You are on page 1of 27
ESTIMATED COST: 200.00 LAKHS Office of the EXECUTIVE ENGINEER, MI& GWD Division, Bangalore ebreOo BXCh-TAVANS Rel, ada Ege, Him Sree emrae sor TRUST eheys aheerbas wEO Her GRO Shay Beads Aamere wsomo, INDEX SINo Particulars 1 FACE SHEET 2 INDEX SHEET 3 INDEX MAP, 4 |GERNERAL REPORT SAILENT FEATURE, 6 CERIFICATES [HyDRAULIC CALCULATION 8 DESIGNS 9 ABRSTRACT OF ESTIMATE 10. |RATE ANALYSIS _11_|LEAD STATEMENT 12. TOPO SHEET 13. [DRAWINGS Pages Teabrebod aixicdj-TeRANG tg, shay age, xem Peeve wrrds HOA combed Higd SBecrbal ead eer oo They Leaded AciRee mEbMO. Chapter 1. Introduction The objective of the project is to construct Checkdam cum bridge across halla near Ramadevarabetta village to impound the water required for catering the needs of villages existing on the upstream side of the proposed Checkdam cum bridge and improve the ground water table. 1.2, Location of the project The project lies in Ramanagara district of Ramanagara Taluk. The proposed Checkdam cum barrage is located at longitude 12° 45’ 19" Nand latitude 77" 17°39" E Vide toposheet No, 56 H/6 near Ramadevarabetta village of Ramanagara — ‘alule, Ramanagara district. CHAPTER-2 2.1, Catchment Area The independent catchment area of proposed Checkdam cum bridge is 57.90 $q Km. Drawing showing catchment area of proposed Checkdam cum bridge is enclosed. 2.2. Yield, ghe whole catchment area of Halla from origin at proposed Checkdam cum bridge is $7.90 Sq Km. The total yield is calculated on the basis of catchment area by using strange table is 7.143Mcum. 2.3. Estimation of Design Flood Flood Estimation at the proposed Checkdam cum bridge across Halla near Ramadevarabetta village: Independent Catchment Area of Halla on upstream of Checkdam cum bridge = 57.90 Sq.Km, Ryve's Formula Q= CA%/3 where C = 12.75 = 12.75 (57.90) 2/3 =190.82 m3/see 5 Discharge of Devarase Gowdanadoddi checkdam on U/S is 367.08 cumecs so by adding both 557.91 Cumecs of discharge to be considered for design Chapter 3, 3.1 Design Report for proposed Checkdam cum bridge Gheckdam cum bridge is proposed across the Halla. The objective of the project is wpeniguct & Checkdem cum bridge across Halla near Ramadevarabetta village to Side a he eater required for catering the needs of villages existing on the upstream Side of the proposed Checkdam cum bridge and improve the ground water table ana it also impound the water to lift for existing scheme, 3.2, General Arrangement for Checkdam cum bridge Bridge cum barrage is proposed across the river comprising 6 vents of 10.00 m £269, and S no of main pier with 1.00m thick. The Length between abutments to abwenert is 60.00 m. The sill level is at 68%.4m. nergy Dissipation arrangement has been done by providing stilling basin. The Gverall width of stiling basin is 64.00m. The Hydraulic jump is calculatey considering 3.2.1 Body Wall ocly wall is proposed between the piers to impound water. The FRL is fixed at RL 691.20 m and the foundation level is fixed at EL 688. m, such that the husderes, résts in soft rock. § no of main pier with 1.00m thek, is provided to facilitue ae Provision of Storage of water. 3.2.2 U/S and D/S apron and cutoff walls “The length of the apron is arrived from the hydraulic jump calculations, According cater wasS and D/S apron is provided as 3.00m and 8.00 respectively, Botk U/S and D/S Cutoff wall are proposed. 