Bahan Kaca
194 Kaca 2 mm m2 40,000.00 35,000.00 38,000.00 39,000.00 37,500.00
195 Kaca 3 mm m2 55,000.00 40,000.00 45,000.00 42,000.00 42,500.00
196 Kaca 5 mm m2 85,000.00 63,500.00 55,000.00 63,000.00 55,000.00
197 Kaca Rayband 12 mm ( ASAHI ) m² 300,000.00 312,000.00 325,000.00 312,000.00 300,000.00
198 Kaca Tebal 8 mm m2 85,000.00 99,500.00 125,000.00 99,000.00 85,000.00
199 Kaca Patri Lokal Terpasang ( ASAHI ) m² 500,000.00 555,000.00 600,000.00 555,000.00 500,000.00
200 Kaca Patri Ex Luar negeri terpasang m² 1,250,000.00 1,281,000.00 1,500,000.00 1,281,000.00 1,250,000.00
201 Glass Block 20 x 20 bh 20,500.00 17,750.00 15,000.00 17,750.00 17,000.00
Bahan Elektrikal
356 Lampu Pijar 25 watt sd. 100 watt bh 6,500.00 8,500.00 7,500.00 7,750.00 8,000.00
357 Lampu Neon TL Sekualitas Philips 20 w bh 35,000.00 37,500.00 40,000.00 38,500.00 30,000.00
358 Lampu Neon TL Sekualitas Philips 40 w bh 60,000.00 65,000.00 75,000.00 75,000.00 80,000.00
359 Lampu Merkuri 80 W bh 85,000.00 90,000.00 85,000.00 90,000.00 90,000.00
360 Kabel Tembaga kg 37,500.00 36,500.00 45,000.00 48,000.00 50,000.00
361 MCB bh 41,000.00 50,000.00 50,000.00 45,000.00 50,000.00
362 Saklar Tunggal bh 15,000.00 14,000.00 15,000.00 12,000.00 15,000.00
363 Saklar Ganda bh 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
364 Stop Kontak bh 12,500.00 14,000.00 15,000.00 12,500.00 12,500.00
365 Stop Kontak Putar bh 25,000.00 25,000.00 22,500.00 25,000.00 20,000.00
366 Box Sekering bh 30,000.00 27,000.00 27,500.00 30,000.00 30,000.00
367 Pipa Penangkal Petir bh 35,000.00 45,000.00 40,000.00 45,000.00 45,000.00
368 Kabel Penangkal Petir kg 30,000.00 33,000.00 32,000.00 33,000.00 35,000.00
file:///conversion/tmp/activity_task_scratch/724242744.xls/quary panumbangan
29 Aspal bitumen M061 - 10,990.00 10,990.00 Cilacap
30 As-buton M062 -
31 Minyak Flux M063 - - - - Ciamis
32 Minyak Aspal M064 - 8,000.00 - - 8,000.00 Ciamis
33 Minyak tanah M065 - 12,000.00 - - 12,000.00 Setempat
34 Kayu bakar M070 10.00 40,000.00 - 40,000.00 Setempat
35 Semen P.C M080 10.00 65,000.00 - 65,000.00 Setempat
36 Kapur Bakar M081 10.00 - - Setempat
37 Batu kapur M082 - - - -
38 Cat jembatan M090 10.00 50,000.00 - 50,000.00 Setempat
39 Baja tralis M161 10.00 10,500.00 - 10,500.00 Setempat
40 Kawat Bronjong M162 25.00 17,500.00 - 17,500.00 Tasikmalaya
41 Baut baja M163 25.00 26,000.00 - 26,000.00 Tasikmalaya
42 Besi galvanisir M164 25.00 23,000.00 - 23,000.00 Tasikmalaya
43 Baja konstruksi M165 25.00 15,000.00 - 15,000.00 Tasikmalaya
44 Baja rangka jembatan M166 - 28,000.00 - 28,000.00 Setempat
45 Paku jembatan M166 10.00 15,000.00 - 15,000.00 Setempat
46 Baja tulangan beton M167 10.00 10,000.00 - 10,000.00 Setempat
47 Kawat baja (blindstaal) M168 - 17,500.00 - - 17,500.00 Setempat
48 Alat-alat bantu *). M170 10.00 60,000.00 - 60,000.00 Setempat
49 Kayu untuk perancah M180 10.00 2,500,000.00 - 2,500,000.00 Setempat
50 Kayu untuk konstruksi jembatan M181 3,000,000.00 - - 3,000,000.00 Setempat
51 Kayu untuk konstruksi jembatan (dekp M181.1 3,500,000.00 - - 3,500,000.00 Setempat
52 Minyak diesel/solar M183 4,500.00 - - 4,500.00 Setempat
53 Bensin premium M184 - 4,500.00 - - 4,500.00 Setempat
54 Minyak pelumas M185 20,000.00 1,000.00 - 20,000.00
55 Cabluk - - - - - Setempat
56 Paving blok 10.00 1,200.00 - 1,200.00 Setempat
57 Tegel Uk. 30 x 30 cm 10.00 5,000.00 - - 5,000.00 Tasikmalaya
58 Abu batu 555,000 Tasikmalaya
59 Laston (AC-WC) 535,000 40.00 1,000,000.00 42,000.00 1,042,000.00 Banjar
60 Laston Atas ATB (AC-BC) 545,000 40.00 970,000.00 42,000.00 1,012,000.00 Banjar
61 Laston Atas ATBL (AC-Base) 580,000 40.00 940,000.00 42,000.00 982,000.00 Banjar
62 Lataston (HRS) 40.00 1,100,000.00 42,000.00 1,142,000.00 Banjar
63 Tanah 5.00 10,500.00 2,000.00 10,000.00 22,500.00 Setempat
64 Gravel 1/2 diameter 20 cm 10.00 15,000.00 - 15,000.00 Setempat
65 Gravel 1/2 diameter 30 cm 10.00 20,000.00 - 20,000.00 Setempat
66 Gravel 1/2 diameter 40 cm 10.00 35,000.00 - 35,000.00 Setempat
