A B C D E F G
20,665
All dimension in mm
335
335
335
7 7
230
230
230
335
335
335
3,000
3,000
2,100
2,100
335
335
6 6
230
230
335
335
No Description Issue Date
3,000
3,000
2,100
8,100
2,100
1,100
335
335
5 5
230
230
335
335
3,000
3,000
2,100
3,230
2,100
1,100 9,000 10,000 1,100
335 230 230 230 335
230 535 335 8,100 335 335 9,100 335 535 230
335
335
335
18,900
18,900
4 4
230
230
230
335
335
335
Project :-
3,000
3,000
PROPOSED BUDMINTON COURT
2,100
2,100
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
335
335
3 3 Client :-
230
230
335
335
3,000
3,000
2,100
8,100
2,100
335
335
Drawing tittle :-
FOUNDATION PLAN
2 2
230
230
Designed by :- R. Y. K Scale
335
335
0717-206762
1 : 100
3,000
3,000
2,100
2,100
Drawn by :- R. Y. K
0717-206762
Date
335
335
335
AUG, 2023
1 1
230
230
230
230 230 230 230 230 230 230
335
335
335
335 335 2,100 335 335 2,100 335 335 2,100 335 335 2,100 335 335 2,100 335 335 3,100 335 335 Chacked by :- Drawing No.
E-1 E-2
19,900
A B C D E F G
E-3
S-A
GSPublisherEngine 0.0.100.100
S-A GENERAL NOTES
A B C D E F G
All dimension in mm
19,000
3,000 3,000 3,000 3,000 3,000 4,000
7 7
1,000 450
1,000 450
40 40
1,800 1,000 720 40 3,880 40 1,980 1,980 40 3,880 40 720 1,000 800 1,000
3,000
3,000
40
40
40 420
40 420
530 40
950 40
6 6
2,530
2,530
No Description Issue Date
3,000
3,000
40
40
1,175 300 300 300
2,530
2,530
5 5
40 950
40 530
1,000 420 40
1,000 420 40
3,000
3,000
3,200
40
40
1,800 1,000 13,400 1,000 1,800
18,000
18,000
450 450
450 450
4 4
Project :-
40 420 1,000
40 420 1,000
PROPOSED BUDMINTON COURT
3,000
3,000
TO BE BUILT ON PLOT No: ….,
3,200
40
40
BLOCK "…", AT UVINZA IN KIGOMA.
40 530
40 950 Client :-
3 3
2,530
2,530
300 300 300 1,200
3,000
3,000
40
40
Drawing tittle :-
2,530
2,530
FLOOR PLAN
2 2
950 40
Designed by :- R. Y. K Scale
530 40 0717-206762
1 : 100
450 1,000 40 420 40
3,000
R. Y. K
0717-206762
40 40
1,800 1,000 720 40 3,880 40 3,960 40 3,880 40 720 1,000 800 1,000 Date
AUG, 2023
1 1
E-4 S-D/A3-02
1,000
1,000
11 11
2,000
2,000
10 10
2,000
2,000
No Description Issue Date
9 9
2,000
2,000
8 8
2,000
2,000
7 7
1,000 1,000
1,000 1,000
20,000
20,000
6 6
5 5 Project :-
PROPOSED BUDMINTON COURT
2,000
2,000
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
4 4
Client :-
2,000
2,000
3 3
2,000
2,000
Drawing tittle :-
ROOF PLAN
2 2 Designed by :- Scale
R. Y. K
2,000
2,000
1 : 100
Drawn by :-
Date
1 1
1,000
1,000
AUG, 2023
1,100 1,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 Chacked by :- Drawing No.