3.2.3 Head wall, Body wall, Wing Well and Return Walle, Oba" the site condition and as per design the length of body wall is Proposed to be 60.00 with § Main pier of \Go0m(Above nala bed) height end 10.00°> c/e distance. Wing oy, jeuuims is proposed on both sides of body wall for the height of 16004 3.4, Key wall. Key walls are proposed at the end of Head walls. The length of key wall is Proposed to be §.00m and height of key wall is -. Im on the banks of reer, Chapter 4, Cost Estimate titived MSR (2018-19). Cost Estimates is have been prepared baved ontak Quantities senegd ftom the Drawings prepared by considering the rates and wens mentioned in the Schedule of Rates of MISR for year i.e. 2018-19, Chapter 5. Conclusion. yg sterros mae oer mo SS SahH Beare mskmo is approved for Rs,200.00 Lakhs under heat of account 4702-00- Mae sincer on MI&GWD Sub division MI&GWD division Ramanagara Bangalore Rmbrboh Axcd;-crabard vg, shay Mage, sew Kaewe emras son maddetd we Berra syo ue! my say Aas Detwr re’ mexrwO. FACE SHEET 1, Division : M.L&GWD Division, Nelamangala 2, Sub-Division : M.l.& GWD Sub-Division ,Bangalore 3. Fund Head : 4, Major Head ? 5. Minor Head 6. Service Head 7, Departmental Head Estimate is farmed in the office of the Executive Engineer, MI&GWD Division, Bangalore and the probable that will be incurred for asanc By, may megH, sum aatwe verse HOR crabelead eg, stoeros! x30 det myo shay tend Aonere mesmo Estimated Cost :-200.00 Lakhs 8. Estimate Administratively Approved under 2 9. Estimate prepared by 10. Estimate Checked by 11. Sanction No & date & assists Keenan ‘Engineer ive Engine M.L&GWD Sub-Division M.1.&GWD Division Ramanagara Bangalore SAILENT FEATURE Pomoc rch, -comANs ag, shsy meagw, sxew alecwe emras sor Grabdend ug steers BEd tie oO Thay Aas Aere msbmo. District/Taluka/Village Location. 2) Longitude by Latitude 4 ‘Toposheet No 8 9 10 un 2 13 14 15 16 7 18 19 a b Sourees | Halla/River/Barrage/Resrvoir | Perennial / Non-perennial 1) LW.L tm) 1) MW.L (m) ©) Suitability of water for irrigation d) Flow in river /nalla at site (cumecs) ¢) Availability for water Down-stream commitments commitments / Whole Catchment area of site (sq Km) Independent Catchment area of site (sq Km) Maximum Mood discharge (Cumecs) High flood level (ax) Length of Barrage/Checkdam|m) ‘Top width of Barrage/Checkctam(m) Bottom width(M) Creast level (m) Sill R.L, (rn) Lowest RL of nala bed (mm) Deckslab bottom level Road top level Width of carriage(m) Foundation ‘Type ‘Taickness(m) Up-stream , Ramanagara/Ramanagara/Ramad * evarabetta 12" 48°10" N TT 1739" E Halla Non ~ perennial 691.200 + 692.700 Water is suitable for drinking : Water available in ménsoon Existing upstream and down stream Commitments will not be affected 57.90 57.90 190.823 695.00 + 60.00 1.20 2 2.55 + 692.700 691.200 691.200 4.25 Raft foundation 0.60 19 Abutment Height(m) b Top wideh(m) 2 22 23 24 Bottom widthin) Deckstab No of span Length) Widthim) Thickness(m) Height of Checkdam above sill (rm) Lowest foundation RL (rr) Estimated cost of the project in Lakhs Villages benefited HOR masiocee byen 4GWD Sub-Dwvision Ramanagara 2.50 0.80 + 2,300 10.80 1 4.65 0.909 1.50 + 888.990 200.00 Ramadevarabetta Executive Engineer. M.L&:GWD Division Bangalore PELROGH BAw;-EVSNG VY, DY WOAH, sxe Rowe emeas son resend 848 Roca wad diet ago abey kee Amer maOMO. SITE SELECTION CERTIFICATE Certified that | have inspected the site of work and satisfied with the location of the proposed site of work. Assntne Executive Engineer Aube “sigowo sub-oivisen Ramanagara jeineer