67 PVC. diameter 1.5" 10.00 5,000.00 - 5,000.00 Setempat
file:///conversion/tmp/activity_task_scratch/724242744.xls/quary panumbangan
68 Thermoplash 10.00 27,273.00 - 27,273.00 Setempat
69 Glassbeads 10.00 22,727.00 - 22,727.00 Setempat
70 Thinner 10.00 17,500.00 - 17,500.00 Setempat
71 Cat Meni 10.00 20,000.00 20,000.00 Setempat
72 Tiang Pancang Beton Pratekan 5,464,800.00 5,464,800.00 Setempat
73 Elastomerik Karet Alam 750,000.00 750,000.00 Setempat
74 Cat Tembok 17,500.00 17,500.00 Setempat
75 Elastomerik Strip -
76 Batu pecah 15 - 20 cm (Batu Putih) -
77 Cansteen 19,000.00
78 Kawat Las 60,000.00
79 Beton Ready Mix K.225 725,000.00 Tasikmalaya
80 Beton Ready Mix K.250 740,000.00 Tasikmalaya
81 Beton Ready Mix K.300 775,000.00 Tasikmalaya
82 Beton Ready Mix K.350 805,000.00 Tasikmalaya
0.06250000
341,550.00
5,464,800.00
87500
file:///conversion/tmp/activity_task_scratch/724242744.xls/quary panumbangan
DAFTAR : HARGA SATUAN BAHAN
DAFTAR : ANALIS WILAYAH UPTD KAWALI I
(KAWALI, CIPAKU)
LOKASI : RATA - RATA TERJAUH
87500
DAFTAR : HARGA SATUAN BAHAN
DAFTAR : ANALIS WILAYAH UPTD CIAMIS I
(CIAMIS, SADANANYA, CIJEUNGJING, BAREGBEG, CIKONENG, SINDANGKASIH, CIMARAGAS)
LOKASI : RATA - RATA TERJAUH
87500
DAFTAR HARGA HASIL SURVEY T.A. 2015
DINAS CIPTA KARYA KEBERSIHAN DAN TATA RUANG
Bahan Kaca
194 Kaca 2 mm m2 65,000.00 40,000.00 40,000.00 40,000.00 65,000.00
195 Kaca 3 mm m2 75,000.00 55,000.00 70,000.00 50,000.00 75,000.00
196 Kaca 5 mm m2 90,000.00 77,000.00 85,000.00 70,000.00 90,000.00
197 Kaca Es 5 mm bh 75,000.00 75,000.00 75,000.00 85,000.00 85,000.00
198 Kaca Rayband 12 mm ( ASAHI ) m² 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00
199 Kaca Tebal 8 mm m2 105,000.00 120,000.00 125,000.00 125,000.00 125,000.00
200 Kaca Patri Lokal Terpasang ( ASAHI ) m² 650,000.00 650,000.00 600,000.00 650,000.00 650,000.00
201 Kaca Patri Ex Luar negeri terpasang m² 1,550,000.00 1,450,000.00 1,500,000.00 1,500,000.00 1,550,000.00
202 Glass Block 20 x 20 bh 21,000.00 22,500.00 20,000.00 20,000.00 22,500.00
Bahan Elektrikal
457 Lampu Pijar 25 watt sd. 100 watt bh 6,500.00 9,000.00 7,500.00 7,750.00 9,000.00
458 Lampu Neon TL Sekualitas Philips 20 w bh 35,000.00 40,000.00 47,500.00 38,500.00 47,500.00
459 Lampu Neon TL Sekualitas Philips 40 w bh 60,000.00 70,000.00 75,000.00 75,000.00 75,000.00
460 Lampu Merkuri 80 W bh 85,000.00 95,000.00 85,000.00 90,000.00 95,000.00
461 Kabel Tembaga kg 37,500.00 38,000.00 45,000.00 48,000.00 48,000.00
462 MCB bh 41,000.00 50,000.00 50,000.00 65,000.00 65,000.00
463 Saklar Tunggal bh 15,000.00 15,500.00 15,000.00 13,000.00 15,500.00
464 Saklar Ganda bh 15,000.00 16,500.00 17,500.00 16,000.00 17,500.00
465 Stop Kontak bh 12,500.00 15,500.00 15,000.00 13,000.00 15,500.00
466 Stop Kontak Putar bh 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00
467 Box Sekering bh 30,000.00 35,000.00 27,500.00 40,000.00 40,000.00
468 Pipa Penangkal Petir bh 35,000.00 48,500.00 40,000.00 90,000.00 90,000.00
469 Kabel Penangkal Petir kg 30,000.00 36,500.00 32,000.00 33,000.00 36,500.00
-
Bahan Penggantung Kunci -
470 Engsel Pintu bh 25,000.00 24,000.00 25,000.00 25,000.00 25,000.00
471 Engsel Jendela bh 15,000.00 16,500.00 15,000.00 20,000.00 20,000.00
472 Kunci Tanam 1 Slaag sekualitas Royal bh 75,000.00 83,000.00 80,000.00 79,000.00 83,000.00
473 Kunci Tanam 1 Slaag Sekualitas Ancor bh 90,000.00 100,000.00 100,000.00 80,000.00 100,000.00
1 2 3 4 5 6 7 8
474 Kunci Tanam 2 Slaag Standar bh 140,000.00 148,500.00 135,000.00 146,000.00 148,500.00
475 Kunci 2 Slaag Bulat Utama Standar bh 220,000.00 215,000.00 190,000.00 215,000.00 220,000.00
476 Kunci 2 Slaag Sekualitas Kuda Terbang bh 75,000.00 88,500.00 85,000.00 85,000.00 88,500.00
477 Kunci Tanam Antik bh 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00
478 Kunci Lemari bh 7,500.00 12,000.00 8,500.00 12,000.00 12,000.00
479 Hak Angin Jendela Biasa bh 10,000.00 10,000.00 15,000.00 10,000.00 15,000.00
