Lapis Pondasi Agregat kelas A ( MC 40 )

VOLUME LAPIS PONDASI AGREGAT KELAS A


NO STA JARAK LEBAR BAWAH LEBAR ATAS LEBAR RERATA RATA - RATA TEBAL VOLUME KETERANGAN
m' m' m' m' m' m3

ACCESS RAMP
1 1+075 20.600 20.000 20.300
25.00 20.455 0.150 76.706 MC 37
2 1+100 20.910 20.310 20.610
25.00 20.610 0.150 77.288 MC 37
3 1+125 20.910 20.310 20.610
25.00 20.610 0.150 77.288 MC 37
4 1+150 20.910 20.310 20.610
25.00 20.610 0.150 77.288 MC 37
5 1+175 20.910 20.310 20.610
25.00 10.305 0.150
6 1+200
25.00 0.000 0.000 -
7 1+225
37.00 10.230 0.000
8 1+262 21.100 20.160 20.460
13.00 20.460 0.150 39.897 MC 36, 38
9 1+275 21.100 20.160 20.460
25.00 20.460 0.150 76.725 MC 36, 38
10 1+300 20.760 20.160 20.460
25.00 20.435 0.150 76.631 MC 36, 38
11 1+325 20.710 20.110 20.410

Sub Total Access Ramp Interchange Nganjuk 501.822


RAMP 1
12 0+000 10.460 9.860 10.160
25.00 10.145 0.150 38.044 MC 36
13 0+025 10.430 9.830 10.130
25.00 10.130 0.150 37.988 MC 36
14 0+050 10.430 9.830 10.130
25.00 10.355 0.150 38.831 MC 36
15 0+075 10.880 10.280 10.580
25.00 11.025 0.150 41.344 MC 35
16 0+100 11.770 11.170 11.470
25.00 11.260 0.150 42.225 MC 35
17 0+125 11.350 10.750 11.050
18.00 11.275 0.150 30.443 MC 35
18 0+143 11.800 11.200 11.500
32.00 11.510 0.150 55.248 MC 35
19 0+175 11.820 11.220 11.520
25.00 11.660 0.150 43.725 MC 35
20 0+200 12.100 11.500 11.800
32.00 11.780 0.150 56.544 MC 35
21 0+232 12.060 11.460 11.760

Sub Total Ramp 1 Interchange Nganjuk 384.391

hal. 1 dari 3
VOLUME LAPIS PONDASI AGREGAT KELAS A
NO STA JARAK LEBAR BAWAH LEBAR ATAS LEBAR RERATA RATA - RATA TEBAL VOLUME KETERANGAN
m' m' m' m' m' m3
RAMP 2
22 0+000 9.880 9.580 9.730
25.00 9.790 0.150 36.712 MC 38
23 0+025 10.000 9.700 9.850
25.00 9.850 0.150 36.938 MC 38
24 0+050 10.000 9.700 9.850
25.00 9.885 0.150 37.069 MC 38
25 0+075 10.070 9.770 9.920
25.00 10.510 0.150 39.413 MC 38
26 0+100 11.400 10.800 11.100
25.00 11.100 0.150 41.625 MC 38
27 0+125 11.400 10.800 11.100
25.00 11.300 0.150 42.375 MC 38
28 0+150 11.800 11.200 11.500
25.00 11.505 0.150 43.144 MC 38
29 0+175 11.810 11.210 11.510
25.00 11.605 0.150 43.519 MC 35
30 0+200 12.000 11.400 11.700
25.00 11.700 0.150 43.875 MC 35
31 0+225 12.000 11.400 11.700
25.00 11.600 0.150 43.500 MC 35
32 0+250 11.800 11.200 11.500
25.00 11.400 0.150 42.750 MC 35
33 0+275 11.600 11.000 11.300
25.00 11.165 0.150 41.869 MC 35
34 0+300 11.330 10.730 11.030
25.00 11.075 0.150 41.531 MC 35
35 0+325 11.420 10.820 11.120
10.00 11.120 0.150 16.680 MC 35
36 0+335 11.420 10.820 11.120

37

38

39

Sub Total Ramp 2 Interchange Nganjuk 550.999

hal. 2 dari 3
VOLUME LAPIS PONDASI AGREGAT KELAS A
NO STA JARAK LEBAR BAWAH LEBAR ATAS LEBAR RERATA RATA - RATA TEBAL VOLUME KETERANGAN
m' m' m' m' m' m3
RAMP 4
40 0+000
66.00 4.280 0.000
41 0+066 8.710 8.410 8.560
9.00 8.560 0.150 11.556 MC 38
42 0+075 8.710 8.410 8.560
25.00 8.590 0.150 32.213 MC 38
43 0+100 8.770 8.470 8.620
25.00 9.680 0.150 36.300 MC 38
44 0+125 10.890 10.590 10.740
25.00 10.620 0.150 39.825 MC 38
45 0+150 10.650 10.350 10.500
25.00 11.050 0.150 41.438 MC 38
46 0+175 11.900 11.300 11.600
25.00 11.555 0.150 43.331 MC 38
47 0+200 11.810 11.210 11.510
25.00 10.970 0.150 41.138 MC 38
48 0+225 10.730 10.130 10.430
25.00 11.355 0.150 42.581 MC 38
49 0+250 12.580 11.980 12.280
25.00 12.280 0.150 46.050 MC 38
50 0+275 12.580 11.980 12.280
25.00 11.810 0.150 44.288 MC 38
51 0+300 11.640 11.040 11.340
25.00 11.270 0.150 42.262 MC 38
52 0+325 11.500 10.900 11.200
25.00 10.670 0.150 40.013 MC 38
53 0+350 10.440 9.840 10.140
25.00 10.170 0.150 38.138 MC 38
54 0+375 10.500 9.900 10.200
25.00 10.510 0.150 39.413 MC 38
55 0+400 11.120 10.520 10.820
25.00 10.550 0.150 39.563 MC 38
56 0+425 10.580 9.980 10.280
25.00 7.860 0.150 29.475 MC 38
57 0+450 5.740 5.140 5.440
25.00 2.720 0.150 10.200
58 0+475

Sub Total Ramp 4 Interchange Nganjuk 617.781


63 Box Pedestrian
4.600 4.000 4.300
43.20 4.30 0.15 27.864
4.600 4.000 4.300

Box Pedestrian -
REKAPITULASI

- Sub Total Access Ramp Interchange Nganjuk 501.822


- Sub Total Ramp 1 Interchange Nganjuk 384.391
- Sub Total Ramp 2 Interchange Nganjuk 550.999
- Sub Total Ramp 4 Interchange Nganjuk 617.781

JUMLAH 2,054.993

Di setujui Di Periksa Di siapkan / di ajukan


Konsultan Pengawas Kontraktor
PT. NGAWI KERTOSONO JAYA PT. BUANA ARCHICON PT. ADHI KARYA ( Persero ) Tbk

(………………………….) (………………….……….) (………….……………….)