inverter is providing parallel operation function.
51
4. Mounting the Unit
When installing multiple units, please follow below chart.
NOTE: For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and approx.
50 cm above and below the unit. Be sure to install each unit in the same level.
5. Wiring Connection
NOTICE: It’s required to connect to battery for parallel operation.
The cable size of each inverter is shown as below:
Recommended battery cable and terminal size for each inverter:
Ring Terminal Ring terminal:
Torque
Model Wire Size Cable Dimensions
value
mm2 D (mm) L (mm)
1*2AWG or
6.2KW 28 6.4 42.7 2~3
2*4AWG
WARNING: Be sure the length of all battery cables is the same. Otherwise, there
will be voltage difference between inverter and battery to cause parallel inverters
not working.
Recommended AC input and output cable size for each inverter:
Model AWG no. Torque
6.2KW 10 AWG 1.2~ 1.6Nm
You need to connect the cables of each inverter together. Take the battery cables for example: You need to
use a connector or bus-bar as a joint to connect the battery cables together, and then connect to the battery
terminal. The cable size used from joint to battery should be X times cable size in the tables above. “X”
indicates the number of inverters connected in parallel.
Regarding AC input and output, please also follow the same principle.
CAUTION!! Please install the breaker at the battery and AC input side. This will ensure the inverter can be
securely disconnected during maintenance and fully protected from over current of battery or AC input. The
recommended mounted location of the breakers is shown in the figures in 5-1 and 5-2.
Recommended breaker specification of battery for each inverter:
Model 1 unit*
6.2KW 160A/70VDC
*If you want to use only one breaker at the battery side for the whole system, the rating of the breaker
should be X times current of 1 unit. “X” indicates the number of inverters connected in parallel.
52
Recommended breaker specification of AC input with single phase:
Model 2 units 3 units 4 units 5 units 6 units 7 units 8 units 9 units
80A/ 120A/ 160A/ 200A/ 240A/ 280A/ 320A/ 360A/
6.2KW
230VAC 230VAC 230VAC 230VAC 230VAC 230VAC 230VAC 230VAC
Note1: Also, you can use 50A breaker for only 1 unit and install one breaker at its AC input in each inverter.
Note2: Regarding three-phase system, you can use 4-pole breaker directly and the rating of the breaker
should be compatible with the phase current limitation from the phase with maximum units
Recommended battery capacity
Battery Capacity 200AH 400AH 400AH 600AH 600AH 800AH 800AH 1000AH
WARNING! Be sure that all inverters will share the same battery bank. Otherwise, the inverters will transfer
to fault mode.
N
L
N
Load L
Communication Connection
53
Three inverters in parallel:
Power Connection
N
L
N
Load L
Communication Connection
N
L
N
Load L
Communication Connection
54
Five inverters in parallel:
Power Connection
N
L
N
Load L
Communication Connection
N
L
N
Load L
Communication Connection
55
Seven inverters in parallel:
Power Connection
N
L
N
Load L
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼
N
L
N
Load L
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼ ❽
N
L
N
Load L
56
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼ ❽ ❾
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼ ❽ ❾
Three inverters in one phase, three inverters in second phase and two inverter for the third phase:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼ ❽
57
Three inverters in one phase, two inverters in second phase and two inverters for the third phase:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
58
Seven inverters in one phase and one inverter for the other two phases:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
P1
P2 P3
① ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨
Note: If there is only one unit in one phase, this unit doesn’t need to connect the current sharing cable.
Or you connect it like as below:
Four inverters in one phase and one inverter for the other two phases:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
Three inverters in one phase, two inverters in second phase and one inverter for the third phase:
59
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
Three inverters in one phase and only one inverter for the remaining two phases:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
Two inverters in two phases and only one inverter for the remaining phase:
60
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
Two inverters in one phase and only one inverter for the remaining phases:
Power Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
61
Communication Connection
P1 P2 P3
N
L1
L2
L3
N
Load L1
L2
L3
Communication Connection
WARNING: Do not connect the current sharing cable between the inverters which are in different phases.
Otherwise, it may damage the inverters.
6. PV Connection
Please refer to user manual of single unit for PV Connection.
CAUTION: Each inverter should connect to PV modules separately.
62
6. LCD Setting and Display
Setting Program:
Program Description Selectable option
Single
63
Fault code display:
80 CAN fault
81 Host loss
82 Synchronization loss
Code Reference:
HS Master unit
SL Slave unit
7. Commissioning
Step 2: Turn on each unit and set “PAL” in LCD setting program 28 of each unit. And then shut down all
units.
NOET: It’s necessary to turn off switch when setting LCD program. Otherwise, the setting cannot be
programmed.
