Harga Satuan Jumlah Harga No Uraian Kode Satuan Koefisien (Rp) (Rp) A TENAGA Pekerja L.O1 OH 0.3500 80,000.00 28,000.00 Tukang Kayu L.O2 OH 0.3500 100,000.00 35,000.00 Kepala Tukang L.O3 OH 0.0350 125,000.00 4,375.00 Mandor L.O4 OH 0.0180 125,000.00 2,250.00 JUMLAH TENAGA KERJA 69,625.00 B BAHAN Besi Hollow 2/4 M' 4.0500 7,500.00 30,375.00 Planfond PVC M' 5.0000 15,500.00 77,500.00 Join PVC M' 3.1000 2,500.00 7,750.00 Paku Skrup Kg 0.1100 30,000.00 3,300.00
JUMLAH HARGA BAHAN 118,925.00
C PERALATAN JUMLAH HARGA ALAT D Jumlah (A+B+C) 188,550.00 E Overhead & Profit 15% x D 28,282.50 F Harga Satuan Pekerjaan (D+E) 216,832.50