480 Hak Angin Jendela Antik bh 25,000.00 22,500.00 19,500.00 18,500.00 25,000.00
481 Hak Angin Jendela Kuningan bh 17,500.00 18,000.00 18,000.00 22,500.00 22,500.00
482 Hak Angin Kait Jendela Biasa ps 12,500.00 12,500.00 12,500.00 12,500.00 12,500.00
483 Kunci jendela bh 18,000.00 17,500.00 18,500.00 22,000.00 22,000.00
484 Kunci Tanam KM Bulat Alfa bh 40,000.00 40,000.00 60,000.00 42,500.00 60,000.00
485 Kunci Gembok bh 25,000.00 30,000.00 50,000.00 35,000.00 50,000.00
486 Espagnolet bh 100,000.00 110,000.00 98,000.00 90,000.00 110,000.00
487 Grendel bh 37,500.00 38,500.00 40,000.00 38,000.00 40,000.00
488 Door Closer Kelas Standard ( Kelas Sedang ) unt 115,000.00 125,000.00 150,000.00 116,500.00 150,000.00
489 Door Closer Kelas Standard ( Kelas Baik ) unt 350,000.00 365,000.00 400,000.00 365,000.00 400,000.00
490 Door Closer Kelas Rendah unt 80,000.00 85,500.00 125,000.00 176,000.00 176,000.00
491 Door Holder bh 125,000.00 128,200.00 145,000.00 128,000.00 145,000.00
492 Door Stop bh 45,000.00 47,400.00 55,000.00 47,000.00 55,000.00
493 Rel Pintu Dorong bh 150,000.00 275,000.00 175,000.00 176,000.00 275,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Pagar Bandara Nusawiru (lanjutan)
PEKERJAAN : Pembangunan Pagar Bandara Nusawiru (lanjutan)
LOKASI : Bandara Nusawiru Kabupaten Pangandaran
TAHUN ANGGARAN : 2017
…………………………
Direktur / Direktris
RENCANA ANGGARAN BIAYA
KEGIATAN : BJIB Pembangunan Pagar Bandara Nusawiru (lanjutan)
PEKERJAAN : Pembangunan Pagar Bandara Nusawiru (lanjutan)
LOKASI : Bandara Nusawiru Kabupaten Pangandaran
TAHUN ANGGARAN : 2017
1 2 3 4 6 7 =(3 x 6)
PEKERJAAN PELAKSANAAN PEMAGARAN PANJANG : 3.110,33 m1
I PAGAR KELILING SEGMEN 1
1 Papan Nama Kegiatan 1.00 m²
2 Pengadaan Direksikeet 1.00 ls
3 Pengukuran dan Bouplank 1.00 ls
4 Pek. Galian Tanah Pondasi 169.94 m³
5 Pek. Urugan Kembali 42.29 m³
6 Pas. Pondasi Batu 1 : 5 193.29 m³
7 Pas. Ring Balk 12/12 3.65 m³
8 Pek. Acian Ring Balk 116.75 m²
9 Pek. Plesteran + Acian 279.18 m²
10 Pas. Tombak Pagar 1,218.24 bh
11 Pek. Kolom (H BEAM) 17 x 18 x 340 101.52 bh
12 Pas. Panel Precast (5 x 40 x 240) 609.12 lbr
SUB JUMLAH 1
Panjang Pagar Segmen 1 253.80 m
Harga Pagar per m :
II PAGAR KELILING SEGMEN 2
1 Pek. Galian Tanah Pondasi 168.32 m³
2 Pek. Urugan Kembali 35.35 m³
3 Pas. Pondasi Batu 1 : 5 193.29 m³
4 Pas. Ring Balk 12/12 3.65 m³
5 Pek. Acian Ring Balk 116.75 m²
6 Pek. Plesteran + Acian 279.18 m²
7 Pas. Tombak Pagar 1,218.24 bh
8 Pek. Kolom (H BEAM) 17 x 18 x 340 101.52 bh
9 Pas. Panel Precast (5 x 40 x 240) 609.12 lbr
SUB JUMLAH 2
Panjang Pagar Segmen 2 253.80 m
Harga Pagar per m :
III PAGAR KELILING SEGMEN 3
1 Pek. Galian Tanah Pondasi 161.82 m³
2 Pek. Urugan Kembali 37.22 m³
3 Pas. Pondasi Batu 1 : 5 193.29 m³
4 Pas. Ring Balk 12/12 3.65 m³
5 Pek. Acian Ring Balk 116.75 m²
6 Pek. Plesteran + Acian 279.18 m²
7 Pas. Tombak Pagar 1,218.24 bh
8 Pek. Kolom (H BEAM) 17 x 18 x 340 101.52 bh
9 Pas. Panel Precast (5 x 40 x 240) 609.12 lbr
SUB JUMLAH 3
Panjang Pagar Segmen 3 253.80 m
Harga Pagar per m :
IV PAGAR KELILING SEGMEN 4
1 Pek. Galian Tanah Pondasi 233.15 m³
2 Pek. Urugan Kembali 53.63 m³
3 Pas. Pondasi Batu 1 : 5 278.49 m³
4 Pas. Ring Balk 12/12 5.27 m³
5 Pek. Acian Ring Balk 168.21 m²
6 Pek. Plesteran + Acian 402.24 m²
7 Pas. Tombak Pagar 1,755.24 bh
8 Pek. Kolom (H BEAM) 17 x 18 x 340 146.27 bh
9 Pas. Panel Precast (5 x 40 x 240) 877.62 lbr
SUB JUMLAH 4
Panjang Pagar Segmen 4 365.68 m
Harga Pagar per m :
1 2 3 4 6 7 =(3 x 6)
V PAGAR BRC
1 Pek. Galian Tanah Pondasi 602.09 m³
2 Pek. Urugan Kembali 119.97 m³
3 Pas. Pondasi Batu 1 : 5 468.08 m³
4 Pek. Plesteran + Acian 1,388.28 m²
5 Pek. Kolom Besi Ǿ 5 cm 6,637.82 m
6 Pas. BRC 120 x 240 Ø 8 mm 1,618.98 lbr
7 Pas. Kawat Duri (barbed wire) 7,933.00 m
SUB JUMLAH 4
Panjang Pagar Segmen 4 1,983.25 m
Harga Pagar per m :
DAFTAR
ANALISA HARGA SATUAN PEKERJAAN
Indeks Harga Upah Bahan Jumlah
No. Uraian Sat
Analisa Satuan (Rp) Rp. Rp. Rp.