E-4
20,100 1,000 S-D/A3-03
E-1 E-2
A B C D E F G H I J
E-3
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
Steel truses
Service space
Ceiling material to further details
11 10 9 8 7 6 5 4 3 2 1
2,000 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000
No Description Issue Date
10 0
+8.000 IT
roof level
100
100
3,820
3,820
+4.000 STEEL
Project :-
8,000
SUPPORT
100
100
PROPOSED BUDMINTON COURT
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
Client :-
3,900
3,900
1,550
1,550
150
+-0.000
Plinth level
200 30
690 600
690 600
-0.600 Drawing tittle :-
SECTION
Ground level
1,500
1,500
890
Designed by :- R. Y. K Scale
230
230
690 690 690 Drawn by :-
150mm thick CONCRETE BED SLAB
Foundation to further Date
D.P.M structural details
AUG, 2023
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
1 2 3 4 5 6 7 8 9 10 11
900 2,000 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000 900
+8.000 IT
roof level
100
3,900
+4.000 STEEL
SUPPORT
100
Project :-
PROPOSED BUDMINTON COURT
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
3,900
2,700
Client :-
+-0.000
Plinth level
600
600
-0.600
Ground level
Drawing tittle :-
ELEVATION
Designed by :- R. Y. K Scale
ELEVATION-1 Drawn by :-
1 : 75
Date
AUG, 2023
S-D/A3-05
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
11 10 9 8 7 6 5 4 3 2 1
900 2,000 2,000 2,000 2,000 1,000 1,000 2,000 2,000 2,000 2,000 900
+8.000 IT
roof level
100
3,900
+4.000 STEEL
SUPPORT
100
Project :-
PROPOSED BUDMINTON COURT
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
3,900
Client :-
+-0.000
Plinth level
600
-0.600
Ground level
Drawing tittle :-
ELEVATION
1 : 75
Drawn by :-
Date
AUG, 2023
S-D/A3-06
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
A B C D E F G H I J
1,100 1,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 1,000
No Description Issue Date
1,220
+8.000 IT
roof level
100
3,900
+4.000 STEEL
SUPPORT Project :-
100
Client :-
3,900
+-0.000
Plinth level
600
ELEVATION-3
Designed by :- R. Y. K Scale
1 : 75
Drawn by :-
Date
AUG, 2023
S-D/A3-07
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
J I H G F E D C B A
1,000 2,500 2,500 2,500 2,500 2,500 2,500 2,500 1,500 1,100
No Description Issue Date
1,220
+8.000 IT
roof level
100
3,900
+4.000 STEEL
SUPPORT Project :-
100
Client :-
3,900
+-0.000
Plinth level
600
ELEVATION-4
Designed by :- R. Y. K Scale
1 : 75
Drawn by :-
Date
AUG, 2023
S-D/A3-08
GSPublisherEngine 0.0.100.100
ROOF DETAIL : GENERAL NOTES
12 723
10 820
9,916 10 846
10 846
10 846
10 846
10 846
10 846
846
1,180
846 10
568 11
937
0
11
8 x 180 x 270 mm MS plate
with four (4) pre drilled holes
42 x 3 mm CHS
150x3.0mm Steel column steel Grade 43
2(MS12) Bolt
Project :-
PROPOSED BUDMINTON COURT
TO BE BUILT ON PLOT No: ….,
88 x 6mmCHS BLOCK "…", AT UVINZA IN KIGOMA.
steel grade 43
DETAIL 1
DETAIL 3 DETAIL 5
Client :-
42 x 3 mm CHS
steel Grade 43
6mm Plate for section to be welded on top
with four predrilled holes to be bolted to Tie rod( 50mm CHS)
another plate for connection
WELDING WELDING
1 : 50
BRACING CONNECTION Drawn by :-
Z purlin
M8 Bolt Date
4mm MS Plate
100mm
AUG, 2023
Truss member
48 x 3 mm CHS
steel grade 43
88x 6 mmCHS
grade 43 Drawing No.
Chacked by :-
Welding M8 Bolt S-D/A3-09
DETAIL 2 DETAIL 4
Z PURLIN CONNECTION
GSPublisherEngine 0.0.100.100
GENERAL NOTES
All dimension in mm
150
No Description Issue Date
200
600
900
250
1,500
670
6T10-02-200B2
900
900
Project :-
PROPOSED BUDMINTON COURT
TO BE BUILT ON PLOT No: ….,
BLOCK "…", AT UVINZA IN KIGOMA.