MAL&GWD Division Bangalore y* ROMO ad;-ceaans ae), DY WAH, ttm Paemwe wmess son PMG 3g Bods wo ver RO HY ead damem war. CERTIFICATE Certified that, The quarries selected forthe various materials required forthe work are from the nearest quarries tothe site of work ihe Quantites of materials required for the work are availabe from the above quarries selected and are ‘Sufficent to complete the work. ‘The Quanttes of materials available from these quarries are good quality and are suitable fom the work, Uhave Personally inspected the above quarries assich Executive ‘Engineer uve Engineer “ M.L&GWD Sub-Division M.L&GWD Division Ramanagara Bangalore membmROch BAc;-COMANT BY. ae Ww, exw Faewe ymras SOR GEMS wigs diners BYO we GRO bey deeds Armee mao. SCRUTINY CERTIFICATE Certified that, Name Of Workosssne BY, Sa REGS. Hite ALAte UMEEE BOM eandese thas eters ais te ap S88 Arba AekReM mtb. Amounting lo Rs.200.00 Lakhs has been Screutinised in this office in all aspects with referrence to the M., S.R. 2018-2019, indeed, A eer EReettite Engineer ok M.L&GWD Sub-Division M.L&GWD Dinision Ramanagara Bangalore my TSAO SCREAMS 2 ahah MERE, wen etwe UMA HOM OMe tye mat! wa de Gao Se ted deere acme, GENERAL ABSTRACT SHEET SL.NO ITEM OF WORK AMOUNT IN RS Oo : 1 DETAILED ESTIMATE FOR BRIDE CUM parrage \T295387 ee (Ber cima OD roman n gi2eoRh.e 7718162.0 2 |ADD GST CHARGES(12%) a3 6848 fh Dp Pe 5 1394s 2126180.03 GONSLITANGY o 4 ADD ate “agg DING 6: sersoe *) a Sot > ER, eas 4 ROUNDING UP 34. 2ET GRAND TOTAL 20000000.00 Assistant Executive Engineer M.L&GWD Sub-Division, Ramanagara mchmoad aitth;-vehene tg, chi meg, Exim Mate emess sort CUT cys ahecrbel wad der mp thay teahed Reiners wisires, = : — Specification unit} Wo.) 2 | > | Qnty | Rete | Amount ola s 6 7 a 3 TT “DETAILED ESTIMATE FOR BRIDE CUM BARRAGE ;n 50 percent open space} including bushes upto 300) er weeds including burning or disposing off the same as directed ete, complete all lead and lifts 9, P. No.105, Item No. 7. [sur Ph. . __ [sqm | 1 | 200.00) 68.00 13000.09-— - sqm _—t 13000.00 [ |} + ‘Isa | 1_| 13000.00 1300.60 1.90, _24700.00 3 of soll by mechanical means Induding Bouldero upio 0.60 m dia J 4 (0.113 cum ) for canal/field channels boundary trench seating of embakement for | |channets/feld channels etc, including dressing of bed and sides to required profile, cost of | all materials, machinery, labour,placing excavated stuf for formation of services road/embakement as directed etc, complete with lead upto SOm and lift upto 3m. [MI SR 2018-19, Tem Nal ring(u/S)____ |oum [Nala trimming(©/S) _|Cum | Excavation lf Toandation tw all Cade of soll tacking boulders upto 0. cum | for dam, spilivay, intake structure, surface power house and other appurcenant | |works and placing the excavated soil neatly in specified dump area or disposing off the same! | es directed inchding cost af all materials, machinery, labour etc., complete with lead upto 1| 1 of cut upto 1 316.80 | cun| 510 | 00 | 283.084 247.95 it reso | j 2.90 | 3.00 | 400 52.90 | 5.20 | 3.00 | 4.00 | 124.80 | — ay 220 | 2.00 | 400 | 52.80 a | | 10 | s00| seen 64.00 | 0.80 | 1.35 i __ 64.00 | 8.00 t 1995.57 54.00 a oe , 10776100) ~~ a Specificatior lunit/no.) ot | B | D | Qnty | Rate | Amount sete | at ae ae seo 3 iT 2 ERGavatiN Tor Toundaiion in sok rack wihout blasting including boulders upto 0. | diameter (0.113 cam ) for dam, spillway, intake structure, surface power house and other j | jan) | appurtenant