1 2 3 4 5 6 7
1 1 m3 Galian Tanah biasa Sedalam 2 meter
Tenaga : Pekerja 0.900 Oh
Mandor 0.045 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
2 1 m3 Urugan Tanah Kembali
Tenaga : Pekerja 0.500 Oh
Mandor 0.050 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
3 1 m3 Urugan Pasir
Bahan : Pasir Urug 1.200 m3
Tenaga : Pekerja 0.300 Oh
Mandor 0.010 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
4 1 m2 Acian
Bahan : Semen Portland (PC) 3.250 Kg
Tenaga : Pekerja 0.200 Oh
Tukang Batu 0.100 Oh
Kepala tukang 0.010 Oh
Mandor 0.010 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
5 1 m2 Plesteran 1 PC : 5 Pasir tebal 15 mm dan Acian
Bahan : Semen Portland (PC) 5.184 Kg
Pasir Pasang 0.026 m3
Tenaga : Pekerja 0.300 Oh
Tukang Batu 0.150 Oh
Kepala Tukang 0.015 Oh
Mandor 0.015 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
6 1 m3 Membuat Balk Beton Bertulang 12/12 (211,29Kg Besi + bekisting)
Besi dia. 8-15 mm dan Besi dia. 10 dan Besi dia. 6 mm
Bahan : Kayu Papan Albasiah 0.3200 m3
Paku 4 cm sd 7 cm 3.2000 Kg
Pelumas Bekisting 1.6000 Lt
Besi Beton U 24 211.2900 Kg
Kawat beton 3.0000 Kg
Semen Portland 323.0000 Kg
Pasir beton 0.5200 m3
Batu pecah 1/2 0.7800 m3
Kayu balok Albasiah 0.1400 m3
Tenaga : Pekerja 5.960 Oh
Tukang batu 0.350 Oh
Tukang kayu 2.800 Oh
Tukang besi 1.400 Oh
Kepala tukang 0.4550 Oh
Mandor 0.2080 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
7 1 Batang Kolom Freecast (17 x 18 x 340) Mutu Beton K 250
Bahan : Kolom 17 x 18 x 370 1.0000 Bh
Tenaga : Ongkos angkut (Pabrik-Lokasi) 110.0000 kg
Ongkos Pasang + Alat Bantu 0.1850 HB
Jumlah
Keuntungan 10 %
Jumlah Semua
8 1 Batang Panel Precast (5 x 40 x 240) Mutu Beton K 250
Bahan : Panel 240 x 40 x 5 1.0000 Bh
Tenaga : Ongkos angkut (Pabrik-Lokasi) 110.0000 kg
Ongkos Pasang + Alat Bantu 0.1850 HB
Jumlah
Keuntungan 10 %
Jumlah Semua
9 1 m2 Papan Nama Kegiatan
Bahan : Kayu Lokal Kelas III 0.025 m3
Paku 5-7 cm 0.250 kg
Banner 1.000 m2
Tenaga : Tukang 0.125 oh
1 2 3 4 5 6 7
Jumlah
Keuntungan 10 %
Jumlah Semua
10 1 m1 Ongkos Pasang Besi Galvanis
Bahan : Besi Galvanis Ǿ5 cm 1.050 m1
Tenaga : Tukang Las 1.200 Oh
Pekerja 1.200 Oh
Kepala tukang 0.0120 Oh
Mandor 0.00060 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
11 1 m3 Pasangan Pondasi Batu Kali 1 PC :5 Pasir
Bahan : Batu Belah 15/20 CM 1.200 m3
Semen Portland (PC) 136.000 Kg
Pasir Pasang 0.544 m3
Tenaga : Pekerja 1.500 Oh
Tukang Batu 0.750 Oh
Kepala Tukang 0.075 Oh
Mandor 0.075 Oh
Jumlah
Keuntungan 10 %
Jumlah Semua
13 1 m² Memasang Pagar BRC
Bahan : BRC 120 x 240 Ø 8 mm 0.600 lbr
Semen Portland 2.000 Kg
Pasir Beton 0.005 m3
UPAH
1 Pekerja / Pembantu Tukang Hari / 8 jam
2 Tukang Gali Hari / 8 jam
3 Kepala Tukang Gali Hari / 8 jam
4 Tukang Batu/ Tembok Hari / 8 jam
5 Kepala Tukang Batu / Tembok Hari / 8 jam
6 Tukang Kayu Hari / 8 jam
7 Kepala Tukang Kayu Hari / 8 jam
8 Tukang Besi Hari / 8 jam
9 Kepala Tukang Besi Hari / 8 jam
10 Tukang Cat Hari / 8 jam
11 Mandor Hari / 8 jam
12 Ongkos Pasang + Alat Bantu OP
13 Ongkos angkut (Pabrik-Lokasi) kg
1 2 3 4
DAFTAR ANALISA SATUAN PEKERJAAN
#REF!
#VALUE!
KODE HARGA
NO. URAIAN PEKERJAAN
ANALISA (Rp)
1 2 3 4
Halaman : 5
1 2 3 4
259 1 m2 Langit-Langit Teakwood (60 x 120 ) cm, tebal 4 mm 09.4.2 #REF!
260 1 m2 Langit-Langit Lat Kayu Jati 09.5.1 #REF!
261 1 m2 List Langit-langit Kayu Profil 09.7.1 #REF!
262 1 m2 Langit-langit Gypsum Board, tebal 9 mm 09.7.1 #REF!