6T10-01-200B1
230
Client :-
A 50 900
Drawing tittle :-
ROOF DETAILS
PLAN SECTION A - A
Designed by :- R. Y. K Scale
1 : 25
Drawn by :-
Date
AUG, 2023
S-D/A3-10
GSPublisherEngine 0.0.100.100
STRUCTURAL CALCULATIONS
Project Name
STRUCTURAL ENGINEER
Eng: R.Y.K
TOP CHORD
STRUTS
BOTTOM CHORD
INTERMEDIATE UB
Member Loading and Member Forces
Loading Combination : 1 UT + 1.4 D1 + 1 D2 + 1.6 L1 + 1 L2
Member Forces in Load Case 3 and Maximum Deflection from Load Case 2
Mem Node Axial Torque Shear Force Bending Moment Maximum Moment Maximum
ber End1 Force Moment (kN) (kN.m) (kN.m @ m) Deflection
No. End2 (kN) (kN.m) x-x y-y x-x y-y x-x y-y (mm @ m)
1 9 2.38T 0.00 25.08 0.00 -8.86 0.00 6.12 0.00 1.09
10 2.38T 0.00 -27.42 0.00 -11.78 0.00 @ 1.200 @ 0.000 @ 1.200
INTERMEDIATE UB
Member Loading and Member Forces
Loading Combination : 1 UT + 1.4 D1 + 1 D2 + 1.6 L1 + 1 L2
Member Forces in Load Case 3 and Maximum Deflection from Load Case 2
Mem Node Axial Torque Shear Force Bending Moment Maximum Moment Maximum
ber End1 Force Moment (kN) (kN.m) (kN.m @ m) Deflection
No. End2 (kN) (kN.m) x-x y-y x-x y-y x-x y-y (mm @ m)
2 10 2.12T 0.00 26.30 0.00 -11.03 0.00 5.43 0.00 0.88
11 2.12T 0.00 -26.20 0.00 -10.91 0.00 @ 1.250 @ 0.000 @ 1.250
INTERMEDIATE UB
Member Loading and Member Forces
Loading Combination : 1 UT + 1.4 D1 + 1 D2 + 1.6 L1 + 1 L2
Member Forces in Load Case 3 and Maximum Deflection from Load Case 2
Mem Node Axial Torque Shear Force Bending Moment Maximum Moment Maximum
ber End1 Force Moment (kN) (kN.m) (kN.m @ m) Deflection
No. End2 (kN) (kN.m) x-x y-y x-x y-y x-x y-y (mm @ m)
3 11 2.13T 0.00 26.18 0.00 -10.87 0.00 5.45 0.00 0.88
12 2.13T 0.00 -26.32 0.00 -11.05 0.00 @ 1.250 @ 0.000 @ 1.250
COLUMN (UC)
Member Forces in Load Case 3 and Maximum Deflection from Load Case 2
Mem Node Axial Torque Shear Force Bending Moment Maximum Moment Maximum
ber End1 Force Moment (kN) (kN.m) (kN.m @ m) Deflection
No. End2 (kN) (kN.m) x-x y-y x-x y-y x-x y-y (mm @ m)
64 12 41.88C 0.00 0.00 0.00 0.06 0.00 0.07 0.00 0.04
20 41.88C 0.00 0.00 0.00 0.07 0.00 @ 0.000 @ 0.000 @ 2.000
COLUMN (UC)
Member Loading and Member Forces
Loading Combination : 1 UT + 1.4 D1 + 1 D2 + 1.6 L1 + 1 L2
Member Forces in Load Case 3 and Maximum Deflection from Load Case 2
Mem Node Axial Torque Shear Force Bending Moment Maximum Moment Maximum
ber End1 Force Moment (kN) (kN.m) (kN.m @ m) Deflection
No. End2 (kN) (kN.m) x-x y-y x-x y-y x-x y-y (mm @ m)
56 4 94.83C 0.00 -0.02 0.00 0.00 0.00 0.00 0.02
12 94.83C 0.00 -0.02 0.00 -0.07 0.00 @ 0.000 @ 2.320