64
NOTE: Master and slave units are randomly defined.
Step 4: Switch on all AC breakers of Line wires in AC input. It’s better to have all inverters connect to utility at
the same time. If not, it will display fault 82 in following-order inverters. However, these inverters will
automatically restart. If detecting AC connection, they will work normally.
LCD display in Master unit LCD display in Slave unit
Step 5: If there is no more fault alarm, the parallel system is completely installed.
Step 6: Please switch on all breakers of Line wires in load side. This system will start to provide power to the
load.
Step 4: Switch on all AC breakers of Line wires in AC input. If AC connection is detected and three phases are
matched with unit setting, they will work normally. Otherwise, the AC icon will flash and they will not
work in line mode.
LCD display in L1-phase unit LCD display in L2-phase unit LCD display in L3-phase unit
Step 5: If there is no more fault alarm, the system to support 3-phase equipment is completely installed.
Step 6: Please switch on all breakers of Line wires in load side. This system will start to provide power to the
load.
Note 1: To avoid overload occurring, before turning on breakers in load side, it’s better to have whole system
in operation first.
Note 2: Transfer time for this operation exists. Power interruption may happen to critical devices, which
cannot bear transfer time.
65
8. Trouble shooting
Situation
Fault Fault Event Solution
Code Description
1. Restart the inverter.
2. Check if L/N cables are not connected reversely in all inverters.
3. For parallel system in single phase, make sure the sharing are
Current feedback into
connected in all inverters.
60 the inverter is
For supporting three-phase system, make sure the sharing cables are
detected.
connected in the inverters in the same phase, and disconnected in
the inverters in different phases.
4. If the problem remains, please contact your installer.
1. Update all inverter firmware to the same version.
2. Check the version of each inverter via LCD setting and make sure the
The firmware version
CPU versions are same. If not, please contact your instraller to
71 of each inverter is not
provide the firmware to update.
the same.
3. After updating, if the problem still remains, please contact your
installer.
The output current of
1. Check if sharing cables are connected well and restart the inverter.
72 each inverter is
2. If the problem remains, please contact your installer.
different.
80 CAN data loss
1. Check if communication cables are connected well and restart the
81 Host data loss
inverter.
Synchronization data
82 2. If the problem remains, please contact your installer.
loss
1. Make sure all inverters share same groups of batteries together.
2. Remove all loads and disconnect AC input and PV input. Then, check
The battery voltage of battery voltage of all inverters. If the values from all inverters are
83 each inverter is not close, please check if all battery cables are the same length and
the same. same material type. Otherwise, please contact your installer to
provide SOP to calibrate battery voltage of each inverter.
3. If the problem still remains, please contact your installer.
1. Check the utility wiring conncetion and restart the inverter.
AC input voltage and 2. Make sure utility starts up at same time. If there are breakers
84 frequency are installed between utility and inverters, please be sure all breakers
detected different. can be turned on AC input at same time.
3. If the problem remains, please contact your installer.
1. Restart the inverter.
2. Remove some excessive loads and re-check load information from
AC output current
85 LCD of inverters. If the values are different, please check if AC input
unbalance
and output cables are in the same length and material type.
3. If the problem remains, please contact your installer.
1. Switch off the inverter and check LCD setting #28.
2. For parallel system in single phase, make sure no 3P1, 3P2 or 3P3 is
AC output mode set on #28.
86
setting is different. For upporting three-phase system, make sure no “PAL” is set on
#28.
3. If the problem remains, please contact your installer.
66
Appendix II: BMS Communication Installation
1. Introduction
If connecting to lithium battery, it is recommended to purchase a custom-made RJ45 communication cable.
Please check with your dealer or integrator for details.
This custom-made RJ45 communication cable delivers information and signal between lithium battery and the
inverter. These information are listed below:
Re-configure charging voltage, charging current and battery discharge cut-off voltage according to the
lithium battery parameters.
Have the inverter start or stop charging according to the status of lithium battery.
LIO-4805 LIO-4810-150A
ID switch
ID switch
ID Switch indicates the unique ID code for each battery module. It's required to assign a unique ID to each
battery module for normal operation. We can set up the ID code for each battery module by rotating the PIN
number on the ID switch. From number 0 to 9, the number can be random; no particular order. Maximum 10
battery modules can be operated in parallel.
67
PYLONTECH
①Dip Switch: There are 4 Dip Switches that sets different baud rate and battery group address. If switch
position is turned to the “OFF” position, it means “0”. If switch position is turned to the “ON” position, it means
“1”.
68
Step 2: Use supplied RJ45 cable (from battery module package) to connect inverter and Lithium battery.
* For multiple battery connection, please check battery manual for the details.