works and placing the excavated material neatly in specified dump area or disposing off the same as directed including cost of all materials, machinert, labour etc., ‘complete with lead upto 1 lem and all lifts “[MIS.R- 2018-19 tem No.2.2 Page No.2) 7 {ey at eum] 6 | 1000 | 220 | os0| sss.60 J [atutmenta Joum 2 | 610 | 5.80 | 080 5661] _ Bee cums | 610 | 370 | o90| 119.09] (Wing wall(U/S) Cam | 2 3.20 3.00 0.80 15.367— | ‘Return wall(U/S) cum) 2 | 220 | 3.00 | 080| 10567 Wing wats) cum! 2 | s20 | 300 | os0| 2496 | Return wallD/S) kcum 2 | 220 | 2.00 | 060| 19,50 Key wall cum) 2 | 5.00 1.40 | 080 | _11.20- | Cutoff wailo/S) cum_1 e400 | 080 | o80| sag l 443.69 75,001 __33277.00;~ 5 Providing and laying Talea vibrated MIE (TE days cube Compressive ? 8 i ‘Retums jelow T 1 ee oR eum! 2 | 200 | 150 | 230] i320] : jRetaras U7 oats; |ground) cum) 2) ‘200° | 2 | 2.80) 10.08) 7 CutofwallD/S) (Cum) 1 | 64.00 | 060 | 2:45) 94.08. U/Sagron ~Teuie!—0- 68.0012 n0— 9.50! —— 0.001 I . t i ; D/S Apron 64.00 | 800 | 0.20, 10249,-~ ' |ustocwm ____|eum| 1 | 6400 | 045 | os agp Tiron i sas 0207357 | | latitmenpictag 520 | 060 3806, Pier(Poating) 310 | 060] 73.47) - Pier cum| s | _s2s_| 100 | 6:70) 17.88 | ee cum! s | sas | 100 | o30| 1535 : - vee rf \cl | | |, "Heep eum 10| oss | 1 | 670| 5695 | ‘Abutment cap cum| 2 | 610 | 080 | 0.30) 2.93 -|f rarapes Wat cum|_2| sooo | 020 | oso| _2urz - | ] | Guard Pillars for 20No's_|Cum| 20 | -o.20 | 020 | 1.09] 0. or Guecly | | sitet: -qrgt70r}— : ; 2 219.00, Ges Te300 7 ing papa nits WE cage ake Ceo sag nt ; laze 96° igus) fade ‘rmcan Gitceta ae 20 mum wa oes appeonislas, har grades eapregnides Oi 20K Mab acd.'naes athidlng, cant AK Al melanin Veeck) (abou (eewreky “eatblcng,, cdaanlog, Wtctiag,, sanlag splaing S| [position, leveling. yibyting, ishing, curing etc., complete with all lead and lis. ( \ cetera: Sb j.caus wire of myer painted | [MIS 2018-19 T.1N0-4.27, Pa-66) wai z | peek sian cin! @ | isos: | nas || 090 | ame | s | 2 | 550 | 040 | 090| 19.117 Tabor 2| sao [52° | 020] sos6 | 42046015. BSAh8 o8 T B [> | ear | mate | amount [6 | > in cube compressive stcngii not a than 5 W sum down size approved, clean, hard, graded all materials, machinery, labour, formuorc| @ placing in position in altemate pane Ainishing, curing, packing joints with asphalt mortar ete,comiog Cement content :260 lg / cum with use of super plasticiver rea oer) [néereentes for wearing coat including. cost of (cleaning. batching, i | fevelting;compacting | frm alten and . [MISR 2018-19 I.No-2. Net Quantiy 2441 93 9 |Previding, fabricating and placing th poslion veinfoceinent wea bart for REG ots [including cleaning, straightening. cutting, bending. hooking, lapping, welding wherever |required, tying with 1.25 mm dia. soft annealed ste wire, including cost of all materials, | machinery, labour etc., complete with initial lead upto tem and all ft. (MI §R 2018-19,P. 10.30, Item No. 2.12) [As per calculation sheet Sheet enclosed IForD/SApron - |Main bars (10mm din at 200mm ef) [kg | 2 | s2i.00 8.00) 0.620) stl Jistitution bars (Smm ~ ia st 200mm c/o) | Kg |__ 68.00, 0.400) I H | Rerb [Main bare (LOmm dia at | | j |200mm 6/0) Kg | 2 4.00 64.00 0.620, _317,44| | [Distribution bars (mm! | | | jain et 200mm c/e) | Kg | 2 | 321.00 1.30, 0.400] 399,84) | | 7 1 ) Lu | _ 52041,80) i | . _ [ore] | s2041,20| 66.13, 3501042.00 [To [Providing semi-pervious 7 pervious casing embankment with soll fom orrew! | jareas in layers