263 Memasang 1 Bh Kloset Duduk/Monoblok 10.1.1 #REF!
264 Memasang 1 Bh Kloset Jongkok Porselen 10.1.2 #REF!
265 Memasang 1 Bh Kloset Jongkok Teraso 10.1.3 #REF!
266 Memasang 1 Bh Urinoir 10.2.1 #REF!
267 Memasang 1 Bh Washtafel 10.3.1 #REF!
268 Memasang 1 Bh Bak Mandi Teraso Volume 0,30 m3 10.4.1 #REF!
269 Memasang 1 Bh Bak Mandi Fibreglass Volume 0,30 m3 10.4.2 #REF!
270 Memasang 1 Bh Bak Mandi Batu Bata Volume 0,30 m3 10.4.3 #REF!
271 Membuat 1 Bh Bak Beton Volume 1 m3 Air 10.6.1 #REF!
272 Membuat 1 Bh Bak Fibreglass Volume 1 m3 Air 10.6.2 #REF!
273 Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, diameter 20 cm 10.7.2 #REF!
274 Memasang 1 m' Pipa Beton, diameter 30 cm - 100 cm 10.8.2 #REF!
275 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30x30) cm, Tinggi 35 c 10.9.3 #REF!
276 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45x45) cm, Tinggi 50 c 10.9.4 #REF!
277 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60x60) cm, Tinggi 65 c 10.9.5 #REF!
278 Memasang 1 m' Pipa Galvanis diameter 1/2 " 10.10.1 #REF!
279 Memasang 1 m' Pipa Galvanis diameter 3/4" 10.10.2 #REF!
280 Memasang 1 m' Pipa Galvanis diameter 1" 10.10.3 #REF!
281 Memasang 1 m' Pipa Galvanis diameter 1 1/2" 10.10.4 #REF!
282 Memasang 1 m' Pipa Galvanis diameter 3" 10.10.5 #REF!
283 Memasang 1 m' Pipa Galvanis diameter 4" 10.10.6 #REF!
284 Memasang 1 m' Pipa PVC Tipe AW diameter 1/2" 10.11.1 #REF!
285 Memasang 1 m' Pipa PVC Tipe AW diameter 3/4" 10.11.2 #REF!
286 Memasang 1 m' Pipa PVC Tipe AW diameter 1" 10.11.3 #REF!
287 Memasang 1 m' Pipa PVC Tipe AW diameter 1 1/2" 10.11.4 #REF!
288 Memasang 1 m' Pipa PVC Tipe AW diameter 2" 10.11.5 #REF!
289 Memasang 1 m' Pipa PVC Tipe AW diameter 2 1/2 " 10.11.6 #REF!
290 Memasang 1 m' Pipa PVC Tipe AW diameter 3" 10.11.7 #REF!
291 Memasang 1 m' Pipa PVC Tipe AW diameter 4" 10.11.8 #REF!
292 Memasang 1 Bh Bak Cuci Piring Stainless Steel 10.12.1 #REF!
293 Memasang 1 Bh Bak Cuci Piring Teraso 10.12.2 #REF!
294 Memasang 1 Bh Kran dia. 3/4 " atau 1/2" 10.13.1 #REF!
295 Memasang 1 Bh Floor drain 10.14.1 #REF!
296 1 Kg Pasang Rangka Atap Baja 11.1.1 #REF!
297 1 m2 Ongkos Pasang Pintu Besi Baja 11.2.1 #REF!
298 1 m2 Ongkos Pasang Jendela Besi 11.3.1 #REF!
299 1 m2 Ongkos Pasang Jendela Besi Tahan Api 11.3.2 #REF!
300 1 m2 Ongkos Pasang Pintu Gulung Besi 10.2.2 #REF!
301 1 m2 Ongkos Pasang Pintu Lipat 10.2.3 #REF!
302 1 m2 Ongkos Pasang Pintu Sunscreen Alumunium 10.2.4 #REF!
303 1 m2 Ongkos Pasang Rolling Door 10.2.5 #REF!
304 1 m2 Ongkos Pasang Pintu Aluminium 10.2.6 #REF!
305 1 m2 Ongkos Pasang Venetions Blinds 10.4.1 #REF!
306 1 m2 Ongkos Pasang Vertikals Blinds 10.4.2 #REF!
307 1 m2 Ongkos Pasang Terali Besi 10.5.1 #REF!
308 1 m2 Pasang Kawat Harmonika 2 cm 10.6.1 #REF!
309 1 m2 Pasang Kawat Nyamuk 10.6.2 #REF!
310 1 m2 Pasang Kawat Kassa 10.6.3 #REF!
311 1 m2 Ongkos Pasang Kawat Burung 10.6.4 #REF!
312 1 m2 Ongkos Pasang Kawat Burung 10.6.5 #REF!
313 1 m2 Ongkos Pasang Jendela Nako & Tralis 11.3.3 #REF!
314 1 m' Pasang Talang Datar Seng 11.7.1 #REF!
315 1 m' Pasang Talang Miring Seng Bjls 11.7.2 #REF!
316 1 m' Pasang Talang 1/2 Lingkaran D-10 cm, Seng Bjls 30 11.7.3 #REF!
317 1 Buah Pasang Kunci Tanam Antik 12.1.1 #REF!
318 1 Buah Pasang Kunci Tanam Biasa 12.1.2 #REF!
319 1 Buah Pasang Kunci Tanam Kamar Mandi 12.1.3 #REF!
320 1 Buah Pasang Kunci Silinder 12.1.4 #REF!
321 1 Buah Pasang Engsel Pintu 12.2.1 #REF!
322 1 Buah Pasang Engsel Jendela Kupu-Kupu 12.2.2 #REF!
323 1 Buah Pasang Engsel Angin 12.2.3 #REF!
Halaman : 6
1 2 3 4
324 1 Buah Pasang Kait Angin 12.3.2 #REF!
325 1 Buah Pasang Door Closer 12.3.3 #REF!