Step 3: Turn the breaker switch “ON". Now, the battery module is ready for DC output.
Step 4: Press Power on/off button on battery module for 5 secs, the battery module will start up.
*If the manual button cannot be approached, just simply turn on the inverter module. The battery module will
be automatically turned on.
If communication between the inverter and battery is successful, the battery icon on LCD display will
flash. Generally speaking, it will take longer than 1 minute to establish communication.
69
PYLONTECH
After configuration, please install LCD panel with inverter and Lithium battery with the following steps.
Step 1. Use custom-made RJ45 cable to connect inverter and Lithium battery.
Step 3. Press more than three seconds to start Lithium battery, power output ready.
70
Step 5. Be sure to select battery type as “PYL” in LCD program 5.
If communication between the inverter and battery is successful, the battery icon on LCD display will
flash. Generally speaking, it will take longer than 1 minute to establish communication.
WECO
Step 1. Use a custom-made RJ45 cable to connect inverter and Lithium battery.
71
Step 4. Be sure to select battery type as “WEC” in LCD program 5.
If communication between the inverter and battery is successful, the battery icon on LCD display will
“flash”. Generally speaking, it will take longer than 1 minute to establish communication.
SOLTARO
Step 1. Use a custom-made RJ45 cable to connect inverter and Lithium battery.
72
Step 3. Turn on the inverter.
If communication between the inverter and battery is successful, the battery icon on LCD display
will “flash”. Generally speaking, it will take longer than 1 minute to establish communication.
Active Function
This function is to activate lithium battery automatically while commissioning. After battery wiring and
commissioning is successfully, if battery is not detected, the inverter will automatically activate battery if the
inverter is powered on.
73
5. Code Reference
Related information code will be displayed on LCD screen. Please check inverter LCD screen for the operation.
Code Description
If battery status is not allowed to charge and discharge after
the communication between the inverter and battery is
successful, it will show code 60 to stop charging and discharging
battery.
Communication lost (only available when the battery type is not
setting as “AGM”, “Flooded” or “User-Defined”.)
After battery is connected, communication signal is not
detected for 3 minutes, buzzer will beep. After 10 minutes,
inverter will stop charging and discharging to lithium
battery.
Communication lost occurs after the inverter and battery is
connected successfully, buzzer beeps immediately.
Internal communication failure in batteries.
74
Appendix III: The Wi-Fi Operation Guide
1. Introduction
Wi-Fi module can enable wireless communication between off-grid inverters and monitoring platform. Users
have complete and remote monitoring and controlling experience for inverters when combining Wi-Fi module
with WatchPower APP, available for both iOS and Android based device. All data loggers and parameters are
saved in iCloud.
The major functions of this APP:
Delivers device status during normal operation.
Allows to configure device setting after installation.
Notifies users when a warning or alarm occurs.
Allows users to query inverter history data.
2. WatchPower App
2-1. Download and install APP
Please scan the following QR code with your smart phone and download WatchPower App.
After the installation, please tap the shortcut icon to access this APP on your mobile screen. In the
screen, tap “Register” to access “User Registration” page. Fill in all required information and scan the Wi-Fi
module PN by tapping icon. Or you can simply enter PN directly. Then, tap “Register” button.
75
Then, a “Registration success” window will pop up. Tap “Go now” to continue setting local Wi-Fi network
connection.
Enter the “SettingsWi-Fi” and select connected Wi-Fi name. The connected Wi-Fi name is the same to your
Wi-Fi PN number and enter default password “12345678”.
Then, return to WatchPower APP and tap “ ” button when Wi-Fi module is
connected successfully.
76
Step 3: Wi-Fi Network settings
Tap icon to select your local Wi-Fi router name (to access the internet) and enter password.
Step 4: Tap “Confirm” to complete the Wi-Fi configuration between the Wi-Fi module and the Internet.
Diagnose Function
If the module is not monitoring properly, please tap “ ” on the top right corner of the screen for further
details. It will show repair suggestion. Please follow it to fix the problem. Then, repeat the steps in the chapter
4.2 to re-set network setting. After all setting, tap “Rediagnosis” to re-connect again.
77
2-3. Login and APP Main Function
After finishing the registration and local Wi-Fi configuration, enter registered name and password to login.
Note: Tick “Remember Me” for your login convenience afterwards.
Overview
After login is successfully, you can access “Overview” page to have overview of your monitoring devices,
including overall operation situation and Energy information for Current power and Today power as below
diagram.
78
Devices
Tap the icon (located on the bottom) to enter Device List page. You can review all devices here by adding
or deleting Wi-Fi Module in this page.
Add device Delete device
Tap icon on the top right corner and manually enter part number to add device. This part number label is
pasted on the bottom of inverter. After entering part number, tap “Confirm” to add this device in the Device list.