of 250 tc 300mm before compaction including cost ‘of all materials, —y | ‘machinery, Inbour, all operations such as excavation, sortingout, transporting, spreding in| | layer of specified thickness, breaking clods, sectioning, wateriag, compacting to density, |contrt of nor less than 95 percent or as sipulatec by power Feller ets. complete with intial | lead upto Ihem and all lifts. he |. [i er 2018-19,0. i [Behind Abutment (6.00700) wing aad return 12.00 0)/2_| 4.40| 254.00, Approach 100.00, 5.25 | 0.60|__ 630.00, 894.00|_ | Sf] specication _[Ualt| wo | L T Rate BD | Oaty 7 a Amount © Tr 1 2 ols 5 61 Ti [Providing and constructing 300 mm headers at 2 per som in packing stone chips and mortar 50 m and all lit. hice rubble stone pitching/revetment with pin including cost of all materials from approved source, labour, into joints, finishing, curing etc,, complete with lead upto a [MIGR 2018-19 P, No.84, tem No.3.87) For sides Sgm| 4 5.00) 1350 30.00 For U/S side Sqm] soso, 8.00 400.00, | ‘Sqm 430.90 249.90 12 |Providing rabble sione/ boulder bekind abutment/ Below apron inciudifg coat of sl |materials labour hand packing.finishing top surface etc., complete with all lead and lifts. (MI SR 2016-19 P. No.72, Item Ne 4.56) For D/S apron Sqm) 1 64.00) 8.00 | 0.70| 358.40) {sqm | 358.40) er9.50- 243354,00, 3 |with all lead and lifts. _ (MI SR 2018-19, pn-33,in-3.21.2) Providing and constricting 75mm dia PVC pipe weep holes foreoncrete/ masonry walls including providing 200x200x200mm size porous concrete block made of cement and 20mm, idown coaree aggregate in 1:4 proportion including 10Cmm thick sand backing at the Vjunction of wall and soll back fil, cost of all matey. machinery, labour, ete., complete Excn! | w=(0.45+2,00)/2_ saad 1.23. 44.10) { Bach’ | cry is | RSRRS 2600.4 (ii) Froviding and fixing in position 360m int filer in expansion joint for fixed ends of ay sored ‘spans not exceeding 10 m to |cater for a horizontal movement upto 20 mm, _&Technical Specification complete as per specifications. (PWDSR 2018-19,- P, No. 243 , Item No. 31.4) Sida in i prmaed Fed. with sealant complete as per drawing| (ORTH Specification 0.2605 Rm 5x3) soa | gm sal | '90,00| _129.09- a. 11616:00)-~ oe mechmbsh aizds—mochane tel, shay secigth, exe akacue UmrHS HOM conbelestd Hyg ahatroe! mas oat mp may Sead ASReTe BDO, BLN gpeainenion unit Wek Qnty Rate Amount 1 - 2 o 4 5 6 7 8 ° n DETAILED ESTIMATE FOR BRIDE CUM BARRAGE "Y6 |KSRRB M2200-9. Providing and laying of Filter media with granular materials / stone crushed aggregates satisfying the requirements laid down in clause 2500.4.2.2. of MORTH specifications to a thickness of not leas than 600 mm with smaller size towards the soil and. |bigger size towards the wall and provided over the entire surface behind abutement, wing wall and return wall to the full height compacted to a firm condition complete as per) |drawing and Technical Specification including cost of materials ,labour,HOM complete as, _pet specifications. em Ne. 28.13) 5 3 68 fs B10 wWo 3 wy hss 060 | 280 ae : cum Total cer wl ae Execute M.L8GWD Sub-Division, Ramanagara M.lLSGWD Division, Bangalore ies | aoe | mew yo wee SS paceman seree ro ooreT « s oe ore rs . oro] *° F fseq sds ery 60 de) si¢ WEN) £ qa p= veins Hesew | ase [oe [he ves let | ee: | ee z oA aie 7 wee | oer: | domme [ite | 5] ee | ore | oe — wane: | seco | cases’ ves |e | coe fons | a aE aaa i farsosass wo | wane [ae] | ox foe | i il kaise = lm revoste , oS? T mw |= | poe Pe me ml coene Ta eee: 2% fate] ou | & | aera] wtor| wena ina _ FingsHos oNiaNas uve ranean exsemne pony Tees oft ap pte mone Hip ampmes yor eran acim eye ‘Gtnee Ge: Ge auscren-tone qoutes \ aes aang | oe: (lama, [00 | 2] ee " aves | av | Sarat ats || Ge: fie || ae 7 £ baiercast woe foe | ome Joe |e fw Powe] |g [a fee Gequionpahyes saya] ¢ ave] woe | esl 3 |] Se: (re | = boas oe ToL wet ovver we t cor 009't ca oeo| we leew 1b fureredoy (eg doxhyer sata] 9 wesc || eis | saice ||] | de |i | a + bess wat fof oem fw [efor foes) | ae | a beg ct pth iinet 3 veme || ver: | terme |e fe | ode [mee a + frames soestt wt ower w z ot o0c's cd veo | os loro + furewdoy ee | oaem lost moal et | om || | fun wel nae fom jusecteas|, "24 last tae soon | &* [atts] afer | spare ca Bindawos ONianaa ave ress | zo | ovo | me |e | ow | os | om ot + bequonngana 0 oo a os roew | wo | avese | se |e | oe | cave | or tea séouns wen a em 43 $/a] 48 ee aves | evo | cose | © | z | ore ows | or we + pesuoneaiasa wee | wo | ssw | oe | z | oe oer | (aun eaasen} seo) sv wae | ost | seve | w | z | ost fore | 1 fea snus wen (ano ean) 0 we via wounnay] ot ————_. —_ wis | coo | cow | 6 | 2 | ~ | oor) we 1 fea vonnauisa so secs | ooo | coon | se | z | ox | ore | a 1 fseasdnuas wen a0 ep wounnay| 6 wes | 290 | owe | we |e | oe | eos] or oe 1 |reqvonnansa on [CET | sea | oy [tee | wets! yoratsioneg | oN io fred veyg ouaHEROL| JOON uizeds | vey |e 208 30 on cs é Fingans SuiaNnas wa we | orm | ee | 9 | ser foowrr | or | g ceo ™ freon owstez | oro | osere | se | 9 | str fosss | wr co + feeweu-uosoy eogveot | ste | ovose | se | 9 | see oor | sz ‘ wor so 1 |rewew-wonog 98% %0q) oF wress | evo | cose | wm | 9 | oe foors | or co wey lve 1 [bot vomanna ress | 290 | ones | ve | 9 | ost fosey | or to sy ey 1 forwees evesr | eo | cose | wx | 9 | oor joors | or rf er Ie 1 fucrog soanguie woot | ovo | coo | ve | 9 | os fosey | ax af =F os} lie 1 |aewwones eps ypeouddy) ey wos | wo | oom | as | z | voce | woe] or Or 1 fequnnasa ors wes | vo fen |e |e | ox fon | on + foes a en tumasio| on | SEPT wf aea | oy | com | cer | co prose | wages [eon mea) Aut gsutee] oon °% | suoeds |ienn| vm see Jen] riot ANGSHOS ONIGNSS uve is ' sesst | zo | orese | + | o cosor | or or 1 fess sow | zso | ovoce | w@ | 9 | set josss | or so. ‘ae 5 1 |eedo (ex) sea | oy | tomy | wy | (ary ets Oh a6iom reo yon Suppeds | yi0u0y | ep 1g, 0 oy 1S “BINGSHOS ONIONS BVS oir =e Jrsoosy = "ans 0 aun awiok eezrr — sa0visvMwo4 not aay jioccizy = snoarwioL wot | oro | ores | os oz | owe] os wae + fecveneaian 0 eo a ore seen | wo | sssser | os oe | sxe | ot [ue sscuns oe or uemApoa| st ao | oco | ome | oe ox |r| 2 roy + fequonmaane vo ova ore be sso} 290 | vse | ot cor | sor | or 1 feaceninieng we sen hay) ox (on [een [ont | 2 cau) | a a en sion moa], 2M basuerieoa) oon | N | suseds | nou 0 | “ ingaHos ONE WE SC annnmnememeemnninaiiiaiiiies. | ichmes abtehi-mcbens ty ay mn gh, omen earve wnresd TOM creel Hg Macros ayy oer yp he ead scr we - __ Rate _Analyets J : = eoceiption ne __ Devkeiations | Clearing Uaioie jungle growth (More than 50 percent open space) including bushes upto 300 mm 1 |/ parthenium and other weeds including burning or disposing off the same as directed etc., ‘complete all lead and lifts.) | _ [MI SR 2018-19, P. Noff05) item Wo. 7.1. = Rate/Ualt Scene 7 me _ Basic Rate! 1,90} | L ‘TOTAL, Sqm 2° Excavation in all kinds of soil by mechanical means including boulders upto 0.60 m dia ( 0.113. lcum ) for canal/field channels boundary trench seating of embakement for channels/feld channels ete., including dressing of bed and sides to required profile, cost of all materials, |machinery, labour placing excavated stuff for formation of services road /embakement as directed i acai fsa (MI SR2018-19,, 323) Rate [Ua r Basic Rate| 31.00 tam ls _ TOTAL! 