326 1 Buah Pasang Kunci Selot 12.1.5 #REF!
327 1 Buah Pasang Pegangan Pintu/Door Holder 12.3.4 #REF!
328 1 Buah Pasang Door Stop 12.3.5 #REF!
329 1 Buah Pasang Rel Pintu Dorong 12.4.1 #REF!
330 1 Buah Pasang Kunci Lemari 12.1.6 #REF!
331 1 m2 Pasang Kaca, Tebal 3 mm 12.5.1 #REF!
332 1 m2 Pasang Kaca, Tebal 5 mm 12.5.2 #REF!
333 1 m2 Pasang Kaca, Tebal 8 mm 12.5.3 #REF!
334 1 m2 Pasang Kaca Patri, Tebal 5 mm 12.5.9 #REF!
335 1 m2 Pasang Lantai Ubin Pc Abu-Abu Uk. 30x30 cm 13.1.2 #REF!
336 1 m2 Pasang Lantai Ubin Pc Abu-Abu Uk. 20x20 cm 13.1.3 #REF!
337 1 m2 Pasang Lantai Ubin Warna Uk. 30x30 cm 13.2.2 #REF!
338 1 m2 Pasang Lantai Ubin Warna Uk. 20x20 cm 13.2.3 #REF!
339 1 m2 Pasang Lantai Ubin Granito 40 x 40 cm 13.4.1 #REF!
340 1 m2 Pasang Lantai Ubin Marmer Alam Ukuran Kecil 13.5.2 #REF!
341 1 m2 Pasang Lantai Ubin Marmer Alam Ukuran Besar 13.5.3 #REF!
342 1 m' Pasang Plint Ubin Pc Abu-abu uk. 15x20 cm 13.6.9 #REF!
343 1 m' Pasang Plint Ubin Pc Abu-abu uk. 10x30 cm 13.6.10 #REF!
344 1 m' Pasang Plint Ubin Pc Warna uk. 10x20 cm 13.6.12 #REF!
345 1 m' Pasang Plint Ubin Pc Warna uk. 10x30 cm 13.6.13 #REF!
346 1 m' Pasang Plint Vinyl Tanpa Adukan 13.12.1 #REF!
347 1 m' Pasang Plint Keramik 10 x 20 cm 13.10.4 #REF!
348 1 m2 Pasang Lantai Keramik 20 x 20 cm 13.10.6 #REF!
349 1 m2 Pasang Lantai Keramik 30 x 30 cm 13.10.9 #REF!
350 1 m2 Pasang Lantai Keramik 30 x 30 cm Anti Slip 13.10.10 #REF!
351 1 m2 Pasang Lantai Keramik 10 x 30 cm 13.10.11 #REF!
352 1 m2 Ongkos Pasang Lantai Karpet 13.11.2 #REF!
353 1 m2 Ongkos Pasang Lantai Parquet Jati 13.11.3 #REF!
354 1 m2 Ongkos Pasang Gymfloor 13.5.1 #REF!
355 1 m2 Pasang Dinding keramik 20 x 20 cm, Warna 13.16.6 #REF!
356 1 m2 Pasang Dinding Keramik 10x20 cm 13.16.9 #REF!
357 1 m2 Pasang Dinding Keramik 20x20 cm polos 13.16.11 #REF!
358 1 m2 Pasang Dinding Keramik 10x20 cm warna 13.16.12 #REF!
359 1 m2 Pasang Dinding Marmer 100x100 cm 13.16.13 #REF!
360 1 m2 Pasang Dinding Bata Pelapis 7x3x24 cm 13.16.14 #REF!
361 1 m2 Pasang Dinding Bata Klinker 5x5x24 cm 13.16.15 #REF!
362 1 m2 Pasang Dinding Batu Tempel Hitam 13.16.17 #REF!
363 1 m2 Plint Kayu 2 x 10 cm 13.16.24 #REF!
364 1 m2 Pengecatan Bidang Kayu Lama 14.1.1 #REF!
365 1 m2 Mengikis/Mengerok Permukaan Cat Tembok Lama 14.1.2 #REF!
366 1 m2 Mencuci Bidang Permukaan Tembok Yang Pernah di Cat 14.1.3 #REF!
367 1 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 14.1.4 #REF!
368 1 m2 Menyabun Permukaan Tembok Lama 14.1.5 #REF!
369 1 m2 Mendempul dan Menggosok kayu 14.2.1 #REF!
370 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir), 1 Lapis Cat Dasar, 2 Lapis Ca 14.3.1 #REF!
371 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir), 1 Lapis Cat Dasar, 3 Lapis Ca 14.3.2 #REF!
372 1 m2 Pelaburan Bidang Kayu dengan Teak Oil 14.3.3 #REF!
373 1 m2 Pelaburan Bidang Kayu dengan Politur 14.3.4 #REF!
374 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 14.3.5 #REF!
375 1 m2 Pelaburan Bidang Kayu dengan Vernis 14.3.6 #REF!
376 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penu 14.3.7 #REF!
377 1 m2 Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 14.4.1 #REF!
378 1 m2 Pemasangan Wall Paper 14.6.1 #REF!
379 1 m2 Pengecatan Permukaan Baja dengan Meni Besi 14.7.1 #REF!
380 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dengan perancah 14.7.2 #REF!
Halaman : 7
1 2 3 4
381 1 m3 Bongkaran Dinding Bata 15.1.1 #REF!
382 1 m2 Bongkaran Lantai Keramik 15.1.2 #REF!
383 1 m2 Bongkaran Plesteran Dinding 15.1.3 #REF!
384 1 m2 Bongkaran Plafond 15.1.4 #REF!
385 1 m2 Bongkaran Genteng ( Jika Bongkaran Tidak Di Pakai ) 15.1.5 #REF!
386 1 m2 Bongkaran Genteng ( Jika Bongkaran Di Pakai ) 15.1.6 #REF!
387 1 m2 Bongkaran Rangka Atap 15.1.7 #REF!