COLUMN FOOTING
Basic Data
Design to BS 8110: 1997
Grades Fy, Fyv, Fcu 460 N/mm², 460 N/mm², 25 N/mm²
Restraint Conditions and Effective Lengths
βx : for 230 mm deep column Top: Shallow, Bottom: Nominal 1.80
βy : for 230 mm wide column Top: Shallow, Bottom: Nominal 1.80
Lc=3150 Lox=3150-(450+0)/2 2925
Loy=3150-(450+0)/2 2925
Lex=5265.0 mm, Lex/h=22.9, exx=11.5 mm
Ley=5265.0 mm, Ley/b=22.9, eyy=11.5 mm
Y-Y Moments
Applied Moments (My1, My2) 0.0 kN.m, -6.2 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 0.05 > (938 - 119)/(938 - 268) < 1 1.00
au = βa • K • h 0.262, 1.000, 230 60.3 mm
Madd= N • au 119 x 60.3 7.1 kN.m
Mi=fn(My1, My2) 0.0 kN.m, -6.2 kN.m 3.7 kN.m
M nom=fn(M2+Madd) 13.3 0.0 kN.m
M nom=fn(N, eyy) 118.5, 11.5 7.1 kN.m
Design Moment 13.3 kN.m
STRUCTURAL CALCULATIONS
PROJECT : PROPOSED BUDMINTON COURT TO BE
BUILT ON PLOT No:…….BLOCK……..AT UVINZA IN
KIGOMA
Designed By : R.Y.K
Date : AUGUST 2023
Checked : ………………….
Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar 0.425, 319 mm, 230 mm, 135.77 mm, 16113 mm², 81.5 mm
Bar group1:M1 fn(bars,d,ε%,,la,F) 1 x 16, 255.4, -0.308, -437, -95.8, -87.9 8.4 kNm
Bar group2:M2 fn(bars,d,ε%,,la,F) 1 x 16, 140.9, -0.013, -27, 18.7, -5.4 -0.1 kNm
Bar group3:M3 fn(bars,d,ε%,,la,F) 1 x 16, 178.3, -0.110, -219, -18.7, -44.1 0.8 kNm
Bar group4:M4 fn(bars,d,ε%,,la,F) 1 x 16, 63.8, 0.185, 371, 95.8, 74.6 7.1 kNm
Concrete Fc=(Ac•.45•fcu) 16113 x 0.45 x 25 181.3 kN
F Equlibrum (Ft) + FC - Fapp= 0 -88 - 5 - 44 + 75 + 181 - 118.5 0.0 kN OK
Concrete Mc=Fc•(H/2-Ybar) 181.3 x (319 / 2 - 81.5) 14.2 kNm
Mu =Mc + (M1+...+M4) 14.2 + (8.4+-0.1+0.8+7.1) 30.4kNm
STRUCTURAL CALCULATIONS
PROJECT : PROPOSED BUDMINTON COURT TO BE
BUILT ON PLOT No:…….BLOCK……..AT UVINZA IN
KIGOMA
Designed By : R.Y.K
Date : AUGUST 2023
Checked : ………………….
COLUMN FOOTING
Basic Properties
Design to BS 8110: 1997
Fy, Fcu, Covers T, B, S 460 N/mm², 25 N/mm², 50 mm, 50 mm, 50 mm
Gross: Area, Area1, Z zz, Z xx 0.81, 0.023, 0.122, 0.122
Conc Den, Surcharge, LFsrv , LFult, SW
23.4, 0.0, 1.0, 1.0, 100
Z-Z Axis Section Capacities
As Bottom bars 5-T10@200 393 mm²
X/d = Fn(AS, Fy, K1, Beff, Fcu, γm) 393, 460, 0.41, 900, 25, 0.95 0.1
Mu conc = Fn(Z, Beff, X, K1, Fcu) 185, 900, 19, 0.41, 25 32 kN.m
vc = Fn(AS, bv, d, Fcu) 393, 900, 195, 25 0.46 N/mm²
X-X Axis Section Capacities
As Bottom bars 5-T10@200 393 mm²
X/d = Fn(AS, Fy, K1, Beff, Fcu, γm) 393, 460, 0.41, 900, 25, 0.95 0.1
Mu conc = Fn(Z, Beff, X, K1, Fcu) 176, 900, 19, 0.41, 25 30 kN.m
vc = Fn(AS, bv, d, Fcu) 393, 900, 185, 25 0.47 N/mm²