1.00) a | ieavaton in all kinds of soil by mechanical means including boulders upto 0.60 m dia T0113 ‘eum } for foundation of canal cross drainage and other appurtenant structure and placing the| ‘excavated soil neatly in specified dump area or disposing off the same as directed including cost| almateris, machinery, abou ee, complete with lend pte SO and inal lad upto 30m, (MISE: 19 item No 4.1.2, Page No 61.) — (Unit i Basis Rate Cum a TOTAL! Sime 4 Excavation in soft rock without blasting by mechanical means inchiding boulders upto 0.60 m dia {( 0.113 cum ) for foundation of canal cross drainage and other appurtenant structure and placing) the excavated soil neatly in specified dump area or disposing off the same as directed including] [co ofall materials, machinery, labour ., compete with lead upio SOm and inital leed upto| 1.501 ae UUM S.R - 2018-19 Ttem Wed Page No.8] Rate/Unit iL Basic Rate] 75.00|/ Cum, —— - PS TOTAL 76.90, un ling and laying insitu vibrated M-15 ( 28 days cube compressive strength not leas then 15) |N / sq mm } grade cement conerete using 40 mm down size approved, clean, hard, graded. |sgpregetes for including cost of all materials, machinery, labour, formwork, cetring, scfolding, cleaning, batching, mixing, placing in position, levelling vibrating, finishing, curing etc, complete for plain conorete works with all lead and lifts.( Cement content: 240 kg /cum with use of| super plasticiser ) (o-2.15, Pg3i_MISR 2018-19) ate ia — Basie Rate| 5206.00(7 C ‘TOTAL, $206.00) 6 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 Ni / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded ‘aggregates including cost of all materials, machinery, labour, formwork, scaffolding, centring, clesning, batching, mixing, placing in positon, levelling, vibrating, fnishing, curing etc, complete| {for RCC works of Gallery, sluice, spillway, D/S face, energy dissipating structures,training walls, [piers,abutments, andsuch other location with all lead and lifts. (Cement content : 830 kg / cum [with use of super plasticiser |.and such other locations with all lead and lifts. Rate/Unit | 913.00/7 Cum_| all SSIS Feu | [oa ‘SR 2018-19,P. No. 30, Iter 2) = a z I Rate Analysis Tern] Description 7 [Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less tian 20 N7 \ I tet f | le cement concrete using 20 mim down size approved clean, hard, d including cost of all mattvials, labour, machinery) “formwork, scaffol (cleaning, batching, 1% placing in position, levelling, vibrating, finishing, curing etc., complete of super plasticiser |iMiSR 2018-19 LN0-66.5, Pe-4.28.1) ten Basie Rate 4807100; Gum a “"TOTAL}-6507,001/ Cum >| rowiding and laying insitu wibrated Mipe 28 daye cibe compressive strength not less than 2517 ‘sq mm } grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates [or| ‘deck slab and kerb inclading cost of all materials, machinery, labour, fermworie eeaffolding, [cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc, compte [with elflead and hits. ( Cement content : 369" / cum with use of saperplasticisr ] | vs 3 go? Mi. 