388 1 m3 Bongkaran Kusen 15.1.8 #REF!
389 1 m2 Perkerasan Blok 16.5.1 #REF!
390 1 Btg Penanaman Pohon Pelindung 16.6.1 #REF!
391 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.1 #REF!
Borrow Area ( Jarak Angkut 0,1 -5 km )
392 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.2 #REF!
Borrow Area ( Jarak Angkut 5-10 km )
393 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.3 #REF!
Borrow Area ( Jarak Angkut 10-15 km )
394 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.2 #REF!
Borrow Area ( Jarak Angkut 5-10 km )
395 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.3 #REF!
Borrow Area ( Jarak Angkut 10-15 km )
396 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.4 #REF!
Borrow Area ( Jarak Angkut 15-20 km )
397 1 m3 Timbunan Tanah dipadatkan dengan menggunakan alat Berat, Material dari 16.7.4 #REF!
Borrow Area ( Jarak Angkut 15-20 km )
398 1 Ha Pembersihan Lapangan dengan Menggunakan Alat Berat 16.7.5 #REF!
399 1 m2 Stripping Permukaan Tanah dengan Menggunakan Alat Berat. 16.1.5 #REF!
400 1 m2 Galian Tanah dengan Menggunakan Alat Berat. 16.1.6 #REF!
401 1 m3 Timbunan Tanah di Padatkan dengan Stamper 16.1.7 #REF!
402 1 m' Tiang Cerucuk Bambu di Pancangkan Kedalam Tanah Lunak 16.8.1 #REF!
403 1 m2 Mencabut Tiang Pancang dari dalam Tanah 16.8.2 #REF!
404 1 m3 Bronjong Uk. (0,5 x 1x2) dia. Kawat di Galvano 3 mm untuk diisi batu kali 16.9.1 #REF!
(dengan 1 sekat )
405 1 m3 Bongkaran Pasangan (tebal lebih dari 50 mm ) 16.10.1 #REF!
406 1 m3 Bongkaran Pasangan (tebal lebih dari 30 mm ) 16.10.2 #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Material disiapkan dilokasi pekerjaan 1. Menggunakan tenaga manusia 400 m2 per hari
2. Menghampar pasir setebal 5 cm 2. Material-material dikirim ke tempat pekerjaan oleh leveransir
3. Batu pecah berukuran besar ( 15 - 20 cm )3. Batu sudah dipecah
disusun berdiri 4. Tanah dasar sudah disiapkan
4. Batu pecah yang lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm
rongga di atasnya sehingga rata kemudian
dipadatkan/ digilas dengan mesin gilas
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Batu belah 15/20 70.0 m3 M.020 #REF! #REF!
T Batu pecah 5-7 cm 20.0 m3 M.022 #REF! #REF!
E Pasir urug 30.0 m3 M.040 - -
R Alat bantu 4.0 set M.170 65,000.00 260,000.00
I
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas 3 roda 8-10 T 1.0 1 E.080 5 53,012.00 265,060.00
R
A
L
A
T
A
N
PERALATAN 265,060.00
TOTAL (Rp.) #REF!
VOLUME/ : 400 SATUAN : m2
QUANTITY HARGA SATUAN #REF! per m2
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Pekerjaan harus dilaksanakan sesuai Bab.1. Harga bahan, prangko ( siap dilokasi )
Spek. Umum Jln. Kab. BM Maret 1992 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah,
2. Alat penyemprotan 1 kg/m2 disemprot berdasarkan berat
menggunakan mesin penyemprot 3. Berat jenis minyak tanah 0,86
4. Berat jenis aspal 1,03
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Aspal Bitumen 510.0 kg M.061 #REF! #REF!
T Minyak tanah 599.0 lt M.065 #REF! #REF!
E Alat bantu 0.16 set M.170 65,000.00 10,400.00
R
I
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin penyemprot aspal 200 Ltr 1.0 1 E.154 5 #REF! #REF!
R Blower 1.0 1 E. 5 #REF! #REF!
A
L
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 1000 SATUAN : m2
QUANTITY HARGA SATUAN #REF! per m2
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Hampar split 5-7 cm, rata-rata 16 m2/m3 1. Menggunakan tenaga manusia
2. Padatkan masing-masing lapisan batu 2. Batu pecah dikirim ketempat pekerjaan oleh leveransir
3. Hampar agregat 3-5 cm 60 m2/m3 3. Tebal perkerasan total 7 cm
4. Padatkan 4. Hasil kerja 2000 m2/minggu ( 6 hari )
5. Semprotkan aspal 2,5 kg/m2
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Batu pecah 5-7 cm 62.0 m3 M.022 #REF! #REF!
T Batu pecah 3-5 cm 24.9 m3 M.023 #REF! #REF!
E Aspal 2,550.0 Kg M.061 #REF! #REF!
R Alat Bantu 8.0 Set M.170 65,000.00 520,000.00
I
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas 3 roda 8-10 T 1.0 3 E.080 15 #REF! #REF!
R Mesin penyemprot aspal 200 Ltr 1.0 3 E.154 15 #REF! #REF!
A Dump truck ( 3,5 T )/44 HP 1.0 3 E.221 15 #REF! #REF!
L Blower 1.0 3 E. 15 #REF! #REF!
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 70 SATUAN : m3
QUANTITY HARGA SATUAN #REF! per m3
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Hamparkan batu pecah 2-3, 45 m2/m3 1. Menggunakan tenaga manusia
2. Setiap lapis batu dipadatkan 2. Material dikirim ke lokasi pekerjaan oleh pemasok
3. Semprotkan aspal ( 1,8 lt/m2 ) 3. Tebal total padat perkerasan 3 cm
4. Hamparkan batu pecah 1-2 , 90 m2/m3 4. Kapasitas penghamparan 2800 m2/minggu (6 hari)
5. Semprotkan aspal (1,5 lt/m2)
6. Hampar screen (blinder), 400 m2/m3
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Batu pecah 2-3 cm 35.20 m3 M.024 - -
T Batu pecah 1-2 cm 22.31 m3 M.025 - -
E Screen 0.5 - 1 cm 12.5 m3 M.026 #REF! #REF!