For more information about Device List, please refer to the section 2.4.
ME
In ME page, users can modify “My information”, including【User’s Photo】,【Account security】, 【Modify
password】,【Clear cache】,and【Log-out】, shown as below diagrams.
79
2-4. Device List
In Device List page, you can pull down to refresh the device information and then tap any device you want to
check up for its real-time status and related information as well as to change parameter settings. Please refer
to the parameter setting list.
Device Mode
On the top of screen, there is a dynamic power flow chart to show live operation. It contains five icons to
present PV power, inverter, load, utility and battery. Based on your inverter model status, there will be【Standby
Mode】,【Line Mode】,【Battery Mode】.
【Standby Mode】Inverter will not power the load until “ON” switch is pressed. Qualified utility or PV source
can charge battery in standby mode.
【Line Mode】Inverter will power the load from the utility with or without PV charging. Qualified utility or
PV source can charge battery.
80
【Battery Mode】Inverter will power the load from the batter with or without PV charging. Only PV source
can charge battery.
Swipe left
【Production Information】displays Model type (Inverter type), Main CPU version, Bluetooth CPU version
and secondary CPU version.
81
【Rated Information】displays information of Nominal AC voltage, Nominal AC current, Rated battery
voltage, Nominal output voltage, Nominal output frequency, Nominal output current, Nominal output apparent
power and Nominal output active power. Please slide up to see more rated information.
【Wi-Fi Module Information】displays of Wi-Fi Module PN, status and firmware version.
Parameter Setting
This page is to activate some features and set up parameters for inverters. Please be noted that the listing in
“Parameter Setting” page in below diagram may differ from the models of monitored inverter. Here will
briefly highlight some of it,【Output Setting】,【Battery Parameter Setting】,【Enable/ Disable items】,
【Restore to the defaults】to illustrate.
There are three ways to modify setting and they vary according to each parameter.
a) Listing options to change values by tapping one of it.
Please refer to below parameter setting list for an overall description and be noted that the available
parameters may vary depending on different models. Please always see the original product manual for
detailed setting instructions.
Parameter setting list:
Item Description
Output setting Output source To configure load power source priority.
priority
AC input range When selecting "UPS", it's allowed to connect personal computer.
Please check product manual for details.
When selecting "Appliance", it's allowed to connect home appliances.
Output voltage To set output voltage.
Output To set output frequency.
frequency
Battery Battery type: To set connected battery type.
parameter Battery cut-off To set the battery stop discharging voltage.
setting voltage Please see product manual for the recommended voltage range
based on connected battery type.
Back to grid When “SBU” or “SOL” is set as output source priority and battery
voltage voltage is lower than this setting voltage, unit will transfer to line mode
and the grid will provide power to load.
Back to When “SBU” or “SOL” is set as output source priority and battery
discharge voltage is higher than this setting voltage, battery will be allowed to
82
voltage discharge.
Charger source To configure charger source priority.
priority:
Max. charging
current
Max. AC It’s to set up battery charging parameters. The selectable values in
different inverter model may vary.
charging current: Please see product manual for the details.
Float charging
voltage
Bulk charging It’s to set up battery charging parameters. The selectable values in
different inverter model may vary. Please see product manual for the
voltage
details.
Battery Enable or disable battery equalization function.
equalization
Real-time It’s real-time action to activate battery equalization.
Activate Battery
Equalization
Equalized Time To set up the duration time for battery equalization.
Out
Equalized Time To set up the extended time to continue battery equalization.
Equalization To set up the frequency for battery equalization.
Period
Equalization To set up the battery equalization voltage.
Voltage
Enable/Disable LCD Auto-return If enable, LCD screen will return to its main screen after one minute
Functions to Main screen automatically.
Fault Code If enabled, fault code will be recorded in the inverter when any fault
Record happens.
Backlight If disabled, LCD backlight will be off when panel button is not
operated for 1 minute.
Bypass Function If enabled, unit will transfer to line mode when overload happened in
battery mode.
Beeps while If enabled, buzzer will alarm when primary source is abnormal.
primary source
interrupt
Over If disabled, the unit won't be restarted after over-temperature fault is
Temperature solved.
Auto Restart
Overload Auto If disabled, the unit won’t be restarted after overload occurs.
Restart
Buzzer If disabled, buzzer won’t be on when alarm/fault occurred.
Enable/disable Turn on or off RGB LEDs
Brightness Adjust the lighting brightness
RGB LED Setting Speed Adjust the lighting speed
Effects Change the light effects
Color Selection Adjust color by setting RGB value
Restore to the This function is to restore all settings back to default settings.