1. (MIR DOI LNoAaT, PeeE Rae/Unit Basic Rate| 7 Cum “TOTAL 3013.001/ Cum [Proving and Toying tnalin W428 (GU daje cube competsaiw sawn not er thes SSN fp ean] rade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing| Jeoat including cost of all materials, machinery, labour, formwork, cleaningbatching, mixin | ny Bs placing in position in alternate panels, levelling,compacting, finishing, curing, packing joints with ‘asphalt mortar etc.,complete with all lead and lifts. ( Cement content :360 ke / cum with use of super! lasticiser } i |[IMISR 2018-19 LN. Rate/ Unit Base Fa $913.00|/ Ou [ TOTAL) 5913.00//Gum | Providing, fabricating and placing in position reinforcement atecl bare for RCC works including |cteaning, straightening, cutting, bending, hooking, lapping, welding wherever required, tying with |1.25 mm dia. soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all lead and lifts. -19,P. 0,30, Item No. 2.12) > Rate/Unit >| 66.13|/leag [ 66-131 /ieg Providing semi-pervious / pervious casing embankment with soil from approved borrow areas) in layers of 250 to 300mm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreding in layer of specified thickness, breaking ciods, sectioning, watering, compacting to density contsol of not less than| |95 percent or as stipulated by ‘power roller etc., complete with all Teseenl iene |[MI SR 2018-19,P. No.6, Item No.3. 8 Rate/Unit = __ Basic Rate| 227.00, 7e0m I TOTAL] 227-00 /Cum roviding and constructing 800 mm thick rubble stone pitching/revetment with pin headers |at 2 per sqm in including cost of all materials {rom approved source, labour, packing stone chips and mortar into joints, finishing, curing etc, complete with all lead es IOP. Wo.84, Weer Nox —_—rae fant - — Basic Rate! 249.00|/Sqmr TOTAL] 249.00] /Sam "Providing rubble stone/ boulder filling behind abutment/ below apron including cost of all |materials,labour,hand packing,finishing top sustece ete, complete with all lead and lifts, (a "How Teen Ro. 4.80) ~ je Unit __Basic Rate! “679.00//Cum TOTAL| 679.00, /Cum 79.00] /Cum_ | | 14 [Providing and constructing 7Smm dia PVC pipe weep holes forconcrete/ masonry walls including Providing 200x200x200mm size porous concrete block made of cement and 20mm down coarse |Gaeiezate in 1:4 proportion including 100mm thick sand backing at the junction of well wea nnn { back fil, cost of all materials, machinery, labour, etc., complete with all lesa and lifts. {MI SR 2018-19, pn-93,in-2,21.2) Rate/Unit Basic Rate 296,00 /Rmtr TOTAL 296.00 /Rmtr 15 ESRRE M2600-4 (iil Providing and fixing in position 300mm wide,20 mm thick eremonten Joint filler in movement nts 20 rane’ ends of simply supported spans not exceeding 10 m to cater fore nermece c ‘movement upto 20 mm, covered with sealant complete as per Grnwing & Technical Specification complete \as per specifications. MORTH Specification 10.2608 ((PWDSR 2018-19, P. No, 343 tem 5 Rave/Unit Basic Rate. 129.00 TOTAL 129.00 /M ifooded over the entire surface behind abutement, wing wall and eeturn wall te ee an height [compacted to a firm condition complete as per drawing and Tech ication including cost of ‘materials labour,HOM complete as per specifications. el |PwDSR 2018-19,- P, No, 226 , Item No. 28,13) Rate/Unit Basic Rate) 1742.00 /Cum sflalpice Asal te ensccer Biecnbe apnea MI.&GWD Sub-Division MIL&OWD Division Ramanigare A> "Bangalore woes EModoSoeY Ss Bt, DARD ay woserY OBAD FE = tlontsiadh. ~

You might also like