R Aspal bitumen 4,620.0 kg M.061 #REF! #REF!
I Alat bantu 8.16 set M.170 65,000.00 530,400.00
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas 3 roda 6-8 Ton 1.0 3 E.080 15 #REF! #REF!
R Mesin penyemprot aspal 200 Ltr 1.0 3 E.153 15 #REF! #REF!
A Dump truck 3,5 T / 115 HP 1.0 3 E.221 15 #REF! #REF!
L Blower 1.0 3 E. 15 #REF! #REF!
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 1400 SATUAN : m2
QUANTITY HARGA SATUAN #REF! per m2
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Semprotkan aspal tack coat 0,8 l/m3 1. Menggunakan tenaga manusia
2. Hamparkan batu pecah 3-5, 25 m2/m3 2. Material dikirim ke lokasi pekerjaan oleh pemasok
3. Hamparkan batu pecah 2-3, 45 m2/m3 3. Tebal total padat perkerasan 5 cm
4. Setiap lapis batu dipadatkan 4. Kapasitas penghamparan 2800 m2/minggu (6 hari)
5. Semprotkan aspal ( 2,5 lt/m2 )
6. Hamparkan batu pecah 1-2 , 90 m2/m3
7. Semprotkan aspal (1,5 lt/m2)
Hampar screen (blinder), 400 m2/m3
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Batu pecah 3-5 cm 71.40 m3 M.024 #REF! #REF!
T Batu pecah 1-2 cm 22.31 m3 M.025 - -
E Screen 0.5 - 1 cm 12.5 m3 M.026 #REF! #REF!
R Aspal bitumen 5,712.0 kg M.061 #REF! #REF!
I Alat bantu 8.16 set M.170 65,000.00 530,400.00
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas 3 roda 6-8 Ton 1.0 3 E.080 15 #REF! #REF!
R Mesin penyemprot aspal 200 Ltr 1.0 3 E.153 15 #REF! #REF!
A Dump truck 3,5 T / 115 HP 1.0 3 E.221 15 #REF! #REF!
L Blower 1.0 3 E. 15 #REF! #REF!
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 1400 SATUAN : m2
QUANTITY HARGA SATUAN #REF! per m2
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Penggalian tanah dengan tenaga manusia1. Menggunakan tanaga manusia
( 50 m3/hari ) 2. Kapasitas kerja kelompok 50 m3/hari
2. Tanah galian disingkirkan sejauh minimal 3. Kedalaman rata-rata galian s/d 3 m
dari lubang galian 4. Untuk jenis tanah berbatu, harga satuan pekerjaan dikalikan dengan faktor 1,5
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Alat Bantu 10.0 set M.170 65,000.00 650,000.00
T
E
R
I
A
L
MATERIAL 650,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN -
TOTAL (Rp.) #REF!
VOLUME/ : 50 SATUAN : m3
QUANTITY HARGA SATUAN #REF! per m3
OVERHEAD 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Bahan timbunan yang baik dihampar deng1. Menggunakan tenaga orang ( 96 m3/hari, pemadatan 960 m bahu jalan )
tenaga orang 2. Material pilihan dikirim sampai tempat pekerjaan oleh leveransir
2. Pemadatan bahu jalan dengan mesin gilas3. Leveransir meletakkan material timbunan sepanjang bahu jalan
gergetar 4. 10 cm timbunan dipadat dibutuhkan pada 1 m lebar bahu jalan
5. Penghamparan timbunan dengan tenaga manusia
6. Pemadatan dengan mesin gilas getar kecil
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Alat Bantu 2.5 set M.170 65,000.00 162,500.00
T
E
R
I
A
L
MATERIAL 162,500.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas bergetar 1 Ton 1.0 1 E.087 5 #REF! #REF!
R
A
L
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 96 SATUAN : m3
QUANTITY HARGA SATUAN #REF! per m3
OVERHEAD 10 % #REF!
JUMLAH DIBULATKAN #REF!
ANALISA BIAYA PEKERJAAN KODE
URAIAN : ANGGAPAN :
1. Agregat di tempat sepanjang jalan oleh lev1. Menggunakan tenaga manusia setempat
2. Menghampar agregat dengan tenaga oran 2. Kerikil ditumbun sepanjang jalan oleh leveransir
3. Pemadatan dalam 2 lapis memakai truck a3. Kerikil dengan ukuran lebih ( oversize ) yang tersingkir saat penghamparan dengan orang dihitung 6 %
mesin gilas roda baja 4. Dihampar dalam 2 lapis dan dipadatkan, tebal padat 10 cm padat
4. Perapihan dengan tangan 5. Penggunaan Alat Bantu kurang lebih 1 bulan-orang
6. Hasil kerja menghampar dan memadatkan 600 m2/hari ( 4 m x 150 m )
7. Kerikil kali tanpa disaring dikirim leveransir sampai ditempat pekerjaan
PEKERJA #REF!
MATERIAL JUMLAH VOLUME KODE HARGA SATUAN BIAYA SUB TOTAL
SATUAN (Rp.) (Rp.) (Rp.)
M
A Aggregat Kls. C 72.0 m3 M.017 #REF! #REF!
T Alat Bantu 2.4 set M.170 65,000.00 156,000.00
E
R
I
A
L
MATERIAL #REF!
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
ALAT KERJA KERJA (Rp./jam) (Rp.) (Rp.)
P
E Mesin gilas 3 roda 6-8 T 1.0 1 E.080 5 #REF! #REF!
R Truck tangki air 115 HP 1.0 1 E.182 5 #REF! #REF!
A
L
A
T
A
N
PERALATAN #REF!
TOTAL (Rp.) #REF!
VOLUME/ : 60 SATUAN : m3
QUANTITY HARGA SATUAN #REF! per m3
KEUNTUNGAN 10 % #REF!
JUMLAH DIBULATKAN #REF!